Questions_Responses.pdf
PDF 432 KB Posted
- Attached to
- Boiler Repair and Replacement Valdez Federal contract opportunity
- Solicitation number
- 51291PR260000038
About this file
This document is a Questions and Answers file for USCG Solicitation 51291PR260000038, addressing contractor inquiries regarding a boiler system demolition and installation project at the Sector Field Office Valdez Housing in Valdez, Alaska.
Key requirements and clarifications include: the entity performing onsite work must possess a valid Alaska General Contractor or Electrical Contractor License, with subcontractors acceptable if they hold the required license; performance must be completed within 90 days of notice to proceed; bid bonds, payment bonds, and performance bonds are not required as this is a commercial services contract under Service Contract Labor Standards; and the scope encompasses demolition and removal of all existing boiler system components, including associated piping, valves, fittings, and controls to facilitate new boiler installation at 1680 Broadway Court, Valdez, Alaska 99686. Contractors should submit quotes in accordance with solicitation instructions. The USCG provided attached supplemental photographs in response to multiple requests for clearer and more detailed images of the existing boiler room, including close-up views of piping, pumps, zone valves, vent piping, exhaust systems, oil lines, electrical wiring, and surrounding components to enable accurate scope determination and cost estimation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Supplemental Pictures.pdf | ||
| 51291PR260000038 STATEMENT OF WORK.pdf | ||
| WD 2015-5687 Rev 27.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question or Comment Number Question/Comment USCG Response
Are bid bonds, payment bonds, performance bonds, insurance, etc.
required for this opportunity?
This is considered a commercial services contract in accordance with the Service Contract Labor Standards. Bid bonds, payment bonds, and performance bonds are not required.
May the prime contractor team with a subcontractor that possesses a valid Alaska General Contractor or Electrical Contractor License?
The entity actually performing the onsite effort must possess a valid Alaska General Contractor or Electrical Contractor License.
What is the period of performance? How quickly does the the Government request the job to be completed? Performance shall be completed within 90 days after a notice to proceed has been issued.
4 Please provide clearer photographs See attached file.
Would it be acceptable for the required “Evidence of a valid Alaska General Contractor License” to be satisfied by our local subcontractor
The entity actually performing the onsite effort must possess a valid Alaska General Contractor or Electrical Contractor License.
Does the boiler scope include replacing the "Trim" components which would include: expansion tank, zone valves, pumps, PRV/BFP, air remover?
The first Paragragh of the SOW submitted is "The intent of this Statement of Work (SOW) is to have the contractor demolish and remove all required components of the existing boiler system, including associated piping, valves, fittings, and controls, to facilitate the installation of a new boiler system at the Sector Field Office Valdez Housing located at 1680 Broadway Ct., Valdez, Alaska, 99686"
7 How would you like me to submit the proposal ? Please submit your quote in accordance with the instructions contained in the solicitation.
Are you able to submit more pictures within the boiler room that show different angles of the full system? We'd like to get more close up pictures of the boiler piping that show (pumps, zone valves, etc.) and the vent piping on top of the boiler as well. This will help us better determine our scope of work and a more accurate estimate. See attached file.
We kindly request clearer and more detailed pictures of the existing boilers, specifically of piping and connections, exhaust system, oil line, electrical wiring, and any surrounding components that may impact installation or removal. See attached file.
Solicitation 51291PR260000038 Questions and Responses
File details come from the government source that posted it. Updated .