533-1A Potable-Water-Tank-System-Disinfection.pdf

PDF 111 KB Posted

Attached to
1305M223QNMAN0122 - NOAA's Ship Thomas Jefferson Drydock FY 2024
Solicitation number
1305M223QNMAN0122
Issued by

About this file

This document provides specifications for disinfecting the potable water tanks and system on NOAA ships. The specifications require isolating each tank from the system and draining and rinsing the interior before disinfection. Tanks must be filled with water dosed with a chlorine solution to achieve a free available chlorine level of at least 100 parts per million, monitored hourly for four hours to sustain a minimum 50 ppm level. The entire system must then be disinfected with a 50 ppm chlorine solution circulated for four hours. Samples taken from fixtures throughout the vessel must validate chlorine levels drop below 1 ppm upon completion. A condition report documenting the sampling locations and results is due to the contracting officer's representative within 24 hours.

The related federal contract opportunity is a solicitation for drydocking services for NOAA's Ship Thomas Jefferson in fiscal year 2024. The solicitation package includes a statement of work, forms for past performance information and a questionnaire, labor law posters, a pricing schedule, an accounting system questionnaire, and references such as vessel drawings and specifications. The solicitation is issued by the National Oceanic and Atmospheric Administration within the Department of Commerce.

View the file

Other files

File Type Posted
Thomas Jefferson - Hull Transducer Suite looking aft FY2022.pdf PDF
101-6634867 Structural Module 8_1.pdf PDF
Thomas Jefferson_FY2024 Drydock Repair Package_20JUN2023_Rev (A).pdf PDF
NOAA Thomas Jefferson Site Survey Telephone Layout Rev1_1.pdf PDF
101-6634861 Structural Module 2.pdf PDF
624-6634931 Joiner Door Schedule.pdf PDF
TJ-085-002G_Booklet_of_General_Plans_1.pdf PDF
iXBlue QUADRANS - User Manual.pdf PDF
Spurs Rope Cutter MV-19_15.pdf PDF
TJ-562-001A Rudder Arrangment and Details_102434736.pdf PDF
NIX-D03066A_NETANSN1_UM_compressed_1.pdf PDF
LM 584 Rev B.pdf PDF
NOAA Thomas Jeffersonr2_XLS_Zenitel.xls XLS spreadsheet
101-6634869 Structural Module 10.pdf PDF
Amendment_0003_1305M223QNMAN0122_(1).pdf PDF
101-6634868 Structural Module 9.pdf PDF
101-6634860 Structural Module 1.pdf PDF
TJ-079-03G - TJ Trim _ Stability Booklet Rev G (4-19)_131122258_131204790.pdf PDF
Amendment_0002_1305M223QNMAN0122_Signed.pdf PDF
TJ-180-001_Generic_Winch_Foundation.pdf PDF
Amendment_0001_1305M223QNMAN0122_Signed.pdf PDF
TJ_FY2024_Fire System Inventory_SCBA Packs.pdf PDF
TJ_FY2024_Fire System Devices.pdf PDF
TJ_FY2024_Fire System_Portable Fire Extinguishers.pdf PDF
436-6634706 Rev C_ACCU elementary wiring diagram - redline.pdf PDF
TJ-583-02A Allied Marine Crane Manual 80-1286.pdf PDF
101-6634906 Structural standards.pdf PDF
TJ-304-001 MCT Locations Rev1.pdf PDF
TJ-593-007 SEWAGE TANK AERATION SYSTEM INSTALLATION_124644075.pdf PDF
Kongsberg124786 Rev -_Gondola Installation Drawing Outline.pdf PDF
TJ-079-03E Trim _ Stability Booklet_101947795.pdf PDF
501-6634830 Piping Module No 2.pdf PDF
NOAA General Technical Requirements (GTR) Rev -.pdf PDF
320-6634679_Cableway Arrangement and Details.pdf PDF
528-6634786D Plumbing and Deck Drain Arrangement.pdf PDF
NOAA Standard Specification AMC-300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
ATTACHMENT D4 U S DOL POSTER.pdf PDF
556-6634805C Hydraulic Systems Info.pdf PDF
TJ-512-004_-_HVAC Makeup Air Modifications.pdf PDF
512-3275003-9 HVAC MODS 2ND DECK _ BLW REV B.pdf PDF
TJ-436-02 FireBoy - Owners Manual _ Install Instructions.pdf PDF
512-3275003-8 HVAC MODS MN DECK REV B.pdf PDF
TJ-331-002 LIGHTING MODS INCID TO SEWAGE TANK AERATION SYSTEM_124586215.pdf PDF
437-6634704 Tank Level Indicating Sys EWD - redline.pdf PDF
426-6634694 Gyro Compass Sys.pdf PDF
501-6634831_Piping Module No 3.pdf PDF
TJ-324-002 POWER MODS INCID TO SEWAGE TANK AERATION SYSTEM_124585409.pdf PDF
TJ-461A-001C Transducer Installation_102018594.pdf PDF
301-001B_Electrical One Line Dia.pdf PDF
321-3274004-2A HVAC Electrical Pwr Mods Incdt HVAC Mods.pdf PDF
Show 40 more

Latest 50 of 226 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

533-1A August 2018

Superseding

MOC-533-1

AUGUST 1991

STANDARD SPECIFICATION

POTABLE WATER TANK and SYSTEM DISINFECTION

1. SCOPE

1.1 This specification contains the general requirements for disinfecting the potable water tanks and system on NOAA ships.

2. REFERENCES

2.1 “Vessel Sanitation Program, 2011 Construction Guidelines, U.S. Department of Health and Human Services, section 22.10, Disinfection of the Potable Water System”.

3. DEFINITIONS

3.1 Free Available Chlorine (FAC) - Concentration of residual chlorine in water present as dissolved gas (Cl2), hypochlorous acid (HClO), and/or hypochorite ion (CIO-). A test kit which measures free chlorine will indicate the combined concentrations of HCLO, ClO-, and Cl2.

4. REQUIREMENTS

4.1 Potable Water Tank Disinfection

4.1.1 General Requirements

a. Isolate the potable water tanks to be disinfected from the rest of the potable water service system. Thoroughly rinse and drain each tank’s interior.

b. The chlorine solution used to disinfect the tank must be diluted and added through a sounding tube or threaded connection. Immediately after adding the chlorine solution, rinse the sounding tube or threaded connection with at least five gallons of potable water.

4.1.2 Disinfection Procedure

a. Fill the tank with potable water until it starts to overflow, then stop. Exercise care not to pressurize the tank. As the tank fills, add chlorine solution to achieve at least 100 parts per million (ppm) Free Available Chlorine (FAC) content in the completely filled tank.

b. Monitor the FAC content hourly for at least four hours. If the FAC content drops below 50 ppm at any time, add additional chlorine solution to raise the FAC content back to 100 ppm and restart the four hour monitoring period. Continue monitoring and raising the FAC content until the FAC content remains at or above 50 ppm for a four hour period.

c. If disinfecting more than one tank, repeat the above procedure for each tank. At the contractor’s discretion, the same water may be used to disinfect each consecutive tank, as long as the initial FAC content is increased to 100 ppm at the start of the four-hour monitoring period.

d. Drain each tank and refill with potable water. Repeat the above disinfection procedure, except start with an initial FAC content of at 1.0 ppm or greater and monitor the FAC content for 30 minutes. Continue monitoring and raising the FAC content until the FAC content remains at or above

0.2 ppm for a 30 minute period.

e. Drain each tank and refill with potable water until the total FAC content falls below 1.0 ppm.

4.2 Potable Water System Disinfection

4.2.1 Disinfect the entire Potable Water System, including the potable water tanks, in accordance with reference 2.1 and the potable water tank disinfection requirements in 4.1 above.

4.2.2 Monitor the FAC at various plumbing fixtures on each deck throughout the vessel (forward, aft, port, and starboard) to ensure that the 50 ppm free residual chlorine has circulated throughout the distribution system to include the distant sampling points.

4.2.3 After completion of the disinfection process, take additional samples at the same distant plumbing fixtures to validate that the FAC levels at these points are below 1.0 ppm.

4.2.4 Within 24 hours, submit a written Condition Report to the Contracting Officer’s Representative (COR) with the sample locations and FAC readings.

APPENDIX A

The following checklists are for guidance only. The Contractor is required to meet all requirements in the specification, whether or not they are captured accurately or fully in the checklists.

Potable Water Tank Disinfection Checklist

Check Delivery Period Action Service 1 Prior Tank Disinfection Perform Isolate the Potable Water Tank (s) from the rest of the system.

2 Prior Tank Disinfection Perform Rinse and drain the Potable Water Tank(s) interiors.

3 Tank Disinfection Perform Fill tank with potable water until it starts to overflow.

Do not pressurize tank.

4 Tank Disinfection Perform Add diluted chlorine solution to tank through a sounding tube or threaded connection until FAC is above 100 ppm.

5 Tank Disinfection Perform Rinse sounding tube or threaded connection with at least 5 gallons of fresh potable water.

6 Tank Disinfection Monitor Each hour, measure the FAC. If the FAC drops below 50 ppm, add additional chlorine solution until it is above 100ppm, and rinse the sounding tube or threaded connection. Continue this process until the FAC stays above 50 ppm for four consecutive hours.

7 Tank Disinfection, if more than one tank

Perform Repeat steps 3 – 6 for each tank.

8 Tank Disinfection Perform Drain each tank and fill with potable water until the FAC falls below 1.0 ppm.

Potable Water System Disinfection Checklist 1 System Disinfection Perform Clean, Disinfect, and Flush potable water tanks and potable water system using potable water with 50 ppm FAC for a minimum of 4 hours.

2 System Disinfection Monitor Monitor various plumbing fixtures on each deck throughout the vessel (forward, aft, port, and starboard) to ensure that the 50 ppm FAC has circulated throughout the distribution system to include distant sampling points.

3 System Disinfection Perform Flush the tanks and system with potable water until the FAC drops below 1.0 ppm.

4 System Disinfection Monitor Monitor various plumbing fixtures on each deck throughout the vessel (forward, aft, port, and starboard) to ensure that the FAC is below 1.0 ppm throughout the distribution system to include distant sampling points.

5 System Disinfection Submit Submit to the COR a Condition Report that includes the sampling locations and FAC measurements taken in steps 2 and 4.

1. SCOPE
1.1 This specification contains the general requirements for disinfecting the potable water tanks and system on NOAA ships.
2. REFERENCES
2.1 “Vessel Sanitation Program, 2011 Construction Guidelines, U.S. Department of Health and Human Services, section 22.10, Disinfection of the Potable Water System”.
3. DEFINITIONS
3.1 Free Available Chlorine (FAC) - Concentration of residual chlorine in water present as dissolved gas (Cl2), hypochlorous acid (HClO), and/or hypochorite ion (CIO-). A test kit which measures free chlorine will indicate the combined concentration...
4. REQUIREMENTS
4.1 Potable Water Tank Disinfection
4.1.1 General Requirements
a. Isolate the potable water tanks to be disinfected from the rest of the potable water service system. Thoroughly rinse and drain each tank’s interior.
b. The chlorine solution used to disinfect the tank must be diluted and added through a sounding tube or threaded connection. Immediately after adding the chlorine solution, rinse the sounding tube or threaded connection with at least five gallons of...
4.1.2 Disinfection Procedure
a. Fill the tank with potable water until it starts to overflow, then stop. Exercise care not to pressurize the tank. As the tank fills, add chlorine solution to achieve at least 100 parts per million (ppm) Free Available Chlorine (FAC) content in th...
b. Monitor the FAC content hourly for at least four hours. If the FAC content drops below 50 ppm at any time, add additional chlorine solution to raise the FAC content back to 100 ppm and restart the four hour monitoring period. Continue monitoring an...
c. If disinfecting more than one tank, repeat the above procedure for each tank. At the contractor’s discretion, the same water may be used to disinfect each consecutive tank, as long as the initial FAC content is increased to 100 ppm at the start of ...
d. Drain each tank and refill with potable water. Repeat the above disinfection procedure, except start with an initial FAC content of at 1.0 ppm or greater and monitor the FAC content for 30 minutes. Continue monitoring and raising the FAC content u...
e. Drain each tank and refill with potable water until the total FAC content falls below 1.0 ppm.
4.2 Potable Water System Disinfection
4.2.1 Disinfect the entire Potable Water System, including the potable water tanks, in accordance with reference 2.1 and the potable water tank disinfection requirements in 4.1 above.
4.2.2 Monitor the FAC at various plumbing fixtures on each deck throughout the vessel (forward, aft, port, and starboard) to ensure that the 50 ppm free residual chlorine has circulated throughout the distribution system to include the distant samplin...
4.2.3 After completion of the disinfection process, take additional samples at the same distant plumbing fixtures to validate that the FAC levels at these points are below 1.0 ppm.
4.2.4 Within 24 hours, submit a written Condition Report to the Contracting Officer’s Representative (COR) with the sample locations and FAC readings.
4.3
APPENDIX A
The following checklists are for guidance only. The Contractor is required to meet all requirements in the specification, whether or not they are captured accurately or fully in the checklists.