511.21337.CAK RENOVATE ARMORY - BIG RAPIDS Project Manual CD VOLUME 0.pdf
PDF 1 MB Posted
- Solicitation number
- RFQ - 171 - 230000000114
- Issued by
- Mecosta County, Michigan
About this file
This document is a State of Michigan Department of Technology, Management and Budget (DTMB) owner and contractor standard construction contract for the renovation of an armory located in Big Rapids, Michigan. The work includes renovation of the existing armory and addition of new classroom spaces, with a total area of 29,724 square feet. A mandatory pre-bid conference will be held virtually and on-site on January 6, 2023. Bids are due by 2:00 PM ET on January 18, 2023 and must remain open for acceptance by the Owner for no less than 90 calendar days. The contract includes defined contract times and associated liquidated damages. Bidders must submit bid security in the amount of 5% of the base bid, as well as other qualification submittals. The awarded contractor will be required to comply with Michigan's soil erosion and sedimentation control regulations, and may be subject to a fine for non-compliance.
The contract requires the use of certain named or specified materials and equipment, but allows for proposals to add alternative products up to 10 calendar days prior to the bid due date. The contract provides for the use of unit price work, as well as cash and provisionary allowances. Payments to the contractor will be subject to the General Conditions, which include provisions regarding changes in the work, claims, progress payments, and final payment.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0
Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition. Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR
STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
MICHSPEC No. 97.0820 − 00020 THROUGH 97.0820 − 00440
RELEASED ON NOVEMBER 1, 1997.
Developed from
Contract Forms and Conditions of the Contract
FORMSPEC Michigan Model and suggested for use with
Bidding Requirements
File No. 511/21337.CAK DMVA Project 26A4622026
Department of Military and Veterans Affairs Renovate Armory – Big Rapids
15900 190th Avenue
Big Rapids, MI 49307
December 9, 2022
1997 Edition/R 03/22 Version
STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS
MICHSPEC DTMB 00010 − 1 (R 03/22)
SECTION 00010 TABLE OF CONTENTS
SECTION/PAGE NO.
SUBJECT INDEX
SECTION 00020 GLOSSARY ............................................................................................................................................. 00020 - 1
SECTION 00030 ADVERTISEMENT .................................................................................................................................. 00030 - 1
SECTION 00100 INSTRUCTIONS TO BIDDERS ............................................................................................................... 00100 - 1
ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS .................................................................................................. 00100 - 1
ARTICLE 2 QUALIFICATIONS OF BIDDERS ..................................................................................................................... 00100 - 1
ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS ....................................... 00100 - 2
ARTICLE 4 INTERPRETATIONS; ADDENDA .................................................................................................................... 00100 - 3
ARTICLE 5 BID SECURITY ................................................................................................................................................ 00100 - 3
ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES .................................................................................................. 00100 - 4
ARTICLE 7 MATERIALS AND EQUIPMENT ...................................................................................................................... 00100 - 4
ARTICLE 8 SUBCONTRACTORS ...................................................................................................................................... 00100 - 5
ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS ................................................................................................. 00100 - 5
ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS.................................................................................................. 00100 - 6
ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ........................................................................................................ 00100 - 6
ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ................................................................................................ 00100 - 7
ARTICLE 13 BIDS TO REMAIN OPEN .................................................................................................................................. 00100 - 7
ARTICLE 14 AWARD OF THE CONTRACT .......................................................................................................................... 00100 - 7
ARTICLE 15 EXECUTION OF THE AGREEMENT ................................................................................................................ 00100 - 9
ARTICLE 16 MOBILIZATION PAY ITEM ............................................................................................................................. 00100 -10 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .................................. 00100 -10 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST........................................................................................ 00110 - 1
SECTION 00120 SUPPLEMENTARY INSTRUCTIONS ..................................................................................................... 00120 - 1
SECTION 00210 INFORMATION FOR BIDDERS .............................................................................................................. 00210 - 1
SECTION 00300 BID SUMMARY ...................................................................................................................... 00300 - SUMMARY
SECTION 00300 BID FORM ............................................................................................................................................... 00300 - 1
ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER"). ................................................. 00300 - 1
ARTICLE 2 THE BIDDER'S REPRESENTATIONS ............................................................................................................... 00300 - 1
ARTICLE 3 TIME OF COMPLETION ..................................................................................................................................... 00300 - 2
ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID .................................................................................................... 00300 - 2
ARTICLE 5 DEFINED TERMS ............................................................................................................................................... 00300 - 2
ARTICLE 6 BID SCHEDULE .................................................................................................................................................. 00300 - 3
ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ...................................................................................................... 00300 - 5
ARTICLE 8 BID SUBMITTED ON ......................................................................................................................................... 00300 - 6
SECTION 00310 BID BOND ............................................................................................................................................... 00310 - 1
SECTION 00320 NONCOLLUSION AFFIDAVIT ................................................................................................................ 00320 - 1
SECTION 00410 BID BREAKDOWN ................................................................................................................................. 00410 - 1
SECTION 00420 QUESTIONNAIRE ................................................................................................................................... 00420 - 1
ARTICLE 1 ORGANIZATION ............................................................................................................................................... 00420 - 1
ARTICLE 2 SPECIALTY CONTRACTOR LICENSES .......................................................................................................... 00420 - 1
ARTICLE 3 EXPERIENCE ................................................................................................................................................... 00420 - 1
ARTICLE 4 ADDITIONAL QUALIFICATIONS ...................................................................................................................... 00420 - 2
ARTICLE 5 REFERENCES .................................................................................................................................................. 00420 - 2 REFERENCES ATTACHMENT ......................................................................................................................... 00420 - 3
SECTION 00430 LIST OF SUBCONTRACTORS ............................................................................................................... 00430 - 1
SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT .................................................................................. 00440 - 1
ARTICLE 1 BID MATERIALS AND EQUIPMENT −LISTED (NAMED OR SPECIFIED) ITEMS ........................................... 00440 - 1
ARTICLE 2 BID MATERIALS AND EQUIPMENT − OPEN SPECIFICATIONS .................................................................... 00440 - 3
SECTION 00500 AGREEMENT .......................................................................................................................................... 00500 - 1
ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK .............................................................................................. 00500 - 1
ARTICLE 2 CONTRACT DOCUMENTS .............................................................................................................................. 00500 - 1
ARTICLE 3 CONTRACT PRICE ........................................................................................................................................... 00500 - 2
ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES ................................................................................................... 00500 - 2
ARTICLE 5 PAYMENTS TO CONTRACTOR ...................................................................................................................... 00500 - 3
MICHSPEC DTMB 00010 − 2 (R 03/22)
ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR ......................................................................................... 00500 - 3
ARTICLE 7 CONTRACTOR'S REPRESENTATIONS .......................................................................................................... 00500 - 3
ARTICLE 8 MISCELLANEOUS ............................................................................................................................................ 00500 - 3
ARTICLE 9 NOTICE AND SERVICE .................................................................................................................................... 00500 - 4
SECTION 00520 ATTACHMENT “A” TO AGREEMENT ................................................................................................... 00520 - 1
SECTION 00610 PERFORMANCE BOND ........................................................................................................................ 00610 - 1
SECTION 00620 PAYMENT BOND ................................................................................................................................... 00620 - 1
SECTION 00700 GENERAL CONDITIONS ........................................................................................................................ 00700 - 1
ARTICLE 1 INTERPRETATIONS ........................................................................................................................................... 00700 - 1
1.1 Section 00020 Glossary:............................................................................................................................................... 00700 - 1
1.2 Intent of the Contract Documents: ................................................................................................................................ 00700 - 1
1.3 Priority of the Contract Documents: .............................................................................................................................. 00700 - 2
1.4 Interpretation of Indemnification Provisions: ................................................................................................................. 00700 - 2
1.5 Additional Interpretations: ............................................................................................................................................. 00700 - 2
1.6 Ownership and Use of the Contract Documents: ......................................................................................................... 00700 - 3.
1.7 Copies of the Contract Documents: ............................................................................................................................... 00700 - 3
ARTICLE 2 THE OWNER−GENERAL PROVISIONS .......................................................................................................... 00700 - 3
2.1 Availability of Lands, Areas, Properties and Facilities: ................................................................................................. 00700 - 3
2.2 Reference Points; Base Lines and Benchmarks: .......................................................................................................... 00700 - 3
2.3 Stop Work Order: ......................................................................................................................................................... 00700 - 3.
2.4 Limitations on the Owner’s Responsibilities: ................................................................................................................ 00700 - 4
2.5 Additional General Provisions: ...................................................................................................................................... 00700 - 4
2.6 Partnering Charter: ...................................................................................................................................................... 00700 - 4.
ARTICLE 3 THE PROFESSIONAL − GENERAL PROVISIONS .......................................................................................... 00700 - 4
3.1 Owner’s Representative: ............................................................................................................................................. 00700 - 4
3.2 Clarifications and Interpretations: ................................................................................................................................. 00700 - 4
3.3 Minor Variations and No-Cost Changes; Minor Delays:................................................................................................ 00700 - 5
3.4 Determinations by the Professional: ........................................................................................................................... 00700 - 5
3.5 Limitations on the Professional’s Responsibilities: ....................................................................................................... 00700 - 5
ARTICLE 4 CONTROL OF WORK − GENERAL PROVISIONS ........................................................................................... 00700 - 5
4.1 Review of the Contract Documents: ............................................................................................................................. 00700 - 5
4.2 Management, Supervision, and Personnel: .................................................................................................................. 00700 - 5
4.3 Materials and Equipment: ............................................................................................................................................. 00700 - 6
4.4 Concerning Control of Work: ....................................................................................................................................... 00700 - 6.
4.5 Patent Fees and Royalties: ........................................................................................................................................... 00700 - 7
4.6 Use of Premises: .......................................................................................................................................................... 00700 - 7
4.7 Record Documents: ...................................................................................................................................................... 00700 - 7
4.8 Emergencies: ................................................................................................................................................................ 00700 - 8
4.9 Indemnification: ............................................................................................................................................................ 00700 - 8
ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS .......................................................................................................... 00700 - 8
5.1 Employment of Subcontractors: .................................................................................................................................... 00700 - 8
5.2 "Or Equal" and Substitute Materials and Equipment:.................................................................................................... 00700 - 9
5.3 The Contractor’s Continuing Responsibilities: ............................................................................................................ 00700 - 9
ARTICLE 6 SUBMITTALS .................................................................................................................................................... 00700 - 9
6.1 Shop Drawing, Sample and Other Technical Submittals: ............................................................................................. 00700 - 9
6.2 Review and Return of Technical Submittals: ............................................................................................................. 00700 - 10.
6.3 Progress Schedule Submittals: ................................................................................................................................... 00700 - 10
6.4 Review and Return of Progress Schedule Submittals: .............................................................................................. 00700 - 10.
6.5 Additional Provisions Concerning Submittals: ........................................................................................................... 00700 - 10.
ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ........................................................................................................ 00700 - 11
7.1 Laws; Permits (Which Include Approvals and Licenses): .......................................................................................... 00700 - 11.
7.2 Sales and Use Tax and Other Similar Taxes: ............................................................................................................ 00700 - 12.
7.3 Safety and Protection: ................................................................................................................................................ 00700 - 12
7.4 Bonds and Insurance - General Requirements: .......................................................................................................... 00700 - 12
7.5 The Contractor’s Liability Insurance:......................................................................................................................... 00700 - 12
7.6 Pollution Liability Insurance: ....................................................................................................................................... 00700 - 13
7.7 Property Insurance (Builder's All Risk Insurance): ...................................................................................................... 00700 - 13
7.8 Waiver of Rights: ........................................................................................................................................................ 00700 - 13
7.9 Receipt and Application of Proceeds: ......................................................................................................................... 00700 - 13
MICHSPEC DTMB 00010 − 3 (R 03/22)
7.10 Unfair Labor Practice: ................................................................................................................................................. 00700 - 13
7.11 Michigan Right-To-Know Law: ................................................................................................................................... 00700 - 13.
7.12 Nondiscrimination: ...................................................................................................................................................... 00700 - 14
7.13 Michigan Residency for Employees: ........................................................................................................................... 00700 - 14
ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION ........................................................................................... 00700 - 15
8.1 Starting the Work: ...................................................................................................................................................... 00700 - 15.
8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ................................................................................................... 00700 - 15
8.3 Compliance with Contract Time Requirements: .......................................................................................................... 00700 - 15
8.4 Substantial Completion: .............................................................................................................................................. 00700 - 15
8.5 Partial Use: ................................................................................................................................................................. 00700 - 16
8.6 Division of Responsibilities: ........................................................................................................................................ 00700 - 16
8.7 Suspension of Work: .................................................................................................................................................. 00700 - 16
8.8 Sharing of Total Float on Non-Critical Paths: .............................................................................................................. 00700 - 16
ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND
APPROVALS; CORRECTION OF WORK ....................................................................................................... 00700 - 17
9.1 Warranty: ................................................................................................................................................................... 00700 - 17
9.2 Tests, Inspections and Approvals: ............................................................................................................................. 00700 - 17
9.3 Uncovering Work: ...................................................................................................................................................... 00700 - 17
9.4 Correction of Work: .................................................................................................................................................... 00700 - 17
9.5 Special Correction Period Requirements: .................................................................................................................. 00700 - 18
9.6 Special Maintenance Requirements: ......................................................................................................................... 00700 - 18
ARTICLE 10 CHANGES ..................................................................................................................................................... 00700 - 19
10.1 Changes in the Work: ................................................................................................................................................ 00700 - 19
10.2 Differing Subsurface or Physical Site Conditions: ..................................................................................................... 00700 - 19.
10.3 Responsibilities for Underground Utilities: ................................................................................................................. 00700 - 20
10.4 Hazardous Material Conditions: ................................................................................................................................. 00700 - 20
10.5 Incidents with Archaeological Features: .................................................................................................................... 00700 - 20
10.6 Unit Price Work: ......................................................................................................................................................... 00700 - 21
10.7 Cash Allowances; Provisionary Allowances: ............................................................................................................. 00700 - 21
10.8 Change Orders; Change Authorizations: ................................................................................................................... 00700 - 21
ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN
CONTRACT TIME ......................................................................................................................................... 00700 - 22
11.1 General Provisions: ................................................................................................................................................... 00700 - 22
11.2 Changes in Contract Time: ........................................................................................................................................ 00700 - 22
11.3 Methods for Making Adjustments in Contract Price: ................................................................................................. 00700 - 22.
11.4 Labor, Subcontract and Material/Equipment Costs: .................................................................................................. 00700 - 23
11.5 Construction Equipment Costs: ................................................................................................................................. 00700 - 23
11.6 Rented or Leased Construction Equipment: .............................................................................................................. 00700 - 23
11.7 Owned Construction Equipment: ............................................................................................................................... 00700 - 24
11.8 General Conditions Costs: ......................................................................................................................................... 00700 - 24
11.9 Limitations on Allowable Costs: ................................................................................................................................. 00700 - 24
11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ....................... 00700 - 24.
11.11 Limits on the Fee for the Work Involved: ................................................................................................................... 00700 - 25.
11.12 Fee for Unabsorbed Home Office Overhead: ............................................................................................................. 00700 - 25
11.13 Changes in Contract Time for Early Completion: ........................................................................................................ 00700 - 25
11.14 Access to Records: ..................................................................................................................................................... 00700 - 26
11.15 Price Reduction for Defective Cost and Pricing Data: ................................................................................................ 00700 - 26
ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ............................................................................................... 00700 - 26
12.1. Schedule of Values: ................................................................................................................................................... 00700 - 26
12.2 Requests for Payment: .............................................................................................................................................. 00700 - 27
12.3 Review of Request for Payment; Intent of Review: .................................................................................................... 00700 - 27
12.4 Refusal to Make or to Recommend Payment: .......................................................................................................... 00700 - 27.
12.5 Final Request for Payment: ....................................................................................................................................... 00700 - 27
12.6 Final Payment and Acceptance: ................................................................................................................................ 00700 - 28
12.7 Contractor’s Continuing Obligation: ......................................................................................................................... 00700 - 28
12.8 Waiver of Claims: ...................................................................................................................................................... 00700 - 28
ARTICLE 13 OTHER WORK .............................................................................................................................................. 00700 - 28
13.1 Related Work at Site: ................................................................................................................................................. 00700 - 28
13.2 Coordination Requirements: ...................................................................................................................................... 00700 - 29
13.3 Claims Between the Contractor and Other Parties: ................................................................................................. 00700 - 29
MICHSPEC DTMB 00010 − 4 (R 03/22)
ARTICLE 14 TERMINATION .............................................................................................................................................. 00700 - 29
14.1 Notice Requiring Assurance of Due Performance: ................................................................................................... 00700 - 29.
14.2 Contractor Default and Termination for Cause: ........................................................................................................ 00700 - 30
14.3 Surety Default: ........................................................................................................................................................... 00700 - 31
14.4 Termination for Convenience of the Owner: .............................................................................................................. 00700 - 31
14.5 The Contractor May Suspend Work: ...................................................................................................................... 00700 – 31.
ARTICLE 15 DISPUTES .................................................................................................................................................... 00700 - 31
15.1 Claims Under This Article: ......................................................................................................................................... 00700 - 31
15.2 Requirement for Certification of Contractor Claims: ................................................................................................. 00700 - 32
15.3 Recommendations or Decisions from the Professional:........................................................................................... 00700 - 32
15.4 Determinations by the Director-DCD: ....................................................................................................................... 00700 - 32
15.5 Supplements to AAA Arbitration: ............................................................................................................................... 00700 - 33
15.6 Interest on a Judgment; Payment of Judgment: ........................................................................................................ 00700 - 33
15.7 Venue; Flow-Through Provision: ............................................................................................................................... 00700 - 33
SECTION 00800 SUPPLEMENTARY CONDITIONS ....................................................................................................... 00800 - 1
DIVISION 01000 GENERAL REQUIREMENTS PROVIDED BY PSC
Division 00 — Procurement and Contracting Requirements
00 3100 - AVAILABLE PROJECT INFORMATION
- GEOTECHNICAL REPORT
- ASBESTOS & LEAD BASE PAINT BUILDING SURVEY
- BULK SAMPLE ANALYTICAL REPORT
00 6323 - CADD FILE TRANSFER WAIVER
00 6324 - BIM TRANSFER WAIVER
00 7343 - WAGE RATE REQUIREMENTS
Division 02 — Existing Conditions
02 4119 - SELECTIVE DEMOLITION
Division 03 — Concrete
03 3000 - CAST-IN-PLACE CONCRETE
03 6000 - POST INSTALLED ANCHORS
Division 04 — Masonry
04 0110 – MASONRY CLEANING
04 2000 - UNIT MASONRY
Division 05 — Metals
05 1200 - STRUCTURAL STEEL FRAMING
05 2100 - STEEL JOIST FRAMING
05 3100 - STEEL DECKING
05 4000 - COLD-FORMED METAL FRAMING
05 5213 - PIPE AND TUBE RAILINGS
Division 06 — Wood, Plastics, and Composites
06 1000 - ROUGH CARPENTRY
06 1600 - SHEATHING
06 4116 - PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS
06 6116 - SOLID SURFACING FABRICATIONS
MICHSPEC DTMB 00010 − 5 (R 03/22)
Division 07 — Thermal and Moisture Protection
07 2100 - THERMAL INSULATION
07 2119 - FOAMED-IN-PLACE INSULATION
07 2413 - POLYMER-BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS)
07 5323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
07 7100 - ROOF SPECIALTIES
07 8413 - PENETRATION FIRESTOPPING
07 8443 - JOINT FIRESTOPPING
07 9200 - JOINT SEALANTS
07 9219 - ACOUSTICAL JOINT SEALANTS
Division 08 — Openings
08 0671 - DOOR HARDWARE SCHEDULE
08 1113 - HOLLOW METAL DOORS AND FRAMES
08 3113 - ACCESS DOORS AND FRAMES
08 3613 - SECTIONAL DOORS
08 4113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 7100 - DOOR HARDWARE
08 8000 - GLAZING
08 8813 - FIRE-RATED GLAZING
Division 09 — Finishes
09 2400 - CEMENT PLASTERING
09 2900 - GYPSUM BOARD
09 3000 - TILING
09 5123 - ACOUSTICAL TILE CEILINGS
09 6513 - RESILIENT BASE AND ACCESSORIES
09 6566 - RESILIENT ATHLETIC FLOORING
09 6813 - TILE CARPETING
09 9114 - EXTERIOR PAINTING
09 9123 - INTERIOR PAINTING
Division 10 — Specialties
10 1453 - TRAFFIC SIGNAGE
10 2113.19 - PLASTIC TOILET COMPARTMENTS
10 2213 - WIRE MESH PARTITIONS
10 2800 - TOILET, BATH, AND LAUNDRY ACCESSORIES
10 4413 - FIRE PROTECTION CABINETS
10 4416 - FIRE EXTINGUISHERS
10 5113 - METAL LOCKERS
Division 12 — Furnishings
12 3661.16 - SOLID SURFACING COUNTERTOPS
VOLUME 2
Division 22 — Plumbing
22 0500 - COMMON WORK RESULTS FOR PLUMBING
22 0523 - GENERAL DUTY VALVES FOR PLUMBING PIPING (2 and smaller)
22 0529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 0553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 0700 - PLUMBING INSULATION
22 1116 - DOMESTIC WATER PIPING
22 1119 - DOMESTIC WATER PIPING SPECIALTIES
22 1316 - SANITARY WASTE AND VENT PIPING
MICHSPEC DTMB 00010 − 6 (R 03/22)
22 1319 - SANITARY WASTE PIPING SPECIALTIES
22 1413 - FACILITY STORM DRAINAGE PIPING
22 1423 - STORM DRAINAGE PIPING SPECIALTIES
22 4000 - PLUMBING FIXTURES
Division 23 — Heating Ventilating and Air Conditioning
23 0500 - COMMON WORK RESULTS FOR HVAC
23 0513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 0519 - METERS AND GAGES FOR HVAC PIPING
23 0523 - GENERAL DUTY VALVES FOR HVAC PIPING
23 0529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 0553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 0700 - HVAC INSULATION
23 0900 - HVAC INSTRUMENTATION AND CONTROLS
23 2113 - HYDRONIC PIPING
23 3113 - METAL DUCTS
23 3300 - AIR DUCT ACCESSORIES
23 3713 - DIFFUSERS, REGISTERS, AND GRILLES
23 7200 - AIR-TO-AIR ENERGY RECOVERY EQUIPMENT
23 7413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS
23 8216 - AIR COILS
Division 26 — Electrical
26 0500 - COMMON WORK RESULTS FOR ELECTRICAL
26 0519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 0533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 0536 - CABLE TRAYS FOR ELECTRICAL SYSTEMS
26 0543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS
26 0544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING
26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 0923 - LIGHTING CONTROL DEVICES
26 2416 - PANELBOARDS
26 2726 - WIRING DEVICES
26 5100 - INTERIOR LIGHTING
26 5600 - EXTERIOR LIGHTING
Division 27 — Data Communication System
27 0500 – DTA COMMUNICATION SYSTEM
Division 28 — Electronic Safety and Security
28 3100 - FIRE DETECTION AND ALARM
Division 31 — Earthwork
31 1000 - SITE CLEARING
31 2000 - EARTH MOVING
31 3116 - TERMITE CONTROL
Division 32 — Exterior Improvements
32 1216 - ASPHALT PAVING
32 1313 - CONCRETE PAVING
MICHSPEC DTMB 00010 − 7 (R 03/22)
32 1373 - CONCRETE PAVING JOINT SEALANTS
32 3113 - CHAIN LINK FENCES AND GATES (sf2)
32 3223 - SEGMENTAL RETAINING WALLS
32 9200 - TURF AND GRASSES (sf0)
Division 33 — Utilities
33 4100 - STORM UTILITY DRAINAGE PIPING
DRAWINGS - BOUND SEPARATELY
TITLE
GENERAL
G 001 COVER SHEET
G 002 TYPICAL SYMBOLS, GENERAL NOTES, INTERIOR PARTITION TYPES & DEVICE ALIGNMENT GUIDLINES
G 101 FIRST FLOOR CODE COMPLIACE PLAN
G 102 CODE COMPLIANCE INFORMATION
CIVIL DEMOLITION
CD 101
CIVIL
C 101
C 201
C 501
LANDSCAPE
L 101 SITE PLAN FEFNCING % LANDSCAPE
STRUCTURAL
S 001 GENERAL NOTES
S 002 SPECIAL INSPECTION
S 003 TYPICAL DETAILS
S 004 TYPICAL DETAILS
S 101 FOUNDATION PLAN
S 201 FRAMING PLAN
S 301 FOUNDATION DETAILS
S 401 FRAMING DETAILS
ARCHITECTURAL DEMOLITION
AD 101 DEMOLITION FLOOR PLAN
AD 201 DEMOLITION REFLECTED
AD 301 DEMOLITION ELEVATIONS
ARCHITECTURAL
A 101 FLOOR PLAN
A 102 ROOF PLAN
A 201 FIRST FLOOR REFLECTED CEILING PLAN
A 301 EXTERIOR ELEVATIONS
A 311 BUILDING SECTION
A 321 WALL SECTIONS
A 322 WALL SECTIONS
A 351 PLAN DETAILS
A 421 ENLARGED PLANS, TYPICAL MOUNTING HEIGHTS AND BARRIER FREE MOUNTING HEIGHTS
A 501 DOOR SCHEDULES, FRAMING ELEVTATION, HEAD AND JAMB DETAILS
A 601 FIRST FLOOR
MICHSPEC DTMB 00010 − 2 (Rev. 02/22)
A 611 MATERIAL SELECTION SCHEDULE & TYPICAL DETAILS
A 701 FIRST FLOOR FURNITURE PLAN
MECHANICAL & PLUMBING GENERAL
MP 001 MECHANICAL & PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
MECHANICAL DEMOLITION
MD 101 FIRST FLOOR MECHANICAL DEMOLITION PLAN
MD 150 ROOF MECHANICAL DEMOLITION PLAN
PLUMBING
P 100 FOUNDATION PLUMBING PLAN
P 101 FIRST FLOOR PLUMBING PLAN
P 301 ENLARGED PLUMBING PLANS
P 501 PLUMBING SCHEDULE AND DETAILS
MECHANICAL
M 101 FIRST FLOOR SHEET METAL PLAN
M 150 MECHANICAL ROOF PLAN
M 201 FIRST FLOOR HVAC PIPING PLAN
M 501 MECHANICAL SCHEDULES AND DETAILS
M 502 MECHANICAL SCHEDULES AND DETAILS
M 601 TEMPERATURE CONTROLS
M 602 TEMPERATURE CONTROLS
M 603 TEMPERATURE CONTROLS DETAILS & SCHEDULES
ELECTRICAL GENERAL
E 001 ELECTRICAL SYMBOLS AND GENERAL NOTES
ELECTRICAL DEMOLITION
ED 101 SITE ELECRICAL DEMOLITION PLAN
ED 102 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
ELECTRICAL SITE
E 010 ELECTRICAL SITE PLAN
ELECTRICAL
E 101 FIRST FLOOR POWER PLAN
E 150 ROOF POWER PLAN
E 201 FIRST FLOOR LIGHTING PLAN
E 401 ELECTRICAL ONE LINE
E 421 SITE PHOTOMETRIC PLAN
E 422 BUILDING PHOTOMETRIC PLAN
E 423 LIGHTING SCHEDULES AND DETAILS
STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY
MICHSPEC DTMB 00020 - 1 (R 03/22)
SECTION 00020 GLOSSARY
1.1 Defined Terms:
1.1.1. The following terms or relative pronouns used in
Division 0 of the Specifications have these intent and meanings:
Activity− An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.
Addenda− Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.
Agreement− The written agreement between the Owner and Contractor covering the Work to be furnished and performed.
Alternate− Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.
Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.
Archaeological Feature− Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.
As-Planned Schedule− The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.
Authorized Technical Data− Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph 3.0 of Section 00210 Information for Bidders.
Bar Chart Schedule− Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
STATE OF MICHIGAN MODEL
Developed from FORMSPEC Michigan Model.
Bid− Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates. The term Bid includes a Rebid.
Bidder− The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.
Bidding Documents− The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.
Bid Price− The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.
Bid Security− A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.
Bidding Requirements− The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.
*AD Board− The Administrative Board of the State of Michigan.
Bonds− Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.
Business Day− Any Day except Saturdays, Sundays and holidays observed by the Owner.
Bulletin− A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.
Calendar Day− Every day shown on the calendar, Saturdays, Sundays, and holidays included.
Cash Allowance− An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents. Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently
MICHSPEC DTMB 00020 - 2 (R 03/22)
detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.
Change Authorization− A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.
Change Order− A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.
Contact Person− Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.
Contract− Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by the Contract Documents.
Contract Award− The official action of the Board, the Director-SFA or the Director-DCD awarding the Contract to the Contractor.
Contract Documents− Those documents itemized or designated in paragraphs 2.2 through 2.4 of Section 00500 Agreement.
Contract Float− Calendar Days between the Contractor's anticipated date for early completion of the Work, or of a specified portion of the Work, if any, and the corresponding Contract Time.
Contract Price− The Contract price for the Work, or a designated portion of the Work, as designated in Section 00500 Agreement or elsewhere in the Contract Documents, is the total compensation, including authorized adjustments, payable by the Owner to the Contractor (subject to provisions for Unit Price Work).
Contract Times− The Contract Times for the entire Work are the periods allowed, including authorized adjustments, for Substantial Completion and final completion of the Work. The Contract Times for a designated portion of the Work are the periods allowed for Substantial Completion and final completion of any such portion of the Work, as specified in the Contract Documents.
Contractor− Person named "the Contractor" in Section 00500 Agreement with whom the Owner has entered into the Contract.
Correction Period− The period during which the Contractor shall, in accordance with the Contract Documents, (a) correct or, if rejected, remove, and replace Defective Work, and (b) maintain warranties for materials and equipment in full force and effect.
Cost of the Work Involved− The sum of all costs that would be, or were, necessarily incurred by the Contractor in providing any Work Involved with the related change, less the costs that would be, or would have been, incurred by the Contractor to provide such Work without the related change.
CPM Schedule− Computerized, Activity-based Progress Schedule, using Critical Path Method (CPM) techniques, and accounting for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
Critical Path Method (CPM)− The Critical Path Method of planning and scheduling. The term “Critical Path” denotes a sequence of Activities controlling achievement of a specified Contract Time.
Date of Commencement of the Contract Time− The date when the Contract Time starts to run.
Defective− An adjective which when referring to or when applied to the term “Work” refers to (a) Work not conforming to the Contract Documents or not meeting the requirements of any inspection, test, or approval, or (b) Work itemized in a Punch List which the Contractor fails to complete or correct within a reasonable time after issuance of the Punch List by the Professional.
Defective Work/Non-Compliance Notice – A DTMB-0499 form or equivalent issued to identify defective or non-compliant conditions requiring response and remedy by the Contractor.
Delay− Any act or omission or other event that in any manner adversely affects or alters the schedule, progress or completion of all or any part of the Work. Delay is a generic term intended to include deferral, stoppage, slow down, interruption and extended performance, and all related hindrance, rescheduling, disruption, interference, inefficiency and productivity and production losses.
*Department (DTMB)− Department of Technology, Management and Budget of the State of Michigan. Director is the Director of the Department.
Director-SFA- The Director of DTMB State Facilities Administration.
Director-DCD- The…
This is the start of the file's text. The full file is on GovTribe.