5-YATB Reno Permit Set 2026-06-22.pdf

PDF 26 MB Posted

Attached to
Mailroom Infill Project
Solicitation number
Not on record
Issued by
York County, Pennsylvania

About this file

This document comprises permit-level architectural drawings and specifications for the York Adams Tax Bureau's Second Floor Office Expansion project located at 1405 North Duke Street, York, PA 17404. The project involves partial demolition and infill construction on both the first and second floors of an existing building, including removal of existing walls, doors, ceilings, and fixtures, followed by construction of new interior partitions, ceiling assemblies, flooring systems, and finishes. The scope encompasses architectural, structural, mechanical, electrical, and plumbing work coordinated by Core Design Group (architect), Paragon Engineering Services (MEP engineer), and Structural Engineering Resources LLC (structural engineer). Key project elements include new interior partitions with metal studs and gypsum wallboard, reflected ceiling plans with acoustical tile and gypsum board assemblies, floor assemblies with concrete and metal deck, new door and window openings, and accessibility compliance per 2009 and 2017 ANSI A117.1 standards. The general contractor is responsible for obtaining all building permits, coordinating inspections, securing a Certificate of Occupancy, verifying all dimensions and site conditions, and ensuring compliance with ADA requirements and all applicable local, state, and federal codes. A pre-bid meeting is scheduled for Wednesday, July 1, 2026 at 1:00 p.m. at the project site, with sealed bids due by 3:00 p.m. on Wednesday, July 22, 2026 via the PennBid system. Bidders must submit questions and substitution requests no later than 2:00 p.m. on Wednesday, July 8, 2026 through PennBid.

Bid security of ten percent (10%) of the maximum bid amount must accompany each bid in the form of a Bid Bond. The contractor must provide full and complete warranties for all HVAC, electrical, and plumbing equipment with a minimum one-year term from substantial completion. Upon project completion, a minimum of two cases or 5% of product finishes must be left at the job site. The general contractor bears sole responsibility for shoring, bracing, site safety, debris management, utility location verification, and coordination of all subcontractors and trades throughout construction. York Adams Tax Bureau reserves the right to waive any irregularities in bids and to reject any and all bids. No proposal may be withdrawn for sixty (60) days following bid opening without the consent of York Adams Tax Bureau. The drawings are issued for permit purposes only and are the exclusive property of Core Design Group; recipients warrant not to reproduce, distribute, or reuse the documents without written permission from the architect.

View the file

Other files

File Type Posted
2-Section 008700 Bid Form-General.pdf PDF
4-Prevailing Wage Rates.pdf PDF
1-Section 000300 Advertisement for Bids.pdf PDF
3-AIA A310-2010 Bid Bond.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE ALARM SYSTEM

DETAILED DRAWINGS FULLY DEFINING THE FOLLOWING SYSTEMS HAVE NOT BEEN INCLUDED.

THE REQUIRED DRAWINGS, SHOP DRAWINGS, SCHEDULES AND FULL SPECIFICATIONS WILL BE

PROVIDED FOR REVIEW A MINIMUM OF THIRTY (30) DAYS PRIOR TO INSTALLATION. ACCEPTANCE

OF DEFERRED SUBMISSION OF THE FOLLOWING INFORMATION IS REQUESTED:

DEFERRED SUBMISSIONS

SPRINKLER SYSTEM

ALL PARTS OF THESE DOCUMENTS AND/OR SPECIFICATIONS ARE THE

EXCLUSIVE PROPERTY OF THE ARCHITECT AND WE RESERVE ALL

RIGHTS TO HAVE THIS WORK REPRODUCED, FABRICATED,

CONSTRUCTED, AND/OR MANUFACTURED. WE HAVE PLACED THESE

DOCUMENTS IN YOUR TEMPORARY CUSTODY, IN CONFIDENCE,

SOLELY FOR YOUR INSPECTION, AND/OR ESTIMATING THE COST OF

FABRICATING, CONSTRUCTING, AND/OR MANUFACTURING THE WORK

SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL

DIMENSIONS AND CONDITIONS AT THE JOBSITE, AS WELL AS BUILDING

RULES AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR

COORDINATING ALL INSPECTIONS AND OBTAINING THE CERTIFICATE

OF OCCUPANCY. THE RECIPIENT OF THESE DOCUMENTS WARRANTS

THAT THEY WILL NOT REPRODUCE, DISTRIBUTE, OR OTHERWISE

MAKE USE OF THE DOCUMENTS WITHOUT THE PERMISSION OF THE

ARCHITECT. THE USE OF THESE DESIGNS FOR ANY OTHER PURPOSE

IS UNAUTHORIZED. DO NOT SCALE THESE DOCUMENTS.

CORE DESIGN GROUP

SHEET NO:

PROJECT TEAM VICINITY MAP SITE LOCATION

SHEET NAME:

PROJECT NO: PROJECT MGR:

REVISIONS

CONSULTANT INFORMATION:

SEAL/STAMP:

155 WEST MARKET STREET, SUITE 200

YORK, PA 17401

PHONE 717.741.2046 FAX: 717.741.6836

WWW.CORE-DESIGNGROUP.COM

6/

/2

2:

:1

PM

Au to de sk

D oc s:

//Y

AT

B

M ai l R oo m

In fil l P ro je ct

/2 5.

- Y

AT

B

- M ai l I nf ill

Pr oj ec t.r vt

COVER SHEET

G000

25.147 M.A.S.

YO

RK

A

DA

M S

TA

X

BU

RE

AU

SE

CO

ND

F

LO

OR

O

FF

IC

E

EX

PA

NS

IO

N

N

OR

TH

D

UK

E

ST

RE

ET

YO

RK

, P

A

YORK ADAMS TAX BUREAU

SECOND FLOOR OFFICE EXPANSION

1405 NORTH DUKE STREET

YORK, PA 17404

ARCHITECT: STRUCTURAL ENGINEER:

OWNER: M.E.P. ENGINEER:

PARAGON ENGINEERING SERVICES

1620 S. QUEEN STREET

YORK, PA 17403

(717) 781-2264

YORK ADAMS TAX BUREAU

1405 NORTH DUKE STREET

YORK, PA 17405

(717) 845-1584

STRUCTURAL ENGINEERING RESOURCES, LLC.

26 NORTH FOURTH STREET

GETTYSBURG, PA 17325

(717) 337-1335

CORE DESIGN GROUP

155 WEST MARKET STREET, SUITE 200

YORK, PA 17401

(717) 741-2046

SHEET LIST AND REVISION DATE

SHEET NAME

GENERAL

G000 COVER SHEET

G100 DRAWING INDEX, SYMBOL LEGEND AND GENERAL NOTES

G201 FIRST FLOOR LIFE SAFETY PLAN

G202 SECOND FLOOR LIFE SAFETY PLAN

G300 ACCESSIBILITY DETAILS

G400 ACCESSIBILITY SIGNAGE

ARCHITECTURAL

AD101 PARTIAL FIRST FLOOR DEMOLITION PLAN

AD102 PARTIAL SECOND FLOOR DEMOLITION PLAN

AD200 PARTIAL FIRST FLOOR CEILING DEMOLITION PLAN

AD201 PARTIAL SECOND FLOOR CEILING DEMOLITION PLAN

A101 PARTIAL FIRST FLOOR NEW WORK PLAN

A102 PARTIAL SECOND FLOOR NEW WORK PLAN

A103 FIRST FLOOR REFLECTED CEILING PLAN

A104 SECOND FLOOR REFLECTED CEILING PLAN

A200 ENLARGED PLANS AND ELEVATIONS

A300 DOOR AND WINDOW SCHEDULE

STRUCTURAL

S1 FOUNDATION PLAN

S2 PARTIAL SECOND FLOOR NEW WORK PLAN

S3 SECTIONS AND DETAILS

MECHANICAL

D101 FIRST FLOOR - DEMO - SANITARY & VENT

D102 SECOND FLOOR - DEMO - SANITARY & VENT

M001 LEGENDS, SCHEDULES, SPECIFICATIONS AND DETAILS

M101 SECOND FLOOR - PLUMBING

M201 FIRST FLOOR - HVAC

M202 SECOND FLOOR - HVAC

ELECTRICAL

E001 SYMBOLS, ABBREVIATIONS & SPECIFICATIONS

E002 SCHEDULES

ED101 FIRST FLOOR - DEMO - LIGHTING AND POWER

ED102 SECOND FLOOR - DEMO - LIGHTING AND POWER

E101 FIRST FLOOR - LIGHTING

E102 SECOND FLOOR - LIGHTING

E201 SECOND FLOOR - POWER PLAN

NO. DATE DESCRIPTION

1 2026/06/05 ISSUED FOR PERMIT

SECTION CALLOUT

EXTERIOR ELEVATION CALLOUT

INTERIOR ELEVATION CALLOUT

ROOM NAME

ROOM NUMBER

DOOR TAG

REVISION DELTA

ELEVATION DESIGNATION

WALL / PARTITION TAG

COLUMN GRID DESIGNATION

REFERENCE LEVEL

DATUM

SCALE

NAME

LEVEL

VIEW TITLE WINDOW TAG

W#

CENTERLINE

CLDETAIL CALLOUT

VIEW NUMBER

SHEET NUMBER

ROOM TAG

ROOM NAME

P##

VIEW NUMBERS

SHEET NUMBER

VIEW NUMBER

SHEET NUMBER

A101

1 VIEW NUMBER

SHEET NUMBER

A101

SIM

A101

LEVEL NAME

X'-X"

STOREFRONT / CURTAINWALL TAG

CW#

PROPOSED EXISTING

A101

XX

TOILET ACCESSORY TAG

VIEW TITLE

SCALE: x/x" = x' - x"

A101

XX'-X" ELEVATION ABOVE

DATUM 0'-0"

TRUE NORTH

AB ANCHOR BOLT(S), AUGER BORING

ACI AMERICAN CONCRETE INSTITUTE

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADDL ADDITIONAL

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AJC ASPHALTIC CONCRETE

ALT ALTERNATE/ ALTERNATING

APPROX APPROXIMATE

ARCH ARCHITECT(URAL)

ASSOC ASSOCIATED/ ASSOCIATION

ASTM AMERICAN SOCIETY OF TESTING MATERIALS

ATC AUTOMATIC TEMPERATURE CONTROL

AWP ACOUSTICAL WALL PANEL

BC BOTTOM OF CURB

BFF BELOW FINISHED FLOOR

BFG BELOW FINISHED GRADE

BKT BRACKET

BLDG BUILDING

BLVD BOULEVARD

BM BENCH MARK

BOB BOTTOM OF BEAM

BOF BOTTOM OF FOOTING

BOJ BOTTOM OF JOIST

BOS BOTTOM OF STEEL

BOTT BOTTOM

BRG BEARING

BSMT BASEMENT

BUR BUILT-UP ROOF

CART CARTWAY

CCT CUBICLE CURTAIN TRACK

CF CUBIC (FOOT) FEET

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CI CAST IRON

CIP CAST IRON PIPE

CIRC CONTRACTION/ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLR CLEARANCE / CLEAR

CM CORRUGATED METAL

CMP CORRUGATED METAL PIPE ARCH

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

CO CLEANOUT

COB CENTER OF BEAM

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONST CONSTRUCTION

CONT CONTINUOUS

CORRG CORRUGATED

CPP CORRUGATED PLASTIC PIPE

CPT CARPET

CR CLASSROOM

CUH CABINET UNIT HEATER

DBL DOUBLE

DH DRILL HOLE

DIAG DIAGONAL

DIFF DIFFUSER

DIM DIMENSION

DP DAMPROOF(ING)

DS DOWN SPOUT

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

ENGR ENGINEER(ING)

EOF EDGE OF FLOOR

EOS EDGE OF SLAB

EQUIP EQUIPMENT

EST ESTIMATE

EW EACH WAY

EX EXISTING

FBD FIBER BOARD

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FFE FINISHED FLOOR ELEVATION

FIN FINISH(ED)

FIX FIXTURE

FM FACTORY MANUAL

FP FULL PENETRATION WELD

FPR FIRE PROOF(ING)

FTG FOOTING

FURN FURNITURE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GFI GROUND FAULT INTERRUPTER

GLBLK GLAZED BLOCK

GPM GALLONS PER MINUTE

GYM GYMNASIUM

GWB GYPSUM WALLBOARD

H/ V HEATING AND VENTILATING

HB HOSE BIB

HC HEATING CONTRACTOR

HM HOLLOW METAL

HORIZ HORIZONTAL

HT HEIGHT

HVAC HEATING/ VENTILATING/ AIR CONDITIONING

HW HOT WATER

HYD HYDRANT

IBC INTERNATIONAL BUILDING CODE

INCL INCLUDE/ INCLUSIVE

INSUL INSULATE/ INSULATION

JAN JANITOR

KSI KIPS PER SQUARE INCH

LAB LABORATORY

LAV LAVATORY

LB(S) POUND(S)

LDY LAUNDRY

LF LINEAL FEET

LH LEFT HAND

LHR LEFT HAND REVERSE

LIB LIBRARY

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

MAS MASONRY

MAX MAXIMUM

MB MAILBOX

MC MECHANICAL CONTRACTOR

MECH MECHANIC(AL)

MED MEDICAL

MEP MECHANICAL, ELECTRICAL, PLUMBING

MFD MANUFACTURED

MFR MANUFACTURE(R)

MIN MINIMUM

MISC MISCELLANEOUS

MM MILLIMETER

MO MASONRY OPENING

MTD MOUNTED

MTG MOUNTING

NA NOT APPLICABLE

NEC NATIONAL ELECTRIC CODE

NFPA NATIONAL FIRE PROTECTION ASSOC.

NIC NOT IN CONTRACT

NO NUMBER

NTS NOT TO SCALE

OC ON CENTER(S)

OPNG OPENING(S)

OPP OPPOSITE

PC PLUMBING CONTRACTOR

PCF POUNDS PER CUBIC FOOT

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLWD PLYWOOD

POLYISO POLYISOCYANURATE

PREFAB PREFABRICATED

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PTL PRESSURE TREATED LUMBER

PTD PAINTED

RA RETURN AIR

RC REINFORCED CONCRETE

RD ROOF DRAIN

REBAR REINFORCING BAR

REG REGISTER

REINF REINFORCED/REINFORCING

RH RIGHT HAND

RHR RIGHT HAND REVERSE

RL RAIN LEADER

RO ROUGH OPENING

RWC RAIN WATER CONDUCTOR

SA SUPPLY AIR

SECT SECTION(AL)

SJ SAW JOINT

SLV SHORT LEG VERTICAL

SOG SLAB ON GRADE

SP SOUNDPROOF

SPAND SPANDREL

SPECS SPECIFICATIONS

SPR SPRINKLER(ED)

SQ SQUARE

SF SQUARE FOOT/FEET

SI SQUARE INCH(ES)

SS STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STER STERILIZER

STOR STORAGE

STRUCT STRUCTURAL

SV SHEET VINYL

SW STORMWATER

T&B TOP AND BOTTOM

T&G TONGUE & GROOVE

TC TOP OF CURB

TEL TELEPHONE

TEMP TEMPERED

TG TOP OF GRATE

TH THICK/THICKNESS

THRU THROUGH

TOB TOP OF BEAM

TOF TOP OF FOOTING

TOJ TOP OF JOIST

TOS TOP OF STEEL

TW TOP OF WALL

TYP TYPICAL

UC UNDERCUT (DOORS)

UCC UNIFORM CONSTRUCTION CODE

UG UNDERGROUND

UNO UNLESS NOTED OTHERWISE

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VOL VOLUME

VT VINYL TREAD

VWC VINYL WALL COVERING

WC WATER CLOSET

WCO WALL CLEAN OUT

WDW WINDOW

WGL WIRE GLASS

WM WOOD MOLDING

WP WEATHERPROOF

WP WORK POINT

WSL WATER SURFACE ELEVATION

WT WEIGHT

WWF WELDED WIRE FABRIC

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

THE WORK INCLUDES ALL LABOR, MATERIALS, EQUIPMENT, AND SERVICES NECESSARY FOR THE COMPLETION OF ALL WORK AS ILLUSTRATED AND DESCRIBED ON THE DRAWINGS AS PREPARED BY CORE DESIGN GROUP. ALL SUCH WORK IS TO BE DONE BY THE GENERAL CONTRACTOR UNLESS

OTHERWISE NOTED.

GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS AT THE JOB SITE AND SHALL NOTIFY THE ARCHITECT OF ANY OMISSIONS, DISCREPANCIES, AND / OR CONFLICTS PRIOR TO CONSTRUCTION / INSTALLATION. INTERIOR DIMENSIONS ARE TO FACE OF STUD

AND FACE OF PLYWOOD WHERE APPLICABLE.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO COMPLETE THIS PROJECT IN COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT AND ALL CITIES, STATE AND LOCAL CODES, INCLUDING THE PREPARATION AND APPROVAL BY LOCAL AUTHORITIES OF ALL MECHANICAL, ELECTRICAL, PLUMBING, SPRINKLER PLANS AND SPECIFICATIONS.

GENERAL CONTRACTOR SHALL OBTAIN FULL AND COMPLETE WARRANTIES FOR ALL HVAC, ELECTRICAL, AND PLUMBING EQUIPMENT FROM THE CONTRACTOR PROVIDING SAID SERVICES. WARRANTIES WILL REMAIN IN EFFECT A MINIMUM OF ONE (1) YEAR FROM SUBSTANTIAL COMPLETION DATE.

WHERE COLOR AND DESIGN SELECTIONS ARE REQUIRED, THE GENERAL CONTRACTOR SHALL SUBMIT SAMPLES TO THE OWNER FOR SELECTION AND APPROVAL. AFTER COMPLETION OF THE PROJECT, A MINIMUM OF 2 CASES OR 5% OF PRODUCT FINISHES TO BE LEFT AT THE JOB SITE.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND REVIEWING ALL SHOP DRAWINGS BEFORE SUBMISSION AND PROVIDING ALL

NECESSARY SAMPLES TO THE ARCHITECT.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND REVIEWING ALL STRUCTURAL ERECTION DRAWINGS BEFORE SUBMISSION TO

THE ARCHITECT / STRUCTURAL ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL REQUIRED BUILDING PERMITS AND OBTAINING A CERTIFICATE OF OCCUPANCY

FROM THE GOVERNING AUTHORITY.

GENERAL CONTRACTOR SHALL HAVE DIRECT CONTROL AND MANAGEMENT OF ALL CONSTRUCTION OPERATIONS AND BE RESPONSIBLE FOR THE SATISFACTORY OVERALL PERFORMANCE OF ALL HIS SUPPLIERS AND SUBCONTRACTORS AS WELL AS ALL ASSIGNED CONTRACTORS.

GENERAL CONTRACTOR IS TO RECEIVE, HANDLE, STORE (IF NECESSARY) AND BE RESPONSIBLE FOR ALL MATERIALS PROVIDED BY OTHERS.

ALL MATERIALS USED IN CONSTRUCTION SHALL BE NEW AND OF FIRST QUALITY UNLESS OTHERWISE INDICATED.

GYPSUM WALLBOARD SHALL BE INSTALLED WITH ALL CORNER BEADS, TRIM ACCESSORIES AND MOLDINGS, ETC. FOR A COMPLETE INSTALLATION.

GYPSUM WALLBOARD TO BE TAPED AND SANDED (READY FOR PAINT). DRYWALL CONTRACTOR TO INSTALL CONTROL JOINTS ACCORDING TO INDUSTRY STANDARDS. ALL FULL HEIGHT STEEL STUD PARTITIONS MUST INCLUDE A DEFLECTION TRACK IF WALL IS SECURED TO ROOF STRUCTURE.

GENERAL CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION.

GENERAL CONTRACTOR SHALL COORDINATE THE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS AND REPORT TO ARCHITECT ANY

UNFORESEEN CONFLICTS BETWEEN THE SUB TRADES.

ITEMS AND CONDITIONS NOTED ON DETAILS ARE APPLICABLE AND BINDING TO SIMILAR CONDITIONS ON ALL THE DRAWINGS. FOR CONDITIONS NOT NOTED OR DETAILED, CONTRACTOR SHALL PROVIDE MATERIALS OF EQUAL QUALITY AND PERFORMANCES TO OTHER SIMILAR CONDITIONS ON THE

JOB.

WALL AND CEILING FINISHES SHALL INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, PILASTERS OR OTHER ENCLOSURES.

ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, DUCTS, WINDOWS, LOUVERS, GRILLES, MECHANICAL WORK, ETC., SHALL FIT SNUGLY AND BE THOROUGHLY SEALED AROUND PERIMETERS. WORK AT EXTERIOR WALLS SHALL BE FLASHED OR OTHERWISE WATERPROOF

SEALED.

FIELD CHECK ROUGH AND / OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF CABINETS, COUNTERS, LOCKERS, DOORS, WINDOWS, FIXTURES, SHELVING, GATES AND OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATIONS. PROVIDE AND INSTALL NECESSARY FILLER STRIPS, SCRIBE STRIPS, BASES, CLOSURES, FINISHES AND TRIM TO COMPLETE SUCH INSTALLATIONS. PROVIDE AND INSTALL ALL NECESSARY CONCEALED

BLOCKING TO SECURELY ANCHOR WALL MOUNTED FIXTURES, CABINETS, EQUIPMENT, ETC.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR CLOSING-IN, SEALING AND PROTECTION OF EXISTING OR PUBLIC SPACES FROM THE WORK AREA INCLUDING NOISE, DUST AND POLLUTION CONTROL. THE CONTRACTOR SHALL MAINTAIN AT ALL TIMES ADEQUATE SAFETY BARRIERS AND CLEAR ACCESS IN AND OUT OF THE SITE AND FACILITY SO AS TO FACILITATE DAILY TRAFFIC MOVEMENT, DELIVERIES AND PUBLIC SAFETY. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR KEEPING THE AREA CLEAN FROM DEBRIS DURING CONSTRUCTION.

GENERAL CONTRACTOR SHALL CONSULT WITH THE OWNER TO VERIFY THE SCOPE OF WORK; TO VERIFY OWNER FURNISHED ITEMS AND COORDINATE THOSE ITEMS INTO THE WORK; TO VERIFY ANY ITEMS TO BE RELOCATED. VERIFY ANY WORK TO BE PROVIDED BY THE OWNER AND TO COORDINATE

THAT WORK INTO THE PROGRESS OF THE SCHEDULED WORK.

GENERAL CONTRACTOR SHALL PROVIDE BLOCKING (FIRE RATED AS REQUIRED) WITHIN WALLS FOR ALL ACCESSORIES.

SECTIONS SHOWN ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE INDEXED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR SECTIONS THROUGHOUT THE PROJECT WHICH DO NOT HAVE SPECIFIC SECTIONS DRAWN. THE MOST SIMILAR SECTION SHALL BE ADAPTED TO ANY SECTION NOT DETAILED. ANY SPECIFIC QUESTION CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE ABOVE

SHOULD BE DIRECTED TO THE ARCHITECT.

OPENINGS FOR PIPES, DUCTS, CONDUIT, SLEEVES, ETC. SHALL BE SEALED AROUND THE COMPONENTS FULL THICKNESS OF THE DECK (FIRE RATED

SEALANT WHERE REQUIRED).

ARCHITECTURAL DRAWINGS INDICATE BEARING ELEVATION FOR INFORMATION PURPOSES ONLY. SEE STRUCTURAL DRAWINGS FOR ACTUAL

STRUCTURAL STEEL AND BEARING ELEVATIONS.

CONSULT PLUMBING, HVAC AND ELECTRICAL DRAWINGS FOR LOCATIONS AND DESCRIPTIONS OF ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILING OR FLOORS AND PROVIDE NECESSARY LINTELS, SUPPORT OR ANCHORING. SEE STRUCTURAL NOTES FOR LINTEL REQUIREMENTS.

SEAL ALL SIDES OF FRAMES ABUTTING DISSIMILAR MATERIALS; TYPICAL, CONTINUOUSLY AT HEADS, JAMBS, AND SILLS (EXCEPT AT DOOR SILLS

UNLESS NOTED OTHERWISE).

FILL ALL HOLLOW METAL (HM) FRAMES ABUTTING MASONRY WITH GROUT. FILL INTERMEDIATE MEMBERS AS SHOWN IN DETAILS (TYPICAL).

GENERAL CONTRACTOR SHALL VERIFY ALL PENETRATIONS THROUGH CONCRETE FLOORS AND FORM ACCORDINGLY (PRIOR TO POURING SLAB).

FLASHING AT HEADS OF WALL OPENINGS SHALL INCLUDE END DAMS.

ALL MASONRY WALL PENETRATIONS TO BE SLEEVED OR CORE DRILLED. SUBCONTRACTORS ARE RESPONSIBLE FOR SEALING ALL OF THEIR

PENETRATIONS IN MASONRY WALLS.

BUILD ALL PARTITIONS IN THEIR ENTIRETY TO THE UNDERSIDE OF THE FLOOR OR ROOF DECK, UNLESS NOTED OTHERWISE. PROVIDE DEFLECTION TRACK AT ALL STUD TO DECK CONDITIONS. SEE DEFLECTION TRACK DETAILS. WHERE FIRE RATED PARTITIONS OR CMU WALLS ARE REQUIRED, SEE

FIRE SAFING DETAIL.

INSTALL ALL MATERIALS / PRODUCTS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS AND SPECIFICATIONS.

GENERAL CONTRACTOR SHALL PROVIDE CAULKING WHERE ALL DISSIMILAR MATERIALS MEET.

34. MAINTAIN THE BUILDING IN A WATERTIGHT CONDITION AT ALL TIMES.

35. THE CONTRACTOR SHALL MAINTAIN (FOR THE ENTIRE LENGTH OF HIS CONTRACT) EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES AND ALARMS TO

CONFORM TO LOCAL BUILDING CODE REQUIREMENTS.

36. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, DISTORTION, AND/OR MISALIGNMENT IN ACCORDANCE WITH APPLICABLE CODE STANDARDS AND GOOD PRACTICE.

37. THE GENERAL CONTRACTOR SHALL BE SOLELY AND EXCLUSIVELY RESPONSIBLE FOR THE ADEQUACY OF ALL SHORING AND BRACING. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION SHORING AND BRACING OF ALL STRUCTURAL WORK AS REQUIRED FOR THE STABILITY OF THE STRUCTURE DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY CONDITION WHICH, IN HIS OPINION, MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE DISTRESS IN THE STRUCTURE.

GENERAL NOTES:

ALL PARTS OF THESE DOCUMENTS AND/OR SPECIFICATIONS ARE THE

EXCLUSIVE PROPERTY OF THE ARCHITECT AND WE RESERVE ALL

RIGHTS TO HAVE THIS WORK REPRODUCED, FABRICATED,

CONSTRUCTED, AND/OR MANUFACTURED. WE HAVE PLACED THESE

DOCUMENTS IN YOUR TEMPORARY CUSTODY, IN CONFIDENCE,

SOLELY FOR YOUR INSPECTION, AND/OR ESTIMATING THE COST OF

FABRICATING, CONSTRUCTING, AND/OR MANUFACTURING THE WORK

SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL

DIMENSIONS AND CONDITIONS AT THE JOBSITE, AS WELL AS BUILDING

RULES AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR

COORDINATING ALL INSPECTIONS AND OBTAINING THE CERTIFICATE

OF OCCUPANCY. THE RECIPIENT OF THESE DOCUMENTS WARRANTS

THAT THEY WILL NOT REPRODUCE, DISTRIBUTE, OR OTHERWISE

MAKE USE OF THE DOCUMENTS WITHOUT THE PERMISSION OF THE

ARCHITECT. THE USE OF THESE DESIGNS FOR ANY OTHER PURPOSE

SHEET NAME:

PROJECT NO: PROJECT MGR:

REVISIONS

CONSULTANT INFORMATION:

SEAL/STAMP:

155 WEST MARKET STREET, SUITE 200

YORK, PA 17401

PHONE 717.741.2046 FAX: 717.741.6836

WWW.CORE-DESIGNGROUP.COM

6/

/2

2:

:1

PM

Au to de sk

D oc s:

//Y

AT

B

M ai l R oo m

In fil l P ro je ct

/2 5.

- Y

AT

B

- M ai l I nf ill

Pr oj ec t.r vt

DRAWING INDEX,

SYMBOL LEGEND

AND GENERAL

NOTES

G100

25.147 M.A.S.

YO

RK

A

DA

M S

TA

X

BU

RE

AU

SE

CO

ND

F

LO

OR

O

FF

IC

E

EX

PA

NS

IO

N

N

OR

TH

D

UK

E

ST

RE

ET

YO

RK

, P

A

ASSEMBLY COMPOSITION LIST

TAG THUMBNAIL COMPOSITION STATUS

A INTERIOR PARTITION

THICKNESS: 4 7/8" (● CORE THICKNESS: 3 5/8")

○ 5/8" GYPSUM WALL BOARD

● 3 5/8" METAL STUD

○ 5/8" GYPSUM WALL BOARD

NEW WORK

B INTERIOR PARTITION

THICKNESS: 4 5/8" (● CORE THICKNESS: 3 5/8")

— TAG SIDE —

○ 5/8" GYPSUM WALL BOARD

● 3 5/8" METAL STUD

○ 3/8" AIR GAP

NEW WORK

C INTERIOR PARTITION

THICKNESS: 4 1/4" (● CORE THICKNESS: 3 5/8")

○ 5/8" GYPSUM WALL BOARD

● 3 5/8" METAL STUD

NEW WORK

D FLOOR ASSEMBLY

THICKNESS: 1' - 9" (● CORE THICKNESS: 1' - 4")

○ 3 1/2" CONCRETE

○ 1 1/2" METAL DECK

● 1' - 4" STEEL BEAMS, SEE STRUCTURAL DRAWINGS

NEW WORK

E CEILING ASSEMBLY

THICKNESS: 2 1/8" (● CORE THICKNESS: 1 1/2")

● 1 1/2" METAL FURRING

○ 5/8" GYPSUM BOARD

NEW WORK

F CEILING ASSEMBLY

THICKNESS: 3/4"

○ 3/4" ACOUSTICAL CEILING TILE 24" X 24"

NEW WORK

ASSEMBLY HEIGHTS LIST

TAG BOTTOM OF ASSEMBLY TOP OF ASSEMBLY

1 TOP OF FLOOR ASSEMBLY UNDERSIDE OF ROOF ASSEMBLY

2 TOP OF FLOOR ASSEMBLY SECOND FLOOR (+ 8' - 6")

3 SECOND FLOOR (+ 8' - 0") SECOND FLOOR (+ 8' - 2 1/8")

4 SECOND FLOOR (+ 8' - 0") SECOND FLOOR (+ 8' - 0 3/4")

5 FIRST FLOOR (+ 12' - 11") SECOND FLOOR

USE GROUP / CONSTRUCTION TYPE

CAPACITY REQUIRED

CAPACITY PROVIDED

NUMBER OF OCCUPANTS

OCCUPANTS PER GROSS FLOOR AREA SF

XXXX

EMERGENCY LIGHT FIXTURE

WALL MOUNTED FIRE EXTINGUISHERFE

EXIT LIGHT

EXIT LIGHT COMBO

105'

1341 SF

MAIL ROOM

173 SF

MACHINE ROOM

139 SF

STAIR

.825" 33.75"

2.625" 33.75"

326 SF

STORAGE

FE

FIRE EXTINGUISHER EQUIPMENT:

A.

B.

C.

D.

E.

A.

B.

1.

2.

3.

4.

a.

b.

c.

5.

FIRE PROTECTION:

EXTINGUISHING EQUIPMENT GUIDELINES:

PROVIDE EXTINGUISHERS PER NFPA 10

MINIMUM PLACEMENT OF ONE 10LB ABC PORTABLE FIRE EXTINGUISHER AND SHALL BE PROVIDED WITH A MAXIMUM OF 75FT OF TRAVEL

DISTANCE TO THE EXTINGUISHER.

FIRE EXTINGUISHERS SHALL BE CONSPICUOUSLY LOCATED WHERE THEY ARE READILY ACCESSIBLE AND IMMEDIATELY AVAILABLE IN THE EVENT

OF A FIRE.

FIRE EXTINGUISHERS SHALL BE LOCATED ALONG NORMAL PATHS OF TRAVEL, INCLUDING EXITS FROM AREAS.

SIGNS OR OTHER MEANS USED TO INDICATE FIRE EXTINGUISHER LOCATIONS SHALL BE LOCATED IN CLOSE PROXIMITY AND SHALL BE VISIBLE

FROM THE NORMAL PATH OF TRAVEL.

INSTALLATION:

BEFORE INSTALLING ANY FIRE-EXTINGUISHING EQUIPMENT, THE OWNER/RESIDENT SHALL READ AND UNDERSTAND THE INSTALLATION AND USE INSTRUCTIONS, INCLUDING THE LIMITATIONS, CAUTION, AND WARNINGS CONTAINED ON THE EQUIPMENT AND IN THE OWNERS MANUAL.

PORTABLE FIRE EXTINGUISHERS SHALL BE INSTALLED PER NFPA 10 AND AS FOLLOWS:

PROVIDE A MINIMUM OF 2 FIRE EXTINGUISHERS. LOCATION SHOWN ON DRAWINGS AND/ OR AS DIRECTED BY FIRE MARSHAL IN THE FIELD.

IN AN ACCESSIBLE LOCATION, FREE FROM BLOCKING BY STORAGE AND EQUIPMENT, AND NEAR ROOM EXITS THAT PROVIDE AN ESCAPE ROUTE.

SO THAT THE TOP OF THE EXTINGUISHER IS NOT MORE THAN 5FT ABOVE TO REACH AND REMOVE AND SHALL BE PLACED WHERE IT WILL NOT BE

DAMAGED.

PORTABLE FIRE EXTINGUISHERS SHALL BE INSTALLED USING ANY OF THE FOLLOWING MEANS:

SECURELY ON A HANGER INTENDED FOR THE FIRE EXTINGUISHER.

IN A BRACKET INCORPORATING RELEASING STRAPS OR BANDS SUPPLIED BY THE EXTINGUISHER MANUFACTURER.

ON A LISTED BRACKET INCORPORATING RELEASING STRAPS OR BANDS APPROVED FOR SUCH A PURPOSE.

PLACED SO THAT THE OPERATING INSTRUCTIONS ON THE EXTINGUISHER FACE OUTWARD.

EMERGENCY AND EXIT LIGHTING SYSTEM NOTES:

A.

B.

C.

D.

EMERGENCY LIGHTING SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 101, SECTION 7.9. THE EMERGENCY LIGHTING SYSTEM SHALL BE ARRANGED TO PROVIDE THE REQUIRE ILLUMINATION AUTOMATICALLY IN THE EVENT OF ANY INTERRUPTION OF NORMAL LIGHTING. EMERGENCY LIGHTING UNITS SHALL CONSIST OF THE RECHARGEABLE BATTERY-OPERATED TYPE IN ACCORDANCE WITH NFPA 70.

EXIT LIGHTING SYSTEM AND MARKING OF MEANS OF EGRESS SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 101, SECTION 7.10. THE EXIT SIGNS SHALL BE INTERNALLY ILLUMINATED BY CIRCUITING FROM THE NORMAL ELECTRICAL SYSTEMS AND SHALL BE FITTED WITH RECHARGEABLE BATTERY OPERATED BACK-UP CIRCUITING IN THE EVENT OF FAILURE OF THE NORMAL POWER SYSTEM.

ALL EXIT AND EMERGENCY LIGHTING SYSTEMS SHALL BE WIRED TO THE NORMAL ELECTRICAL DISTRIBUTION SYSTEM AHEAD OF ANY LOCAL

SWITCHING.

ALL EXIT AND EMERGENCY LIGHTING SYSTEMS SHALL BE PROVIDED IN ACCORDANCE WITH APPLICABLE SECTIONS OF NFPA 70.

ALL PARTS OF THESE DOCUMENTS AND/OR SPECIFICATIONS ARE THE

EXCLUSIVE PROPERTY OF THE ARCHITECT AND WE RESERVE ALL

RIGHTS TO HAVE THIS WORK REPRODUCED, FABRICATED,

CONSTRUCTED, AND/OR MANUFACTURED. WE HAVE PLACED THESE

DOCUMENTS IN YOUR TEMPORARY CUSTODY, IN CONFIDENCE,

SOLELY FOR YOUR INSPECTION, AND/OR ESTIMATING THE COST OF

FABRICATING, CONSTRUCTING, AND/OR MANUFACTURING THE WORK

SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL

DIMENSIONS AND CONDITIONS AT THE JOBSITE, AS WELL AS BUILDING

RULES AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR

COORDINATING ALL INSPECTIONS AND OBTAINING THE CERTIFICATE

OF OCCUPANCY. THE RECIPIENT OF THESE DOCUMENTS WARRANTS

THAT THEY WILL NOT REPRODUCE, DISTRIBUTE, OR OTHERWISE

MAKE USE OF THE DOCUMENTS WITHOUT THE PERMISSION OF THE

ARCHITECT. THE USE OF THESE DESIGNS FOR ANY OTHER PURPOSE

PROJECT NO: PROJECT MGR:

REVISIONS

CONSULTANT INFORMATION:

SEAL/STAMP:

155 WEST MARKET STREET, SUITE 200

YORK, PA 17401

PHONE 717.741.2046 FAX: 717.741.6836

WWW.CORE-DESIGNGROUP.COM

6/

/2

2:

:1

PM

Au to de sk

D oc s:

//Y

AT

B

M ai l R oo m

In fil l P ro je ct

/2 5.

- Y

AT

B

- M ai l I nf ill

Pr oj ec t.r vt

FIRST FLOOR LIFE

SAFETY PLAN

G201

25.147 M.A.S.

YO

RK

A

DA

M S

TA

X

BU

RE

AU

SE

CO

ND

F

LO

OR

O

FF

IC

E

EX

PA

NS

IO

N

N

OR

TH

D

UK

E

ST

RE

ET

YO

RK

, P

A

LIFE SAFETY PLAN LEGEND

SCALE: 1/4" = 1'-0"G201

FIRST FLOOR LIFE SAFETY1

UP

R ef rig er at or

USE GROUP / CONSTRUCTION TYPE

CAPACITY REQUIRED

CAPACITY PROVIDED

NUMBER OF OCCUPANTS

OCCUPANTS PER GROSS FLOOR AREA SF

XXXX

EMERGENCY LIGHT FIXTURE

WALL MOUNTED FIRE EXTINGUISHERFE

EXIT LIGHT

EXIT LIGHT COMBO

RO

OF

B

EL

OW

132 SF

STORAGE

CORRIDOR

283 SF

CONFERENCE

64 SF

TOILET ROOM

192 SF

STORAGE & ROOF

ACCESS

EXIST. ELEV.

1208 SF

DATA ENTRY

201 SF

KITCHENETTE

TOILET ROOM

TOILET ROOM

116 SF

OFFICE

129 SF

OFFICE

99 SF

SERVER

139 SF

STAIR

CO

RR

ID

OR

3A

65'

102'

FE

BOARD ROOM

FIRE EXTINGUISHER EQUIPMENT:

A.

B.

C.

D.

E.

A.

B.

1.

2.

3.

4.

a.

b.

c.

5.

FIRE PROTECTION:

EXTINGUISHING EQUIPMENT GUIDELINES:

PROVIDE EXTINGUISHERS PER NFPA 10

MINIMUM PLACEMENT OF ONE 10LB ABC PORTABLE FIRE EXTINGUISHER AND SHALL BE PROVIDED WITH A MAXIMUM OF 75FT OF TRAVEL

DISTANCE TO THE EXTINGUISHER.

FIRE EXTINGUISHERS SHALL BE CONSPICUOUSLY LOCATED WHERE THEY ARE READILY ACCESSIBLE AND IMMEDIATELY AVAILABLE IN THE EVENT

OF A FIRE.

FIRE EXTINGUISHERS SHALL BE LOCATED ALONG NORMAL PATHS OF TRAVEL, INCLUDING EXITS FROM AREAS.

SIGNS OR OTHER MEANS USED TO INDICATE FIRE EXTINGUISHER LOCATIONS SHALL BE LOCATED IN CLOSE PROXIMITY AND SHALL BE VISIBLE

FROM THE NORMAL PATH OF TRAVEL.

INSTALLATION:

BEFORE INSTALLING ANY FIRE-EXTINGUISHING EQUIPMENT, THE OWNER/RESIDENT SHALL READ AND UNDERSTAND THE INSTALLATION AND USE INSTRUCTIONS, INCLUDING THE LIMITATIONS, CAUTION, AND WARNINGS CONTAINED ON THE EQUIPMENT AND IN THE OWNERS MANUAL.

PORTABLE FIRE EXTINGUISHERS SHALL BE INSTALLED PER NFPA 10 AND AS FOLLOWS:

PROVIDE A MINIMUM OF 2 FIRE EXTINGUISHERS. LOCATION SHOWN ON DRAWINGS AND/ OR AS DIRECTED BY FIRE MARSHAL IN THE FIELD.

IN AN ACCESSIBLE LOCATION, FREE FROM BLOCKING BY STORAGE AND EQUIPMENT, AND NEAR ROOM EXITS THAT PROVIDE AN ESCAPE ROUTE.

SO THAT THE TOP OF THE EXTINGUISHER IS NOT MORE THAN 5FT ABOVE TO REACH AND REMOVE AND SHALL BE PLACED WHERE IT WILL NOT BE

DAMAGED.

PORTABLE FIRE EXTINGUISHERS SHALL BE INSTALLED USING ANY OF THE FOLLOWING MEANS:

SECURELY ON A HANGER INTENDED FOR THE FIRE EXTINGUISHER.

IN A BRACKET INCORPORATING RELEASING STRAPS OR BANDS SUPPLIED BY THE EXTINGUISHER MANUFACTURER.

ON A LISTED BRACKET INCORPORATING RELEASING STRAPS OR BANDS APPROVED FOR SUCH A PURPOSE.

PLACED SO THAT THE OPERATING INSTRUCTIONS ON THE EXTINGUISHER FACE OUTWARD.

EMERGENCY AND EXIT LIGHTING SYSTEM NOTES:

A.

B.

C.

D.

EMERGENCY LIGHTING SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 101, SECTION 7.9. THE EMERGENCY LIGHTING SYSTEM SHALL BE ARRANGED TO PROVIDE THE REQUIRE ILLUMINATION AUTOMATICALLY IN THE EVENT OF ANY INTERRUPTION OF NORMAL LIGHTING. EMERGENCY LIGHTING UNITS SHALL CONSIST OF THE RECHARGEABLE BATTERY-OPERATED TYPE IN ACCORDANCE WITH NFPA 70.

EXIT LIGHTING SYSTEM AND MARKING OF MEANS OF EGRESS SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 101, SECTION 7.10. THE EXIT SIGNS SHALL BE INTERNALLY ILLUMINATED BY CIRCUITING FROM THE NORMAL ELECTRICAL SYSTEMS AND SHALL BE FITTED WITH RECHARGEABLE BATTERY OPERATED BACK-UP CIRCUITING IN THE EVENT OF FAILURE OF THE NORMAL POWER SYSTEM.

ALL EXIT AND EMERGENCY LIGHTING SYSTEMS SHALL BE WIRED TO THE NORMAL ELECTRICAL DISTRIBUTION SYSTEM AHEAD OF ANY LOCAL

SWITCHING.

ALL EXIT AND EMERGENCY LIGHTING SYSTEMS SHALL BE PROVIDED IN ACCORDANCE WITH APPLICABLE SECTIONS OF NFPA 70.

ALL PARTS OF THESE DOCUMENTS AND/OR SPECIFICATIONS ARE THE

EXCLUSIVE PROPERTY OF THE ARCHITECT AND WE RESERVE ALL

RIGHTS TO HAVE THIS WORK REPRODUCED, FABRICATED,

CONSTRUCTED, AND/OR MANUFACTURED. WE HAVE PLACED THESE

DOCUMENTS IN YOUR TEMPORARY CUSTODY, IN CONFIDENCE,

SOLELY FOR YOUR INSPECTION, AND/OR ESTIMATING THE COST OF

FABRICATING, CONSTRUCTING, AND/OR MANUFACTURING THE WORK

SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL

DIMENSIONS AND CONDITIONS AT THE JOBSITE, AS WELL AS BUILDING

RULES AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR

COORDINATING ALL INSPECTIONS AND OBTAINING THE CERTIFICATE

OF OCCUPANCY. THE RECIPIENT OF THESE DOCUMENTS WARRANTS

THAT THEY WILL NOT REPRODUCE, DISTRIBUTE, OR OTHERWISE

MAKE USE OF THE DOCUMENTS WITHOUT THE PERMISSION OF THE

ARCHITECT. THE USE OF THESE DESIGNS FOR ANY OTHER PURPOSE

PROJECT NO: PROJECT MGR:

REVISIONS

CONSULTANT INFORMATION:

SEAL/STAMP:

155 WEST MARKET STREET, SUITE 200

YORK, PA 17401

PHONE 717.741.2046 FAX: 717.741.6836

WWW.CORE-DESIGNGROUP.COM

6/

/2

2:

:2

PM

Au to de sk

D oc s:

//Y

AT

B

M ai l R oo m

In fil l P ro je ct

/2 5.

- Y

AT

B

- M ai l I nf ill

Pr oj ec t.r vt

SECOND FLOOR

LIFE SAFETY

PLAN

G202

25.147 M.A.S.

YO

RK

A

DA

M S

TA

X

BU

RE

AU

SE

CO

ND

F

LO

OR

O

FF

IC

E

EX

PA

NS

IO

N

N

OR

TH

D

UK

E

ST

RE

ET

YO

RK

, P

A

LIFE SAFETY PLAN LEGEND

SCALE: 1/4" = 1'-0"G202

SECOND FLOOR LIFE SAFETY1

60" MIN - 2009 ANSI A117.1

67" MIN - 2017 ANSI A117.1

" M

AX

A

NS

I A

7.1

OVERLAP OF KNEE AND TOE CLEARANCE

CIRCULAR TURNING SPACE -

SIZE AND OVERLAP

" M

AX

A

NS

I A

7.1

SCALE: 1/2" = 1'-0"

FORWARD

APPROACH

CLEAR FLOOR SPACE

IN ALCOVE

SCALE: 1/4" = 1'-0"

CLEAR FLOOR SPACE GUIDELINES

" M

IN

X > 24"

48" MAX - 2009 ANSI A117.1

52" MAX - 2017 ANSI A117.1 60" MIN

X>

" M

IN

48" MIN - 2009 ANSI A117.1

52" MIN - 2017 ANSI A117.1

" M

IN

48" MIN - 2009 ANSI A117.1

52" MIN - 2017 ANSI A117.1

" M

IN

CLEAR FLOOR SPACE

IN ALCOVE

CLEAR FLOOR

SPACE

CLEAR FLOOR

SPACE

PARALLEL

APPROACH

1.

2.

3.

NO CHANGES IN LEVEL EXCEPT SLOPES 1:48 MAX

PERMITTED TO INCLUDE KNEE SPACE

ALCOVE CLEARANCES ALSO APPLY TO OTHER

CONFINEMENTS ON 3 SIDES OF THE CLEAR FLOOR SPACE

4" M

IN

" M

IN

4" MIN

28" MIN

36" MIN

" M

IN

40" MIN

" M

IN

OPTION (1)

CLEAR WIDTH AT 90 DEGREE TURN

SCALE: 1/4" = 1'-0"

36" MIN

" M

IN

OPTION (2)

8" MIN

8" M

IN

36" MIN - 2009 ANSI A117.1

X - 2017 ANSI A117.1

" M

IN

A

NS

I A

7.1

Y

- 2

7 A

NS

I A

7.1

OPTION (3)

X= 38" MIN IF Y= 42" MIN

X= 36" MIN IF Y= 44" MIN

1. WHERE AN ACCESSIBLE ROUTE MAKES

A 90-DEGREE TURN AT DOOR,

DOORWAYS, GATES, ELEVATOR OR

PLATFORM LIFTS THE ACCESSIBLE

ROUTE SHALL NOT BE REQUIRED TO

COMPLY WITH THIS SECTION

CLEAR WIDTH OF AN ACCESSIBLE ROUTE - INTERIOR

SCALE: 1/2" = 1'-0"

SLOPE

1"/20" MAX36

" M

IN

" M

IN

24" MAX

48" MIN - 2009 ANSI A117.1

52" MIN - 2017 ANSI A117.1 24" MAX

" M

IN

" M

IN

SL

OP

E 1"

/48 " M

AX

CLEAR WIDTH AT DOORWAYS

NOTE: DOUBLE LEAF DOORS AND GATES SHALL HAVE

AT LEAST ONE LEAF THAT COMPLIES

SCALE: 1/2" = 1'-0"

32" MIN

90°

32" MIN

HINGED DOOR

32" MIN 36" MIN

SLIDING DOOR

FOLDING DOOR DOORS AND DOORWAYS

WITHOUT DOORS

MANEUVERING CLEARANCES AT DOORWAYS

WITHOUT DOORS

SIDE APPROACHFRONT APPROACH

SCALE: 1/4" = 1'-0"

" M

IN

A

NS

I A

7.1

" M

IN

A

NS

I A

7.1

" M

IN

MANEUVERING CLEARANCES AT SWINGING DOORS

LATCH SIDE APPROACH HINGE SIDE APPROACH

PUSH SIDE:

X=12" IF DOOR HAS BOTH A

LATCH AND A CLOSER

FRONT APPROACH

SCALE: 1/4" = 1'-0"

1.

2.

FRONT APPROACH PROVIDED AT RECESSED DOORS WHERE AN OBSTRUCTION WITHIN 18" OF LATCH SIDE IS 8" DEEP MIN.

DOORS IN SERIES ARE SEPARATED BY 48" MIN PLUS THE WIDTH OF DOORS SWINGING BETWEEN THE TWO

" M

IN

" M

IN

A

NS

I A

7.1

" M

IN

A

NS

I A

7.1

MIN

18"

Y

" M

IN

Y

" M

INX

24" MIN

24" MIN 22" MIN

Y

" M

IN

YX

PULL SIDE:

Y=54" MIN. IF DOOR HAS CLOSER

PUSH SIDE:

Y=48" MIN. IF DOOR HAS CLOSER

PULL SIDE:

X=36" MIN. IF Y=60"

X=42" MIN. IF Y=54"

PUSH SIDE:

Y=48" MIN. IF DOOR HAS BOTH A LATCH AND

CLOSER

68" MIN

" M

IN

" M

IN

" M

IN8"

8"

16" MIN

36" MIN

16" MIN

2017 ANSI A117.1 - OPTION (1)

12" MIN (3)

11" MIN (2) 40" MIN (3)

42" MIN (2)

12" MIN (3)

11" MIN (2)

" M

IN

(3

" M

IN

(2

" M

IN

(3

" M

IN

(2

64" MIN

" M

IN

2017 ANSI A117.1 - OPTION (2) / OPTION (3)

OVERLAP OF KNEE AND TOE CLEARANCE 1.

2.

TURNING SPACE SHALL BE PERMITTED TO INCLUDE KNEE

& TOE CLEARANCE OF EITHER THE BASE OR ONE ARM.

UNLESS OTHERWISE SPECIFIED, DOORS SHALL BE

PERMITTED TO SWING INTO TURNING SPACES.

T-SHAPE TURNING SPACE

BASE

AR

M

BASE

AR

M

SCALE: 1/4" = 1'-0"

12" MIN

36" MIN

12" MIN

" M

IN

" M

IN

60" MIN

" M

IN

BASE

AR

M

2009 ANSI A117.1

SL

OP

E 6"

/1" M

IN

KNEE AND TOE CLEARANCES -

ELEVATION

SCALE: 1" = 1'-0"

1.

2.

APPLIES WHERE SPACE UNDER AN ELEMENT IS PART

OF CLEAR FLOOR SPACE OR TURNING SPACE

CLEARANCES SHALL BE 30" MIN. IN WIDTH

" M

IN

C

LE

AR

K

NE

E

SP

AC

E

AT 27" AFF

8" MIN

6" MAX

AT 9" AFF

11" MIN

TO

E

SP

AC

E

9" M

IN

C

LE

AR

17"-25"

KNEE AND TOE CLEARANCES - PLAN

SCALE: 1" = 1'-0"

" M

IN

25" MAX CLEAR KNEE SPACE

17-25" CLEAR TOE SPACE

PROTRUSION LIMITS

SCALE: 1/4" = 1'-0"

1.

2.

HANDRAILS PROTRUDE 4 1/2" MAX

PROTRUDING OBJECTS MAY NOT

OBSTRUCT REQUIRED CLEAR WIDTH

4" MAX

" M

IN

X

KNEE

SPACE

UNOBSTRUCTED

FORWARD REACH

1. X= 20" MAX IF Y= 48" MAX

X= 20"-25" IF Y= 44" MAX

2. REACH DEPTH NOT TO EXTEND

PAST CLEAR KNEE SPACE

REACH RANGES

SCALE: 1/2" = 1'-0"

" M

AX

" M

IN

Y

CO

UN

TE

R

HE

IG

HT

" M

AX

X

" M

AX

" M

IN

X

Y

" M

AX

OBSTRUCTED HIGH

FORWARD REACH

UNOBSTRUCTED

SIDE REACH

OBSTRUCTED

SIDE REACH

1. X= 10" MAX IF Y= 48" MAX

X= 10"-24" IF Y=46" MAX

OPERABLE

HARDWARE

NO PROJECTIONS INTO THE CLEAR OPENING

WIDTH LOWER THAN 34" ABOVE THE FLOOR

DOOR GUIDELINES

SCALE: 3/8" = 1'-0"

" M

AX

"-4

8"

" M

IN

VISION

LITE

SMOOTH

SURFACE

AREA

VIEWING

SURFACE

FINISHED FLOOR

DOOR WITHOUT SIDELITE

OPERABLE

HARDWARE

NO PROJECTIONS INTO THE CLEAR OPENING

WIDTH LOWER THAN 34" ABOVE THE FLOOR

" M

AX

" M

IN

VISION

LITE

SMOOTH

SURFACE

AREA

VIEWING

SURFACE

FINISHED FLOOR

DOOR WITH SIDELITE

VISION

LITE

SINGLE POST

POST-MOUNTED PROTRUDING OBJECTS

SCALE: 1/4" = 1'-0"

MULTIPLE POSTS

1.

2.

DOES NOT APPLY TO SLOPED PORTIONS OF STAIR AND RAMP HANDRAILS

PROTRUDING OBJECTS MAY NOT OBSTRUCT REQUIRED CLEAR WIDTH

"-8

0"

MAX

4"

MAX

4"

" M

AX X > 12"

" M

IN

X > 12"

4" MAX4" MAX

SIDE ELEVATION FRONT ELEVATION

ACCESSIBLE WATER CLOSET

IN WHEELCHAIR ACCESSIBLE COMPARTMENTS:

X= 59" IF WATER CLOSET IS FLOOR MOUNTED

SCALE: 1/2" = 1'-0"

TOILET PAPER

DISPENSER

LOCATION

X

56" CLEAR FLOOR SPACE

"-3

6"

" M

IN

"-4 1"

39" - 41"

MAX

12" 42" MIN

MI

N

1 1 /2"

54" MIN

6" MAX 36" MIN

MIN

12" 24" MIN

16"-18"

60" CLEAR FLOOR SPACE

42" MAX

" M

IN

"-1

9"

42" MIN

24" MIN

NOTE: FIXTURE IS SHOWN FOR REFERENCE ONLY.

CL

1. FORWARD APPROACH PROVIDED

CENTERED ON UNIT

DRINKING FOUNTAINS

SCALE: 1/2" = 1'-0"

KNEE

SPACE

15" MIN 5" MAX

" M

IN

X

A

NS

I A

7.1

A

NS

I A

7.1

30"

1. X= WIDTH VARIES PER ACTUAL UNIT

SIDE ELEVATION PLAN VIEW

1. FORWARD APPROACH PROVIDED

CENTERED ON UNIT

KNEE

SPACE

FRONT ELEVATION

30"

NOTE: FIXTURE IS SHOWN FOR REFERENCE ONLY.

FINISH FLOOR

FIRE EXTINGUISHER

WITHOUT CABINET

" M

AX

F

RO

M

FI

NI

SH

F

LO

OR

T O

HA

ND

LE

O

F

FI

RE

E

XT

IN

GU

IS

HE

R

SE

E

PL

AN

TO

M

EE

T

A.

D.

A.

OR

T O

4"

WALL MOUNTED FIRE

EXTINGUISHER WITH

BRACKET

FIRE EXTINGUISHER PLAN

WITHOUT CABINET

SCALE: 1" = 1' - 0"

SCALE: 1" = 1' - 0"

KNEE

SPACE

SINK AND MIRROR CLEARANCES

SCALE: 1/2" = 1'-0"

SU

RF

AC

E

OF

M

IR

RO

R

RE

FL

EC

TI

VE

X

" M

AX

" M

AX

" M

IN

R

EC

OM

ME

ND

ED

1. X= 35" MAX IF NOT ABOVE

SINK OR COUNTERTOP

2. FORWARD APPROACH

PROVIDED CENTERED ON UNIT

48" CLEAR- 2009 ANSI A117.1

52" CLEAR- 2017 ANSI A117.1

CL

EA

R

NOTE: FIXTURE IS SHOWN FOR REFERENCE ONLY.

4'

- 0

4'

- 0

3'

- 4

3'

- 8

" M

AX

2'

- 0

" M

IN

MIRROR SOAP DISPENSER PAPER TOWEL

DISPENSER

2'

- 0

" M

IN

4'

- 0

2'

- 6

TOILET PAPER

DISPENSER

TOILET PAPER

HOLDER

SANITARY NAPKIN

DISPOSAL

SANITARY NAPKIN

DISPENSER

MA

X.

MA

X.

MA

X.

MA

X.

TYPICAL TOILET ACCESSORIES MOUNTING HEIGHTS

SCALE: 3/8" = 1'-0"

MA

X.

MA

X.

MI

N.

BABY

CHANGING

STATION

" M

IN

" M

AX

3'

- 6

TOILET PARTITION

COAT HOOKS

FITTING ROOM COAT

HOOKS

NOTE: ALL ACCESSORIES ARE SHOWN FOR REFERENCE ONLY.

ALL PARTS OF THESE DOCUMENTS AND/OR SPECIFICATIONS ARE THE

EXCLUSIVE PROPERTY OF THE ARCHITECT AND WE RESERVE ALL

RIGHTS TO HAVE THIS WORK REPRODUCED, FABRICATED,

CONSTRUCTED, AND/OR MANUFACTURED. WE HAVE PLACED THESE

DOCUMENTS IN YOUR TEMPORARY CUSTODY, IN CONFIDENCE,

SOLELY FOR YOUR INSPECTION, AND/OR ESTIMATING THE COST OF

FABRICATING, CONSTRUCTING, AND/OR MANUFACTURING THE WORK

SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL

DIMENSIONS AND CONDITIONS AT THE JOBSITE, AS WELL AS BUILDING

RULES AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR

COORDINATING ALL INSPECTIONS AND OBTAINING THE CERTIFICATE

OF OCCUPANCY. THE RECIPIENT OF THESE DOCUMENTS WARRANTS

THAT THEY WILL NOT REPRODUCE, DISTRIBUTE, OR OTHERWISE

MAKE USE OF THE DOCUMENTS WITHOUT THE PERMISSION OF THE

ARCHITECT. THE USE OF THESE DESIGNS FOR ANY OTHER PURPOSE

PROJECT NO: PROJECT MGR:

REVISIONS

CONSULTANT INFORMATION:

SEAL/STAMP:

155 WEST MARKET STREET, SUITE 200

YORK, PA 17401

PHONE 717.741.2046 FAX: 717.741.6836

WWW.CORE-DESIGNGROUP.COM

6/

/2

2:

:2

PM

Au to de sk

D oc s:

//Y

AT

B

M ai l R oo m

In fil l P ro je ct

/2 5.

- Y

AT

B

- M ai l I nf ill

Pr oj ec t.r vt

ACCESSIBILITY

DETAILS

G300

25.147 M.A.S.

YO

RK

A

DA

M S

TA

X

BU

RE

AU

SE

CO

ND

F

LO

OR

O

FF

IC

E

EX

PA

NS

IO

N

N

OR

TH

D

UK

E

ST

RE

ET

YO

RK

, P

A

NOTE:

EXISTING CONSTRUCTION - 2009 ANSI A117.1

NEW CONSTRUCTION - 2017 ANSI A117.1

6" M

AX

" M

AX

4"

SCALE: 3" = 1'-0"

STANDARD

INTERNATIONAL

SYMBOL

PICTOGRAM

UPPERCASE

RAISED TEXT

CHARACTERS

GRADE 2

BRAILLE

AE

SCALE: 3" = 1'-0"

SIGNS HAVE A NON-GLARE FINISH AND A BACKGROUND WITH A HIGH LIGHT

TO DARK VISUAL CONTRAST TO THE PICTOGRAMS AND TEXT CHARACTERS

MISCELLANEOUS VISUAL SIGNS

ACCESSIBLE

ENTRANCE

AX ES

EXIT STAIRS

E X T I N G U I S H E R

FE

" M

AX

TACTILE / VISUAL SIGNS

NOTE:

REPLACE WHEELCHAIR ICON FOR

STATES AND CITIES AS REQUIRED.

ALTERNATIVE WHEELCHAIR ICON SYMBOL

1.

2.

3.

NOTES APPLY TO ALL TACTILE / VISUAL SIGNS:

SIGNS HAVE SMOOTH EDGES WITH A NON-GLARE FINISH AND A

BACKGROUND WITH A HIGH LIGHT TO DARK VISUAL CONTRAST TO

THE PICTOGRAMS AND TEXT CHARACTERS

TEXT CHARACTERS AND BRAILLE ARE SEPARATED FROM EACH

OTHER, RAISED BORDERS, AND DECORATIVE ELEMENTS BY 3/8" MIN

TEXT CHARACTER HEIGHT IS 5/8" TO 2" UNLESS SAME INFO IS

SEPARATELY PROVIDED IN VISUAL TEXT CHARACTERS THEN THE

TACTILE TEXT CHARACTER HEIGHT IS 1/2" TO 2"

ACCESSIBLE

EXIT

SIGN DESIGNATION

ON ARCHITECT'S

PLANS

AR AB AU

AREA OF

RESCUE

ASSISTANCE

ACCESSIBLE

BREAK ROOM

RESTROOM

NO STORAGE

ABOVE

NO ROOF

ACCESS

THIS DOOR TO REMAIN

UNLOCKED DURING

BUSINESS HOURS

ST

IN CASE

OF FIRE

USE STAIRS

E

EXIT

EEO

EMERGENCY

EXIT ONLY

MAXIMUM

OCCUPANCY

PERSONS

MO

CERAMIC TILE

SETTING BEDDIVIDER STRIP CONCRETE

SUB-FLOOR

TYPE 3

ALUMINUM

THRESHOLD

TYPE 1 TYPE 4

VCT VINYL

TRANSITION

CARPET

CONCRETE

SUB-FLOOR

CERAMIC TILE

SETTING BED

CARPET

CONCRETE SUB-FLOOR

TYPE 5

ALUMINUM TRANSITION

TYPE 2

VCT

FIRST FLOOR

0' - 0"

FIRST FLOOR

0' - 0"

FIRST FLOOR

0' - 0"

FIRST FLOOR

0' - 0"

1/2

4" - 10"

ALUMINUM

THRESHOLD

1/2

1/8

5" 3"

FIRST FLOOR

0' - 0"

ALL PARTS OF THESE DOCUMENTS AND/OR SPECIFICATIONS ARE THE

EXCLUSIVE PROPERTY OF THE ARCHITECT AND WE RESERVE ALL

RIGHTS TO HAVE THIS WORK REPRODUCED, FABRICATED,

CONSTRUCTED, AND/OR MANUFACTURED. WE HAVE PLACED THESE

DOCUMENTS IN YOUR TEMPORARY CUSTODY, IN CONFIDENCE,

SOLELY FOR YOUR INSPECTION, AND/OR ESTIMATING THE COST OF

FABRICATING, CONSTRUCTING, AND/OR MANUFACTURING THE WORK

SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL

DIMENSIONS AND CONDITIONS AT THE JOBSITE, AS WELL AS BUILDING

RULES AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR

COORDINATING ALL INSPECTIONS AND OBTAINING THE CERTIFICATE

OF OCCUPANCY. THE RECIPIENT OF THESE DOCUMENTS WARRANTS

THAT THEY WILL NOT REPRODUCE, DISTRIBUTE, OR OTHERWISE

MAKE USE OF THE DOCUMENTS WITHOUT THE PERMISSION OF THE

ARCHITECT. THE USE OF THESE DESIGNS FOR ANY OTHER PURPOSE

PROJECT NO: PROJECT MGR:

REVISIONS

CONSULTANT INFORMATION:

SEAL/STAMP:

155 WEST MARKET STREET, SUITE 200

YORK, PA 17401

PHONE 717.741.2046 FAX: 717.741.6836

WWW.CORE-DESIGNGROUP.COM

6/

/2

2:

:2

PM

Au to de sk

D oc s:

//Y

AT

B

M ai l R oo m

In fil l P ro je ct

/2 5.

- Y

AT

B

- M ai l I nf ill

Pr oj ec t.r vt

ACCESSIBILITY

SIGNAGE

G400

25.147 M.A.S.

YO

RK

A

DA

M S

TA

X

BU

RE

AU

SE

CO

ND

F

LO

OR

O

FF

IC

E

EX

PA

NS

IO

N

N

OR

TH

D

UK

E

ST

RE

ET

YO

RK

, P

A

SCALE: 3" = 1'-0"G400

ACCESSIBLE / STANDARD TRANSITION TYPES2

A B C

4.5

6'

4"

4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 8' - 0"

MAIL ROOM

MACHINE ROOM

STORAGE

STAIR

D06

D06D06D06D06

AD101

A300

EXISTING WALL

EXISTING DOOR

LEGEND

DEMO WALL

DEMO DOOR

EXISTING ACT GRID

EXISTING PENDANT LIGHT

EXISTING HVAC DIFFUSER

EXISTING 2X2 CEILING LIGHT

EXISTING PENDANT CEILING LIGHT

EXISTING ACT GRID

TO BE REMOVED

EXISTING PENDANT LIGHT

TO BE REMOVED

EXISTING HVAC DIFFUSER

TO BE REMOVED

EXISTING TO REMAIN(E)

EXISTING TO BE REMOVED(ER)

EXISTING HVAC SUPPLY TO BE REMOVED

GENERAL ALTERATION NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

THESE DEMOLITION PLANS INDICATE MAJOR AREAS TO BE REMOVED OR ALTERED. ANY ITEMS NOT NOTED SHALL

BE CONSIDERED EXISTING TO REMAIN.

THE EXTENT OF DEMOLITION WORK IS TO INCLUDE ALL WORK REQUIRED TO COMPLETE THE OVERALL INTENT OF

THE PROJECT WHETHER INDICATED ON THE DRAWINGS OR NOT.

THESE RENOVATIONS SHALL BE CONSTRUCTED IN COMPLIANCE WITH ALL GOVERNING CODES. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPORT ANY DISCREPANCIES TO THE ARCHITECT PRIOR TO CONSTRUCTION. ANY COMPLETED WORK REQUIRING REMOVAL OR ALTERATIONS SHALL BE THE CONTRACTOR'S

RESPONSIBILITY.

ALL WORK TO BE COORDINATED WITH EACH RESPECTIVE CONTRACTOR. EACH CONTRACTOR SHALL THOROUGHLY REVIEW ALL PLANS AND SPECIFICATIONS PRIOR DEMOLITION AND CONSTRUCTION.

THE RESPECTIVE CONTRACTOR FOR EACH TRADE SHALL VERIFY LOCATION OF ALL UTILITIES PRIOR TO

DEMOLITION AND CONSTRUCTION.

THE RESPECTIVE CONTRACTOR FOR EACH TRADE SHALL VERIFY THAT ALL BUILDING PERMITS, ZONING, PLUMBING AND ELECTRICAL CODES HAVE BEEN MET PRIOR TO BEGINNING OF DEMOLITION AND CONSTRUCTION.

THE CONTRACTORS SHALL ADVISE THE ARCHITECT OF ANY ITEMS WHICH DO NOT MEET WITH LOCAL APPROVALS.

ALL PERMITS SHALL BE OBTAINED AND FEES PAID BY THE RESPECTIVE SUBCONTRACTOR.

ALL DEMOLITION WORK SHALL BE COORDINATED AND SCHEDULED ACCORDINGLY WITH THE NEW

CONSTRUCTION BY THE GENERAL CONTRACTOR.

ALL USABLE ITEMS SHALL BE STORED OR REMOVED AS DIRECTED BY THE OWNER.

DISPOSAL OF ITEMS SHALL BE DONE IN ACCORDANCE WITH ALL 'ENVIRONMENTAL PROTECTION AGENCIES' AND

THE 'DEPARTMENT OF ENVIRONMENTAL RESOURCES' STANDARDS.

ALL EXISTING EQUIPMENT HAVING PLUMBING, HVAC OR ELECTRICAL CONNECTIONS AND NOTED TO BE REMOVED

SHALL BE DISCONNECTED BY THE APPROPRIATE CONTRACTOR.

ALL DISTURBED OR DAMAGED AREAS (EXTERIOR OR INTERIOR) SHALL BE REPAIRED AND FINISHED WITH MATERIALS TO MATCH EXISTING ADJACENT SURFACES OR AS NOTED ON THE ROOM FINISH SCHEDULE.

ALL RESPECTIVE CONTRACTORS SHALL BE RESPONSIBLE FOR UNREASONABLE DAMAGE TO ITEMS THAT ARE

EXISTING AND TO REMAIN.

WHERE EXISTING FLOORS, WALLS, CEILINGS, DOOR FRAMES, WINDOWS, CABINETS, SINKS, PIPING, LIGHTS, ETC.

ARE REMOVED, THE EXISTING OPENING SHALL BE CLOSED OR REPAIRED WITH MATERIALS TO MATCH EXISTING

ADJACENT SURFACES OR AS NOTED ON THE ROOM FINISH SCHEDULE.

WHERE NEW OPENINGS ARE REQUIRED IN AN EXISTING WALL, THE CONTRACTOR SHALL PROVIDE THE REQUIRED

LINTEL, WHETHER INDICATED ON THE DRAWING OR NOT.

WHERE NEW WALLS, FLOORS OR CEILINGS ABUT EXISTING WALLS, FLOORS OR CEILINGS, THE TWO SURFACES

SHALL ALIGN.

ALL RESPECTIVE CONTRACTORS SHALL BE RESPONSIBLE FOR CLEAN-UP AND REMOVAL OF CONSTRUCTION

DEBRIS WITHIN THE LIMITS OF THE CONTRACT TO DUMPSTERS PROVIDED BY THE OWNER.

PERMITS AND FEES THAT ARE NOT TO BE OBTAINED AND PAID FOR BY THE SUBCONTRACTORS SHALL BE

OBTAINED AND PAID FOR BY THE GENERAL CONTRACTOR.

18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, DISTORTION, AND/OR MISALIGNMENT IN ACCORDANCE

WITH APPLICABLE CODE STANDARDS AND GOOD PRACTICE.

FIRST FLOOR

0' - 0"

SECOND FLOOR

14' - 8"

ABC

2'

8" 4'

8"

4' - 0"12' - 0"4' - 0"

2'

8" 4'

8"

4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"

D06 D06 D06 D06

A300

D06 D06

ALL PARTS OF THESE DOCUMENTS AND/OR SPECIFICATIONS ARE THE

EXCLUSIVE PROPERTY OF THE ARCHITECT AND WE RESERVE ALL

RIGHTS TO HAVE THIS WORK REPRODUCED, FABRICATED,

CONSTRUCTED, AND/OR MANUFACTURED. WE HAVE PLACED THESE

DOCUMENTS IN YOUR TEMPORARY CUSTODY, IN CONFIDENCE,

SOLELY FOR YOUR INSPECTION, AND/OR ESTIMATING THE COST OF

FABRICATING, CONSTRUCTING, AND/OR MANUFACTURING THE WORK

SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL

DIMENSIONS AND CONDITIONS AT THE JOBSITE, AS WELL AS BUILDING

RULES AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR

COORDINATING ALL INSPECTIONS AND OBTAINING THE CERTIFICATE

OF OCCUPANCY. THE RECIPIENT OF THESE DOCUMENTS WARRANTS

THAT THEY WILL NOT REPRODUCE, DISTRIBUTE, OR OTHERWISE

MAKE USE OF THE DOCUMENTS WITHOUT THE PERMISSION OF THE

ARCHITECT. THE USE OF THESE DESIGNS FOR ANY OTHER PURPOSE

PROJECT NO: PROJECT MGR:

REVISIONS

CONSULTANT INFORMATION:

SEAL/STAMP:

155 WEST MARKET STREET, SUITE 200

YORK, PA 17401

PHONE 717.741.2046 FAX: 717.741.6836

WWW.CORE-DESIGNGROUP.COM

6/

/2

2:

:2

PM

Au to de sk

D oc s:

//Y

AT

B

M ai l R oo m

In fil l P ro je ct

/2 5.

- Y

AT

B

- M ai l I nf ill

Pr oj ec t.r vt

PARTIAL FIRST

FLOOR

DEMOLITION

PLAN

AD101

25.147 M.A.S.

YO

RK

A

DA

M S

TA

X

BU

RE

AU

SE

CO

ND

F

LO

OR

O

FF

IC

E

EX

PA

NS

IO

N

N

OR

TH

D

UK

E

ST

RE

ET

YO

RK

, P

A

4SCALE: 1/4" = 1'-0"AD101

PARTIAL FIRST FLOOR DEMOLITION PLAN1

NOT TO SCALE

AREA OF WORK

NO WORK THIS AREA

KEYPLAN

DEMOLITION NOTES

MARK DESCRIPTION

D01 DEMOLISH EXISTING WALL AND ANY ASSOCIATED ACCESSORIES - COMPLETE.

D02 REMOVE EXISTING DOOR, FRAME, AND HARDWARE - COMPLETE.

D03 REMOVE EXISTING CEILING AND ASSOCIATED FIXTURES - COMPLETE.

D04 REMOVE EXISTING STOREFRONT AND FRAME TO ACCOMMODATE NEW CONSTRUCTION.

D06 REMOVE PORTION OF EXISTING WALL TO ACCOMMODATE NEW WINDOW. - SEE NEW WORK PLANS

D07 SALVAGE EXISTING LIGHTS FOR RELOCATION. - SEE NEW WORK PLANS

D08 SALVAGE EXISTING HVAC DIFFUSERS FOR RELOCATION. - SEE NEW WORK PLANS

D09 REMOVE EXISTING CEILING TILES. EXISTING GRID TO REMAIN.

D10 REMOVE PORTION OF EXISTING GRID & CEILING TILES A REQUIRED FOR NEW CONSTRUCTION.

SCALE: 1/4" = 1'-0"AD101

WEST DEMOLITION ELEVATION2

4.5

3.5

RO

OF

B

EL

OW

D01

D02

D01

D01

D01

D04

D03

DATA ENTRY

STORAGE & ROOF

ACCESS

TOILET ROOM

KITCHENETTE

TOILET ROOM

SERVER

STAIR

D04

4' - 0" 12' - 0" 4' - 0" 8' - 0"

9' - 2 5/8"

D06 D06

EXISTING WALL

EXISTING DOOR

LEGEND

DEMO WALL

DEMO DOOR

EXISTING ACT GRID

EXISTING PENDANT LIGHT

EXISTING HVAC DIFFUSER

EXISTING 2X2 CEILING LIGHT

EXISTING PENDANT CEILING LIGHT

EXISTING ACT GRID

TO BE REMOVED

EXISTING PENDANT LIGHT

TO BE REMOVED

EXISTING HVAC DIFFUSER

TO BE REMOVED

EXISTING TO REMAIN(E)

EXISTING TO BE REMOVED(ER)

EXISTING HVAC SUPPLY TO BE REMOVED

GENERAL ALTERATION NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

THESE DEMOLITION PLANS INDICATE MAJOR AREAS TO BE REMOVED OR ALTERED. ANY ITEMS NOT NOTED SHALL

BE CONSIDERED EXISTING TO REMAIN.

THE EXTENT OF DEMOLITION WORK IS TO INCLUDE ALL WORK REQUIRED TO COMPLETE THE OVERALL INTENT OF

THE PROJECT WHETHER INDICATED ON THE DRAWINGS OR NOT.

THESE RENOVATIONS SHALL BE CONSTRUCTED IN COMPLIANCE WITH ALL GOVERNING CODES. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPORT ANY DISCREPANCIES TO THE ARCHITECT PRIOR TO CONSTRUCTION. ANY COMPLETED WORK REQUIRING REMOVAL OR ALTERATIONS SHALL BE THE CONTRACTOR'S

RESPONSIBILITY.

ALL WORK TO BE COORDINATED WITH EACH RESPECTIVE CONTRACTOR. EACH CONTRACTOR SHALL THOROUGHLY REVIEW ALL PLANS AND SPECIFICATIONS PRIOR DEMOLITION AND CONSTRUCTION.

THE RESPECTIVE CONTRACTOR FOR EACH TRADE SHALL VERIFY LOCATION OF ALL UTILITIES PRIOR TO

DEMOLITION AND CONSTRUCTION.

THE RESPECTIVE CONTRACTOR FOR EACH TRADE SHALL VERIFY THAT ALL BUILDING PERMITS, ZONING, PLUMBING AND ELECTRICAL CODES HAVE BEEN MET PRIOR TO BEGINNING OF DEMOLITION AND CONSTRUCTION.

THE CONTRACTORS SHALL ADVISE THE ARCHITECT OF ANY ITEMS WHICH DO NOT MEET WITH LOCAL APPROVALS.

ALL PERMITS SHALL BE OBTAINED AND FEES PAID BY THE RESPECTIVE SUBCONTRACTOR.

ALL DEMOLITION WORK SHALL BE COORDINATED AND SCHEDULED ACCORDINGLY WITH THE NEW

CONSTRUCTION BY THE GENERAL CONTRACTOR.

ALL USABLE ITEMS SHALL BE STORED OR REMOVED AS DIRECTED BY THE OWNER.

DISPOSAL OF ITEMS SHALL BE DONE IN ACCORDANCE WITH ALL 'ENVIRONMENTAL PROTECTION AGENCIES' AND

THE 'DEPARTMENT OF ENVIRONMENTAL RESOURCES' STANDARDS.

ALL EXISTING EQUIPMENT HAVING PLUMBING, HVAC OR ELECTRICAL CONNECTIONS AND NOTED TO BE REMOVED

SHALL BE DISCONNECTED BY THE APPROPRIATE CONTRACTOR.

ALL DISTURBED OR DAMAGED AREAS (EXTERIOR OR INTERIOR) SHALL BE REPAIRED AND FINISHED WITH MATERIALS TO MATCH EXISTING ADJACENT SURFACES OR AS NOTED ON THE ROOM FINISH SCHEDULE.

ALL RESPECTIVE CONTRACTORS SHALL BE RESPONSIBLE FOR UNREASONABLE DAMAGE TO ITEMS THAT ARE

EXISTING AND TO REMAIN.

WHERE EXISTING FLOORS, WALLS, CEILINGS, DOOR FRAMES, WINDOWS, CABINETS, SINKS, PIPING, LIGHTS, ETC.

ARE REMOVED, THE EXISTING OPENING SHALL BE CLOSED OR REPAIRED WITH MATERIALS TO MATCH EXISTING

ADJACENT SURFACES OR AS NOTED ON THE ROOM FINISH SCHEDULE.

WHERE NEW OPENINGS ARE REQUIRED IN AN EXISTING WALL, THE CONTRACTOR SHALL PROVIDE THE REQUIRED

LINTEL, WHETHER INDICATED ON THE DRAWING OR NOT.

WHERE NEW WALLS, FLOORS OR CEILINGS ABUT EXISTING WALLS, FLOORS OR CEILINGS, THE TWO SURFACES

SHALL ALIGN.

ALL RESPECTIVE CONTRACTORS SHALL BE RESPONSIBLE FOR CLEAN-UP AND REMOVAL OF CONSTRUCTION

DEBRIS WITHIN THE LIMITS OF THE CONTRACT TO DUMPSTERS PROVIDED BY THE OWNER.

PERMITS AND FEES THAT ARE NOT TO BE OBTAINED AND PAID FOR BY THE SUBCONTRACTORS SHALL BE

OBTAINED AND PAID FOR BY THE GENERAL CONTRACTOR.

18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, DISTORTION, AND/OR MISALIGNMENT IN ACCORDANCE

WITH APPLICABLE CODE STANDARDS AND GOOD PRACTICE.

ALL PARTS OF THESE DOCUMENTS AND/OR SPECIFICATIONS ARE THE

EXCLUSIVE PROPERTY OF THE ARCHITECT AND WE RESERVE ALL

RIGHTS TO HAVE THIS WORK REPRODUCED, FABRICATED,

CONSTRUCTED, AND/OR MANUFACTURED. WE HAVE PLACED THESE

DOCUMENTS IN YOUR TEMPORARY CUSTODY, IN CONFIDENCE,

SOLELY FOR YOUR INSPECTION, AND/OR ESTIMATING THE COST OF

FABRICATING, CONSTRUCTING, AND/OR MANUFACTURING THE WORK

SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL

DIMENSIONS AND CONDITIONS AT THE JOBSITE, AS WELL AS BUILDING

RULES AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR

COORDINATING ALL INSPECTIONS AND OBTAINING THE CERTIFICATE

OF OCCUPANCY. THE RECIPIENT OF THESE DOCUMENTS WARRANTS

THAT THEY WILL NOT REPRODUCE, DISTRIBUTE, OR OTHERWISE

MAKE USE OF THE DOCUMENTS WITHOUT THE PERMISSION OF THE

ARCHITECT. THE USE OF THESE DESIGNS FOR ANY OTHER PURPOSE

PROJECT NO: PROJECT MGR:

REVISIONS

CONSULTANT INFORMATION:

SEAL/STAMP:

155 WEST MARKET STREET, SUITE 200

YORK, PA 17401

PHONE 717.741.2046 FAX: 717.741.6836

WWW.CORE-DESIGNGROUP.COM

6/

/2

2:

:2

PM

Au to de sk

D oc s:

//Y

AT

B

M ai l R oo m

In fil l P ro je ct

/2 5.

- Y

AT

B

- M ai l I nf ill

Pr oj ec t.r vt

PARTIAL SECOND

FLOOR

DEMOLITION

PLAN

AD102

25.147 M.A.S.

YO

RK

A

DA

M S

TA

X

BU

RE

AU

SE

CO

ND

F

LO

OR

O

FF

IC

E

EX

PA

NS

IO

N

N

OR

TH

D

UK

E

ST

RE

ET

YO

RK

, P

A

NOT TO SCALE

NO WORK THIS AREA

AREA OF WORK

KEYPLAN

SCALE: 1/4" = 1'-0"AD102

PARTIAL SECOND FLOOR DEMOLITION PLAN1

DEMOLITION NOTES

MARK DESCRIPTION

D01 DEMOLISH EXISTING WALL AND ANY ASSOCIATED ACCESSORIES - COMPLETE.

D02 REMOVE EXISTING DOOR, FRAME, AND HARDWARE - COMPLETE.

D03 REMOVE EXISTING CEILING AND ASSOCIATED FIXTURES - COMPLETE.

D04 REMOVE EXISTING STOREFRONT AND FRAME TO ACCOMMODATE NEW CONSTRUCTION.

D06 REMOVE PORTION OF EXISTING WALL TO ACCOMMODATE NEW WINDOW. - SEE NEW WORK PLANS

D07 SALVAGE EXISTING LIGHTS FOR RELOCATION. - SEE NEW WORK PLANS

D08 SALVAGE EXISTING HVAC DIFFUSERS FOR RELOCATION. - SEE NEW WORK PLANS

D09 REMOVE EXISTING CEILING TILES. EXISTING GRID TO REMAIN.

D10 REMOVE PORTION OF EXISTING GRID & CEILING TILES A REQUIRED FOR NEW CONSTRUCTION.

EXISTING WALL

EXISTING DOOR

LEGEND

DEMO WALL

DEMO DOOR

EXISTING ACT GRID

EXISTING PENDANT LIGHT

EXISTING HVAC DIFFUSER

EXISTING 2X2 CEILING LIGHT

EXISTING PENDANT CEILING LIGHT

EXISTING ACT GRID

TO BE REMOVED

EXISTING PENDANT LIGHT

TO BE REMOVED

EXISTING HVAC DIFFUSER

TO BE REMOVED

EXISTING TO REMAIN(E)

EXISTING TO BE REMOVED(ER)

EXISTING HVAC SUPPLY TO BE REMOVED

A B C

4.5

D07

D07

D07

D07

D07

(ER)(ER)

(ER) (ER)

(ER) (ER)

(ER) (ER)

(ER) (ER)

(ER) (ER)

(ER) (ER)(E)

(E)

(E)

(E)

(E)

(E)

GENERAL ALTERATION NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

THESE DEMOLITION PLANS INDICATE MAJOR AREAS TO BE REMOVED OR ALTERED. ANY ITEMS NOT NOTED SHALL

BE CONSIDERED EXISTING TO REMAIN.

THE EXTENT OF DEMOLITION WORK IS TO INCLUDE ALL WORK REQUIRED TO COMPLETE THE OVERALL INTENT OF

THE PROJECT WHETHER INDICATED ON THE DRAWINGS OR NOT.

THESE RENOVATIONS SHALL BE CONSTRUCTED IN COMPLIANCE WITH ALL GOVERNING CODES. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPORT ANY DISCREPANCIES TO THE ARCHITECT PRIOR TO CONSTRUCTION. ANY COMPLETED WORK REQUIRING REMOVAL OR ALTERATIONS SHALL BE THE CONTRACTOR'S

RESPONSIBILITY.

ALL WORK TO BE COORDINATED WITH EACH RESPECTIVE CONTRACTOR. EACH CONTRACTOR SHALL THOROUGHLY REVIEW ALL PLANS AND SPECIFICATIONS PRIOR DEMOLITION AND CONSTRUCTION.

THE RESPECTIVE CONTRACTOR FOR EACH TRADE SHALL VERIFY LOCATION OF ALL UTILITIES PRIOR TO

DEMOLITION AND CONSTRUCTION.

THE RESPECTIVE CONTRACTOR FOR EACH TRADE SHALL VERIFY THAT ALL BUILDING PERMITS, ZONING, PLUMBING AND ELECTRICAL CODES HAVE BEEN MET PRIOR TO BEGINNING OF DEMOLITION AND CONSTRUCTION.

THE CONTRACTORS SHALL ADVISE THE ARCHITECT OF ANY ITEMS WHICH DO NOT MEET WITH LOCAL APPROVALS.

ALL PERMITS SHALL BE…