This is a bridge inspection report dated June 17, 2022 for the James River Bridge (Structure No. 5140-016P) on the Blue Ridge Parkway in Virginia, conducted by the Federal Highway Administration's Federal Lands Bridge Office.
The inspection found the concrete tee beam bridge to be in fair condition overall, with high preservation priority due to ongoing structural deterioration. Key issues identified include missing and damaged railing hardware, debris accumulation and vegetation clogging deck drains, misalignment and excessive rotation of bridge rocker bearings with missing/broken anchor bolts, cracking with moisture stains and efflorescence, delamination and spalling with exposed rebar on the substructure, missing masonry stones at the north abutment, vegetation growth, erosion issues, and damaged metal stair nosings. The bridge, built in 1959, spans 1,045 feet with 11 main spans and carries two lanes of traffic. Recent maintenance includes joint repair in 1984 and wearing surface/approach resurfacing in 2020. The bridge has an inventory rating of 21.0 tons and operating rating of 36.0 tons. The inspection includes detailed documentation of structural conditions through photographs and measurements, with recommended maintenance and rehabilitation actions outlined.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
JAMES RIVER BRIDGE
BLUE RIDGE PARKWAY OVER JAMES RIVER & U.S. ROUTE 501
BLUE RIDGE PARKWAY
LS
STRUCTURE NO. 5140-016P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/17/2022
WU
Report prepared by:
Federal Highway Administration MILE POINT: 63.64 Federal Lands Bridge Office KILOMETER POINT: 102.4 Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-016P
JAMES RIVER BRIDGE INSPECTION DATE: 06/17/2022
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: .
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUDNATION(S):
ABUTMENT / PIER MAT'L: ..
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
1 - CONCRETE NO. OF MAIN SPANS:
04 - TEE BEAM NO. OF APPR. SPANS:
4 STRUCT. TOTAL LENGTH: . 1045.0 FT (318.5
M)
1 - CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: ......... 100 FT (30.5 M)
6 - BITUMINOUS DECK WIDTH: ..................... 33.0 FT (10.1 M)
2 - SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: .... 26.0 FT (7.9 M)
2 - SPREAD FTG ON BEARING MAT'L YEAR BUILT:
1 - CONCRETE YEAR RECONSTRUCTED: .
1H3, 1H8 SKEW ANGLE: .................... 0 °
1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ....... N
1984-JOINT REPAIR. 2020-WEARING SURFACE AND APPROACHES RESURFACED.
LOCATION
BLUE RIDGE PARKWAY
STATE: .............................. 513 - VIRGINIA
FACILITY CARRIED: ......... BLUE RIDGE PARKWAY
FEATURE INTERSECTED: JAMES RIVER & U.S. ROUTE
MILE POINT: .. 63.64 (KM PT 102.4)
LOCATION: .... 2.0 MILES TO VA ROUTE 130.
INSPECTION TEAM: L. Sheptuck, M. Speas
CONDITION ASSESSMENT:
Luke Sheptuck
REPORT REVIEW:
Marcus Miller
REPORT APPROVAL: Date: 11/29/2022
Jorgomai Ceesay
STRUCTURE EVALUATION SUMMARY
This concrete tee beam bridge is in fair condition overall and is considered a high preservation priority due to the ongoing deterioration of the structural elements and the projected costs associated with delaying corrective action. Problems include missing and damaged railing hardware; debris accumulation and vegetation in the curblines clogging the deck drains; misalignment and excessive rotation of the bridge rocker bearings for the temperature conditions with several bearing anchor bolts either missing or broken off due to movement;
cracking with moisture stains and efflorescence, delamination, and spalling with exposed rebar on the substructure; missing masonry stones at the north abutment slope protection and pedestrian bridge north approach walkway; vegetation growth on the substructure; erosion at the north abutment and southeast wingwall; flood debris lodged between the beams of the pedestrian bridge; and broken/missing metal stair nosings for the pedestrian staircase.
STRUCTURE SUMMARY STRUCTURE NO. 5140-016P
JAMES RIVER BRIDGE INSPECTION DATE: 06/17/2022
The Structure Evaluation Summary continues on the following page.
It should be noted that the asphalt wearing surface and approaches have been resurfaced since the last inspection.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-016P
JAMES RIVER BRIDGE INSPECTION DATE : 06/17/2022
226 PRIORITY OF IMPROVEMENT B
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.7
REMOVE VEGETATION AND DEBRIS FROM CURBLINES.
CLEAN CLOGGED DECK DRAINS AS NECESSARY. 1 LS
59.11
REMOVE FLOOD DEBRIS FROM PEDESTRIAN BRIDGE.
1 LS
PRELIM. MAINTENANCE TOTAL :
Item REHABILITATION/RECONSTRUCTION
UNIT
UNIT PRELIM. COST ESTIMATES
No. (TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. COST
REHAB RECONSTR
58,59,60 REMOVE UNSOUND CONCRETE FROM PIERS,
CLEAN REBAR, AND PLACE NEW CONCRETE
TO ORIGINAL DIMENSIONS. CLEAN EXPOSED
REBAR THROUGHOUT STRUCTURE AND COAT
WITH APPROVED SEALANT. CLEAN AND SEAL
CRACKING OF PIER WALLS AND COLUMNS.
1 LS
59.1 REPLACE OR RESET EXPANSION BEARINGS AS
NECESSARY. REPLACE MISSING BEARING
ANCHOR BOLTS AT PIERS #3, #5, AND #6, AND
AT PIERS #2 THROUGH #4 FOR PEDESTRIAN
BRIDGE.
1 LS
58.6,59.
REPLACE MISSING AND DAMAGED RAILING
HARDWARE. REPAIR METAL STAIR NOSINGS AT
SOUTH END PEDESTRIAN STAIRCASE. REPAIR
MISSING MASONRY AT NORTH PEDESTRIAN
APPROACH AND DELAMINATION AND SPALLING
OF SOUTH PEDESTRIAN STAIRCASE.
1 LS
60.9,60.
FILL AND STABILIZE AREAS OF EROSION AT
PIER #5, NORTH ABUTMENT, AND SOUTHEAST
WINGWALL.
1 LS
60.11 REPLACE MISSING STONE MASONRY ON
NORTH ABUTMENT SLOPE PROTECTION. 1 LS
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-016P
JAMES RIVER BRIDGE INSPECTION DATE : 06/17/2022
PRIORITY OF IMPROVEMENT226
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
B
60 REMOVE VEGETATION GROWTH FROM PIERS.
1 LS
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, AND CONTINGENCIES. 1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-016P
JAMES RIVER BRIDGE INSPECTION DATE: 06/16/2022
58. DECK
1. DECK SLAB
4. RIDEABILITY
5. CURBS, SIDEWALKS, AND MEDIAN
6. PARAPETS AND/OR RAILINGS
7. DRAINS AND DRAINAGE
8. UTILITIES
9. DEFLECTION AND/OR VIBRATION
10.OTHER:
59. SUPERSTRUCTURE
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10.ALIGNMENT
11.OTHER
60. SUBSTRUCTURE
61. CHANNEL
1. ALIGNMENT
2. EROSION AND/OR SCOUR
3. CHANNEL PROTECTION
4. WATERWAY OBSTRUCTIONS
5. OTHER
6. ADEQUACY OF OPENING
7. NORMAL VELOCITY
8. AVERAGE CLEAR OPENING
9. STREAMBED COMPOSITION:
222. APPROACHES
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
223. RETAINING WALL
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
F
G
F
F
F
G
N
P
F
N
N
N
F
G
N
G
G
F
G
G
N
G
N
1- SUFF
2 - MED
N
N
N
G
G
G
G
N
N
2. EXPANSION JOINTS F
3. WEARING SURFACE G
F
PEDESTRIAN BRIDGE
40 FT
F
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLEN
EXCELLENT CONDITION9
VERY GOOD CONDITION - no problems noted.8
GOOD CONDITION - some minor problems.7
SATISFACTORY CONDITION - structural elements show some minor deterioration.6
FA R CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.4
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“ MM NENT” FA LURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability.
Structure is closed to
FA LED CONDITION - out of service; beyond corrective action. 0
SILT, ROCK, STONES
ABUTMENTS
1. BREASTWALLS OR COLUMNS F
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS G
4. BACKWALLS AND/OR BULKHEADS G
5. FOUNDATIONS N
6. WINGWALLS F
7. WEEP HOLES G
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR F
10.SETTLEMENT OR DEFLECTION G
11.SLOPE PROTECTION F
12.OTHER N
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS:
B. TRANSITIONS:
C. APPROACH GUARDRAILS:
D. APPROACH GUARDRAIL ENDS:
N
N
N
PIER(S) TRAFFIC SAFETY RATING CODES
13. WALLS AND/OR COLUMNS F
N
F
G
F
G
N
0 - Does not meet standards or a safety features is 14.PILE BENTS required and none is provided.
15.CAPS AND/OR BEARING SEATS
1 - Meets currently acceptable standards.
16.FOUNDATIONS 09 - SPREAD FTG
17.EROSION AND/OR SCOUR N - Not applicable or a safety features is not required.
18.SETTLEMENT OR DEFLECTION
19.OTHER
FIELD INSPECTION REPORT STRUCTURE NO. 5140-016P
ITEM REFERENCE AND REMARKS
58.1 MINOR RANDOM CRACKING WITH EFFLORESCENCE ON DECK UNDERSIDE AT ISOLATED LOCATIONS. MINOR MOISTURE STAINING AND EFFLORESCENCE ON DECK UNDERSIDE BETWEEN BEAMS #3 AND #4 AT FIRST INTERMEDIATE DIAPHRAGM FROM NORTH ABUTMENT IN SPAN #1. MINOR SPALLING WITH EXPOSED REBAR ON DECK UNDERSIDE BETWEEN BEAMS #3 AND #4 IN SPANS #7 AND #8 ADJACENT TO BEAM #4. MINOR HONEYCOMBING OF DECK UNDERSIDE BETWEEN BEAMS #1 AND #2 IN SPAN #10 NEAR MIDSPAN. MINOR DELAMINATION OF DECK UNDERSIDE BETWEEN BEAMS #1 AND #2 IN SPAN #10 NEAR PIER #10.
EXPOSED REBAR CHAIRS ON UNDERSIDE OF OVERHANGS. MINOR LONGITUDINAL CRACKING WITH EFFLORESCENCE ON UNDERSIDE OF EAST OVERHANG IN SPAN #1 NEAR NORTH ABUTMENT AND WEST OVERHANG IN SPAN #8 AT PIER #8. MINOR
SPALL ON UNDERSIDE OF WEST OVERHANG IN SPAN #1 AT NORTH ABUTMENT.
MINOR TRANSVERSE CRACKING OF PEDESTRIAN BRIDGE DECK SURFACE AND UNDERSIDE, SOME WITH EFFLORESCENCE.
58.2
58.3
ASPHALTIC PLUG EXPANSION JOINTS AT ABUTMENTS AND PIERS HAVE BEEN RESURFACED SINCE LAST INSPECTION.
POURABLE JOINTS IN CURBS AT ABUTMENTS AND PIERS #2, #4, #6, AND #8; SLIDING PLATE JOINTS IN CURBS AT PIERS #1, #3, #5, #7, #9, AND #10. MINOR TO MODERATE RUSTING OF STEEL SLIDING PLATES IN CURBS.
ASPHALT WEARING SURFACE HAS BEEN RESURFACED SINCE LAST INSPECTION. MINOR TRANSVERSE CRACKING OF WEARING SURFACE OVER ASPHALTIC PLUG JOINTS AT ISOLATED LOCATIONS. MINOR GOUGES ON WEARING SURFACE ON SOUTHBOUND LANE OF SPAN #4 NEAR PIER #3. MINOR POTHOLE ON WEARING SURFACE IN SOUTHBOUND LANE OF SPAN #5 NEAR PIER #4 AND SPAN #10 NEAR PIER #10. ONE CORE HOLE ON ASPHALT WEARING SURFACE IN NORTHBOUND LANE OF SPAN #7.
58.4
222.6
SLIGHT UNEVEN ROADWAY SURFACE AT APPROACH DUE TO MINOR SETTLEMENT OF APPROACH PAVEMENT.
PEDESTRIAN DECK SURFACE UNEVEN (UP TO 1") AT JOINTS OVER PIERS #2, #3, AND #4.
58.5 MINOR DELAMINATION AND SPALLING OF CURBS AT EXPANSION JOINTS OVER PIERS; EXPOSED REBAR ON EAST CURB ADJACENT TO SPALL OVER PIER #2. MINOR MAP CRACKING WITH EFFLORESCENCE AND DELAMINATION OF CURBS OVER PIERS #8, #9, #10. MINOR SPALL WITH EXPOSED REBAR ON EAST CURB IN SPAN #6 AT DECK DRAIN NEAR PIER #5. MINOR HORIZONTAL CRACKING WITH EFFLORESCENCE AND DELAMINATION OF EAST CURB IN SPAN #7 AT SEVERAL LOCATIONS.
WIDESPREAD MINOR MAP AND TRANSVERSE CRACKING OF SIDEWALKS. MODERATE TRANSVERSE CRACKING (UP TO 1/8"W) OF APPROACH SIDEWALKS. MINOR DELAMINATION AND SPALLING OF EAST SIDEWALK IN SPAN #2 AT UTILITY COVER PLATE.
EXPOSED REBAR ON TOP OF EAST SIDEWALK IN SPAN #6 NEAR DECK DRAIN. MINOR PONDING ON SIDEWALKS IN SPANS #6, #7, AND #8 NOT OBSERVED THIS INSPECTION DUE TO DRY CONDITIONS. MINOR DELAMINATION AND SPALLING OF EAST SIDEWALK IN SPAN #7 NEAR PIER #7. MINOR HORIZONTAL CRACKING WITH EFFLORESCENCE ON WEST CURB AND SIDEWALK IN SPAN #10
NEAR PIER #10.
58.6 MINOR MAP CRACKING OF PARAPETS THROUGHOUT; MINOR VERTICAL CRACKING AT RAIL POST LOCATIONS. MODERATE VERTICAL CRACKING (UP TO 1/8"W) OF APPROACH PARAPETS; MINOR DELAMINATION AND SPALLING ALONG CRACKS. MINOR VINE GROWTH ON WEST RAIL AT PIER #5. MINOR DELAMINATION AND SPALLING OF WEST PARAPET IN SPAN #9 AT PIER #8.
MINOR MAP CRACKING WITH EFFLORESCENCE AND DELAMINATION ON WEST PARAPET IN SPAN #9 NEAR MIDSPAN.
ONE RAIL POST ANCHOR BOLT NUT MISSING ON WEST RAILING IN SPAN #1 AT NORTH ABUTMENT, SPAN #1 OVER PIER #1, AND SPAN #8 OVER PIER #7. LOOSE RAIL POST ANCHOR BOLT NUTS ON WEST RAILING AT RAIL POSTS #1 AND #2 IN SPAN #1.
SHEARED RAIL POST ANCHOR BOLT ON WEST RAILING OF SPAN #1 AT NORTH END. BOTTOM RAIL OF EAST RAILING DETACHED IN SPAN #7 NEAR PIER #7, SPAN #8 NEAR PIER #7, SPAN #10 NEAR PIER #9, AND SPAN #10 NEAR PIER #10 (FOUR LOCATIONS TOTAL). BOTTOM RAIL OF EAST RAILING USED AS A UTILITY CONDUIT. MINOR COLLISION DAMAGE TO TOP RAIL OF EAST RAILING IN SPAN #8 AT PIER #8. LOOSE ANCHOR BOLT NUT ON WEST RAILING IN SPAN #10 AT PIER #11. VEGETATION GROWTH
ENCROACHING STRUCTURE ON WEST SIDE AT SOUTH APPROACH.
TWO MISSING BOTTOM RAIL-TO-RAIL POST CONNECTION BOLTS ON WEST RAILING IN SPAN #3 AT PIER #2 OF PEDESTRIAN BRIDGE. ISOLATED MISSING MASONRY STONES AT NORTH APPROACH PARAPETS FOR PEDESTRIAN BRIDGE. TWO BENT PEDESTRIAN RAILING BALUSTERS ON WEST RAILING AT SOUTH END STAIRCASE AT THIRD FLIGHT FROM BOTTOM.
58.7 MINOR TO MODERATE DEBRIS ACCUMULATION AND VEGETATION GROWTH IN CURBLINES; SOME DECK DRAINS CLOGGED.
PREVIOUSLY NOTED SIGNS OF PONDING AT PIERS #4 AND #5 ON EAST SIDE, PIER #7 ON BOTH SIDES, AND PIER #9 ON WEST
SIDE NOT OBSERVED THIS INSPECTION DUE TO DRY CONDITIONS.
58.8 UTILITY HATCH COVERS IN EAST SIDEWALK MISSING ALL HARDWARE AND WELDED SHUT.
BOTTOM RAIL IN EAST RAILING IS USED AS A UTILITY CONDUIT. SEE ALSO ITEM 58.6.
59.1 MINOR RUSTING OF BEARINGS. BEARINGS AT PIERS #1 AND #5 UP TO FULLY CONTRACTED AT 75°F. BEAM #1 BEARING IN SPAN #2 AT PIER #1 1/4" EXPANDED AT 75°F. MISSING ANCHOR BOLT ON EAST SIDE OF BEAM #3 BEARING IN SPAN #3 AT PIER #3.
ANCHOR BOLT NUT NOT FULLY SEATED ON WEST SIDE OF BEAM #2 BEARING IN SPAN #4 AT PIER #4. MISSING ANCHOR BOLTS AT BEAM #2 BEARING AND EAST SIDE OF BEAM #4 BEARING IN SPAN #6 AT PIER #5. THREE BEARING ANCHOR BOLTS BROKEN AT PIER #6 (NOTED IN 2004 UBIV INSPECTION). BEAM #3 BEARING SOLE PLATE IMPROPERLY INSTALLED IN SPAN #10 AT PIER #10.
MINOR TO MODERATE RUSTING OF BEARING PLATES FOR PEDESTRIAN BRIDGE; NUMEROUS BROKEN ANCHOR BOLTS AT PIERS
#2 THROUGH #4. BENT ANCHOR BOLT AT PIER #4.
59.2 EXPOSED REBAR CHAIRS ON UNDERSIDE OF SEVERAL BEAMS. MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON HAUNCHES FOR BEAMS #1, #2, AND #4 IN SPAN #1 AND BEAMS #1 AND #4 IN SPAN #8. MINOR HORIZONTAL CRACKING WITH EFFLORESCENCE ALONG EXTERIOR SIDE OF BEAM #4 AT TOP IN SPAN #2. MINOR HONEYCOMBING WITH EXPOSED REBAR ON UNDERSIDE OF BEAM #1 IN SPAN #8 NEAR PIER #8 AND BEAMS #1 THROUGH #3 IN SPAN #10. MINOR DELAMINATION ON EXTERIOR SIDE OF BEAM #4 IN SPAN #2 NEAR MIDSPAN. MINOR SPALL WITH EXPOSED REBAR ON EXTERIOR SIDE OF BEAM #1 IN SPAN #10 AT PIER #9. CONCRETE PATCHING ON UNDERSIDE OF BEAMS #1, #2, AND #3 IN SPAN #10.
MINOR RUSTING OF PEDESTRIAN BRIDGE BEAMS. MINOR DISTORTION OF ISOLATED BEAMS IN SPANS #3 AND #4 OF
PEDESTRIAN BRIDGE, LIKELY DUE TO FLOOD DEBRIS IMPACT.
59.6 MINOR VERTICAL AND DIAGONAL CRACKING WITH MODERATE EFFLORESCENCE ON SEVERAL DIAPHRAGMS. EXPOSED REBAR CHAIRS THROUGHOUT UNDERSIDE OF MOST DIAPHRAGMS. MINOR SPALLING WITH EXPOSED REBAR ON UNDERSIDE OF END
DIAPHRAGMS AT PIERS #1 AND #3.
MINOR SPOT RUSTING OF PEDESTRIAN BRIDGE DIAPHRAGMS.
59.11 SEVERAL BENT HANGER RODS FOR PEDESTRIAN BRIDGE. MINOR RUSTING THROUGHOUT PEDESTRIAN BRIDGE FLOOR BEAMS.
MINOR FLOOD DEBRIS WEDGED BETWEEN DIAPHRAGMS/BEAMS AND DECK IN SPANS #1 AND #2.
BROKEN/MISSING METAL STAIR NOSING ON THREE STEPS AT SOUTH END STAIRCASE; NUMEROUS OTHER METAL STAIR
NOSINGS LOOSE. MINOR DELAMINATION AND SPALLING OF ONE STEP.
60.1
60.4
60.11
MINOR HORIZONTAL CRACKING WITH RUST STAINING ON SOUTH ABUTMENT BREASTWALL. MINOR DELAMINATION OF NORTH ABUTMENT BREASTWALL BELOW BEAM #2 AT TOP. MINOR SPALL WITH EXPOSED REBAR ON NORTH ABUTMENT BREASTWALL BELOW BEAM #3 AT BOTTOM. MINOR RANDOM CRACKING (UP TO 1/32"W) OF SOUTH ABUTMENT BREASTWALL. MODERATE VEGETATION GROWTH ON SOUTH ABUTMENT BREASTWALL AT WEST END AT TOP. PEELING PAINT ON SOUTH ABUTMENT
BREASTWALL.
MINOR HONEYCOMBING OF NORTH ABUTMENT BACKWALL BEHIND BEAM #4. MINOR VERTICAL CRACK WITH EFFLORESCENCE
ON NORTH ABUTMENT BACKWALL AT WEST END.
MINOR TO MODERATE CRACKING (UP TO 1/8"W) AND DETERIORATION OF NORTH ABUTMENT BREASTWALL MASONRY MORTAR
JOINTS FOR SLOPE PROTECTION, PEDESTRIAN WALKWAY, AND PEDESTRIAN BRIDGE.
60.3 MINOR DEBRIS ACCUMULATION ON ABUTMENT BEARING SEATS.
60.6 MINOR VINE GROWTH ON WINGWALLS. MINOR TO MODERATE RANDOM CRACKING WITH EFFLORESCENCE ON WINGWALLS.
MINOR SPALLING WITH EXPOSED REBAR ON SOUTHEAST AND NORTHWEST WINGWALLS. MINOR SPALLING OF SOUTHEAST
WINGWALL AT END.
60.9 MINOR EROSION ALONG NORTHWEST WINGWALL. MINOR EROSION ALONG WEST SIDE OF NORTH ABUTMENT SLOPE PROTECTION. MODERATE EROSION (4'L X 1'W X 6"D) WITH VOID (3' UNDER) ALONG SOUTHEAST WINGWALL. MODERATE SIZED
ANIMAL BURROW (UP TO 3'D) ADJACENT TO SOUTHEAST WINGWALL.
60.11 MISSING STONE ON NORTH ABUTMENT SLOPE PROTECTION NEAR EAST SIDE WITH MINOR UNDERMINING.
60.13 MINOR TO MODERATE VERTICAL, HORIZONTAL, AND RANDOM CRACKING (UP TO 1/8"W) WITH MOISTURE STAINS AND EFFLORESCENCE ON PIER WALLS AND COLUMNS AT RANDOM LOCATIONS. MINOR DELAMINATION AND SPALLING, SOME WITH MINOR SECTION LOSS ON EXPOSED REBAR, ON PIER WALLS AND COLUMNS AT RANDOM LOCATIONS. MINOR POPOUTS ON PIER WALLS AND COLUMNS AT ISOLTED LOCATIONS. MINOR MOWER SCRAPES ON PIER COLUMNS AT PIERS #5 - #8 AT BOTTOM.
MODERATE VEGETATION GROWTH ON PIERS #1, #3, #5, #9, AND #10. FILLED CORE HOLES ON PIER WALLS AND COLUMNS AT
ISOLATED LOCATIONS.
MINOR SCALING OF PIER WALLS AND COLUMNS ALONG WATERLINE AT PIERS #2 THROUGH #5. MINOR DELAMINATION OF NORTH SIDE OF PIER #1 WALL AT TOP BELOW EAST BEAM OF PEDESTRIAN BRIDGE. MINOR SPALING WITH EXPOSED REBAR ON NORTH SIDE OF PIER #3 WALL AND SOUTH SIDE OF PIER #4 WALL. SEVERE VERTICAL THROUGH CRACK (1/2"W X FULL HEIGHT X FULL DEPTH) AT CENTERLINE OF PIER #7 WALL WITH MINOR TO MODERATE EDGE SPALLING WITH EXPOSED REBAR ALONG CRACK; MODERATE MAP CRACKING WITH EFFLORESCENCE AND MOISTURE STAINING AT TOP; MODERATE DELAMINATION ON
BOTH SIDES.
60.15 MINOR TO MODERATE RANDOM CRACKING (UP TO 1/16"W) WITH EFFLORESCENCE ON BEARING SEATS AND SIDES OF PIER CAPS; MINOR SCALING/ABRASION AND WIDESPREAD STAINING DUE TO LEAKAGE THROUGH DECK JOINTS. MINOR DELAMINATION AND SPALLING, SOME WITH MINOR SECTION LOSS ON EXPOSED REBAR, ON PIER CAPS AT RANDOM
LOCATIONS. FILLED CORE HOLES ON PIER CAPS AT ISOLATED LOCATIONS.
DETERIORATION OF GROUT ON TOP OF PIER CAPS SURROUNDING MASONRY PLATES AT RANDOM LOCATIONS. MINOR TO MODERATE ACCUMULATION OF TIMBER DEBRIS ON TOP OF PIERS #1 AND #2. MINOR TO MODERATE SPALLING (1-1/2"D) WITH EXPOSED REBAR ON NORTH SIDE OF PIER #2 CAP, NORTH SIDE OF PIER #6 CAP BELOW BEAM #1, NORTH SIDE OF PIER #7 CAP, AND SOUTH SIDE OF PIER #9 CAP.
MINOR TO MODERATE CRACKING (1/32"W), SOME WITH EFFLORESCENCE, AND WIDESPREAD MINOR TO MODERATE DELAMINATION AND SPALLING (UP TO 2"D) WITH EXPOSED REBAR ON UNDERSIDE OF PIER CAPS. SEVERAL AREAS OF DELAMINATION OVERHEAD OF PEDESTRIAN BRIDGE POSE A HAZARD TO PEDESTRIANS; SEVERAL AREAS REMOVED WITH
SOUNDING HAMMER AT TIME OF INSPECTION.
60.17 MINOR EROSION ON BOTH SIDES OF PIER #5.
FROM 2014 INSPECTION REPORT: EMERGENCY UNDERWATER INSPECTION PERFORMED 10/14. PIER #2 FOOTINGS PARTIALLY EXPOSED. TOP FACE OF PIERS #3 AND #4 FOOTINGS EXPOSED. UPSTREAM FACE OF PIER #4 UPSTREAM FOOTING EXPOSED, INCLUDING APPARENT CONCRETE OVERPOUR OR POSSIBLE PORTION OF TREMIE SEAL AT RIVER BOTTOM. PIER #5 FOOTINGS
NOT EXPOSED. NO UNDERMINING NOTED.
FROM 2018 UNDERWATER INSPECTION REPORT: SUBSTRUCTURE UNITS OF JAMES RIVER BRIDGE WERE OBSERVED TO BE IN GOOD CONDITION OVERALL WITH AGE-RELATED STRUCTURAL DEFICIENCIES CONSISTING OF SPALLS WITH NO EXPOSED REBAR, SCALING UP TO 1/2"D, AND HAIRLINE TO 1/16"W CRACKING IN CONCRETE COLUMNS WHICH SHOW NO SIGNS OF RUST STAINING. MAJORITY OF THESE CONDITIONS ARE PRE-EXISTING AND HAVE REMAINED UNCHANGED SINCE THE 2013 UNDERWATER INSPECTION. IN LIGHT OF 2018 INSPECTION FINDINGS, NO STRUCTURAL REPAIRS ARE WARRANTED BECAUSE OBSERVED DEFICIENCIES ARE NOT STRUCTURALLY SIGNIFICANT AT THIS TIME. IT IS RECOMMENDED, HOWEVER THAT SUBSTRUCTURE ELEMENTS BE INSPECTED AT INTERVALS NOT EXCEEDING 60 MONTHS TO MONITOR ANY CHANGES IN CONDITIONS OF SUBSTRUCTURE UNITS. FOOTING EXPOSURE AT PIERS #2, #3, AND #4 (UP TO 4.1'D) SHOWS NO APPRECIABLE CHANGE SINCE 2013 INSPECTION. IN LIGHT OF UNCHANGED CONDITIONS, NO REPAIRS OR SCOUR COUNTERMEASURES ARE RECOMMENDED AT THIS TIME. IT IS RECOMMENDED, HOWEVER THAT CHANNEL BOTTOM BE MONITORED FOR CHANGES
DURING FUTURE ROUTINE INSPECTIONS AND AFTER SIGNIFICANT STORM OR FLOOD EVENTS.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.4 MINOR DRIFT ACCUMULATION AT UPSTREAM END OF PIER #3.
222.4
222.6
ASPHALT APPROACH ROADWAY RESURFACED SINCE LAST INSPECTION. EVIDENCE OF PONDING AT NORTH ABUTMENT.
MINOR SETTLEMENT (3/4") OF NORTH APPROACH MASONRY FOR PEDESTRIAN BRIDGE. SEVERAL MASONRY STONES MISSING
AT EAST END OF NORTH APPROACH FOR PEDESTRIAN BRIDGE.
222.7 "HARRY FLOOD BYRD MEMORIAL BRIDGE - JAMES RIVER" SIGN PRESENT ON EAST SIDE AT SOUTH APPROACH; MINOR DAMAGE.
SURVEY MARKER ON TOP OF NORTHEAST WINGWALL.
36.A BRIDGE RAILING HEIGHT OF 2'-4" DOES NOT MEET MINIMUM HEIGHT REQUIREMENTS OF 3'-6" FOR PEDESTRIAN SAFETY
BARRIERS.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-016P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 8 7 15 14
HS 21 19 36 33
TYPE 3 14 13 25 23
TYPE 3S2 21 19 36 33
TYPE 3-3 23 21 40 36
DESIGN LOADING: 2 - H 15
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
X CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 06/19/2019
LOAD RATING CONTROLLED BY:
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-016P
JAMES RIVER BR DGE INSPECTION DATE: 06/16/2022
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY
(202) STRUCTURE NAME:..............JAMES RIVER BRIDGE
(203) STRUCTURE KIND:............... 1 - BRIDGE
(204) STRUCTURE NUMBER:.........5140-016 P
4 - SOUTHEAST(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:............. 016P
(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................JAMES RIVER
(211) PROJECT NO(S):................... 1H3, 1H8
(212) DRAWING NUMBERS:
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
513 - VIRGINIA
51019 BEDFORD
00000
1 6 1 00001 0
JAMES RIVER & U.S. ROUTE 501
BLUE RIDGE PARKWAY
5140016P0000000
2 0 MILES TO VA ROUTE 130.
99.99 FT ( 99.99 M)
63.64 (KM PT: 102.4)
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........1 - CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 04 - TEE BEAM (44B) APPR. STR. TYPE:.................... 00 - OTHER
(45) NO. OF MAIN SPANS:..............011 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............100 FT ( 30.5 M)
(49) STRUCTURE LENGTH:........... 1045 FT ( 318.5 M) (108) WEAR SURFACE/PROTECT SYSTEM:
.0
(216A) ABUTMENT #1 FDN:........... 2 - SPREAD FTG ON BEARING MAT'L A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS
(216B) ABUTMENT #2 FDN:........... 2 - SPREAD FTG ON BEARING MAT'L B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 2 - SPREAD FTG ON BEARING MAT'L C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 2 - SPREAD FTG ON BEARING MAT'L (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:..............21.0 TONS ( 19.1 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL
LOADS
(64) OPERATING RATING:..............36.0 TONS ( 32.7 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 06/17/2022 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 4 - NON-DESTRUCTIVE TESTING (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 4 - NON-DESTRUCTIVE TESTING INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: 11/07/2019 (B) UNDERWATER:..................... Y
INSP. EVERY 60 MONTHS - LAST INSP: 07/01/2018
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
https://RATING:
https://RATING:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-016P
JAMES RIVER BR DGE INSPECTION DATE: 06/16/2022
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 37° 33'17.70" (51) CURB TO CURB WIDTH:............ 26.0 FT ( 7.9 M)
(17) LONGITUDE:............................ 79°22 '11 50" (52) DECK WIDTH:.......................... 33.0 FT ( 10.1 M)
(19) DETOUR LENGTH:.................. 6 MI ( 10 KM) (32) APPR. ROADWAY WIDTH:...... 30.0 FT ( 9.1 M)
(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)
(28B) LANES UNDER STRUCT:......02 LEFT SHOULDER:............... 4 0 FT ( 1.2 M)
(42A) SERVICE ON:.........................5 - HIGHWAY-PEDESTRIAN RIGHT SHOULDER:.......... 4 0 FT ( 1.2 M)
(42B) SERVICE UNDER:................. 8 - HIGHWAY - WATERWAY - (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
RAILROAD
(29) AVG DAILY TRAFFIC:..............474 (34) SKEW ANGLE:......................... 0 °
(30) YEAR OF ADT:......................... 2012 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................521 (47) TOTAL HORIZ. CLEARANCE:.. 26 FT ( 7.9 M)
(115) YEAR OF FUTURE ADT:........2032 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 2 5 FT ( 0.8 M)
(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 2 5 FT ( 0.8 M)
WATERWAY (BRIDGE PERMIT NOT
REQUIRED)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 2 - MOUNTED ON PARAPET
(111) ABUT OR PIER PROT:........... MATERIAL:........................... 2 - CONCRETE/ALUMINUM
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:..............................22.0 FT ( 6.71 M) (215) BRIDGE RAIL HEIGHT:.......... 3 00 FT ( 0 91 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... 23.42 FT ( 7.14 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............5 (68) DECK GEOMETRY:
(60) SUBSTRUCTURE:.......... 5 (69) UNDERCLEARANCES:
(61) CHANNEL:................................7 (71) WATERWAY ADEQUACY:
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 4 - ACTION IS REQUIRED TO
PROTECT EXPOSED FOUNDATIONS
(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(36) TRAFFIC SAFETY FEAT: 0 N N N (226) PRIORITY OF IMPROVEMENT: B - MAJOR
(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:.............$
(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:..... $
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:.......... $
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1984-JOINT REPAIR. 2020-WEARING SURFACE AND APPROACHES RESURFACED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
https://RIGHT:
https://33'17.70
Inspector: Luke Sheptuck Structure Number: 5140016P0000000
Inspection Date: 06/17/2022 Facility Carried: BLUE RIDGE PARKWAY
Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING NORTHBOUND TOWARD SKYLINE DRIVE
PHOTO 4
Description EAST (DOWNSTREAM) SIDE
Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOPSIDE VIEW LOOKING NORTH; NOTE ASPHALT WEARING SURFACE
RESURFACED SINCE LAST INSPECTION
PHOTO 6
Description TYPICAL RUSTING OF STEEL SLIDING PLATES ON CURBS AT DECK EXPANSION JOINTS;
WEST SIDE AT PIER #1 SHOWN
Bridge Inspection Report
Pictures
PHOTO 7
Description TYPICAL TRANSVERSE CRACKING OF ASPHALT WEARING SURFACE OVER ASPHALTIC
PLUG EXPANSION JOINTS; OVER PIER #5 SHOWN
PHOTO 8
Description POTHOLE IN SPAN #10 NEAR PIER #10
Bridge Inspection Report
Pictures
PHOTO 9
Description TYPICAL DELAMINATION AND SPALLING OF CURBS AT EXPANSION JOINTS OVER PIERS;
WEST CURB AT PIER #2 SHOWN
PHOTO 10
Description DELAMINATION AND SPALLING OF EAST SIDEWALK IN SPAN #7 NEAR PIER #7
Bridge Inspection Report
Pictures
PHOTO 11
Description TYPICAL TRANSVERSE CRACKING OF APPROACH SIDEWALKS; EAST SIDE AT NORTH
APPROACH SHOWN; ALSO NOTE TYPICAL VERTICAL CRACKING OF APPROACH
PARAPETS WITH DELAMINATION AND SPALLING ALONG CRACKS
PHOTO 12
Description DELAMINATION AND SPALLING OF WEST PARAPET IN SPAN #9 AT PIER #8
Bridge Inspection Report
Pictures
PHOTO 13
Description SHEARED RAIL POST ANCHOR BOLT ON WEST RAILING IN SPAN #1 AT NORTH END; ALSO
NOTE MISSING RAIL POST ANCHOR BOLT NUT
PHOTO 14
Description BOTTOM RAIL OF EAST RAILING DETACHED IN SPAN #8 NEAR PIER #7
Bridge Inspection Report
Pictures
PHOTO 15
Description COLLISION DAMAGE TO TOP RAIL OF EAST RAILING IN SPAN #8 AT PIER #8
PHOTO 16
Description TYPICAL DEBRIS ACCUMULATION AND VEGETATION GROWTH IN CURBLINES; WEST SIDE
IN SPANS #1 AND #2 SHOWN; NOTE CLOGGED DECK DRAINS
Bridge Inspection Report
Pictures
PHOTO 17
Description TYPICAL UTILITY HATCH COVERS IN EAST SIDEWALK MISSING ALL HARDWARE AND
WELDED SHUT; SPAN #2 SHOWN; ALSO NOTE DELAMINATION AND SPALLING OF
SIDEWALK
PHOTO 18
Description UNEVEN ROADWAY SURFACE DUE TO SETTLEMENT OF NORTH APPROACH PAVEMENT
Bridge Inspection Report
Pictures
PHOTO 19
Description VEGETATION GROWTH ENCROACHING STRUCTURE ON WEST SIDE AT SOUTH
APPROACH
PHOTO 20
Description DAMAGE TO SIGN ON EAST SIDE AT SOUTH APPROACH
Bridge Inspection Report
Pictures
PHOTO 21
Description GENERAL UNDERSIDE VIEW LOOKING SOUTH, SPAN #4
PHOTO 22
Description SPALL ON UNDERSIDE OF WEST OVERHANG AT NORTH ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 23
Description TYPICAL BEARING CONTRACTION AT PIER #1; BEAM #3 IN SPAN #1 SHOWN; ALSO NOTE
TYPICAL RUSTING OF BEARINGS
PHOTO 24
Description MISSING ANCHOR BOLT ON EAST SIDE OF BEAM #3 BEARING IN SPAN #3 AT PIER #3;
ALSO NOTE TYPICAL RUSTING OF BEARINGS
Bridge Inspection Report
Pictures
PHOTO 25
Description MISSING ANCHOR BOLTS AT BEAM #2 BEARING IN SPAN #6 AT PIER #5
PHOTO 26
Description HONEYCOMBING WITH EXPOSED REBAR ON UNDERSIDE OF BEAM #2 IN SPAN #10; ALSO
NOTE CONCRETE PATCHING
Bridge Inspection Report
Pictures
PHOTO 27
Description DELAMINATION ON EXTERIOR SIDE OF BEAM #4 IN SPAN #2 NEAR MIDSPAN
PHOTO 28
Description TYPICAL VERTICAL CRACKING WITH EFFLORESCENCE ON DIAPHRAGMS; END
DIAPHRAGM BETWEEN BEAMS #3 AND #4 IN SPAN #5 AT PIER #4 SHOWN
Bridge Inspection Report
Pictures
PHOTO 29
Description TYPICAL SPALLING WITH EXPOSED REBAR ON UNDERSIDE OF END DIAPHRAGMS AT
PIERS #1 AND #3; END DIAPHRAGM BETWEEN BEAMS #2 AND #3 AT PIER #1 SHOWN
PHOTO 30
Description GENERAL VIEW OF SOUTH ABUTMENT; NOTE VEGETATION GROWTH AT WEST END AT
TOP
Bridge Inspection Report
Pictures
PHOTO 31
Description DELAMINATION OF NORTH ABUTMENT BREASTWALL BELOW BEAM #2 AT TOP
PHOTO 32
Description SPALL WITH EXPOSED REBAR ON NORTH ABUTMENT BREASTWALL BELOW BEAM #3 AT
BOTTOM
Bridge Inspection Report
Pictures
PHOTO 33
Description TYPICAL DEBRIS ACCUMULATION ON ABUTMENT BEARING SEATS; NORTH ABUTMENT
BETWEEN BEAMS #3 AND #4 SHOWN
PHOTO 34
Description TYPICAL VINE GROWTH ON WINGWALLS; NORTHEAST WINGWALL SHOWN
Bridge Inspection Report
Pictures
PHOTO 35
Description SPALLING OF SOUTHEAST WINGWALL AT END
PHOTO 36
Description EROSION ALONG WEST SIDE OF NORTH ABUTMENT SLOPE PROTECTION
Bridge Inspection Report
Pictures
PHOTO 37
Description EROSION WITH VOID BELOW SOUTHEAST WINGWALL
PHOTO 38
Description MISSING STONE IN NORTH ABUTMENT SLOPE PROTECTION NEAR EAST SIDE; NOTE
UNDERMINING
Bridge Inspection Report
Pictures
PHOTO 39
Description GENERAL VIEW OF PIER #6, NORTH SIDE
PHOTO 40
Description TYPICAL VERTICAL CRACKING WITH MOISTURE STAINS AND EFFLORESCENCE ON PIER
COLUMNS; EAST COLUMN AT PIER #7 SHOWN
Bridge Inspection Report
Pictures
PHOTO 41
Description TYPICAL SPALLING WITH EXPOSED REBAR ON PIER COLUMNS; SOUTH SIDE OF WEST
COLUMN AT PIER #5 SHOWN
PHOTO 42
Description VEGETATION GROWTH ON PIER #5
Bridge Inspection Report
Pictures
PHOTO 43
Description TYPICAL VERTICAL CRACKING WITH MOISTURE STAINING AND EFFLORESCENCE ON
PIER WALLS; NORTH SIDE OF PIER #1 WALL SHOWN; ALSO NOTE DELAMINATION AT TOP
PHOTO 44
Description VERTICAL CRACK AT CENTERLINE OF PIER #7 WALL WITH EDGE SPALLING AND
EXPOSED REBAR ALONG CRACK; NORTH SIDE SHOWN; ALSO NOTE MAP CRACKING
WITH EFFLORESCENCE AND MOISTURE STAINING WITH DELAMINATION AT TOP
Bridge Inspection Report
Pictures
PHOTO 45
Description TYPICAL CRACKING WITH EFFLORESCENCE AND STAINING ON PIER CAPS DUE TO
LEAKAGE THROUGH DECK JOINTS; SOUTH SIDE OF PIER #3 CAP AT WEST END SHOWN
PHOTO 46
Description TYPICAL SPALLING WITH EXPOSED REBAR ON PIER CAPS; SOUTH SIDE OF PIER #4 CAP
NEAR WEST END SHOWN
Bridge Inspection Report
Pictures
PHOTO 47
Description ACCUMULATION OF TIMBER DEBRIS ON TOP OF PIER #1 CAP
PHOTO 48
Description TYPICAL DELAMINATION AND SPALLING WITH EXPOSED REBAR ON UNDERSIDE OF PIER
CAPS; PIER #3 CAP SHOWN
Bridge Inspection Report
Pictures
PHOTO 49
Description EROSION AT WEST SIDE OF PIER #5
PHOTO 50
Description DRIFT ACCUMULATION AT UPSTREAM END OF PIER #3
Bridge Inspection Report
Pictures
PHOTO 51
Description GENERAL VIEW OF PEDESTRIAN BRIDGE LOOKING SOUTH
PHOTO 52
Description GENERAL VIEW OF PEDESTRIAN BRIDGE STAIRCASE LOOKING NORTH
Bridge Inspection Report
Pictures
PHOTO 53
Description GENERAL TOPSIDE VIEW OF PEDESTRIAN BRIDGE LOOKING SOUTH
PHOTO 54
Description TYPICAL TRANSVERSE CRACKING OF PEDESTRIAN BRIDGE DECK SURFACE; SPAN #3
SHOWN
Bridge Inspection Report
Pictures
PHOTO 55
Description PEDESTRIAN DECK SURFACE UNEVEN AT JOINT OVER PIER #3
PHOTO 56
Description MISSING BOTTOM RAIL-TO-RAIL POST CONNECTION BOLTS ON WEST RAILING IN SPAN
#3 AT PIER #2 OF PEDESTRIAN BRIDGE
Bridge Inspection Report
Pictures
PHOTO 57
Description TWO BENT PEDESTRIAN RAILING BALUSTERS ON WEST RAILING AT SOUTH END
STAIRCASE AT THIRD FLIGHT FROM BOTTOM
PHOTO 58
Description SETTLEMENT OF NORTH APPROACH MASONRY FOR PEDESTRIAN BRIDGE
Bridge Inspection Report
Pictures
PHOTO 59
Description MISSING MASONRY STONES AT EAST END OF NORTH APPROACH FOR PEDESTRIAN
BRIDGE
PHOTO 60
Description GENERAL UNDERSIDE VIEW OF PEDESTRIAN BRIDGE LOOKING SOUTH, SPAN #2
Bridge Inspection Report
Pictures
PHOTO 61
Description TYPICAL RUSTING OF BEARINGS FOR PEDESTRIAN BRIDGE; BEARINGS OVER PIER #2
SHOWN; ALSO NOTE BROKEN ANCHOR BOLTS
PHOTO 62
Description TYPICAL RUSTING OF PEDESTRIAN BRIDGE BEAMS; EAST SIDE OF BEAM #2 IN SPAN #1
Bridge Inspection Report
Pictures
PHOTO 63
Description TYPICAL RUSTING OF PEDESTRIAN BRIDGE FLOOR BEAMS; WEST SIDE IN SPAN #4
SHOWN
PHOTO 64
Description TYPICAL BENT HANGER RODS FOR PEDESTRIAN BRIDGE; WEST SIDE IN SPAN #2
Bridge Inspection Report
Pictures
PHOTO 65
Description FLOOD DEBRIS WEDGED BETWEEN DIAPHRAGMS/BEAMS AND DECK IN SPAN #2 OF
PEDESTRIAN BRIDGE
PHOTO 66
Description BROKEN/MISSING METAL STAIR NOSING ON STEPS AT SOUTH END STAIRCASE OF
PEDESTRIAN BRIDGE; THIRD FLIGHT FROM BOTTOM SHOWN
Bridge Inspection Report
Pictures
PHOTO 67
Description DELAMINATION AND SPALLING OF STEP AT SOUTH END STAIRCASE FOR PEDESTRIAN
BRIDGE
PHOTO 68
Description GENERAL VIEW OF NORTH ABUTMENT FOR PEDESTRIAN BRIDGE
Bridge Inspection Report
Pictures
PHOTO 69
Description TYPICAL DETERIORATION OF MASONRY MORTAR JOINTS AT NORTH ABUTMENT
BREASTWALL OF PEDESTRIAN BRIDGE; EAST END SHOWN
PHOTO 70
Description UPSTREAM CHANNEL
Bridge Inspection Report
Pictures
PHOTO 71
Description DOWNSTREAM CHANNEL
File details come from the government source that posted it. Updated .