511.22358.TAP DMVA Renovate Armory - Calumet - MICH Spec (Rev 02-24) - PART 3.pdf

PDF 4 MB Posted

Attached to
511/22358. TAP; Calumet Armory - Renovate Armory
Solicitation number
RFQ - 171 - 240000000400
Issued by
Houghton County, Capac Village, Michigan

About this file

This document appears to be a state and local contract opportunity for the renovation of the Calumet Armory in Michigan. The project, titled "TAP; Calumet Armory - Renovate Armory", is being solicited by the Michigan Department of Military and Veterans Affairs (DMVA). Key details include:

The contract requires the renovation of the armory facility located in Calumet, Michigan, within Houghton County. The bid attachments and supporting documents contain information such as the scope of work, project description, specifications, and exhibits. Questions regarding the opportunity should be emailed to the Project Manager, Aaron Janke, at ajanke@upea.com. Bid submissions must be uploaded to the SIGMA VSS system by the 2:00 p.m. deadline, and emailed submissions may be accepted on a case-by-case basis with prior approval.

The pricing structure, set-asides, and incumbent contractor details are not explicitly provided in the document. However, it notes the project is funded by the state and that respondents must meet all applicable requirements. Interested parties are encouraged to review the full bid package for comprehensive details on the requirements, specifications, and submission process.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[M12-03212]

Vibration and Seismic Controls for Fire-Suppression Piping and Equipment

21 05 48 - 1

SECTION 21 05 48

VIBRATION AND SEISMIC CONTROLS FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Vibration isolators.

B. Related Sections:

1. Section 22 05 29 - Hangers and Supports for Plumbing Piping and Equipment: Product requirements for pipe hangers and supports.

1.2 REFERENCES

A. American Society of Heating, Refrigerating and:

1. ASHRAE Handbook - HVAC Applications.

B. Sheet Metal and Air Conditioning Contractors’:

1. SMACNA - HVAC Duct Construction Standard - Metal and Flexible.

1.3 PERFORMANCE REQUIREMENTS

A. Provide vibration isolation on motor driven equipment over 0.5 hp, plus connected piping.

B. Consider upper floor locations critical unless otherwise indicated.

C. Use concrete inertia bases for fans having static pressure in excess of 3.5 inches water column or motors in excess of 40 hp, and on base mounted pumps over 10 hp.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Submittal procedures.

B. Shop Drawings: Indicate inertia bases and locate vibration isolators, with static and dynamic load on each. Indicate assembly, materials, thickness, dimensional data, pressure losses, acoustical performance, layout, and connection details for sound attenuation products fabricated for this project.

C. Product Data: Submit schedule of vibration isolator type with location and load on each. Submit catalog information indicating, materials, dimensional data, pressure losses, and acoustical performance for standard sound attenuation products.

D. Design Data: Submit calculations indicating maximum room sound levels are not exceeded.

E. Manufacturer's Installation Instructions: Submit special procedures and setting dimensions.

DMVA - RENOVATE ARMORY - CALUMET

21 05 48 - 2

F. Manufacturer's Certificate: Certify isolators meet or exceed specified requirements.

G. Manufacturer's Field Reports: Indicate sound isolation installation is complete and in accordance with instructions.

1.5 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Closeout procedures.

B. Project Record Documents: Record actual locations of hangers including attachment points.

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with ARI 575.

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years experience.

B. Installer: Company specializing in performing Work of this section with minimum three years experience approved by manufacturer.

1.8 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.9 WARRANTY

A. Section 01 70 00 - Execution and Closeout Requirements: Product warranties and product bonds.

B.

PART 2 PRODUCTS

2.1 VIBRATION ISOLATORS

A. Open Spring Isolators:

1. Spring Isolators:

a. For Exterior and Humid Areas: Furnish hot dipped galvanized housings and neoprene coated springs.

b. Code: Color code springs for load carrying capacity.

2. Springs: Minimum horizontal stiffness equal to 75 percent vertical stiffness, with working deflection between 0.3 and 0.6 of maximum deflection.

3. Spring Mounts: Furnish with leveling devices, minimum 0.25 inch thick neoprene sound pads, and zinc chromate plated hardware.

4. Sound Pads: Size for minimum deflection of 0.05 inch; meet requirements for neoprene pad isolators.

21 05 48 - 3

B. Restrained Spring Isolators:

1. Spring Isolators:

a. For Exterior and Humid Areas: Furnish hot dipped galvanized housings and neoprene coated springs.

b. Code: Color code springs for load carrying capacity.

2. Springs: Minimum horizontal stiffness equal to 75 percent vertical stiffness, with working deflection between 0.3 and 0.6 of maximum deflection.

3. Spring Mounts: Furnish with leveling devices, minimum 0.25 inch thick neoprene sound pads, and zinc chromate plated hardware.

4. Sound Pads: Size for minimum deflection of 0.05 inch; meet requirements for neoprene pad isolators.

5. Restraint: Furnish mounting frame and limit stops.

C. Closed Spring Isolators:

1. Spring Isolators:

a. For Exterior and Humid Areas: Furnish hot dipped galvanized housings and neoprene coated springs.

b. Code: Color code springs for load carrying capacity.

2. Type: Closed spring mount with top and bottom housing separated with neoprene rubber stabilizers.

3. Springs: Minimum horizontal stiffness equal to 75 percent vertical stiffness, with working deflection between 0.3 and 0.6 of maximum deflection.

4. Housings: Incorporate neoprene isolation pad meeting requirements for neoprene pad isolators, and neoprene side stabilizers with minimum 0.25 inch clearance.

D. Restrained Closed Spring Isolators:

1. Spring Isolators:

a. For Exterior and Humid Areas: Furnish hot dipped galvanized housings and neoprene coated springs.

b. Code: Color code springs for load carrying capacity.

2. Type: Closed spring mount with top and bottom housing separated with neoprene rubber stabilizers.

3. Springs: Minimum horizontal stiffness equal to 75 percent vertical stiffness, with working deflection between 0.3 and 0.6 of maximum deflection.

4. Housings: Incorporate neoprene isolation pad meeting requirements for neoprene pad isolators, and neoprene side stabilizers with minimum 0.25 inch clearance and limit stops.

E. Spring Hanger:

1. Spring Isolators:

a. For Exterior and Humid Areas: Furnish hot dipped galvanized housings and neoprene coated springs.

b. Code: Color code springs for load carrying capacity.

2. Springs: Minimum horizontal stiffness equal to 75 percent vertical stiffness, with working deflection between 0.3 and 0.6 of maximum deflection.

3. Housings: Incorporate [neoprene isolation pad meeting requirements for neoprene pad isolators] [rubber hanger with threaded insert].

4. Misalignment: Capable of 20 degree hanger rod misalignment.

F. Neoprene Pad Isolators:

21 05 48 - 4

1. Rubber or neoprene-waffle pads.

a. 30 durometer.

b. Minimum 1/2 inch thick.

c. Maximum loading 40 psi.

d. Height of ribs: not to exceed 0.7 times width.

2. Configuration: Single layer.

G. Rubber Mount or Hanger: Molded rubber designed for 0.5 inches deflection with threaded insert.

H. Glass Fiber Pads: Neoprene jacketed pre-compressed molded glass fiber.

I. Seismic Snubbers:

1. Type: Non-directional and double acting unit consisting of interlocking steel members restrained by neoprene elements.

2. Neoprene Elements: Replaceable, minimum of 0.75 inch thick.

3. Capacity: 4 times load assigned to mount groupings at 0.4 inch deflection.

4. Attachment Points and Fasteners: Capable of withstanding 3 times rated load capacity of seismic snubber.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions.

B. Verify equipment and piping is installed before work in this section is started.

3.2 INSTALLATION

A. Install isolation for motor driven equipment.

B. Bases:

1. Set steel bases for 1 inch clearance between housekeeping pad and base.

2. Set concrete inertia bases for 2 inch clearance between housekeeping pad and base.

C. Adjust equipment level.

D. Install spring hangers without binding.

E. On closed spring isolators, adjust so side stabilizers are clear under normal operating conditions.

F. Prior to making piping connections to equipment with operating weights substantially different from installed weights, block up equipment with temporary shims to final height. When full load is applied, adjust isolators to load to allow shim removal.

G. Provide resiliently mounted equipment, piping, and ductwork with seismic snubbers. Provide each inertia base with minimum of four seismic snubbers located close to isolators. Snub

21 05 48 - 5 equipment designated for post disaster use to 0.05 inch maximum clearance. Provide other snubbers with clearance between 0.15 inch and 0.25 inch.

H. Support piping connections to isolated equipment resiliently to nearest flexible pipe connector.

3.3 FIELD QUALITY CONTROL

A. Section 01 70 00 - Execution and Closeout Requirements: Field inspecting, testing, adjusting, and balancing.

B. Inspect isolated equipment after installation and submit report. Include static deflections.

END OF SECTION

Wet-Pipe Sprinkler Systems

21 13 13 - 1

SECTION 21 13 13

WET-PIPE SPRINKLER SYSTEMS

PART 1 GENERAL

1.1 SUMMARY

A. Section includes wet-pipe sprinkler system, system design, installation, and certification.

B. Related Sections:

1. Section 26 05 03 - Equipment Wiring Connections: Execution requirements for electric connections to equipment specified by this section.

1.2 REFERENCES

A. National Fire Protection Association:

1. NFPA 13 - Installation of Sprinkler Systems.

1.3 SYSTEM DESCRIPTION

A. System to provide coverage for entire building.

B. Provide hydraulically designed system to NFPA 13 occupancy requirements as indicated on the drawings.

C. Determine volume and pressure of incoming water supply from water flow test data. Verify existing water flows are compatible with the existing building and the addition.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Submittal procedures.

B. Shop Drawings: Indicate layout of finished ceiling areas indicating sprinkler locations coordinated with ceiling installation. Indicate detailed pipe layout, hangers and supports, sprinklers, components and accessories. Indicate system controls.

C. Product Data: Submit data on sprinklers, valves, and specialties, including manufacturers catalog information. Submit performance ratings, rough-in details, weights, support requirements, and piping connections.

D. Design Data: Submit design calculations; signed and sealed by professional engineer

E. Manufacturer's Certificate: Certify products meet or exceed specified requirements.

1.5 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Closeout procedures.

21 13 13 - 2

B. Project Record Documents: Record actual locations of sprinklers and deviations of piping from drawings. Indicate drain and test locations.

C. Operation and Maintenance Data: Submit components of system, servicing requirements, record drawings, inspection data, replacement part numbers and availability, and location and numbers of service depot.

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with NFPA 13.

B. Maintain one copy of each document on site.

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years experience.

B. Installer: Company specializing in performing Work of this section with minimum three years experience approved by manufacturer.

C. Design system under direct supervision of Professional Engineer experienced in design of this

Work and licensed at Project location.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Section 01 60 00 - Product Requirements: Product storage and handling requirements.

B. Store products in shipping containers until installation.

C. Furnish piping with temporary inlet and outlet caps until installation.

1.9 WARRANTY

A. Section 01 70 00 - Execution and Closeout Requirements: Product warranties and product bonds.

1.10 EXTRA MATERIALS

A. Section 01 70 00 - Execution and Closeout Requirements: Spare parts and maintenance products.

B. Furnish extra sprinklers under provisions of NFPA 13.

C. Furnish suitable wrenches for each sprinkler type.

PART 2 PRODUCTS

2.1 SPRINKLERS

A. Manufacturers:

21 13 13 - 3

1. Tyco Fire Products

2. Viking Corporation.

3. Substitutions: Section 01 60 00 - Product Requirements.

B. Suspended Ceiling Type:

1. Type: Standard pendant type with matching push on escutcheon plate.

2. Finish: Brass.

3. Escutcheon Plate Finish: Chrome plated.

4. Fusible Link: Glass bulb type temperature rated for specific area hazard.

C. Exposed Area Type:

1. Type: Standard upright type with guard.

2. Finish: Brass.

3. Fusible Link: Glass bulb type temperature rated for specific area hazard.

D. Guards: Finish to match sprinkler finish.

PART 3 EXECUTION

3.1 INSTALLATION

A. Install in accordance with NFPA 13.

B. Place pipe runs to minimize obstruction to other work.

C. Install piping in concealed spaces above finished ceilings.

D. Center sprinklers in two directions in ceiling tile and install piping offsets.

E. Install guards on sprinklers in exposed areas.

F. Hydrostatically test entire system.

G. Require test be witnessed by Authority having jurisdiction.

3.2 INTERFACE WITH OTHER PRODUCTS

A. Verify signal devices are installed and connected to fire alarm system.

3.3 CLEANING

A. Section 01 70 00 - Execution and Closeout Requirements: Final cleaning.

B. Flush entire piping system of foreign matter.

3.4 PROTECTION OF INSTALLED CONSTRUCTION

A. Section 01 70 00 - Execution and Closeout Requirements: Protecting installed construction.

21 13 13 - 4

B. Apply masking tape or paper cover to protect concealed sprinklers, cover plates, and sprinkler escutcheons not receiving field paint finish. Remove after painting.

Expansion Fittings and Loops for Plumbing Piping

22 05 16 - 1

SECTION 22 05 16

EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Flexible pipe connectors.

2. Expansion joints.

3. Expansion compensators.

4. Pipe alignment guides.

5. Swivel joints.

6. Pipe anchors.

B. Related Sections:

1. Section 22 05 29 - Hangers and Supports for Plumbing Piping and Equipment: Product and installation requirements for piping hangers and supports.

2. Section 22 11 00 - Facility Water Distribution: Product and installation requirements for piping used in domestic water systems.

1.2 REFERENCES

A. American Society of Mechanical Engineers:

1. ASME B31.9 - Building Services Piping.

2. ASME Section IX - Boiler and Pressure Vessel Code - Welding and Brazing Qualifications.

B. American Welding Society:

1. AWS D1.1 - Structural Welding Code - Steel.

1.3 DESIGN REQUIREMENTS

A. Provide structural work and equipment required for expansion and contraction of piping. Verify anchors, guides, and expansion joints provide and adequately protect system.

B. Expansion Compensation Design Criteria:

1. Installation Temperature: 50 degrees F.

2. Domestic Hot Water: 140 degrees F.

3. Safety Factor: 30 percent.

1.4 SUBMITTALS

A. Section 01300 - Submittal Procedures: Requirements for submittals.

B. Product Data:

22 05 16 - 2

1. Flexible Pipe Connectors: Indicate maximum temperature and pressure rating, face-to-face length, live length, hose wall thickness, hose convolutions per foot and per assembly, fundamental frequency of assembly, braid structure, and total number of wires in braid.

2. Expansion Joints: Indicate maximum temperature and pressure rating, and maximum expansion compensation.

C. Design Data: Indicate criteria and show calculations.

D. Manufacturer's Installation Instructions: Submit special procedures.

E. Manufacturer's Certificate: Certify products meet or exceed specified requirements.

F. Manufacturer’s Field Reports: Indicate results of inspection by manufacturer’s representative.

1.5 CLOSEOUT SUBMITTALS

A. Section 01700 - Contract Closeout.

B. Project Record Documents: Record actual locations of flexible pipe connectors, expansion joints, anchors, and guides.

C. Operation and Maintenance Data: Submit adjustment instructions.

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with State of Michigan standard.

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years experience.

B. Installer: Company specializing in performing Work of this section with minimum three years experience.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Section 01600 – Material and Equipment.

B. Accept expansion joints on site in factory packing with shipping bars and positioning devices intact. Inspect for damage.

C. Protect equipment from exposure by leaving factory coverings, pipe end protection, and packaging in place until installation.

1.9 WARRANTY

A. Section 00700 – General Conditions: 5. Warranties

22 05 16 - 3

1.10 EXTRA MATERIALS

A. Section 01650 – Facility Start-Up.

PART 2 PRODUCTS

2.1 FLEXIBLE PIPE CONNECTORS

A. Manufacturers:

1. NIBCO INC.

2. Tyco Fire and Building Products

3. Victaulic Company

4. Substitutions: Section 01300 - Submittals.

B. Steel Piping:

1. Inner Hose: Stainless Steel.

2. Exterior Sleeve: Double braided stainless steel.

3. Pressure Rating: 125 psig WSP and 450 degrees F.

4. Joint: As specified for pipe joints.

5. Size: Use pipe-sized units.

6. Maximum offset: 3/4 inch on each side of installed center line.

C. Copper Piping:

1. Inner Hose: Bronze.

2. Exterior Sleeve: Braided bronze.

3. Pressure Rating: 125 psig WSP and 450 degrees F.

4. Joint: As specified for pipe joints.

5. Size: Use pipe sized units.

6. Maximum offset: 3/4 inch on each side of installed center line.

2.2 EXPANSION JOINTS

A. Manufacturers:

1. NIBCO INC.

2. Tyco Fire and Building Products

3. Victaulic Company

4. Substitutions: Section 01300 - Submittals.

B. Stainless Steel Bellows Type:

1. Pressure Rating: 125 psig WSP and 400 degrees F.

2. Maximum Compression: 1-3/4 inch.

3. Maximum Extension: 1/4 inch.

4. Joint: As specified for pipe joints.

5. Size: Use pipe sized units.

6. Application: Steel piping 3 inch and smaller.

C. External Ring Controlled Stainless Steel Bellows Type:

1. Pressure Rating: 125 psig WSP and 400 degrees F.

DMVA - RENOVATE ARMORY - CALUMET

http://www.specagent.com/LookUp/?ulid=7929&mf=04&src=wd http://www.specagent.com/LookUp/?ulid=7929&mf=04&src=wd

22 05 16 - 4

2. Maximum Compression: 15/16 inch.

3. Maximum Extension: 5/16 inch.

4. Maximum Offset: 1/8 inch.

5. Joint: Flanged.

6. Size: Use pipe sized units.

7. Accessories: Internal flow liner.

8. Application: Steel piping 3 inch and larger.

D. Two-ply Bronze Bellows Type:

1. Construction: Bronze with anti-torque device, limit stops, internal guides.

2. Pressure Rating: 125 psig WSP and 400 degrees F.

3. Maximum Compression: 1-3/4 inch.

4. Maximum Extension: 1/4 inch.

5. Joint: As specified for pipe joints.

6. Size: Use pipe sized units.

7. Application: Copper piping.

E. Low Pressure Compensators with two-ply Bronze Bellows:

1. Working Pressure: 75 psig.

2. Maximum Temperatures: 250 degrees F.

3. Maximum Compression: 1/2 inch.

4. Maximum Extension: 5/32 inch.

5. Joint: Soldered.

6. Size: Use pipe sized units.

7. Application: Copper or steel piping 2 inch and smaller.

F. Copper with Packed Sliding Sleeve:

1. Maximum Temperature: 250 degrees F.

2. Joint: As specified for pipe joints.

3. Size: Use pipe sized units.

4. Copper or steel piping 2 inches and larger.

5. Application: Copper or steel piping 2 inch and larger.

2.3 ACCESSORIES

A. Manufacturers:

1. NIBCO INC.

2. Tyco Fire and Building Products

3. Victaulic Company

4. Substitutions: Section 01300 - Submittals.

B. Pipe Alignment Guides: Two piece welded steel with enamel paint, bolted, with spider to fit standard pipe, frame with four mounting holes, clearance for minimum 1 inch thick insulation, minimum 3 inch travel.

22 05 16 - 5

PART 3 EXECUTION

3.1 INSTALLATION

A. Install flexible pipe connectors on pipes connected to equipment supported by vibration isolation.

Provide line size flexible connectors.

B. Install flexible connectors at right angles to displacement. Install one end immediately adjacent to isolated equipment and anchor other end. Install in horizontal plane unless indicated otherwise.

C. Rigidly anchor pipe to building structure. Provide pipe guides to direct movement only along axis of pipe. Erect piping so strain and weight is not on cast connections or apparatus.

D. Provide support and anchors for controlling expansion and contraction of piping. Provide loops, pipe offsets, and swing joints, or expansion joints where required. Refer to Section 22 05 29 for pipe hanger installation requirements.

E. Provide grooved piping systems with minimum one joint per inch pipe diameter instead of flexible connector supported by vibration isolation. Grooved piping systems need not be anchored.

3.2 MANUFACTURER'S FIELD SERVICES

A. Section 01400 – Quality Control.

B. Furnish inspection services by flexible pipe manufacturer's representative for final installation and certify installation is in accordance with manufacturer's recommendations and connectors are performing satisfactorily.

Hangers and Supports for Plumbing Piping and Equipment

22 05 29 - 1

SECTION 22 05 29

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Pipe hangers and supports.

2. Hanger rods.

3. Flashing.

4. Sleeves.

5. Mechanical sleeve seals.

6. Equipment bases and supports.

1.2 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Submittal procedures.

B. Shop Drawings: Indicate system layout with location including critical dimensions, sizes, and pipe hanger and support locations and detail of trapeze hangers.

C. Product Data:

1. Hangers and Supports: Submit manufacturers catalog data including load capacity.

2. Firestopping: Submit data on product characteristics, performance and limitation criteria.

D. Manufacturer's Installation Instructions:

1. Hangers and Supports: Submit special procedures and assembly of components.

E. Manufacturer's Certificate: Certify products meet or exceed specified requirements.

1.3 QUALITY ASSURANCE

A. Perform Work in accordance with applicable authority for welding hanger and support attachments to building structure.

B. Perform Work in accordance with State of Michigan standard.

1.4 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing Products specified in this section with minimum three years experience.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Section 01 60 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

22 05 29 - 2

B. Accept materials on site in original factory packaging, labeled with manufacturer's identification.

C. Protect from weather and construction traffic, dirt, water, chemical, and damage, by storing in original packaging.

1.6 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.7 WARRANTY

A. Section 01 70 00 - Execution and Closeout Requirements: Product warranties and product bonds.

PART 2 PRODUCTS

2.1 PIPE HANGERS AND SUPPORTS

A. Manufacturers:

1. Globe Pipe Hanger Products Inc.

2. Michigan Hanger Co.

3. Substitutions: Section 01 60 00 - Product Requirements.

B. Plumbing Piping - DWV:

1. Hangers for Pipe Sizes 1/2 to 1-1/2 inch: Malleable iron, adjustable swivel, split ring.

2. Hangers for Pipe Sizes 2 inches and Larger: Carbon steel, adjustable, clevis.

3. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods.

4. Wall Support for Pipe Sizes 3 inches and Smaller: Cast iron hook.

5. Wall Support for Pipe Sizes 4 inches and Larger: Welded steel bracket and wrought steel clamp.

6. Vertical Support: Steel riser clamp.

7. Floor Support: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.

8. Copper Pipe Support: Copper-plated, carbon-steel adjustable, ring.

C. Plumbing Piping - Water:

1. Hangers for Pipe Sizes 1/2 to 1-1/2 inch: Malleable iron, adjustable swivel, split ring.

2. Hangers for Cold Pipe Sizes 2 inches and Larger: Carbon steel, adjustable, clevis.

3. Hangers for Hot Pipe Sizes 2 to 4 inches: Carbon steel, adjustable, clevis.

4. Hangers for Hot Pipe Sizes 6 inches and Larger: Adjustable steel yoke, cast iron roll, double hanger.

5. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods.

6. Multiple or Trapeze Hangers for Hot Pipe Sizes 6 inches and Larger: Steel channels with welded spacers and hanger rods, cast iron roll.

7. Wall Support for Pipe Sizes 3 inches and Smaller: Cast iron hook.

8. Wall Support for Pipe Sizes 4 inches and Larger: Welded steel bracket and wrought steel clamp.

9. Wall Support for Hot Pipe Sizes 6 inches and Larger: Welded steel bracket and wrought steel clamp with adjustable steel yoke and cast iron roll.

22 05 29 - 3

10. Vertical Support: Steel riser clamp.

11. Floor Support for Cold Pipe: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.

12. Floor Support for Hot Pipe Sizes 4 inches and Smaller: Cast iron adjustable pipe saddle, lock nut, nipple, floor flange, and concrete pier or steel support.

13. Floor Support for Hot Pipe Sizes 6 inches and Larger: Adjustable cast iron roll and stand, steel screws, and concrete pier or steel support.

14. Copper Pipe Support: Copper-plated, Carbon-steel ring.

2.2 ACCESSORIES

A. Hanger Rods: Mild steel threaded both ends, threaded on one end, or continuous threaded.

2.3 FLASHING

A. Metal Flashing: 26 gage thick galvanized steel.

B. Metal Counterflashing: 22 gage thick galvanized steel.

C. Lead Flashing:

1. Waterproofing: 5 lb./sq. ft sheet lead.

2. Soundproofing: 1 lb./sq. ft sheet lead.

D. Flexible Flashing: 47 mil thick sheet compatible with roofing.

E. Caps: Steel, 22 gage minimum; 16 gage at fire resistant elements.

2.4 SLEEVES

A. Sleeves for Pipes Through Non-fire Rated Floors: 18 gage thick galvanized steel.

B. Sleeves for Pipes Through Non-fire Rated Beams, Walls, Footings, and Potentially Wet Floors:

Steel pipe or 18 gage thick galvanized steel.

C. Sealant: Acrylic.

2.5 MECHANICAL SLEEVE SEALS

1. Link Seal

2. Substitutions: Section 01 60 00 - Product Requirements.

B. Product Description: Modular mechanical type, consisting of interlocking synthetic rubber links shaped to continuously fill annular space between object and sleeve, connected with bolts and pressure plates causing rubber sealing elements to expand when tightened, providing watertight seal and electrical insulation.

22 05 29 - 4

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Verification of existing conditions before starting work.

B. Verify openings are ready to receive sleeves.

C. Verify openings are ready to receive firestopping.

3.2 PREPARATION

A. Obtain permission from Architect/Engineer before using powder-actuated anchors.

B. Do not drill or cut structural members.

3.3 INSTALLATION - INSERTS

A. Install inserts for placement in concrete forms.

B. Install inserts for suspending hangers from reinforced concrete slabs and sides of reinforced concrete beams.

C. Provide hooked rod to concrete reinforcement section for inserts carrying pipe 4 inches and larger.

D. Where concrete slabs form finished ceiling, locate inserts flush with slab surface.

3.4 INSTALLATION - PIPE HANGERS AND SUPPORTS

A. Support horizontal piping as scheduled.

B. Install hangers with minimum 1/2 inch space between finished covering and adjacent work.

C. Place hangers within 12 inches of each horizontal elbow.

D. Use hangers with 1-1/2 inch minimum vertical adjustment.

E. Support horizontal cast iron pipe adjacent to each hub, with 5 feet maximum spacing between hangers.

F. Support vertical piping at every floor. Support vertical cast iron pipe at each floor at hub.

G. Where piping is installed in parallel and at same elevation, provide multiple pipe or trapeze hangers.

H. Support riser piping independently of connected horizontal piping.

I. Provide copper plated hangers and supports for copper piping.

22 05 29 - 5

J. Design hangers for pipe movement without disengagement of supported pipe.

K. Provide clearance in hangers and from structure and other equipment for installation of insulation.

Refer to Section 22 07 00.

3.5 INSTALLATION - EQUIPMENT BASES AND SUPPORTS

A. Using templates furnished with equipment, install anchor bolts, and accessories for mounting and anchoring equipment.

B. Provide rigid anchors for pipes after vibration isolation components are installed.

3.6 INSTALLATION - FLASHING

A. Provide flexible flashing and metal counterflashing where piping penetrates weather or waterproofed walls, floors, and roofs.

B. Flash vent and soil pipes projecting 3 inches minimum above finished roof surface with lead worked 1 inch minimum into hub, 8 inches minimum clear on sides with 24 x 24 inches sheet size. For pipes through outside walls, turn flanges back into wall and caulk, metal counter-flash, and seal.

C. Flash floor drains in floors with topping over finished areas with lead, 10 inches clear on sides with minimum 36 x 36 inch sheet size. Fasten flashing to drain clamp device.

D. Seal floor drains, shower drains, and mop sink drains watertight to adjacent materials.

E. Adjust storm collars tight to pipe with bolts; caulk around top edge. Use storm collars above roof jacks. Screw vertical flange section to face of curb.

3.7 INSTALLATION - SLEEVES

A. Exterior watertight entries: Seal with mechanical sleeve seals.

B. Set sleeves in position in forms. Provide reinforcing around sleeves.

C. Size sleeves large enough to allow for movement due to expansion and contraction. Provide for continuous insulation wrapping.

D. Extend sleeves through floors 1 inch above finished floor level. Caulk sleeves.

E. Install chrome plated steel escutcheons at finished surfaces.

3.8 PROTECTION OF FINISHED WORK

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for protecting finished

Work.

B. Protect adjacent surfaces from damage by material installation.

22 05 29 - 6

3.9 SCHEDULES

PIPE HANGER SPACING

PIPE MATERIAL MAXIMUM

HANGER SPACING

Feet

HANGER ROD

DIAMETER

Inches

ABS (All sizes) 4 3/8

Aluminum (All sizes) 10 1/2

Brass

Cast Iron (All Sizes) 5 5/8

Cast Iron (All Sizes) with 10 foot length of pipe 10 5/8

CPVC, 1 inch and smaller 3 1/2

CPVC, 1-1/4 inches and larger 4 1/2

Copper Tube, 1-1/4 inches and smaller 6 1/2

Copper Tube, 1-1/2 inches and larger 10 1/2

Fiberglass 4 1/2

Glass 8 1/2

Polybutylene 2.67 3/8

Polypropylene 4 3/8

PVC (All Sizes) 4 3/8

Steel, 3 inches and smaller 12 1/2

Steel, 4 inches and larger 12 5/8

Identification for Plumbing Piping and Equipment

22 05 53 - 1

SECTION 22 05 53

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Nameplates.

2. Tags.

3. Stencils.

4. Pipe markers.

5. Ceiling tacks.

6. Labels.

B. Related Sections:

1. Section 09 90 00 - Painting and Coating: Execution requirements for painting specified by this section.

1.2 REFERENCES

A. American Society of Mechanical Engineers:

1. ASME A13.1 - Scheme for the Identification of Piping Systems.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Submittal procedures.

B. Product Data: Submit manufacturers catalog literature for each product required.

C. Shop Drawings: Submit list of wording, symbols, letter size, and color coding for mechanical identification and valve chart and schedule, including valve tag number, location, function, and valve manufacturer's name and model number.

D. Manufacturer's Installation Instructions: Indicate installation instructions, special procedures, and installation.

E. Manufacturer's Certificate: Certify products meet or exceed specified requirements.

1.4 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Closeout procedures.

B. Project Record Documents: Record actual locations of tagged valves; include valve tag numbers.

22 05 53 - 2

1.5 QUALITY ASSURANCE

A. Conform to NFPA 99 requirements for labeling and identification of medical gas piping systems and accessories.

B. Conform to ASME A13.1 for color scheme for identification of piping systems and accessories.

1.6 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years experience.

B. Installer: Company specializing in performing Work of this section with minimum three years experience.

1.7 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

PART 2 PRODUCTS

2.1 NAMEPLATES

A. Manufacturers:

1. Craftmark Identification Systems.

2. Safety Sign Co.

3. Seton Identification Products.

4. Substitutions: Section 01 60 00 - Product Requirements

B. Product Description: Laminated three-layer plastic with engraved black letters on light contrasting background color.

2.2 TAGS

A. Plastic Tags:

1. Laminated three-layer plastic with engraved black letters on light contrasting background color. Tag size minimum 1-1/2 inches diameter.

B. Metal Tags:

1. Brass with stamped letters; tag size minimum 1-1/2 inches diameter with finished edges.

C. Information Tags:

1. Clear plastic with printed "Danger," "Caution," or "Warning" and message; size 3-1/4 x 5-

5/8 inches with grommet and self-locking nylon ties.

D. Tag Chart: Typewritten letter size list of applied tags and location.

22 05 53 - 3

2.3 STENCILS

A. Stencils: With clean cut symbols and letters of following size:

1. Up to 2 inches Outside Diameter of Insulation or Pipe: 1/2 inch high letters.

2. 2-1/2 to 6 inches Outside Diameter of Insulation or Pipe: 1-inch high letters.

3. Over 6 inches Outside Diameter of Insulation or Pipe: 1-3/4 inches high letters.

4. Ductwork and Equipment: 1-3/4 inches high letters.

B. Stencil Paint: As specified in Section 09 90 00, semi-gloss enamel, colors and lettering size conforming to ASME A13.1.

2.4 PIPE MARKERS

A. Color and Lettering: Conform to ASME A13.1.

B. Plastic Pipe Markers:

1. Factory fabricated, flexible, semi-rigid plastic, preformed to fit around pipe or pipe covering.

Larger sizes may have maximum sheet size with spring fastener.

C. Plastic Tape Pipe Markers:

1. Flexible, vinyl film tape with pressure sensitive adhesive backing and printed markings.

D. Plastic Underground Pipe Markers:

1. Bright colored continuously printed plastic ribbon tape, minimum 6 inches wide by 4 mil thick, manufactured for direct burial service.

E. Pipe Label Color Scheme

1. Equipment Drains

a. Background: Brown

b. Letter Colors: White

2. Domestic Water Piping (Cold):

a. Background: Safety green

b. Letter Colors: White

3. Domestic Water Piping (Hot Water Supply)

a. Background: Orange

b. Letter Colors: White

4. Domestic Water Piping (How Water Return):

a. Background: Safety green

b. Letter Colors: White

5. Sanitary Waste Piping:

a. Background: Brown

b. Letter Colors: White

F. Directional flow arrows on all labels.

2.5 CEILING TACKS

A. Description: Steel with 3/4 inch diameter color-coded head.

22 05 53 - 4

B. Color code as follows:

1. HVAC equipment: Yellow.

2. Fire dampers/smoke dampers: Red.

3. Plumbing valves: Green.

4. Heating/cooling valves: Blue.

2.6 LABELS

A. Description: Aluminum or Laminated Mylar, size 1.9 x 0.75 inches, adhesive backed with printed identification.

2.7 LOCKOUT DEVICES

A. Lockout Hasps:

1. Anodized aluminum hasp with erasable label surface; size minimum 7-1/4 x 3 inches.

B. Valve Lockout Devices:

1. Steel device preventing access to valve operator, accepting lock shackle.

PART 3 EXECUTION

3.1 PREPARATION

A. Degrease and clean surfaces to receive adhesive for identification materials.

B. Prepare surfaces in accordance with Section 09 90 00 for stencil painting.

3.2 INSTALLATION

A. Apply stencil painting in accordance with Section 09 90 00.

B. Install identifying devices after completion of coverings and painting.

C. Install plastic nameplates with corrosive-resistant mechanical fasteners, or adhesive.

D. Install labels with sufficient adhesive for permanent adhesion and seal with clear lacquer. For unfinished canvas covering, apply paint primer before applying labels.

E. Install tags using corrosion resistant chain. Number tags consecutively by location.

F. Install underground plastic pipe markers 6 to 8 inches below finished grade, directly above buried pipe.

G. Install piping identification on medical gas systems. Refer to Section 22 60 13.

H. Identify water heaters, pumps, tanks, and water treatment devices with plastic nameplates.

Identify in-line pumps and other small devices with tags.

22 05 53 - 5

I. Identify control panels and major control components outside panels with plastic nameplates.

J. Identify valves in main and branch piping with tags.

K. Identify piping, concealed or exposed, with plastic tape pipe markers. Use tags on piping 3/4 inch diameter and smaller. Identify service, flow direction, and pressure. Install in clear view and align with axis of piping. Locate identification not to exceed 20 feet on straight runs including risers and drops, adjacent to each valve and tee, at each side of penetration of structure or enclosure, and at each obstruction.

L. Provide ceiling tacks to locate valves above T-bar type panel ceilings. Locate in corner of panel closest to equipment.

Plumbing Insulation

22 07 00 - 1

SECTION 22 07 00

PLUMBING INSULATION

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Plumbing piping insulation, jackets and accessories.

B. Related Sections:

1. Section 07 84 00 - Firestopping: Product requirements for firestopping for placement by this section.

2. Section 09 90 00 - Painting and Coating: Execution requirements for painting insulation jackets and covering specified by this section.

1.2 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Submittal procedures.

B. Product Data: Submit product description, thermal characteristics and list of materials and thickness for each service, and location.

C. Manufacturer's Installation Instructions: Submit manufacturers published literature indicating proper installation procedures.

D. Manufacturer's Certificate: Certify products meet or exceed specified requirements.

1.3 QUALITY ASSURANCE

A. Pipe insulation manufactured in accordance with ASTM C585 for inner and outer diameters.

B. Factory fabricated fitting covers manufactured in accordance with ASTM C450.

1.4 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years experience.

B. Applicator: Company specializing in performing Work of this section with minimum three years experience.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Section 01 60 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

22 07 00 - 2

B. Accept materials on site in original factory packaging, labeled with manufacturer's identification, including product density and thickness.

C. Protect insulation from weather and construction traffic, dirt, water, chemical, and damage, by storing in original wrapping.

1.6 ENVIRONMENTAL REQUIREMENTS

A. Section 01 60 00 - Product Requirements: Environmental conditions affecting products on site.

B. Install insulation only when ambient temperature and humidity conditions are within range recommended by manufacturer.

C. Maintain temperature before, during, and after installation for minimum period of 24 hours.

1.7 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.8 WARRANTY

A. Section 01 70 00 - Execution and Closeout Requirements: Product warranties and product bonds.

PART 2 PRODUCTS

2.1 MANUFACTURER

A. Manufacturers; Glass Fiber and Mineral Fiber Insulation:

1. CertainTeed.

2. Knauf.

3. Johns Manville.

4. Owens-Corning.

Substitutions: Section 01 60 00 - Product Requirements.

B. Manufacturers; Closed Cell Elastomeric Insulation:

1. CertainTeed.

2. Knauf.

3. Johns Manville.

4. Owens-Corning.

Substitutions: Section 01 60 00 - Product Requirements.

C. Manufacturers; Polyisocyanurate Foam Insulation:

1. CertainTeed.

2. Knauf.

3. Johns Manville.

4. Owens-Corning.

5. Substitutions: Section 01 60 00 - Product Requirements.

DMVA - RENOVATE ARMORY - CALUMET

http://www.specagent.com/LookUp/?ulid=8001&mf=04&src=wd http://www.specagent.com/LookUp/?ulid=8002&mf=04&src=wd http://www.specagent.com/LookUp/?ulid=8003&mf=04&src=wd

22 07 00 - 3

D. Manufacturers; Extruded Polystyrene Insulation:

1. CertainTeed.

2. Knauf.

3. Johns Manville.

4. Owens-Corning.

5. Substitutions: Section 01 60 00 - Product Requirements.

2.2 PIPE INSULATION

1. See insulation schedule on plumbing drawings for insulation specifications.

2.3 PIPE INSULATION JACKETS

A. Vapor Retarder Jacket:

1. ASTM C921, white Kraft paper with glass fiber yarn, bonded to aluminized film.

2. Water Vapor Permeance: ASTM E96/E96M; 0.02 perms.

B. PVC Plastic Pipe Jacket:

1. Product Description: ASTM D1785, One piece molded type fitting covers and sheet material, off-white color.

2. Thickness: 10 mil.

3. Connections: Pressure sensitive color matching vinyl tape.

2.4 PIPE INSULATION ACCESSORIES

A. Vapor Retarder Lap Adhesive: Compatible with insulation.

B. Covering Adhesive Mastic: Compatible with insulation.

C. Piping 1-1/2 inches diameter and smaller: Galvanized steel insulation protection shield. MSS SP-

69, Type 40. Length: Based on pipe size and insulation thickness.

D. Piping 2 inches diameter and larger: Wood insulation saddle, hard maple. Inserts length: not less than 6 inches long, matching thickness and contour of adjoining insulation.

E. Closed Cell Elastomeric Insulation Pipe Hanger: Polyurethane insert with aluminum single piece construction with self adhesive closure. Thickness to match pipe insulation.

F. Tie Wire: 0.048 inch stainless steel with twisted ends on maximum 12 inch centers.

G. Mineral Fiber Hydraulic-Setting Thermal Insulating and Finishing Cement: ASTM C449/C449M.

H. Insulating Cement: ASTM C195; hydraulic setting on mineral wool.

I. Adhesives: Compatible with insulation.

http://www.specagent.com/LookUp/?ulid=8004&mf=04&src=wd

22 07 00 - 4

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions.

B. Verify piping has been tested before applying insulation materials.

C. Verify surfaces are clean and dry, with foreign material removed.

3.2 INSTALLATION - PIPING SYSTEMS

A. All piping shall be insulated in accordance with insulation schedules on drawings.

B. Piping Exposed to View in Finished Spaces: Locate insulation and cover seams in least visible locations.

C. Continue insulation through penetrations of building assemblies or portions of assemblies having fire resistance rating of one hour or less. Provide intumescent firestopping when continuing insulation through assembly. Finish at supports, protrusions, and interruptions. Refer to Section

07 84 00 for penetrations of assemblies with fire resistance rating greater than one hour.

D. Piping Systems Conveying Fluids Below Ambient Temperature:

1. Insulate entire system including fittings, valves, unions, flanges, strainers, flexible connections, and expansion joints.

2. Furnish factory-applied or field-applied vapor retarder jackets. Secure factory-applied jackets with pressure sensitive adhesive self-sealing longitudinal laps and butt strips. Secure field-applied jackets with outward clinch expanding staples and seal staple penetrations with vapor retarder mastic.

3. Insulate fittings, joints, and valves with molded insulation of like material and thickness as adjacent pipe. Finish with glass cloth and vapor retarder adhesive or PVC fitting covers.

E. Glass Fiber Board Insulation:

1. Apply insulation close to equipment by grooving, scoring, and beveling insulation. Fasten insulation to equipment with studs, pins, clips, adhesive, wires, or bands.

2. Fill joints, cracks, seams, and depressions with bedding compound to form smooth surface.

On cold equipment, use vapor retarder cement.

3. Cover wire mesh or bands with cement to a thickness to remove surface irregularities.

F. Hot Piping Systems less than 140 degrees F:

1. Furnish factory-applied or field-applied standard jackets. Secure with outward clinch expanding staples or pressure sensitive adhesive system on standard factory-applied jacket and butt strips or both.

2. Insulate fittings, joints, and valves with insulation of like material and thickness as adjoining pipe. Finish with glass cloth and adhesive or PVC fitting covers.

3. Do not insulate unions and flanges at equipment, but bevel and seal ends of insulation at such locations.

G. Hot Piping Systems greater than 140 degrees F:

22 07 00 - 5

1. Furnish factory-applied or field-applied standard jackets. Secure with outward clinch expanding staples or pressure sensitive adhesive system on standard factory-applied jacket and butt strips or both.

2. Insulate fittings, joints, and valves with insulation of like material and thickness as adjoining pipe. Finish with glass cloth and adhesive or PVC fitting covers.

3. Insulate flanges and unions at equipment.

H. Inserts and Shields:

1. Piping 1-1/2 inches Diameter and Smaller: Install galvanized steel shield between pipe hanger and insulation.

2. Piping 2 inches Diameter and Larger: Install insert between support shield and piping and under finish jacket.

a. Insert Configuration: Minimum 6 inches long, of thickness and contour matching adjoining insulation; may be factory fabricated.

b. Insert Material: Compression resistant insulating material suitable for planned temperature range and service.

3. Piping Supported by Roller Type Pipe Hangers: Install galvanized steel shield between roller and inserts.

I. Insulation Terminating Points:

1. Coil Branch Piping 1 inch and Smaller: Terminate hot water piping at union upstream of the coil control valve.

2. Chilled Water Coil Branch Piping: Insulate chilled water piping and associated components up to coil connection.

3. Condensate Piping: Insulate entire piping system and components to prevent condensation.

J. Closed Cell Elastomeric Insulation:

1. Push insulation on to piping.

2. Miter joints at elbows.

3. Seal seams and butt joints with manufacturer’s recommended adhesive.

4. When application requires multiple layers, apply with joints staggered.

5. Insulate fittings and valves with insulation of like material and thickness as adjacent pipe.

K. High Temperature Pipe Insulation:

1. Install in multiple layers to meet thickness scheduled.

2. Attach each layer with bands. Secure first layer with bands before installing next layer.

3. Stagger joints between layers.

4. Finish with canvas jacket.

L. Pipe Exposed in Mechanical Equipment Rooms or Finished Spaces (less than 10 feet above finished floor): Finish with canvas jacket sized for finish painting.

M. Piping Exterior to Building: Provide vapor retarder jacket. Insulate fittings, joints, and valves with insulation of like material and thickness as adjoining pipe, and finish with glass mesh reinforced vapor retarder cement. Cover with aluminum jacket with seams located at 3 or 9 o’clock position on side of horizontal piping with overlap facing down to shed water or on bottom side of horizontal piping.

22 07 00 - 6

N. Buried Piping: Insulate only where insulation manufacturer recommends insulation product may be installed in trench, tunnel or direct buried. Install factory fabricated assembly with inner all-purpose service jacket with self-sealing lap, and asphalt impregnated open mesh glass fabric, with

1 mil thick aluminum foil sandwiched between three layers of bituminous compound; outer surface faced with polyester film.

O. Prepare pipe insulation for finish painting. Refer to Section 09 90 00.

3.3 SCHEDULES

A. Water Supply Services Piping Insulation Schedule: See Piping Insulation Schedule on drawings.

Facility Water Distribution

22 11 00 - 1

SECTION 22 11 00

FACILITY WATER DISTRIBUTION

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Domestic water piping, above grade.

2. Unions and flanges.

3. Valves.

4. Pressure gages.

5. Pressure gage taps.

6. Thermometers.

7. Relief valves.

8. Water hammer arrestors.

9. Thermostatic mixing valves.

10. Pressure balanced mixing valves.

11. In-line circulator pumps.

B. Related Sections:

1. Section 22 05 29 - Hangers and Supports for Plumbing Piping and Equipment: Product requirements for pipe hangers and supports and firestopping for placement by this section.

2. Section 22 05 53 - Identification for Plumbing Piping and Equipment: Product requirements for pipe identification and valve tags for placement by this section.

3. Section 22 07 00 - Plumbing Insulation: Product and execution requirements for pipe insulation.

1.2 REFERENCES

A. American National Standards Institute:

1. ANSI Z21.22 - Relief Valves for Hot Water Supply Systems.

B. American Society of Mechanical Engineers:

1. ASME B16.18 - Cast Copper Alloy Solder Joint Pressure Fittings.

2. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings.

3. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes.

4. ASME B31.9 - Building Services Piping.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Submittal procedures.

B. Product Data:

1. Piping: Submit data on pipe materials, fittings, and accessories. Submit manufacturer's catalog information.

22 11 00 - 2

1.4 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Closeout procedures.

1.5 QUALIFICATIONS

A. Installer: Company specializing in performing Work of this section with minimum three years experience.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Section 01 60 00 - Product Requirements: Product storage and handling requirements.

B. Accept valves and equipment on site in shipping containers with labeling in place. Inspect for damage.

C. Provide temporary end caps and closures on piping and fittings. Maintain in place until installation.

D. Protect piping systems from entry of foreign materials by temporary covers, completing sections of the Work, and isolating parts of completed system.

1.7 ENVIRONMENTAL REQUIREMENTS

A. Section 01 60 00 - Product Requirements.

B. Do not install underground piping when bedding is wet or frozen.

1.8 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.9 WARRANTY

A. Section 01 70 00 - Execution and Closeout Requirements: Product warranties and product bonds.

PART 2 PRODUCTS

2.1 DOMESTIC WATER PIPING, ABOVE GRADE

A. Copper Tubing: ASTM B88, Type L, drawn.

1. Fittings: ASME B16.18, cast copper alloy or ASME B16.22, wrought copper and bronze.

2. Joints: ASTM B32, Alloy Grade Sb5 tin-antimony, or Alloy Grade Sn95 tin-silver, solder

AWS A5.8 Classification BCuP-3 or BCuP-4 silver braze.

2.2 UNIONS AND FLANGES

A. Unions for Pipe 2 inches and Smaller:

22 11 00 - 3

1. Ferrous Piping: Class 150, malleable iron, threaded.

2. Copper Piping: Class 150, bronze unions with soldered.

3. Dielectric Connections: Union with galvanized or plated steel threaded end, copper solder end, water impervious isolation barrier.

B. Flanges for Pipe 2-1/2 inches and Larger:

1. Ferrous Piping: Class 150, forged steel, slip-on flanges.

2. Copper Piping: Class 150, slip-on bronze flanges.

3. Gaskets: 1/16 inch thick preformed neoprene gaskets.

2.3 GATE VALVES

A. Manufacturers:

1. Milwaukee Valve Company

2. NIBCO, Inc.

3. Substitutions: Section 01 60 00 - Product Requirements.

B. 2 inches and Smaller: MSS SP 80, Class 125, bronze body, bronze trim, threaded bonnet, rising stem, inside screw with back-seating stem, solid wedge disc, alloy seat rings, solder or threaded ends.

C. 2-1/2 inches and Larger: MSS SP 70, Class 125, cast iron body, bronze trim, bolted bonnet, rising stem, hand-wheel, outside screw and yoke, solid wedge disc with bronze seat rings, flanged ends.