525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf
PDF 30 KB Posted
- Attached to
- Architectural Services Continuing Contract State and local contract opportunity
- Solicitation number
- 25-069-RSQ
- Issued by
- Lee County, Fruitville CDP, Florida
About this file
This document is a Florida Department of Transportation (FDOT) Program Management LAP Certification of Current Capacity form, which is a standardized two-page document used to verify a contractor's available work capacity for bidding on transportation projects. The form requires a contractor to certify that their proposed bid does not exceed their current capacity rating, calculated by subtracting total uncompleted work from their maximum capacity rating. The certification must be prepared according to specific timing rules: if the letting is before the 25th of the month, it reflects uncompleted work as of the 15th of the preceding month, and if after the 25th, it reflects work in progress as of the 15th of the letting month. All new contracts awarded within five days of the letting date must be included and charged against the total rating.
The form includes a "Status of Contracts on Hand" section where contractors must comprehensively list all current projects, whether prime or subcontracts, including owner, location, description, contract amounts, sublet amounts, and uncompleted work amounts. The form allows contractors to consolidate smaller contracts (individually not exceeding 3% of total and collectively less than 20%) for simplified reporting. In this specific document, all total amounts are listed as $0.00, suggesting this is a blank template or example form rather than a completed submission. The document is marked as confidential per Chapter 337.14(1) of Florida Statutes and is specifically applicable to FDOT pre-qualified contractors.
View the file
Other files for this state and local contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
525-010-46
09/20
STATE OF FLOR DA DEPARTMENT OF TRANSPORTATION
PROGRAM MANAGEMENT LAP CERTIFICATION OF CURRENT CAPACITY
CONFIDENTIAL per Ch 337.14(1) F.S.
Fill in your FDOT Vendor Number For bids to be received on
(Letting Date) VF
(Only applicable to FDOT pre-qualified contractors)
CERTIFICATE
I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).
The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $
I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:
1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.
2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.
3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.
I certify that the information above is correct. NAME OF FIRM
Sworn to and subscribed this of , 20 day By:
Title
525-010-46
PROGRAM MANAGEMENT
STATUS OF CONTRACTS ON HAND 09/20
(Furnish complete information about all your contracts, whether prime or subcontracts;
whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)
1 2 3 4 5 6
PROJECTS
OWNER, LOCATION AND DESCRIPTION
CONTRACT (OR
SUBCONTRACT)
AMOUNT
AMOUNT
SUBLET
TO OTHERS
BALANCE OF
CONTRACT
AMOUNT
UNCOMPLETED AMOUNT TO BE DONE
BY YOU
AS PRIME
CONTRACTOR
AS
SUBCONTRACTOR
NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.
TOTALS $0.00 $0.00
TOTAL UNCOMPLETED WORK ON
HAND TO BE DONE BY YOU
(TOTAL COLUMNS 5 AND 6)
$0.00
File details come from the government source that posted it. Updated .