RFI 1 answered 2.docx
DOCX document 23 KB Posted
- Attached to
- Resolve HVAC Issues in Building 15 Federal contract opportunity
- Solicitation number
- 36C25020B0031
About this file
This document contains a request for information (RFI) related to a federal contract opportunity to resolve HVAC issues in Building 15 at the Department of Veterans Affairs Cincinnati VA Medical Center. The RFI seeks information on the basis of design for an equipment access platform and fume hood venturi valves. It also requests extending the replacement date for air handling unit 15-AHU-31 to November 30th and the basis of design for the replacement unit. The reply provides Daikin as the basis of design for the air handling unit and notes the contractor will be responsible for re-certifying the fume hoods after the work. It also includes responses to the other questions and notes changes to relevant drawings.
The related federal contract opportunity is a solicitation to resolve HVAC issues in Building 15 at the Department of Veterans Affairs Indianapolis Network Contracting Office for between $100,000 to $200,000. It is a 100% set-aside for service-disabled veteran-owned small businesses. Interested parties should register at SAM.gov and VIP.vetbiz.gov and monitor FBO.gov for the solicitation release on or around July 15th, 2018 with a proposal due date approximately 30 days later. The work must be completed within 365 days of notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sight visit signin sheet.jpg | JPG image | |
| RFI answered 3.docx | DOCX document | |
| M-001 ADDENDUM.pdf | ||
| RFI Form answered.docx | DOCX document | |
| 15-A101 -2020.0723.pdf | ||
| 36C25020B0031 0001_1.docx | DOCX document | |
| 36C25020B0031 0001.docx | DOCX document | |
| Honeywell Fire Alarm Sole Source Justification 1.pdf | ||
| RFI Form.docx | DOCX document | |
| 539-20-212 bldg 15 specs 2020 0401.pdf | ||
| 36C25020B0031.docx | DOCX document | |
| 539-20-212 bldg 15 drawings 2020.0312.pdf | ||
| Contractor Certification Regarding EMR.docx | DOCX document | |
| WAGE DETERMINATIONS.6.23.20.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI) 36C25019B0022
| PROJECT NUMBER: |
| 539-20-212 |
| Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner. |
| PROJECT TITLE: |
| Resolve HVAC Issues in Bldg. 15 |
| PROJECT LOCATION: |
| Department of Veterans Affairs |
Cincinnati VA Medical Center 3200 Vine Street Cincinnati, OH 45220
| SUBMITTED BY: |
| Jeffrey Jett |
| City/State: |
| Paducah, KY |
| PHONE NO.: |
| 270-564-0351 |
TO: Contract Specialist Patrice Scott (email: Patrice.Richardson-Scott@va.gov)
| RFI NO.:1 |
| DATE:7/21/2020 |
| REFERENCE: |
REPLY NEEDED BY:
INFORMATION NEEDED: Who is the basis of design on the Modular Equipment access platform note 8 on drawing number 15-A101?
What brand is the basis of design for the Fume Hood Venturi Valves on Drawing Number 15-M601?
Can the replacement of 15-AHU-31 be extended to November 30th as it will not be possible to get the AHU in that amount of time.
What brand is the basis of design for the AHU on this project that it to be replaced? Daikin is the basis of design.
Will the fume hoods have to be re-certified after the new work is completed and if so who is responsible for this?
REPLY:
The equipment platform is fabricated with bar grating and steel support as specified on section 05 50 00. There will be a change in drawing 15-A101, Note 8 to read “equipment platform with 1”X3/16” bar grating on Steel supports.” See amended 15-A101.
Phoenix Controls is the basis of design of the Fume Hood Venturi Air Valves.
The designer checked if 12-ton rental heat pumps were available that could extend the time of the year that the AHU installation could occur. Only 24-ton rentals were available which would require a re-design of the electrical hook up. As a result, the original dates will have to stay.
Daikin is the basis of design for the AHU.
The contractor will re-certify the fume hoods. See amended drawing M-001.
| REPLY FROM: |
| DATE: |
| ATTACHMENTS: |
| COPY TO: |