5) USG Responses to Industry Day Questions24SEP25 SAM.pdf

PDF 74 KB Posted

Attached to
Industry Day Follow Up Announcement for Project Manager Mounted Armored Vehicle Systems Logistic Field Service Support System Technical Support
Solicitation number
W912CH-25-R-0182-1
Issued by

About this file

This document contains Q&A notes from an Army industry day for a military vehicle contract, specifically related to the Armored Multi-Purpose Vehicle (AMPV) and its medical variants. Key details include clarifications about the procurement process, such as past performance citation requirements, Field Service Representative (FSR) expectations, and technical data availability. The Army indicated that FSRs will be required to cover all PM MAV platforms, technical data will be attached to the RFP, and there is currently no phase-in period for the contract. The document also notes that approximately 1,200 M113 vehicles will remain in the Army formation, and the AMPV is not a direct 1-to-1 replacement. The slides from the industry day will be released on SAM.GOV, and the government will not disclose the list of competitors who attended the event. Material/part/component procurement may be required, with specific details to be outlined in the scope and work directives.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. As the OEM for the medical interiors on both the AMPV MEV and MTV will there be a list of competitors that attended industry day so our information can be shared as a resource to train, maintain, logistically support the medical variants

a. No, the list of competitors that attended industry day will not be released.

2. Are the Past Performance citations limited to the Prime or can our small businesses also contribute to meeting the three PP citation requirement. Also, can a company submit additional PP citations in excess of the three required

Past Performance citations or is it limited to just three?

a. The past performance requirements and parameters for submittal will be outlined in the RFP.

3. Are FSRs SME on a specific platform, or will they cover all PM MAV products?

a. FSRs will be required to cover all PM MAV platforms.

4. What is the phase in period?

a. There is no phase in period. We will negotiate the timeframe necessary upon work directive award.

5. Will the contractor have access to support through standard Army systems, such as GCSS-A, ELMS/DPAS, SMART and others?

a. The USG typically does not have a requirement for the contractor to be in these systems. If the need arises, the USG will provide access upon work directive award.

6. Will you be sending out a list of participants for today with emails?

7. Will material/part/component procurement be required by the contractor under this effort?

a. Material/part/component procurement will be identified within the scope. In some instances, yes, however, scope and work directives will provide direction.

8. Will the USG be sharing the list of who attended?

9. Will the slides be available?

a. Yes, the slide deck will be released on SAM.GOV

10. Talk to technical data that will be available-will it be the whole engineering package, etc.?

a. The type of data that will be part of the solicitation will be identified within the scope. The technical data will be available as attachments in the RFP.

11. Is the AMPV a 1 to 1 replacement of M113?

a. Currently the Army decision is to keep ~1200 M113s in the formation. This will be the path forward until a different guidance is given.