About this file
This document is a set of plans and specifications for a state and local contract opportunity to renovate the Calumet Armory in Calumet, Michigan, issued by the Michigan Department of Military and Veterans Affairs (DMVA) and the Michigan Department of Technology, Management and Budget (DTMB).
The project involves renovations to the existing armory, including work in the maintenance bay, arms vaults, communication room, unit storage, supply area, locker rooms, and other spaces. The project has a completion date of March 27, 2024. Bidders must submit questions via email, and proposals must be uploaded to the SIGMA VSS system by the due date. The state reserves the right to salvage any demolished fixtures. Pricing terms, funding sources, and other commercial details are not provided in the document.
Text of this file
MAINTENANCE
BAY
PLATOON 1
EXTG ARMS
VAULT
125A
NBC
COMM
UNIT
STORAGE
ARMS
VAULT
ADDITION
125B
SUPPLY
SGT
JANITOR
114B
LOCKERS
113B
MEN'S
SHOWERS
113A
MEN
WOMEN'S
WOMEN'S
SHOWERS /
LOCKERS
114A
TOILET
1 REMOVE EXISTING SPRINKLER HEADS AND PIPING AS
REQUIRED IN THIS SPACE. ALL UNUSED BRANCH PIPING
SHALL BE REMOVED AND CAPPED AT MAIN. REMOVE
ALL UNUSED ASSOCIATED SUPPORTS.
KEYNOTES
2 REMOVE EXISTING FIRE SPRINKLER DRAIN, PIPING TO
THE CEILING, AND ASSOCIATED SUPPORTS.
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
1S T
FL
O
O R
E X
IS
TI
N G
F
IR
E P
R O
TE
C
TI
O
N P
LA
N
FP
D
M
-0
1/8" = 1'-0"1
EXISTING 1ST FLOOR FIRE PROTECTION PLAN
NORTH
GENERAL DEMO NOTE: THE STATE RESERVES THE RIGHT TO SALVAGE ANY DEMOED FIXTURES.
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
FI
R
E S
P R
IN
K
LE
R
A S
-B U
IL
T
D R
A W
IN
G
S (F
O R
R E
FE
R
E N
C E
FP
M
-0
THIS SHEET IS FOR INFORMATIONAL PURPOSES ONLY. ALL CONDITIONS MUST BE VERIFIED BY THE CONTRACTOR. DRAWING IS NOT TO SCALE.
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
FI
R
E S
P R
IN
K
LE
R
A S
-B U
IL
T
D R
A W
IN
G
S (F
O R
R E
FE
R
E N
C E
FP
M
-0
THIS SHEET IS FOR INFORMATIONAL PURPOSES ONLY. ALL CONDITIONS MUST BE VERIFIED BY THE CONTRACTOR. DRAWING IS NOT TO SCALE.
T
LACTATION
ROOM
WOMEN'S
WOMEN'S
SHOWERS /
LOCKERS
114A
JANITOR
114B
LOCKERS
113B
UNISEX
SHOWER
119C
UNISEX
SHOWER
119B
MEN'S
SHOWERS
113A
MEN
TOILET
SUPPLY
SGT
COMM
NBC
PLATOON 1
UNIT
STORAGE
EXTG ARMS
VAULT
125A
ARMS
VAULT
ADDITION
125B
MAINTENANCE
BAY
PLATOON 2
126D
PLATOON 3
126E
INSPECTION
& LIBRARY
126F
SUPPLY
ROOM
126G
TOOL
ROOM
126H
BATTERY
ROOM
126J
1 1
1 PROVIDE FULL FIRE SPRINKLER COVERAGE IN ALL AREAS AS INDICATED.
KEYNOTES
CLASSIFICATIONS
LIGHT HAZARD AS DEFINED IN NFPA 13:
OCCUPANCIES OR PORTIONS OF OTHER OCCUPANCIES WHERE THE QUANTITY
AND/OR COMBUSTIBILITY OF CONTENTS IS LOW, AND FIRE WITH RELATIVELY
LOW RATES OF HEAT RELEASE ARE EXPECTED.
ORDINARY HAZARD GROUP 1 AS DEFINED IN NFPA 13:
OCCUPANCIES OR PORTIONS OF OTHER OCCUPANCIES WHERE THE QUANTITY
AND/OR COMBUSTIBILITY OF CONTENTS IS LOW, QUANTITY OF COMBUSTIBLES
IS MODERATE, STOCKPILES OF COMBUSTIBLES DO NOT EXCEED 8 FT., AND
FIRES WITH MODERATE RATES OF HEAT ARE EXPECTED.
GENERAL FIRE PROTECTION NOTES:
1. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN OF A
COMPLETE FIRE SUPPRESSION SYSTEM IN COMPLIANCE WITH NFPA13.
2. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE ALL FIRE
PROTECTION PLANS AND HYDRAULIC CALCULATIONS ARE SUBMITTED AND APPROVED BY THE
AUTHORITY HAVING JURISDICTION.
3. THE FIRE PROTECTION CONTRACTOR SHALL COORDINATE WITH THE LOCAL WATER SERVICE
PROVIDER TO OBTAIN HYDRANT FLOW TESTS REQUIRED FOR DESIGN OF THE SYSTEM.
EXTRA HAZARD GROUP 1 AS DEFINED IN NFPA 13:
OCCUPANCIES OR PORTIONS OF OTHER OCCUPANCIES WHERE THE QUANTITY
AND COMBUSTIBILITY OF CONTENTS ARE VERY HIGH AND DUST, LINT, OR OTHER
MATERIALS ARE PRESENT, INTRODUCING THE PROBABILITY OF RAPIDLY
DEVELOPING FIRES WITH HIGH RATES OF HEAT RELEASE BUT WITH LITTLE OR NO
COMBUSTIBLE OR FLAMMABLE LIQUIDS.
2 NEW SPRINKLER DRAIN. EXTEND PIPING AS REQUIRED.
P L
U R
I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
1S T
FL
O
O R
P R
O P
O S
E D
F
IR
E P
R O
TE
C
TI
O
N P
LA
N
FP
M
-0
3/32" = 1'-0"1
PROPOSED 1ST FLOOR FIRE PROTECTION PLAN
STM
STM
PLUMBING PIPING MECHANICAL PIPING
DUCTWORK
CDS
CDR
CHWS
CHWR
CDS
CDR
CHWR
CHWS
AIR
ST
G
G
AIR
HWR
HWR
HWS
HWS
FP
FP
C
C
ST
V
V
SAN
HWC
SAN
EA24x14
EA24x14
EA24x14
HW
CW
HWC
OA24x14
OA24x14
OA24x14
RA24x14
SA24x14
SA24x14
S D
SA24x14
RA24x14
RA24x14
CW
HW
STM
CDR
CDS
CHWR
CHWS
HWR
HWS
G
AIR
FP
C
ST
CW
V
SAN
HWC
HW
HYDRONIC HOT WATER SUPPLY - NEW
HYDRONIC HOT WATER SUPPLY - EXISTING
HYDRONIC HOT WATER SUPPLY - DEMO
HYDRONIC HOT WATER RETURN - NEW
HYDRONIC HOT WATER RETURN - EXISTING
HYDRONIC HOT WATER RETURN - DEMO
COMPRESSED AIR - NEW
COMPRESSED AIR - EXISTING
COMPRESSED AIR - DEMO
GAS - NEW
GAS - EXISTING
GAS - DEMO
DOMESTIC COLD WATER - EXISTING
DOMESTIC COLD WATER - DEMO
DOMESTIC COLD WATER - NEW
DOMESTIC HOT WATER - EXISTING
DOMESTIC HOT WATER - DEMO
DOMESTIC HOT WATER - NEW
DOMESTIC HOT WATER RECIRC - EXISTING
DOMESTIC HOT WATER RECIRC DEMO
DOMESTIC HOT WATER RECIRC - NEW
SANITARY - EXISTING
SANITARY - DEMO
SANITARY - NEW
VENT - EXISTING
VENT - DEMO
VENT - NEW
STORM - EXISTING
STORM - DEMO
STORM - NEW
CONDENSATE - EXISTING
CONDENSATE - DEMO
CONDENSATE - NEW
FIRE PROTECTION - EXISTING
FIRE PROTECTION - DEMO
FIRE PROTECTION - NEW
ABBREVIATIONS
PIPING "T"
PIPING 90
STRAINER
SYMBOL LEGEND
CAP
NOTES
INLINE PUMP
BALANCE VALVE
PRESSURE RELIEF VALVE
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
GLOBE VALVE
GATE VALVE
CHECK VALVE
CIRCUIT SETTER
BUTTERFLY VALVE
BALL VALVE
EXHAUST AIR DUCT DOWN
EXHAUST AIR DUCT UP
RETURN AIR DUCT DOWN
RETURN AIR DUCT UP
SUPPLY AIR DUCT DOWN
SUPPLY AIR DUCT UP
AIR FLOW
HUMIDISTAT - 60" A.F.F.
THERMOSTAT - 60" A.F.F.
DUCT SMOKE DETECTOR
MOTORIZED DAMPER
FIRE / SMOKE DAMPER
(RATING DETERMINED BY WALL TYPE)
VOLUME CONTROL DAMPER
SQUARE TO ROUND TRANSITION
RETURN OR EXHAUST REGISTER
SUPPLY REGISTER
RELIEF AIR HOOD - ROOF
FRESH AIR INTAKE HOOD - ROOF
EXHAUST FAN - ROOF
RETURN OR EXHAUST AIR GRILLE
LINEAR DIFFUSER
SUPPLY AIR DIFFUSER PIPE BREAK
PIPE DOWN
PIPE UP
CLEAN OUT
GAS METER
UNION
HOSE BIBB
ELECTRIC BELL
SIAMESE CONNECTION
BARE FIN TUBE ELEMENT
FIN TUBE ELEMENT WITH COVER
EXTERNALLY INSULATED DUCTWORK
INTERNALLY LINED DUCTWORK
SUPPLY AIR DUCT - EXISTING
SUPPLY AIR DUCT - DEMO
SUPPLY AIR DUCT - NEW
RETURN AIR DUCT - EXISTING
RETURN AIR DUCT - DEMO
RETURN AIR DUCT - NEW
OUTSIDE AIR DUCT - EXISTING
OUTSIDE AIR DUCT - DEMO
OUTSIDE AIR DUCT - NEW
EXHAUST AIR DUCT - EXISTING
EXHAUST AIR DUCT - DEMO
EXHAUST AIR DUCT - NEW
CONDENSOR WATER SUPPLY
CONDENSOR WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSOR WATER SUPPLY - DEMO
CONDENSOR WATER SUPPLY - EXIST
CONDENSOR WATER RETURN - DEMO
CONDENSOR WATER RETURN - EXIST
CHILLED WATER SUPPLY - DEMO
CHILLED WATER SUPPLY - EXIST
CHILLED WATER RETURN - DEMO
CHILLED WATER RETURN - EXIST
METER
STEAM - NEW
STEAM - EXISTING
STEAM - DEMO
CONNECTION TO EXISTING
ACCU AIR COOLED CONDENSING UNIT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
AS AIR SEPERATOR
B BOILER
BB BASEBOARD
BC BOOSTER COIL
BDD BACKDRAFT DAMPER
BFG BELOW FINISHED GRADE
BFP BACKFLOW PREVENTER
BHP BRAKE HORSE POWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BT BATH TUB
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
C CONVECTOR
CA COMPRESSED AIR
CB CATCH BASIN
CC COOLING COIL
CCF 100 CUBIC FEET
CD CEILING DIFFUSER
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFP CLEAN OUT FERRULE AND PLUG
CH CHILLER
CI CAST IRON
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEAN OUT
CO CARBON MONOXIDE
COND CONDENSATE
CO2 CARBON DIOXIDE
CT COOLING TOWER
CU CONDENSING UNIT
CU FT CUBIC FOOT
CUH CABINET UNIT HEATER
CW COLD WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DIFFUSER
DB DRY BULB
DEG F DEGREE FAHRENHEIT
DF DRINKING FOUNTAIN
DI DIGITAL INPUT
DIA DIAMETER
DN DOWN
DO DIGITAL OUTPUT
DWV DRAIN, WASTE AND VENT
EA EACH
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EG EXHAUST AIR GRILLE
ELEV ELEVATION
ER EXHAUST AIR REGISTER
EUH ELECTRIC UNIT HEATER
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
EXH EXHAUST
F FURNACE
FAI FRESH AIR INTAKE
FBO FURNISHED BY OTHERS
FC FAN COIL
FD FLOOR DRAIN
FD FIRE DAMPER
FIN FIN TUBE RADIATION
FLG FLANGE
FP FIRE PROTECTION
FPM FEET PER MINUTE
FT FOOT OR FEET
F&T FLOAT AND THERMOSTATIC TRAP
G GAS (NATURAL)
GAL GALLON
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GT GREASE TRAP
H HYDROGEN
HB HOSE BIBB
HC HEATING COIL
HCO HORIZONTAL CLEANOUT
HP HORSE POWER
HTR HEATER
HVAC HEATING, VENTILATING & AIR COND
HW HOT WATER
HWC HOT WATER RECIRCULATING
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
IE INVERT ELEVATION
IF INLINE FAN
IN INCH OR INCHES
IP IRON PIPE
INV INVERT
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
JC JANITOR'S CLOSET
JS JANITOR'S SINK
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LBS POUNDS
LHWR LOW TEMPERATURE HOT WATER
RETURN
LHWS LOW TEMPERATURE HOT WATER
SUPPLY
LIQ LIQUID (REFRIGERATION)
LV LOUVER
LP PROPANE GAS (LIQUID)
LWT LEAVING WATER TEMPERATURE
M METER
MAU MAKE-UP AIR HANDLING UNIT
MAX MAXIMUM
MB MOP BASIN
MBH BRITISH THERMAL UNITS (1000)
MBTUH BRITISH THERMAL UNITS (1000)
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MECH MECHANICAL
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT
PROTECTION
OA OUTDOOR AIR
OAI OUTDOOR AIR INTAKE
OC ON CENTER
OD OVERFLOW DRAIN
ODP OPEN DRIP PROOF
OXY OXYGEN
P PUMP
PC PLUMBING CONTRACTOR
PD PNEUMATIC OPERATED DAMPER
PIV POST INDICATING VALVE
PRV PRESSURE REDUCING VALVE
PT PRESSURE TEMPERATURE PLUG
PTAC PACKAGED TERMINAL AIR COND. UNIT
PVAC PROCESS VACUUM
S SINK
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAF SUPPLY AIR FAN
SAN SANITARY SEWER
SD SMOKE DETECTOR
SG SUPPLY AIR GRILLE
SH SHOWER HEAD
SHC STEAM HEATING COIL
SR SUPPLY REGISTER
SS STAINLESS STEEL
ST STORM
STM STEAM
SUCT SUCTION (REFRIGERATION)
TCC TEMPERATURE CONTROL CONTRACTOR
TCD TEMPERATURE CONTROL DAMPER
TCP TEMPERATURE CONTROL PANEL
TD TRANSFER DUCT
TG TRANSFER AIR GRILLE
TT THERMOSTATIC TRAP
TYP TYPICAL
UG UNDERGROUND
UH UNIT HEATER
UV UNIT VENTILATOR
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME BOX
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VS VENT STACK (SANITARY)
VTR VENT THRU ROOF (SANITARY)
VUV VERTICAL UNIT VENTILATOR
W WASTE
WB WET BULB
WC WATER CLOSET
W/O WITHOUT
WH WATER HEATER
WSHP WATER SOURCE HEAT PUMP
NOTE:
NOT ALL ABBREVIATIONS AND/OR SYMBOLS ARE
USED IN THIS SET OF DOCUMENTS.
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NIC NOT INCLUDED OR NOT IN CONTRACT
NIT NITROGEN
NO NORMALLY OPEN
KW KILOWATT
R REGISTER
RA RETURN AIR
RD ROOF DRAIN
RET RETURN
RF RETURN FAN
RG RETURN AIR GRILLE
RPZ REDUCED PRESSURE ZONE BACKFLOW PREVENTER
RR RETURN REGISTER
RTU ROOF TOP UNIT
MECHANICAL/PLUMBING AND FIRE PROTECTION GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE
EVERY OFFSET, VALVE, FITTING, ETC. REQUIRED. CONTRACTOR IS RESPONSIBLE FOR FIELD ROUTING
ALL DUCTWORK AND PIPING AT NO ADDITIONAL COST.
2. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS AND OPERATIONS AND
PERFORM ALL LABOR REQUIRED FOR INSTALLATIONS AS INDICATED THE DRAWINGS, IN THE
SPECIFICATIONS AND AS REQUIRED BY LOCAL, STATE AND FEDERAL CODES, AND AS MAY BE
REASONABLY IMPLIED TO ACCOMPLISH COMPLETE MECHANICAL, PLUMBING AND FIRE PROTECTION
SYSTEMS.
3. ALL ELECTRICAL DISCONNECTS REQUIRED PER NEC CODE SHALL BE FURNISHED AND
INSTALLED BY THE ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE.
4. CONTRACTOR SHALL PROVIDE PRODUCTS AS SPECIFIED ON THE DRAWINGS AND
SPECIFICATIONS, HOWEVER, WHERE THE WORDS "EQUAL TO" ARE USED, ADDITIONAL PRODUCTS
MAY BE SUBMITTED AS PROPOSED SUBSTITUTIONS, BUT REQUIRE APPROVAL FROM
ARCHITECT/ENGINEER.
5. DESIGN DRAWINGS SHOW GENERAL ARRANGEMENT AND EXTENT OF WORK. THE DRAWINGS
ARE DIAGRAMMATIC AND MAY NOT NECESSARILY BE DRAWN TO SCALE FOR PURPOSE OF CLARITY AND LEGIBILITY. IT IS INTENDED THAT ALL ITEMS BE LOCATED SYMMETRICALLY WITH ARCHITECTURAL
ELEMENTS WHERE FEASIBLE AND BE INSTALLED TO AVOID OBSTRUCTIONS AND PRESERVE
HEADROOM. CONTRACTOR SHALL REVIEW PLANS OF OTHER TRADES WITH HIS OWN WORK TO AVOID CONFLICTS AND INTERFERENCES. CONTRACTOR MUST MAKE USE OF ALL SOURCES OF INFORMATION
INCLUDING DRAWINGS OF EQUIPMENT FURNISHED BY OTHERS. FAILURE TO REVIEW WORKING
SPACES OR CHECK DIMENSIONS IN QUESTION SHALL NOT WARRANT CONFLICTS.
6. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY. WHERE DRAWINGS
AND SPECIFICATIONS CONFLICT EACH OTHER, IT IS THE CONTRACTORS RESPONSIBILITY TO GET CLARIFICATION FROM THE ARCHITECT/ENGINEER PRIOR TO BIDDING. FAILURE TO GET CLARIFICATION SHALL NOT RESULT IN ADDITIONAL COST AND THE MORE STRINGENT SHALL BE USED AS INTENDED
BASIS FOR BIDDING.
7. PLANS AND SPECIFICATIONS ARE INTENDED TO CONFORM TO GOVERNING CODES AND
STANDARDS. IF NON-CONFORMITIES ARE DISCOVERED WHILE BIDDING, OR PERFORMING THE WORK IMPLIED, BRING THE SAME TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR CLARIFICATION IN WRITING PRIOR TO SUBMITTING BID OR PROCEEDING WITH WORK. NON-CONFORMITIES OF CODE COMPLIANCE WORK INSTALLED AND CORRECTIONS REQUIRED WITHOUT CONSULTION AND WRITTEN RESPONSE OF SAME BY THE ENGINEER WILL BE THE CONTRACTORS FINANCIAL RESPONSIBILITY.
8. MOTORS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AS REQUIRED BY THE
EQUIPMENT FURNISHED BY THE MECHANICAL CONTRACTOR. MOTORS TO BE SUITABLE FOR LOAD, DUTY, VOLTAGE, FREQUENCY, HAZARD, SERVICE AND LOCATION INTENDED. SINGLE PHASE MOTORS MUST HAVE INTEGRAL THERMAL OVERLOAD PROTECTION IN ADDITION TO THAT PROVIDED IN MOTOR
CONTROLLERS. MOTORS TO CONFORM IN DESIGN AND PERFORMANCE TO THE MOTOR STANDARDS
OF NEMA. MOTORS RATED FOR CONTINUOUS DUTY UNDER FULL LOAD WITH A MAXIMUM
TEMPERATURE RISE OF 105 DEG F FOR OPEN, 125 DEG F FOR DRIP PROOF AND 130 DEG F FOR
EXPLOSION PROOF AND TOTALLY ENCLOSED TYPES. SUPPLY MOTORS WITH BELT DRIVES WITH
ADJUSTABLE BASES, REMOVABLE BELT GUARDS AND VARIABLE PITCH DRIVE PULLEY SELECTED SO THAT MIDPOINT OF VARIABLE RANGE OF PULLEY WILL DRIVE EQUIPMENT AT RATED SPEED. MOTORS
1 HP AND LARGER SHALL BE THREE PHASE (UNLESS OTHERWISE LISTED).
9. MOTOR CONTROLLERS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR FOR
MOTORS FURNISHED BY THE MECHANICAL CONTRACTOR. MOTOR CONTROLLERS SHALL BE OF SIZES AND TYPES AS NEEDED TO MEET THE OPERATIONAL CONDITIONS AS REQUIRED BY THE SEQUENCE OF OPERATION. ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL THE POWER CIRCUIT, LOCAL
DISCONNECT AND CONNECTION TO MOTOR TERMINALS. MECHANICAL CONTRACTOR TO MOUNT
MOTOR CONTROLLERS AND CONTROL COMPONENTS AND WIRE AND MAKE ALL FINAL CONTROL
CONNECTIONS BETWEEN DEVICES.
10. THE DRAWINGS INDICATE KNOWN UTILITY AND DRAINAGE LINES IN ACCORDANCE WITH THE
INFORMATION FURNISHED TO THE ENGINEER. RESPONSIBILITY FOR LOCATING, UNCOVERING,
DISPOSING OR MAINTAINING ALL EXISTING UTILITY LINES TO REST SOLELY WITH THE CONTRACTOR.
VERIFY LOCATIONS AND DEPTHS OF SERVICE CONNECTION POINTS BEFORE PROCEEDING WITH
CONSTRUCTION.
11. CONTRACTOR SHALL CHECK EXISTING PREMISES BEFORE SUBMISSION OF BIDS TO CHECK
ALL CONDITIONS WHICH MAY EFFECT THE PERFORMANCE OF THE WORK INVOLVED. NO
ALLOWANCES OR EXTRA PAYMENT WILL BE MADE DUE TO CONTRACTOR'S FAILURE TO EXAMINE SITE
AND FULLY DISCERN WORKING CONDITIONS.
12. MECHANICAL CONTRACTOR SHALL RECEIVE, PROPERLY HOUSE, HANDLE, HOIST, AND
DELIVER TO PROPER LOCATION EQUIPMENT AND OTHER MATERIALS REQUIRED FOR THIS CONTRACT.
13. THE CONTRACTOR SHALL OBTAIN PERMITS, ARRANGE FOR INSPECTIONS, AND PAY FEES AND EXPENSES IN CONNECTION THEREWITH, AS A PART OF THE WORK REQUIRING SUCH PERMITS. EVERY
EFFORT IS MADE TO DESCRIBE THE WORK REQUIREMENTS IN CONFORMITY WITH APPLICABLE
CODES.
14. THE CONTRACTOR SHALL REVIEW ANY ALTERNATES OF OTHER TRADES, AND PRICE THEIR BID
TO ACCOUNT FOR ITEMS AFFECTING HIS WORK.
15. PIPING PASSING THROUGH CORRIDORS, TUNNELS, CHASES, ETC. SHALL BE CONSIDERED FOR
PROPER DRAINAGE. CONSULT WITH THE OTHER CONTRACTORS AND AVOID CONFLICT WITH
LOCATION OF PIPING. ORDER OF PRIORITY FOR ALL PIPING AND CONDUITS TO BE INSTALLED SHALL
BE AS FOLLOWS WITH THE HIGHEST PRIORITY LISTED FIRST.
A. PLUMBING DRAIN LINES
B. CONDENSATE LINES
C. DUCTWORK
D. FIRE PROTECTION
E. HOT AND COLD WATER PIPING
F. ELECTRICAL CONDUIT
16. WORK ASSIGNMENTS INFERRED BY THE DRAWINGS AND NOTES INCLUDED IN THESE PROJECT
DOCUMENTS ARE INFORMATIONAL ONLY AND ARE NOT INTENDED TO RELIEVE THE BIDDING
CONTRACTOR OF HIS OBLIGATION TO THE OWNER TO PROVIDE A COMPLETE AND COORDINATED
PROJECT. COMPREHENSIVE SUBCONTRACTOR COORDINATION AND FINAL WORK ASSIGNMENTS TO
SUBCONTRACTORS ARE THE SOLE RESPONSIBILITY OF THE BIDDING CONTRACTOR.
17. ALL DUCTS SERVING SUPPLY, RETURN AND EXHAUST TERMINALS SHALL BE PROVIDED WITH
BALANCE DAMPERS. FOR CLARITY, ALL DAMPERS MAY NOT BE SHOWN ON PLANS.
18. PROVIDE DIELECTRIC UNIONS/CONNECTIONS AT ALL JUNCTIONS OF DISSIMILAR METALS.
19. ALL EXISTING MECHANICAL, PLUMBING, AND FIRE PROTECTION PIPING AND DUCTWORK
SHOWN IS BASED ON PRIOR DRAWINGS AND CASUAL OBSERVATIONS. IT IS THE CONTRACTORS
RESPONSIBILITY TO VERIFY THE ACTUAL LOCATION OF ALL EXISTING SYSTEMS PRIOR TO
PERFORMING ANY WORK.
20. THE STATE/ OWNER RESERVES THE RIGHT TO RETAIN/ SALVAGE ANY ITEMS IDENTIFIED TO BE
DEMOLISHED FOR THE PROJECT.
M
M
H
T
M
OD
OD
OD
OVERFLOW STORM - EXISTING
OVERFLOW STORM - DEMO
OVERFLOW STORM - NEW
P L
U R
I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
M E
C H
A N
IC
A
L A
N D
P
LU
M B
IN
G
A B
B R
E V
IA
TI
O N
S A
N D
S Y
M B
O
LS
P
M
-0
WOMEN'S
SHOWERS /
LOCKERS
114A
WOMEN'S
LOCKERS
113B
JANITOR
114B
TOILET
MEN
MEN'S
SHOWERS
113A
SUPPLY
SGT
EXTG ARMS
VAULT
125A
PLATOON 1
COMM
NBC
UNIT
STORAGE
MAINTENANCE
BAY
ARMS
VAULT
ADDITION
125B
PD100
4"ø
6"ø
"ø
4"ø
4"ø
3"ø4"ø
EX. SANITARY SERVICE
PD100
PD100
WOMEN'S
SHOWERS /
LOCKERS
114A
WOMEN'S
4"ø
"ø
"ø
"ø
4"ø
SAN
3"ø 3"ø 3"ø
4"ø
4"ø
1 REMOVE EXISTING CONCRETE SLAB FOR NEW UNDERSLAB SANITARY. AREA SHOWN IS APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO SAW CUTTING THE SLAB. GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING CONCRETE.
KEYNOTES
2 REMOVE PORTION OF EXISTING SANITARY PIPING AS REQUIRED FOR CONNECTION TO NEW SANITARY PIPING.
3 REMOVE EXISTING FLOOR DRAIN AND ASSOCIATED PLUMBING. CAP ALL UNUSED PIPING ABOVE THE CEILING OR BELOW THE FLOOR.
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
U N
D E
R S
LA
B
E X
IS
TI
N G
P
LU
M B
IN
G
P
LA
N
P D
M
-0
1/16" = 1'-0"1
EXISTING UNDERSLAB PLUMBING PLAN
1/4" = 1'-0"3
ENLARGED WOMENS SHOWER
EXISTING UNDERSLAB PLUMBING
PLAN
NORTH
1/4" = 1'-0"2
ENLARGED MENS SHOWER EXISTING
UNDERSLAB PLUMBING PLAN
1/4" = 1'-0"4
ENLARGED BREAKROOM EXISTING
UNDERSLAB PLUMBING PLAN
1" CW
1" HW
¾" HWC
1" HW160
½" HWC160
UP TO MEZZANINE
2"ø
/2 "ø
"ø
/4
"ø
C W
H W
H W
C
"ø 1
"ø /4
"ø
3/4"ø
1"ø1 1/4"ø
CW
CW
HW HWC
M
EX. WATER METER AND SERVICE
PD101
1"ø
HW
/4
"ø
/4
"ø
/4
"ø3 /4
"ø
H W
C W
1/2"ø1"ø
1"ø 1/2"ø
HW
CW
H W
CH
W
C W
HW
HWC
"ø
/2 "ø
1"ø
1"ø
3/4"ø
3 3
1 REMOVE EXISTING SHOWER ASSEMBLY AND ASSOCIATED PLUMBING. CAP ALL UNUSED PIPING ABOVE THE CEILING OR BELOW THE
FLOOR.
KEYNOTES
2 REMOVE EXISTING DOMESTIC WATER PIPING AS SHOWN. CAP UNUSED PIPING AT MAIN.
3 REMOVE EXISTING FLOOR DRAIN AND ASSOCIATED PLUMBING. CAP ALL UNUSED PIPING ABOVE THE CEILING OR BELOW THE FLOOR.
4 REMOVE EXISTING DOMESTIC COLD WATER PIPING SERVING THE MEZZANINE AND ASSOCIATED PLUMBING. CAP PIPING AT MAIN.
5 REMOVE EXISTING GAS WATER HEATER AND ASSOCIATED PLUMBING.
6 REMOVE EXISTING HOT WATER STORAGE TANK AND ASSOCIATED PLUMBING.
7 REMOVE EXISTING WATER HEATER BREACHING AND ASSOCIATED SUPPORTS.
8 REMOVE EXISTING DOMESTIC HOT WATER PIPING.
9 REMOVE EXISTING EXPANSION TANK AND ASSOCIATED PIPING.
EX. DOMESTIC WATER
PIPING DOWN TO
CEILING BELOW
EX. AHU
EX. AHU
EX. HRU
EX. HRU
HW
HOSE-END DRAIN VALVE (TYP)
UNION (TYP)
HOT WATER STORAGE TANK
EX. GAS PIPING
THERMOMETER (TYP)
HWC PUMP
BALL VALVE (TYP)
EX. MIXING VALVE
WATER HEATER CIRC PUMP
CHECK VALVE (TYP)
3/4" CW TO BOILER FILL
1"
C W
BOLD AND DASHED LINES INDICATE DEMO
SHADED LINES INDICATE EXISTING TO REMAIN
GAS WATER HEATER
1"
1"
1"
¾" ¾"
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
1S T
FL
O
O R
M
E C
H A
N
IC
A L
R O
O M
E X
IS
TI
N G
P
LU
M B
IN
G
P
LA
N
P D
M
-0
1/16" = 1'-0"1
EXISTING 1ST FLOOR PLUMBING PLAN
1/4" = 1'-0"2
ENLARGED WOMENS SHOWER EXISTING PLUMBING PLAN
1/8" = 1'-0"3
MECHANICAL ROOM EXISTING PLUMBING PLAN
12" = 1'-0"4
EXISTING WATER HEATER PIPING DIAGRAM
P100
P100
P100
FD-2
2" SAN UP
4"ø 4"ø
SAN
C.O. AT GRADE
2" ST UP
2" ST UP
"ø
S T
STORM SERVICE. SEE
SITE PLAN FOR
CONTINUATION
SUPPLY
ROOM
126G
TOOL
ROOM
126H
PLATOON 3
126E
PLATOON 2
126D
LACTATION
ROOM
SAN
4"ø
2" SAN UP
2" SAN UP
FD-2 L-1
S A
N
"ø
FD-2 FD-2
FD-2
FD-1
SH-2
FD-1
3"ø
2"ø
3" ø
SAN
2" SAN UP
2" SAN UP
2" SAN UP
3" UP
2" SAN UP2" SAN UP
UNISEX
SHOWER
119C
UNISEX
SHOWER
119B
LOCKERS
113B
MEN'S
SHOWERS
113A
WOMEN'S
SH-2
3"ø
FD-1 FD-1 FD-1 FD-1
SH-1
SH-1
SH-1 SH-1
"ø 3 "ø 2
"ø
"ø
4"ø 4"ø
S A
N
SAN
WOMEN'S
SHOWERS /
LOCKERS
114A
WOMEN'S
P L
U R
I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
U N
D E
R S
LA
B
P R
O P
O S
E D
P
LU
M B
IN
G
P
LA
N
P
M
-0
1/16" = 1'-0"1
PROPOSED UNDERSLAB PLUMBING PLAN
1/4" = 1'-0"4
ENLARGED PROPOSED LACTATION
ROOM UNDERSLAB PLUMBING PLAN
1/4" = 1'-0"2
ENLARGED PROPOSED MENS SHOWER UNDERSLAB PLUMBING PLAN
1/4" = 1'-0"3
ENLARGED PROPOSED WOMENS
SHOWER UNDERSLAB PLUMBING
PLAN
NOTE: CONTRACTOR SHALL SOLIDLY GROUT THE BOTTOM OF ALL SHOWER INSERTS.
P101
P101
P101
V1
/2
"ø
EX. 1" HW
EX. 1" HW160
EX. 1/2" HWC160
EX. 3/4" HWC
PROPOSED 1¼" CW
PROPOSED 1¼" HW
PROPOSED ¾" HWC
1 1/4"ø
/4
"ø
/4 "ø
2" OD UP
2" ST UP
2" ST DN
C.O. AT BASE (TYP)
2" ST DN
2" ST UP
2" OD UP
HIGHWALL
DOWNSPOUT FOR
OVERFLOW ROOF
DRAIN (TYP). SEE
DETAIL
HB-1
/4 "ø
C W
FD-2
DEHUMIDIFIER LOCATED
ABOVE VAULT CEILING
1" CW
1/8" DRAIN LINE
FROM HB-1
HUB DRAIN
/2 "ø
"ø
/4
"ø
1 1/2"ø
/2 "ø
"ø
/4
"ø
C W
H W
H W
C
SEE 1/P101 FOR CONTINUATION
2" SAN DN
1½" V UP
½" HW/CW DN
V H
W
H W
C
CW
L-1FD-2
SEE A1/P101 FOR CONTINUATION
V
H W
H W
C
H W
C
C W
H W
2"ø
/4
"ø2 "ø
"ø
"ø
"ø
/4
"ø /4
"ø
/4 "ø
1"ø
1"ø
1"ø
SEE A1/P101 FOR CONTINUATION
FD-2FD-2
FD-2
FD-1 FD-1
SH-2
SH-2
3" SAN DN
2" V UP
¾" HW/CW DN
WALL CLEANOUT 1
/4 "ø
/4 "ø
1"ø 3/4"ø
"ø
1/2"ø
1"ø
SEE A1/P101 FOR CONTINUATION (TYP)
/2
"ø
¾" HW/CW DN
H W
HW
CW
FD-1
FD-1
FD-1
FD-1
SH-1
SH-1
SH-1
1 1/4"ø
H W
H W
C
C W
HW
HWC
CW
"ø
/2 "ø
1"ø 3/4"ø
1¼" HW
1¼" CW
¾" HWC
UP TO MEZZANINE
SH-1
(TYP)
1 CONNECT TO EXISTING VENT PIPING ABOVE CEILING. VERIFY LOCATION OF EXISTING PIPING
PRIOR TO CONNECTION.
KEYNOTES
2 GROUT SHOWER SOLID UNDERNEATH.
3 ROOF HYDRANT LOCATED ON ROOF NEAR ROOFTOP UNIT. COORDINATE LOCATION WITH
OWNER AND EQUIPMENT. PROVIDE DRAIN LINE TO NEAREST SANITARY PIPING OR FLOOR
DRAIN.
4 PROVIDE DRAIN LINE FROM DEHUMIDIFIER TO FLOOR DRAIN. PROVIDE DRAIN HUB ON FLOOR
DRAIN.
5 PROVIDE ¾" INDIRECT DRAIN FROM HUB DRAIN TO THE EXISTING WASH FOUNTAIN.
CONTRACTOR MAY ELECT TO ROUTE IT TO A FLOOR DRAIN IF THE LOCATION IS ACCEPTABLE
TO THE OWNER.
EXISTING DOMESTIC
WATER PIPING DOWN
TO CEILING BELOW
1¼" HW
1¼" CW
¾" HWC
SEE WATER HEATER
PIPING DETAIL
WH-1
ST-1
RD-1
RD-1
4" ST/OD DN (TYP)
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
A B
O V
E G
R O
U N
D P
R O
P O
S E
D P
LU
M
B
IN
G P
LA
N
P
M
-0
1/16" = 1'-0"1
PROPOSED 1ST FLOOR PLUMBING PLAN
1/4" = 1'-0"6
ENLARGED PROPOSED LACTATION
ROOM PLUMBING PLAN
1/4" = 1'-0"4
ENLARGED PROPOSED MENS SHOWER PLUMBING PLAN
1/4" = 1'-0"5
ENLARGED PROPOSED WOMENS
SHOWER PLUMBING PLAN
NORTH
1/8" = 1'-0"2
MECHANICAL ROOM PROPOSED
PLUMBING PLAN
1/8" = 1'-0"3
ROOF PLUMBING PLAN - ADDITION
ZURN MODEL Z199
DOWNSPOUT NOZZLE
MATCH PIPE SIZE
GALVANIZED PIPE SLEEVE.
SEAL WATERTIGHT
THREADED ROD
CLEVIS HANGER
ROOF DECK
STRAINER PER
SCHEDULE
TRAP SEAL
"QUAD-CLOSE" BY
J.R.SMITH MFG. CO.
FLOOR DRAIN BODY WITH
ADJUSTABLE STRAINER
AND
MEMBRANE CLAMP PER
SCHEDULE
PVC DRAIN PIPING TO MAIN
(SEE PLAN FOR SIZE)
FLOOR DRAIN W/TRAP SEAL
HANGER ROD
ADJUSTING NUT
'UL' LISTED
CLEVIS HANGER
PIPE SHIELD WITH
HEAVY DENSITY
INSULATION OR
PROTECTION
SADDLE.
SECTION
ELEVATION
PIPE
PIPE
INSULATION AND
COVERING
GALVANIZED AND MINIMUM
12" LONG. PIPE COVERING
SHIELD, 18 GAUGE.
FLARED ENDS WHERE
HEAVY DENSITY INSULATION
SADDLES ARE USED.
FLASHING
CLAMP AND
GRAVEL STOP
REMOVABLE DOME
METAL DECK
BEAM CLAMP
HANGER
CLEAN OUT
INSULATE ALL HORIZONTAL STORM PIPING
OVERFLOW
DRAIN WITH 2"
INTERNAL WATER
DAMDECK PLATE
RIGID INSULATION
SEE ARCHITECTURAL
(5" MINIMUM)
CAST IRON SUMP CASTINGS (TYP)
STAINLESS STEEL
ACCESS COVER
WITH SCREW
WALL
CLEAN-OUT TEE
WITH BRASS PLUG
1'-6"
FLOOR
LONG SWEEP PVC FITTINGS
OR 45° FITTING
SANITARY SEWER PIPING
HW
HOSE-END DRAIN VALVE (TYP)
UNION (TYP)
HOT WATER STORAGE TANK ST-1
EX. GAS PIPING
NEW EXPANSION TANK. AMTROL ST-12C-DD
OR EQUAL. 6.4 GALLON CAPACITY.
THERMOMETER (TYP)
EX. HWC PUMP
BALL VALVE (TYP)
EX. MIXING VALVE
EX. WATER HEATER CIRC PUMP
CHECK VALVE (TYP)
3/4" CW TO BOILER FILL
¾" HWC
TACO PUMP IL006 OR EQUAL
CONNECT NEW
WATER HEATER TO
EX. GAS PIPING.
CONDENSATE
TO FLOOR DRAIN
1¼" CW TO MAIN ON FIRST FLOOR (SEE PLUMBING DRAWINGS)
1¼" HW TO FLOOR BELOW.
SEE PLUMBING DRAWINGS.
FLUE
CA
GAS WATER HEATER WH-1
1½" HW
BOLD LINES INDICATE NEW
SHADED LINES INDICATE EXISTING
1¼" 1¼"
1½"
1½"
COORDINATE LOCATION OF CA AND EA WITH NEW
ROOF MONITOR SYSTEM. LOCATE AS CLOSE TO THE
ROOF PEAK AS POSSIBLE PER MANUFACTURER'S
RECOMMENDATIONS, CLEARANCES, AND
INSTALLATION INSTRUCTIONS. COORDINATE WITH
ROOFING CONTRACTOR.
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
P
LU
M B
IN
G
D E
TA
IL
S
S C
H E
D U
LE
S
P
M
-0
NOT TO SCALE2
DOWN SPOUT - HIGH WALL DETAIL
NOT TO SCALE1
FLOOR DRAIN DETAIL
NOT TO SCALE7
PIPE HANGER DETAIL
NOT TO SCALE5
ROOF DRAIN DETAIL
NOT TO SCALE6
WALL CLEANOUT DETAIL
PLUMBING FIXTURE SCHEDULE
ID ADA DESCRIPTION MANUFACTURER MODEL
NUMBER
MATERIAL BASIN
DIMENSIONS
(IN)
TRIM MANUF. TRIM MODEL HOT WATER
(IN)
COLD WATER
(IN)
SANITARY (IN) NOTES
FD-1 - 5" DIAMETER FLOOR DRAIN WITH STRAINER ZURN Z415B CAST IRON - - - - - SEE PLAN 2
FD-2 - 6" DIAMETER FLOOR DRAIN WITH STRAINER ZURN Z415B CAST IRON - - - - - SEE PLAN 2
HB-1 - FREEZE PROOF ROOF HYDRANT WOODFORD RHY1-MS BRASS - - - - 1" - 4,5,6
L-1 YES COUNTERTOP MOUNT LAVATORY KOHLER K-2196 VITREOUS CHINA - DELTA 523-WFHGMHDF 1/2" 1/2" 1-1/2" 1
RD-1 - COMBINATION ROOF/OVERFLOW DRAIN ZURN Z163 CAST IRON - - - - - -
SH-1 - FIBERGLASS SHOWER INSERT WARM RAIN WR136 FIBERGLASS - DELTA T13H132 1/2" 1/2" 2" 3
SH-2 - FIBERGLASS SHOWER INSERT WARM RAIN WR484 FIBERGLASS - DELTA T13H132 1/2" 1/2" 2" 3
1. PROVIDE THERMOSTATIC MIXING VALVE AND TRAP WRAPS PER ADA REQUIREMENTS.
2. PROVIDE WITH TRAP SEAL EQUAL TO "QUAD-CLOSE" BY J.R. SMITH.
3. PROVIDE WITH CONCEALED ROUGH-IN VALVE.
4. INSTALL PER MANUFACTUERER'S INSTRUCTIONS.
5. ENSURE WATERTIGHT SEAL. COORDINATE WITH ROOFING CONTRACTOR.
6. PROVIDE WITH INIRECT DRAIN TO ACCEPTABLE LOCATION.
PLUMBING PIPE INSULATION SCHEDULE
SYSTEM TYPE INSUL.
TYPE
PIPE SIZES INSULATION
THICKNESS
DOMESTIC HOT WATER SUPPLY AND
RECIRCULATION
P-1
1-1/4" AND SMALLER
1-1/2" AND LARGER
1" 1-1/2"
DOMESTIC COLD WATER P-1 OR P-5
1-1/4" AND SMALLER
1-1/2" AND LARGER
1/2" 1"
STORM PIPING (HORIZONTAL ABOVE GROUND
WITHIN BUILDING
P-1 OR P-5 ALL SIZES 1/2"
STORM PIPING (HORIZONTAL AND VERTICAL
ABOVE GROUND WITHIN BUILDING WHEN PVC
IS USED)
P-1 OR P-5 ALL SIZES 1/2"
PIPING INSULATION SCHEDULE
INSULATION
TYPE
DESCRIPTION
P-1 ASTM C547, MOLDED GLASS FIBER PIPE INSULATION, OPERATING TEMPERATURE RANGE: 0 TO 850 DEG F, VAPOR BARRIER JACKET: ASTM C1136, TYPE I, FACTORY APPLIED REINFORCED FOIL DRAFT WITH
SELF SEALING ADHESIVE JOINTS.
P-5 ASTM C534, TYPE I, FLEXILE, CLOSED CELL ELASTOMERIC INSULATION, TUBULAR, OPERATING
TEMPERATURE RANGE: MINUS 70 TO 180 DEG F.
NOT TO SCALE4
PROPOSED WATER HEATER PIPING DIAGRAM
GAS WATER HEATER SCHEDULE
ID MANUFACTURER
MODEL
NUMBER
INPUT
CAPACITY
(BTU)
TANK
CAPACITY
(GAL)
RECOVERY
RATE @ 100°F
RISE (GPH)
TANK SIZE
(IN)
WATER
CONN. (IN)
GAS
CONN.
(IN)
CA
CONN.
(IN)
VENT
CONN.
(IN)
SHIPPING
WIEGHT
(LBS)
ELECTRICAL
VOLTS PHASE
WH-1 A.O. SMITH BTH-500A 499,900 119 576 76"H x 33"W 1-1/2 1-1/2 4 4 855 120 1
NOTES:
PROVIDE WITH TEMPERATURE AND PRESSURE RELIEF VALVE.
PROVIDE WITH CONCENTRIC VENT TERMINATION PER MANUFACTURER'S REQUIREMENTS.
STORAGE TANK SCHEDULE
ID MANUFACTURER
MODEL
NUMBER
TANK
CAPACITY
(GAL)
TANK SIZE
(IN)
WATER
CONN. (IN)
ST-1 A.O. SMITH TJV-200A 200 83"h x 36"W 1
T
T
M
M
M
M
M
M
1 2
(TYP)
12 12
1 REMOVE EXISTING DIFFUSER, BALANCING DAMPER, AND ASSOCIATED DUCT AND SUPPORTS.
DUCTS SHALL BE REMOVED TO BACK TO MAIN TRUNK AND CAPPED UNLESS BEING REUSED.
SALVAGE DIFFUSER FOR RE-USE.
KEYNOTES
2 REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED DUCT, SUPPORTS, ELECTRICAL,
CONTROLS, AND REFRIGERATION LINES.
GENERAL NOTES:
1. BOLD DASHED LINES INDICATE DEMO ITEMS.
2. ALL UNUSED DUCT OPENINGS SHALL BE CAPPED AIRTIGHT AND INSULATED TO MATCH
EXISTING.
3. OWNER HAS RIGHT TO SALVAGE ANY EQUIPMENT. ALL DEMOED MATERIAL AND EQUIPMENT NOT
SALVAGED BY THE OWNER SHALL BE DISPOSED OF BY THE CONTRACTOR.
3 REMOVE EXISTING DUCT AND ASSOCIATED BALANCING DAMPERS AND SUPPORTS.
4 REMOVE EXISTING MOTORIZED DAMPER AND ASSOCIATED SUPPORTS, CONTROLS, AND
ELECTRICAL.
5 DISCONNECT ALL ELECTRICAL AND DUCT FROM THE EXISTING FIRE DAMPER. CLOSE FIRE
DAMPER AND ABANDON IN PLACE.
6 REMOVE EXISTING ROOFTOP EXHAUST FAN AND ASSOCIATED CURB, DUCT, AND SUPPORTS.
SALVAGE FAN FOR RE-USE. PATCH ROOF TO MATCH EXISTING.
7 REMOVE EXISTING LOUVER, DUCT, MOTORIZED DAMPER, AND ASSOCIATED SUPPORTS,
ELECTRICAL, AND CONTROLS. SALVAGE DAMPER FOR RE-USE. INFALL WALL. SEE
ARCHITECTURAL.
8 REMOVE EXISTING EXHAUST DUCT AND ASSOCIATED SUPPORTS AND WALL CAP. INFILL WALL
TO MATCH EXISTING.
9 REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED REFRIGERATION LINES, SUPPORTS,
ELECTRICAL AND CONTROLS. PATCH HOLES THROUGH EXTERIOR WALLS WITH GROUT TO
MATCH EXISTING.
10 REMOVE EXISTING UNIT HEATER AND ASSOCIATED HYDRONIC LINES, VALVES, SUPPORTS,
ELECTRICAL, AND CONTROLS.
11 REMOVE EXISTING THERMOSTAT AND ASSOCIATED ELECTRICAL AND WIRING.
12 REMOVE EXISTING LOUVER AND ASSOCIATED DUCT AND SUPPORTS. INFILL WALL TO MATCH
EXISTING.
13 REMOVE EXISTING THERMOSTAT AND ASSOCIATED ELECTRICAL AND WIRING. SALVAGE
THERMOSTAT FOR RE-USE.
14 REMOVE EXISTING RETURN GRILLE AND ASSOCIATED DUCT AND SUPPORTS. SALVAGE GRILLE
FOR RE-USE.
P L
U R
I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
1S T
FL
O
O R
E X
IS
TI
N G
M E
C H
A N
IC
A
L P
LA
N
M D
M
-0
1/8" = 1'-0"1
1ST FLOOR EXISTING MECHANICAL PLAN
EX. HRU-1
EX. HRU-2
EX. AHU-2
EX. AHU-1
EX. AIR SEPARATOR TO REMAIN
EX. SYSTEM PUMP TO REMAIN
HWR
HWS
4"ø
4"ø
8"ø
"ø
"ø
6"ø
"ø
"ø
REGULATOR VENT PIPING
GAS REGULATOR
SHUT-OFF VALVE (TYP)
EX. AIR SEPARATOR TO REMAIN
EX. SYSTEM
PUMPS TO
REMAIN
EX. EXPANSION TANK TO REMAIN
G
2"
1½"
1½"
2 2
4"
4"4"
3"
2½"
4"
4"
PRESSURE
REDUCING VALVE
BACKFLOW PREVENTER
CW
1 REMOVE EXISTING HOT WATER SUPPLY OR HOT WATER RETURN LINE AND ASSOCIATED
SUPPORTS, VALVES, AND CONTROLS.
KEYNOTES
2 REMOVE EXISTING BOILER AND ASSOCIATED COMBUSTION AIR PIPING, EXHAUST PIPING,
HYDRONIC PIPING, CONTROLS, GAS REGULAR, GAS PIPING, AND ELECTRICAL.
3 REMOVE EXISTING COMBUSTION AIR PIPING AND ASSOCIATED SUPPORTS. PATCH WALL TO
MATCH EXISTING.
4 REMOVE EXISTING EXHAUST AIR PIPING AND ASSOCIATED SUPPORTS AND CONDENSATE
PIPING.
5 REMOVE EXISTING GAS PIPING AND ASSOCIATED REGULATOR, SHUT-OFF VALVE, SUPPORT
AND REGULATOR PIPING.
6 REMOVE EXISTING COLD WATER MAKE UP SYSTEM TO BOILERS. CAP PIPING AT MAIN.
7 REMOVE PORTION OF PIPING FROM EXPANSION TANK TO EXISTING BOILER PIPING.
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
M E
ZZ
A
N
IN
E E
X
IS
TI
N
G M
E C
H A
N
IC
A L
P
LA
N
M D
M
-0
1/8" = 1'-0"2
EXISTING MEZZANINE MECHANICAL PLAN
NORTH
12" = 1'-0"1
EXISTING BOILER PIPING DETAIL
HWR
HWS
H W
S H
W R
HWS
HWR
1 1/2"ø
1 1/2"ø
"ø
"ø
/4
"ø
/4
"ø
/4
"ø
/4
"ø 3 /4
"ø
/4
"ø
"ø
"ø
"ø
"ø
1 1/4"ø
1 1/4"ø
1"ø
1"ø
/4
"ø
/4
"ø
(TYP)
1 REMOVE EXISTING HOT WATER SUPPLY OR HOT WATER RETURN LINE AND ASSOCIATED
SUPPORTS, VALVES, AND CONTROLS. CAP UNUSED PIPING AT MAIN.
KEYNOTES
GENERAL NOTES:
1. BOLD DASHED LINES INDICATE DEMO ITEMS.
2. ALL UNUSED PIPES SHALL BE CAPPED AT MAIN.
3. OWNER HAS RIGHT TO SALVAGE ANY EQUIPMENT. ALL DEMOED MATERIAL AND EQUIPMENT NOT
SALVAGED BY THE OWNER SHALL BE DISPOSED OF BY THE CONTRACTOR.
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
1S T
FL
O
O R
E X
IS
TI
N G
H Y
D R
O N
IC
P
IP
IN
G P
LA
N
M D
M
-0
1/8" = 1'-0"1
1ST FLOOR EXISTING HYDRONIC PLAN
T T
T
LACTATION
ROOM
TOILET
MEN
WOMEN'S
WOMEN'S
SHOWERS /
LOCKERS
114A
JANITOR
114B
LOCKERS
113B
MEN'S
SHOWERS
113A
SUPPLY
SGT
COMM
NBC
PLATOON 1
MAINTENANCE
BAY
EXTG ARMS
VAULT
125A
ARMS
VAULT
ADDITION
125B
6"
EA THROUGH ROOF.
TERMINATE PER
MANUFACTURER'S
RECOMMENDATIONS.
VD-1
75 CFM
75 CFM (EXISTING RETURN GRILLE)
10"x10"
"ø10"x10"
12"x12"
S A
RA
RG-1
FIRE DAMPER (TYP)
RTU-1 ON ROOF ABOVE
VAV-1
"x
"x
"ø
6"ø
18"x10"
"x
"ø
"ø
4"ø
4"ø
VAV-3
VAV-2
"ø
EG-1
75 CFM
EG-2
75 CFM
24"x10"
8"x6"
SR-1
75 CFM
SR-1
75 CFM
SG-1
245 CFM
RG-2
245 CFM
10"ø
10"ø10"ø
10"ø
10"ø
VAV-1
VAV-3
"x
"x
14"x14"
VAV-2
RG-1
500 CFM
VD-1
100 CFM VD-1
100 CFM
VD-1
100 CFM
VD-1
100 CFM
VD-1
100 CFM
DH-1
"x
"x
50 CFM
50 CFM
(TYP OF ALL
ROOF
PENETRATIONS)
1 TAKE SUPPLY AND RETURN CFM READINGS OF THIS SPACE PRIOR TO DEMOLITION.
ALLOCATE CFM TO THE NEW SPACES AS SHOWN. EXISTING SPACES SHALL BE BALANCED
WITH THE REMAINDER OF THE CFM FROM THE PRE-DEMOLITION READINGS.
KEYNOTES
2 RE-INSTALL SALVAGED THERMOSTAT. EXTEND WIRING AS REQUIRED.
3 RE-INSTALL SALVAGED DIFFUSER. PROVIDE NEW DUCT CONNECTION. RE-USE EXISTING
BALANCING DAMPER OR PROVIDE NEW.
4 DEHUMIDIFIER LOCATED ABOVE ARMS VAULT. PROVIDE WITH OPTION FOR DDC CONTROL.
PIPE DRAIN TO NEW FLOOR DRAIN.
5 LOCATE DUCT PENETRATION AS CLOSE TO THE WALL AS POSSIBLE COORDINATED WITH
THE SUPPLY REGISTER OR RETURN GRILLE. TRANSITION TO 6"
BEFORE PENETRATING THE
VAULT CEILING.
6 RELOCATED EXHAUST GRILLE. COORDINATE EXACT LOCATION WITH FIELD CONDITIONS.
BALANCE TO PRE-DEMOLITION VALUES.
7 ROOFING CONTRACTOR SHALL REPAIR ALL ROOFING MEMBRANE AND MAINTAIN ALL
EXISTING ROOF WARRANTIES. COORDINATE ROOF PENETRATIONS AND SEALS WITH
ROOFING CONTRACTOR.
P L
U R
I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
1S T
FL
O
O R
P R
O P
O S
E D
M E
C H
A N
IC
A
L P
LA
N
E
X
IS
TI
N
G B
U
IL
D
IN
G
M
M
-0
1/8" = 1'-0"1
1ST FLOOR PROPOSED MECHANICAL PLAN - EXISTING BUILDING
T
T
T
T
EX. HRU-1
EX. HRU-2
EX. AHU-2
EX. AHU-1
B-2
B-1 P-1
P-2
EX. SYSTEM PUMPS
EX. AIR SEPARATOR
"ø
2 1/2"ø
4"ø
2 1/2"ø
HWR
HWS
4" DECOUPLER LOOP
EX. EXPANSION TANK
GMP-1
EX. ACC CONTROL PANEL
PLATOON 2
126D
PLATOON 3
126E
INSPECTION
& LIBRARY
126F
SUPPLY
ROOM
126G
TOOL
ROOM
126H
BATTERY
ROOM
126J
UH-1
UH-2
FTR-1
UH-3
UH-4
UH-5
' M
IN
ERV-1
M
M
RG-3
50 CFM
20"x20"
20"x20"OA
OA
EG-2
200 CFM 5
"x
M
UH-4
UH-5
UH-3
FTR-1
UH-2
UH-1
"ø
"ø
"ø
"ø
VD-1
30 CFM
SHUT-OFF VALVE (TYP)
EX. AIR SEPARATOR TO REMAIN
EX. SYSTEM
PUMPS TO
REMAIN
EX. EXPANSION TANK TO REMAIN
G
2" 1½"
4"
4"4"
3"
2½"
FF
CHECK VALVE (TYP)
BOILER CIRC
PUMP P-1
BOILER B-1BOILER B-2
Y-STRAINER
UNION (TYP)
BOILER
DRAIN (TYP)
2½"
2½"
2½"
BOILER CIRC
PUMP P-2
PRESSURE
RELIEF VALVE
TEMP/PRES.
GAUGE
4"
4"
2½"
4 4
4"
¾"
GLYCOL MAKE-UP PACKAGE
GMP-1
1 RE-INSTALL SALVAGED LOUVER AND MOTORIZED DAMPER. EXTEND WIRING AS REQUIRED.
KEYNOTES
2 UTILIZE EXISTING WALL OPENING FOR NEW DUCT. PROVIDE GALVANIZED STEEL MESH OVER
OPEN ENDED DUCT. INFILL UNUSED OPENING AREA TO MATCH EXISTING.
3 4" CA AND 6" EA THROUGH ROOF. TYPICAL OF EACH BOILER. TERMINATE PER
MANUFACTURER'S REQUIREMENTS. LOCATE NEAR ROOF PEAK. COORDINATE WITH NEW
ROOF MONITOR SYSTEM AND ROOFING CONTRACTOR.
4 1½" GAS DOWN TO BOILER. PROVIDE WITH SHUT-OFF, REGULATOR, AND DIRT LEG.
5 (2) EG-1 LOCATED ON DUCT DROP. ONE @ 12" AFF AND ONE @ 8'-0" AFF.
6 RE-INSTALL SALVAGED EXHAUST FAN. PROVIDE NEW 24" HIGH CURB. EXHAUST DUCT DOES
NOT NEED TO BE INSULATED.
7 RE-INSTALL SALVAGED LOUVER AND DAMPER. FAN AND LOUVER SHALL BE
INTERCONNECTED WITH LIGHT SWITCH FOR THE BATTERY ROOM.
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
1S T
FL
O
O R
P R
O P
O S
E D
A D
D
IT
IO
N
A N
D M
E
ZZ
A N
IN
E
M E
C H
A N
IC
A
L P
LA
N
M
M
-0
1/8" = 1'-0"2
MEZZANINE PROPOSED MECHANICAL
PLAN
1/8" = 1'-0"1
1ST FLOOR PROPOSED MECHANICAL
PLAN - ADDITION
NORTH
NOT TO SCALE3
PROPOSED BOILER PIPING DETAIL
NOTE: CONTRACTOR SHALL THOROUGHLY FLUSH THE ENTIRE HYDRONIC SYSTEM. ONCE FLUSHED, SYSTEM SHALL BE FILLED WITH 35% PROPYLENE GLYCOL TO PROVIDE BURST PROTECTION DOWN TO -30 DEGREES. ESTIMATED SYSTEM VOLUME IS 500 GALLONS.
END CAPS, WHERE
REQUIRED
BALL VALVE
PIGTAIL VENT
FLOOR
ECCENTRIC REDUCER
ELEMENT
OUTLET GRILLE
ZONE VALVE
ECCENTRIC REDUCER
HEIGHT PER
MANUFACTURER'S
RECOMMENDATIONS
RADIATOR VALVE OR
BALL VALVE
WALL
T
*ZONE VALVE MAY ALSO BE LOCATED IN THE CEILING WHERE EASILY ACCESSIBLE AND NEARBY.
OUTDOOR AIR INTAKE
RELIEF / EXHAUST
APPROVED FLASHING
HWS/HWR PIPING
POWER SUPPLY
FINISHED ROOF
24" FACTORY INSULATED ROOF CURB
ELECTRICAL DISCONNECT
SUPPLY AIR
TREATED BLOCKING TO MATCH
INSULATION THICKNESS
INSULATION WITHIN CURB
RETURN AIR
INSULATE/SEAL ALL OPENINGS
SUPPORT ROD UP TO ROOF OR
CEILING CONSTRUCTION.
(TYPICAL)
VAV BOX (SEE SCHEDULE)
INSULATED FLEXIBLE DUCT W/
COMPRESSION STRAPS. MAXIMUM
2' LENGTH
CONICAL TAKE OFF FITTING
COIN OPERATED
AIR VENT
COMBINATION BALANCE
AND SHUT-OFF VALVE
HWS
HWR
INTERNALLY LINED
SUPPLY DUCT - MIN. 5'-0".
SEE PLANS FOR SIZE.
ACCESS DOOR EACH SIDE OF COIL
HYDRONIC REHEAT COIL
DUCT TRANSITION AS REQUIRED PER PLANS
RIGID STRAIGHT DUCT. MINIMUM LENGTH
EQUAL
TO 1.5x"D". DUCT SIZE EQUAL BOX INLET SIZE
"D"
INSULATED PRIMARY SUPPLY
TRUCK DUCT. SEE PLAN FOR
SIZE.
UNION (TYP)
2-WAY CONTROL VALVE
DRAIN VALVE WITH HOSE CONNECTION
BRANCH PIPING FROM
TOP OF MAIN
ISOLATION BALL VALVE
CONTROL BOX. MAINTAIN MIN. 18" CLEARANCE
3-WAY CONTROL VALVE
UNION
BALANCE VALVE (TYP)
SHUT-OFF VALVE
RETURN
SUPPLY
STRAINER WITH BLOWDOWN
HOSE BIBB DRAIN
T&P GAUGE (TYP.)
HEATING
COIL WITH
FREEZESTAT
AIR VENT
HIGH DENSITY PIPE COVERING
OR RIGID INSULATION FOR PIPE
SIZES 2" OR LARGER.
HANGER
HANGER ROD
(SEE SCHEDULE)
22 GA. METAL SLEEVE
@ SUPPORT 10" LONG
HWR
GATE VALVE
BALANCING VALVE
UNIT HEATER
UNION (TYP)
1/2" AIR VENT
HWS
AUQUASTAT
HOSE BIBB DRAIN
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
M E
C H
A N
IC
A
L D
E
TA
IL
S
M
M
-0
NOT TO SCALE2
FINTUBE PIPING DETAIL
NOT TO SCALE4
ROOFTOP UNIT DETAIL
NOT TO SCALE1
VAV WITH REHEAT DETAIL
NOT TO SCALE5
HEATING COIL PIPING DETAIL
NOT TO SCALE3
PIPE HANGER DETAILS
NOT TO SCALE6
UNIT HEATER PIPING DETAIL
DUAL WALL TURNING VANES
"D
"R
"R" = 1/2 x "D"
T H
R O
A T
INSULATION
STAND-OFF
HANDLE WITH
LOCKING QUADRANT
INSIDE END BEARING
1/8" CLEARANCE
ALL AROUND
DAMPER BLADE
OUTSIDE END
BEARING
DUCT
INSULATION
INSULATION
STAND-OFF
HANDLE WITH
LOCKING QUADRANT
INSIDE END BEARING
STIFFEN BLADE AS REQUIREDINSULATION
DAMPER BLADE
HANDLE WITH
LOCKING QUADRANT
DUCT
INSULATION STAND-OFF
SECTION (SQUARE DUCT) SECTION (ROUND DUCT)
SIDE ELEVATION
NOTES:
1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-
BLADE DAMPERS AND ROUND DAMPERS.
1/2" ROUND ROD
PIN
DUCT INSULATION
(SEE SCHEDULE)
PARALLEL BLADE
DAMPER
LOW VOLTAGE DAMPER
ACTUATOR MOUNTED ON
EXTERIOR OF DUCT
(PROVIDE INSULATION
STANDOFF)
PITCH DUCT UP
SEAL JOINTS WITH SILICONE
CAULK PERIMETER
VERIFY WALL CONSTRUCTION
O P
E N
IN
G
S
IZ
E
F
IE
L D
V E
R
IF
Y
DRAINABLE FIXED BLADE LOUVER
(SEE SCHEDULE)
FA
OA
ENERGY
RECOVERY UNIT
TO WALL CAP WITH
BACKDRAFT
DAMPER
FROM WALL CAP
EA
RA
CONDENSATE TO APPROVED LOCATION
EXHAUST OR
SUPPLY DUCT
TAPERED TAKEOFF
INSIDE PAINTED FLAT
BLACK
GALVANIZED SHEET
METAL HOUSING
CEILING
MOUNTING FLANGE
PER CEILING TYPE
GRILLE WITH OPPOSED
BLADE DAMPER
(SEE SCHEDULE)
A/D
FIRE RATED WALL OR
PARTITION
SEE ARCHITECTURAL DRAWING
FOR RATING
1-1/2" x H x 1/8" GALVANIZED
MOUNTING ANGLE (4 SIDES) 1"
OVER-LAP
DUCT INSULATION
16 GAUGE SLEEVE
FUSIBLE LINK
FIRE DAMPER
SINGLE DAMPER
SIZE 72" x 48" (MAX.)
SLEEVE EXCEEDING 36"W x
24"H SHALL BE 14 GAUGE6" MAX
ACCESS DOOR WITH
CAMLOCK FASTENER SIDE
OR BOTTOM OF DUCT
A/D
'UL' APPROVED
CONNECTION METHOD
1/4" DIA. STEEL NUTS &
BOLTS 6" O.C. AND 2"
FROM EA. END
WALL OPENING TO BE 1/4" TO 1/2"
LARGER THEN DAMPER & SLEEVE
ASSEMBLY ON ALL SIDES FOR
EXPANSION
ROOF STRUCTURE
METAL BAND SUPPORT
VOLUME DAMPER
SUPPLY DUCT
BELLMOUTH OR SCOOPED
TAKE-OFF FITTING FLEXIBLE DUCT
(60" MAX LENGTH)
DIFFUSER
(FRAME TO MATCH CEILING TYPE)
CABLE TIE WITH MASTIC
SEALER AT INNER CORE.
TAPE SEAL OUTER JACKET.
ELBOW ADJUSTED TO
DIRECTION OF AIRFLOW
CEILING DIFFUSER
(FRAME TO MATCH CEILING TYPE)
FLEXIBLE DUCT
(24" MAX LENGTH)
VOLUME DAMPER
(SEE DETAIL)
SUPPLY DUCT
CONICAL BELLMOUTH OR
SCOOPED TAKE-OFF
FITTING.
METAL BAND
SUPPORT
STRUCTURE
CABLE TIE WITH MASTIC
SEALER AT INNER CORE.
TAPE SEAL OUTER
JACKET. (TYP)
ELBOW ADJUSTED TO
DIRECTION OF AIRFLOW
GALVANIZED SHEET
METAL HOUSING WITH
INTERIOR PAINTED FLAT BLACK
CEILING
MOUNTING FLANGE PER
CEILING TYPE
EGGCRATE RETURN GRILLE
(SEE SCHEDULE)
VOLUME DAMPER
(SEE DETAIL)
RETURN DUCT MAIN
P L
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
M E
C H
A N
IC
A
L D
E
TA
IL
S
M
M
-0
NOT TO SCALE8
ACCEPTABLE DUCT TURNS
NOT TO SCALE2
DAMPER DETAIL
NOT TO SCALE4
DUCTED WALL LOUVER DETAIL
NOT TO SCALE6
ERV DETAIL
NOT TO SCALE7
EXHAUST GRILLE DETAIL
NOT TO SCALE3
FIRE DAMPER DETAIL
NOT TO SCALE1
FLEX DUCT CONNECTION DETAIL
NOT TO SCALE5
RETURN GRILLE DETAIL
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
C O
N
TR
O L
D R
A W
IN
G
S
M
M
-0
ADD CO2 DETECTOR IN RETURN AIR DUCT FOR DEMAND CONTROL VENTILATION
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
C O
N
TR
O L
D R
A W
IN
G
S
M
M
-0
U R I B
U
E
S U
N U M
C I
R C
U M
S P
I C
E
S I
Q U
E R E I S
P E N I N S U L A M
A M O E N A M
X X
P R
E L
IM
IN
A
R Y
C O
N S
T R
U C
T
IO
N
F
IN
A L R
E C
O R
D
D A
T E
IS
S
U E
D F
O R
IN
D
E X
C O
D E
D M
V A
P R
O J E
C T
A
ID
E
N T
IF
IC
A T
IO
N
N O
S
H E
E T
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
A P
P R
O V
E D
U P
E A
P R
O
JE
C T
/2
7/
R E
N O
V A
T E
A R
M O
R Y
C
A L U
M E
T
C A
L U
M E
T
M
IC
H
IG
A N
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
S A
F F
A
IR
S
S C P
S C P
A S J
JK
G
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
S T
A T
E O
F M
IC
H
IG
A
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
A D
A M
L A
C H
R
A D
IR
E
C T
O R w w w .u p e a .c o m
/1
3/
D T
M B
F
IL
E
/2
.T
A P
M E
C H
A N
IC
A
L S
C H
E D
U
LE
S
M
M
-0
HOT WATER REHEAT ROOFTOP UNIT SCHEDULE
ID MANUFACTURER MODEL NUMBER
FAN HEATING COOLING ELECTRICAL
Notes
CFM RPM
ESP
(IN)
MBH EWT (°F) LWT (°F)
COIL FLOW
RATE (GPM)
COIL FLUID
PRESSURE
DROP (FT. HD)
SUPPLY AIR
(CFM)
RETURN AIR
(CFM)
OUTSIDE AIR
(CFM)
OAT
(°F)
MAT
(°F)
LAT
(°F)
TYPE
GROSS
CAPACITY
(MBH)
SENSIBLE
CAPACITY
(MBH)
EADB
(°F)
EAWB
(°F)
LADB
(°F)
LAWB
(°F)
VOLTS PHASE HP MCA MOCP
This is the start of the file's text. The full file is on GovTribe.
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .