This is a Project Specifications document for Pocono Township's Police Wing Renovations located at 205 Old Mill Road in Tannersville, Pennsylvania, issued for bidding on September 30, 2026, by Kimmel Architecture, Inc. The project encompasses renovation and expansion work to the police wing of the Pocono Township Building, with sealed bids required via PennBid by November 12 at 1:00 PM for four separate construction contracts: General Construction (GC), Mechanical Construction (MC), Electrical Construction (EC), and Plumbing Construction (PC). A mandatory Pre-Bid Conference is scheduled for October 14 at 10:00 AM at the Pocono Township Administration Building, followed by a site tour. Bid documents are available for download starting October 7 at 9:00 AM through PennBid (www.PennBid.net). All addenda and Requests for Information (RFIs) are managed through the same platform, with RFI submissions required at least seven days prior to the bid deadline. The Owner intends to award contracts to the lowest responsible and responsive bidders, with award anticipated at the November 16 Board of Commissioners meeting. The contract will commence upon issuance of a Notice to Proceed with substantial completion required within a timeframe specified in the contract documents.
Bids must be accompanied by bid security equal to 10% of the Base Bid in the form of a certified check, cashier's check, letter of credit, or bid bond issued by a corporate surety authorized to do business in Pennsylvania. The successful bidder must furnish Performance and Payment Bonds equal to 100% of the contract price and provide a Qualification Statement. The project is subject to the Pennsylvania Prevailing Wage Act, Steel Products Procurement Act, Reciprocal Limitations Act (Act 146 of 1986), Trade Practices Act (P.L. 686), Pennsylvania Human Relations Act, Public Works Employment Verification Act (Act 127 of 2012), Contractor and Subcontractor Payment Act, and Americans with Disabilities Act. All bidders are required to submit a Non-Collusion Affidavit. Liquidated damages are established at $750.00 per calendar day for delays beyond the agreed completion date. The Owner shall award the contract within 90 days of bid opening (or 120 days if approval from another governmental agency, bond sales, or grant awards are required), and bidders may not withdraw bids before the applicable deadline. The specifications include extensive general requirements, divisions covering concrete, masonry, metals, wood, thermal protection, openings, finishes, and specialty items, with detailed bid breakdown forms required for each trade contract and unit price quotations for specific electrical and mechanical components.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Specifications for:
Pocono Township
Renovations to
Police Wing of Pocono Township Bldg
Old Mill Rd
Tannersville, PA
Issued for Bidding
Date: September 30, 2026
Kimmel Architecture, Inc.
Kimmel Architecture Pocono Township
Renovations to Police Wing
TABLE OF CONTENTS 00 01 10-1
Table of Contents
Division Section Title Pages
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 03
00 11 00
00 21 00
00 30 02
00 30 04
00 30 06
00 30 08
00 41 00
00 41 01
00 41 02
00 41 03
00 41 04
00 42 50
00 52 20
00 52 60
00 52 70
00 53 10
00 53 20
00 54 00
00 60 00
ADVERTISEMENT FOR BID
TIME FOR COMPLETION
INSTRUCTIONS TO BIDDERS A701
GENERAL CONSTRUCTION BID BREAKDOWN
MECHANICAL CONSTRUCTION BID BREAKDOWN
ELECTRICAL CONSTRUCTION BID BREAKDOWN
PLUMBING CONSTRUCTION BID BREAKDOWN
BID DOCUMENT CHECKLIST
GC BID FORM
MC BID FORM
EC BID FORM
PC BID FORM
LIQUIDATED DAMAGES
A201 SUPPLEMENTARY CONDITIONS
AIA A310 BID BOND
PERFORMANCE AND PAYMENT BONDS
NON COLLUSION
WAIVER OF LIENS
PREVAILING WAGE RATES
ELECTRONIC FILE TRANSFER
SPECIFICATIONS GROUP
General Requirements Subgroup
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00
01 10 50
01 12 00
01 12 01
SUMMARY
SUPPLEMENTARY CONDITIONS
MULTIPLE CONTRACT SUMMARY
PRIME CONTRACT CHECKLIST
01 22 00 UNIT PRICES
01 23 00 ALTERNATES
01 25 00 SUBSTITUTION PROCEDURES
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
TABLE OF CONTENTS 00 01 10-2
01 33 00 SUBMITTAL PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 39
01 78 46
PROJECT RECORD DOCUMENTS
ATTIC STOCK
01 79 00 DEMONSTRATION AND TRAINING
Facility Construction Subgroup
DIVISION 02 - EXISTING CONDITIONS
02 41 19 SELECTIVE DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 35 43 POLISHED CONCRETE FINISHING
DIVISION 04 - MASONRY
04 22 00 CONCRETE UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL FRAMING
05 21 00 STEEL JOIST FRAMING
05 31 00 STEEL DECKING
05 40 00 COLD-FORMED METAL FRAMING
05 52 13 PIPE AND TUBE RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 16 00
06 20 23
SHEATHING
INTERIOR FINISH CARPENTRY
06 41 16 LAMINATE CABINETS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 20 UNDERSLAB VAPOR BARRIER
07 13 26 SELF-ADHERED WATERPROOFING
07 21 00 THERMAL INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 54 23
07 59 00
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING
EXPANSION JOINTS
07 62 00 SHEET METAL FLASHING AND TRIM
07 72 00 ROOF ACCESSORIES
07 91 00 PREFORMED JOINT SEALANTS
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
TABLE OF CONTENTS 00 01 10-3
08 11 13
08 11 16.13
HOLLOW METAL DOORS AND FRAMES
ALUMINUM INTERIOR DOORS AND FRAMES
08 14 16 FLUSH WOOD DOORS
08 33 00 OVERHEAD DOORS AND MOTORIZED OPERATORS
08 56 53 TRANSACTION WINDOWS
08 80 00 GLAZING
08 83 00 MIRRORS
08 87 00 WINDOW FILM BALLISTIC
DIVISION 09 - FINISHES
09 22 16
09 29 00
NON-LOD BEARING FRAMING
GYPSUM WALLBOARD
09 30 13 CERAMIC TILING
09 51 23
09 65 00
ACOUSTICAL TILE CEILINGS
RESILIENT FLOORING
09 65 13 RESILIENT BASE AND ACCESSORIES
09 68 13 TILE CARPETING
09 77 00 FRP
09 91 33 PAINTING
DIVISION 10 -
10 21 10
DIVISION 13
13 47 13
TOILET COMPARTMENTS
BULLET RESISTANT PANELS
ADVERTISEMENT FOR BID 00 11 00-1
ADVERTISEMENT FOR BID - NOTICE TO CONTRACTORS:
Pocono Township Renovations to Police Wing
Sealed bids will be received by Owner via PennBid until Nov 12 @ 1 pm for the construction of Pocono Township Police Wing Renovations and all associated site work. Bids will be reviewed privately by the Architect and Owner and will be made public through PennBid by 4:00 PM the same day. Bids will be received for the following construction contracts:
A. General Construction B. Mechanical Construction C. Electrical Construction D. Plumbing Construction
A mandatory Pre-Bid Conference will be held at Pocono Township Administration Building, October 14 @ 10 a.m. A site tour will be conducted after the conference. The purpose of the Pre- Bid meeting will be to address and consider all questions posed by bidders and disseminate timely information. The meeting will be open to all prime contractors and subcontract bidders. All information given at this meeting will be considered part of the contract documents, via addendum, and is to be included in the bids.
The bidding process will be managed through PennBid (www.PennBid.net). All bid documents will be available for download starting October 7 by 9 a.m.. All addendums and RFI�s will be managed through PennBid as well. No RFI�s will be considered after the date indicated at the pre-bid meeting or seven days prior to the bid submission deadline.
Bids must be accompanied by bid security in the amount of 10% of the Base Bid in one of the following forms naming Owner as payee or obligee as applicable: certified check, bank cashier's check, letter of credit, or bid bond in the required form by a corporate surety authorized to do business in the Commonwealth of Pennsylvania and acceptable to the Township.
This project is subject to the provisions of (a) the Pennsylvania Prevailing Wage Act as amended; (b) the Steel Products Procurement Act � only steel products permitted thereunder shall be used or supplied in performance of the Contractor Subcontracts hereunder; (c) the Reciprocal Limitations Act, Act 146 of 1986, which prohibits the use of supplies, equipment or materials manufactured in a state or territory which discriminates against the purchase of such supplies, equipment or materials manufactured in the Commonwealth of Pennsylvania in said state or territory�s public buildings and other works; (d) the Trade Practices Act of July 23, 1968, P.L. 686 prohibiting use of aluminum or steel products made in a foreign country that discriminates against such products manufactured in the Commonwealth of Pennsylvania; (e)Pocono Township shall require the submission of a Non-collusion Affidavit with the Bid.
(f) the Pennsylvania Human Relations Act of 1955, P.L. 744, No. 222, as amended, which prohibits any bidder from discriminating against any employee, applicant for employment, contractor or any other person because of race, color, religious creed, ancestry, national origin, age or sex; (g) Public Works Employment Verification Act (Act 127 of 2012, 43 P.S. §167.1, et seq.), (h) The act of February 17, 1994 (P.L. 73, No. 7) known as the �Contractor and Subcontractor Payment Act.� and (i) the Americans with Disabilities Act (Public Law 101-336).
ADVERTISEMENT FOR BID 00 11 00-2
Owner shall award the contract to the lowest responsible and responsive bidder or shall reject all bids within 90 days following the date of bid opening, and no bidder may withdraw its bid before the expiration of such 90 day period; provided, however, that if the award of the contract is delayed by required approval of another governmental agency, the sale of bonds, or the award of a grant, Owner shall reject all bids or award the contract to the lowest responsible and responsive bidder within 120 days of the date of bid opening, and no bidder may withdraw its bid before the expiration of such 120 day period. Thirty day extensions of the date for the award of the contract may be made by the mutual written consent of the Owner and the lowest responsible and responsive bidder. Bids may be withdrawn after opening only as set forth in PA Act 4 Pennsylvania Public Contract Bid Withdrawal Law, 72 P.S. 1601 et seq. (Act 4 of 1974), as amended from time to time.
Successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the contract price and is also required to furnish a Qualification Statement.
It is the intention of the Owner to accept bids that will be awarded at November 16th Board of Commissioner�s meeting. The Owner reserves the right to reject any or all proposals as indicated in the General and Supplementary Conditions included with the Project Specifications. The Owner reserves the right to select the bid which it deems to be in the best interest of themselves.
TIME FOR COMPLETION 00 20 15-1
SECTION 00 20 15 - TIME FOR COMPLETION
PART 1 - GENERAL
1.1 COMPLETION
A. It is hereby understood and mutually agreed by and between the Contractors and Pocono Township that the date of beginning and the time for completion as specified in the Contract of work to be done hereunder are ESSENTIAL CONDITIONS of this contract;
and it is further mutually understood and agreed that the work embraced in this contract shall be commenced on a date to be specified in the Notice to Proceed.
B. The Contractors agrees that said work shall be prosecuted regularly, diligently and without interruption at such rate of progress as will insure full completion thereof within the time specified. It is expressly understood and agreed by and between the Contractors and Pocono Township that the time for the completion of the work described herein is a reasonable time for the completion of the same, taking consideration the average climatic range and usual industrial conditions prevailing in this locality.
C. It is further agreed that time is of the essence for each and every portion of this contract and for the specifications wherein a definite and certain length of time is fixed for the performance of any act whatsoever; and where under the contract an additional time is allowed for the completion of any work. A request for an extension of time shall be submitted to the Architect in writing. If approved, a Change Order will be issued to reflect the specific amount of time that the contract will be extended. The new time limit fixed by such extension shall be of the essence of this contract; Provided, the Township determines that (1) the Contractor is without fault and (2) the Contractor’s reasons for the time extension are acceptable to the Township or (3) the delay in the work is due:
1. To any preference, priority or allocation order duly issued by the Government;
2. To unforeseeable cause beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God or the public enemy, acts of the Owner, acts of another Contractor in the performance of contract with the Montgomery County, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes and severe weather; and
3. To any delays of subcontractors or suppliers occasioned by any of the causes specified in subsections (1) and (2) of this article; Provided further, that the Contractor shall within ten (10) days from the beginning of such delay, unless the Montgomery County shall grant a further period of time prior to the date of final settlement of the contract, notify the Montgomery County in writing of the cause of delay, who shall ascertain the facts and extent of the delay and notify the Contractor within a reasonable time of its decision in the matter.
D. Pocono Township reserves the right to withhold payments due under the Contract if the work of the Contractor is significantly behind the CPM schedule agreed upon by the each
TIME FOR COMPLETION 00 20 15-2
Contractor. Any such payments so withheld shall be promptly paid to the Contractor when the work is substantially back on schedule.
END OF SECTION 00 02 15
AIA
Document A701
� 2018
Instructions to Bidders
AIA Document A701� � 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved. The
�American Institute of Architects,� �AIA,� the AIA Logo, and �AIA Contract Documents� are registered trademarks and may not be used without permission. This draft was produced by AIA software at 13:45:41 ET on 10/04/2021 under Order No.9144871668 which expires on 09/15/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (1883797840)
ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and
Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed.
This document has important legal consequences.
Consultation with an attorney is encouraged with respect to its completion or modification.
FEDERAL, STATE, AND LOCAL
LAWS MAY IMPOSE REQUIREMENTS
ON PUBLIC PROCUREMENT
CONTRACTS. CONSULT LOCAL
AUTHORITIES OR AN ATTORNEY TO
VERIFY REQUIREMENTS
APPLICABLE TO THIS
PROCUREMENT BEFORE
COMPLETING THIS FORM.
It is intended that AIA
Document G612��2017, Owner�s
Instructions to the
Architect, Parts A and B will be completed prior to using this document.
ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
for the following Project:
(Name, location, and detailed description)
« Pocono Township »
« Building - Police Wing Renovation and Expansion»
THE OWNER:
(Name, legal status, address, and other information)
« Pocono Township »« »
THE ARCHITECT:
(Name, legal status, address, and other information)
TABLE OF ARTICLES
1 DEFINITIONS
2 BIDDER’S REPRESENTATIONS
3 BIDDING DOCUMENTS
4 BIDDING PROCEDURES
5 CONSIDERATION OF BIDS
6 POST-BID INFORMATION
7 PERFORMANCE BOND AND PAYMENT BOND
8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS
AIA Document A701� � 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved. The
�American Institute of Architects,� �AIA,� the AIA Logo, and �AIA Contract Documents� are registered trademarks and may not be used without permission. This draft was produced by AIA software at 13:45:41 ET on 10/04/2021 under Order No.9144871668 which expires on 09/15/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (1883797840)
ARTICLE 1 DEFINITIONS
§ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding
Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of
Agreement between the Owner and Contractor and that Agreement�s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in
Article 8 of these Instructions.
§ 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract
Documents apply to the Bidding Documents.
§ 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.
§ 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.
§ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding
Documents, to which Work may be added or deleted by sums stated in Alternate Bids.
§ 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.
§ 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents.
§ 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding Documents.
§ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the
Work.
ARTICLE 2 BIDDER’S REPRESENTATIONS
§ 2.1 By submitting a Bid, the Bidder represents that:
.1 the Bidder has read and understands the Bidding Documents;
.2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction;
.3 the Bid complies with the Bidding Documents;
.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder�s observations with the requirements of the Proposed Contract
Documents;
.5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception;
.6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of
Agreement between the Owner and Contractor.
.7 The Base Bid is made without applicable cost for Workers� Compensation, General Liability, Umbrella/Excess, or Builder�s Risk insurance being included, in accordance with contract documents.
.8 That it is aware and has been advised that the Contractor is solely responsible for initiating, maintaining and supervising all safety precautions and programs required under its portion of the Work and their Subcontractors and Sub-subcontractors Work and that the Contractor shall review, evaluate and take into consideration these requirements when making its bid.
.9 That it is aware and has been advised that Subcontractors and Sub-subcontractors ought to be given these requirements for bidding purposes so as to ensure consistency and contract adherence.
.10 That it will require each Subcontractor and each Sub-subcontractor, through legally enforceable written
Contracts, to meet all of the responsibilities of the Contractor with respect to any portion of the Work performed by any Subcontractor or Sub-subcontractor.
AIA Document A701� � 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved. The
�American Institute of Architects,� �AIA,� the AIA Logo, and �AIA Contract Documents� are registered trademarks and may not be used without permission. This draft was produced by AIA software at 13:45:41 ET on 10/04/2021 under Order No.9144871668 which expires on 09/15/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (1883797840)
.11 By submitting the bid, the Contractor is certifying that it has excluded all insurance costs from the Base Bid, Alternates and Unit Prices with respect to those insurance coverages that will be provided because the Owner is implementing the OCIP as set forth in the Contract Documents. The Contractor further certifies and represents that the Owner may rely on the Contractor�s representation that it has removed all such insurance costs from the
Base Bid, Alternates and Unit Prices and that the Owner is justified in relying upon said representation.
.12 Based on historical data, the Owner expects that the Base Bids, �net of insurance� will be less by approximately 2% to 5% or higher for general construction; 2% to 4% for plumbing; 2% to 4% for heating and ventilating; and 2% to 4% for lighting, electrical and wiring. The Owner reserves the right to view the insurance cost data of any bidder to ensure that the Owner, has been provided with the proper credits with respect to the
Contractor�s bids without insurance.
ARTICLE 3 BIDDING DOCUMENTS
§ 3.1 Distribution § 3.1.1 Bidders shall obtain complete Bidding Documents, as indicated below, from the issuing office designated in the advertisement or invitation to bid, for the deposit sum, if any, stated therein.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall obtain Bidding
Documents.)
§ 3.1.2 Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return the paper Bidding
Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the paper Bidding
Documents, and the Bidder�s deposit will be refunded.
§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders.
§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents.
§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Documents.
§ 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2.
§ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least seven days prior to the date for receipt of Bids.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall submit requests for clarification and interpretation.)
« See Advertisement for Bids »
§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely upon them.
§ 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution.
AIA Document A701� � 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved. The
�American Institute of Architects,� �AIA,� the AIA Logo, and �AIA Contract Documents� are registered trademarks and may not be used without permission. This draft was produced by AIA software at 13:45:41 ET on 10/04/2021 under Order No.9144871668 which expires on 09/15/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (1883797840)
§ 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of
Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in
Section 3.2.2.
§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding
Documents.
§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment, or other portions of the Work, including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution.
§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect�s decision of approval or disapproval of a proposed substitution shall be final.
§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an
Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.
§ 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract
Documents.
§ 3.4 Addenda § 3.4.1 Addenda will be transmitted to Bidders known by the issuing office to have received complete Bidding Documents.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Addenda will be transmitted.)
§ 3.4.2 Addenda will be available where Bidding Documents are on file.
§ 3.4.3 Addenda will be issued no later than four days prior to the date for receipt of Bids, except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.
§ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the
Bidder shall acknowledge their receipt in the Bid.
ARTICLE 4 BIDDING PROCEDURES
§ 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted on the forms included with or identified in the Bidding Documents.
§ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable medium.
§ 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern.
§ 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.
§ 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter �No Change� or as required by the bid form.
§ 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder�s refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other manner.
AIA Document A701� � 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved. The
�American Institute of Architects,� �AIA,� the AIA Logo, and �AIA Contract Documents� are registered trademarks and may not be used without permission. This draft was produced by AIA software at 13:45:41 ET on 10/04/2021 under Order No.9144871668 which expires on 09/15/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (1883797840)
§ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the
Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent�s authority to bind the Bidder.
§ 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid.
§ 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by the following bid security:
(Insert the form and amount of bid security.)
« See Bid Advertisement »
§ 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply with Section 6.2, the amount of the bid security shall not be forfeited to the Owner.
§ 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A310�, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.
§ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until (a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that Bids may be withdrawn; or (c) all Bids have been rejected. However, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginning« 120 »days after the opening of Bids, withdraw its Bid and request the return of its bid security.
§ 4.3 Submission of Bids § 4.3.1 A Bidder shall submit its Bid as indicated below:
(Indicate how, such as by website, host site/platform, paper copy, or other method Bidders shall submit their Bid.)
« See Bid Advertisement »
§ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder�s name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation �SEALED BID ENCLOSED� on the face thereof.
§ 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the invitation to bid. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted.
§ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.
§ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.
§ 4.4 Modification or Withdrawal of Bid § 4.4.1 Prior to the date and time designated for receipt of Bids, a Bidder may submit a new Bid to replace a Bid previously submitted, or withdraw its Bid entirely, by notice to the party designated to receive the Bids. Such notice shall be received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the amount of the original Bid.
AIA Document A701� � 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved. The
�American Institute of Architects,� �AIA,� the AIA Logo, and �AIA Contract Documents� are registered trademarks and may not be used without permission. This draft was produced by AIA software at 13:45:41 ET on 10/04/2021 under Order No.9144871668 which expires on 09/15/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (1883797840)
§ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted.
§ 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its Bid shall notify the Architect of such error within two days, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section
4.4.3, the bid security will be attended to as follows:
(State the terms and conditions, such as Bid rank, for returning or retaining the bid security.)
ARTICLE 5 CONSIDERATION OF BIDS
§ 5.1 Opening of Bids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened and read aloud. A summary of the Bids may be made available to
Bidders.
§ 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids.
§ 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the
Owner�s judgment, is in the Owner�s best interests.
§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible
Bidder on the basis of the sum of the Base Bid and Alternates accepted.
ARTICLE 6 POST-BID INFORMATION
§ 6.1 Contractor’s Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305�, Contractor�s Qualification Statement, unless such a Statement has been previously required and submitted for this Bid.
§ 6.2 Owner’s Financial Capability A Bidder to whom award of a Contract is under consideration may request in writing, fourteen days prior to the expiration of the time for withdrawal of Bids, that the Owner furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner�s obligations under the Contract. The Owner shall then furnish such reasonable evidence to the Bidder no later than seven days prior to the expiration of the time for withdrawal of Bids. Unless such reasonable evidence is furnished within the allotted time, the Bidder will not be required to execute the Agreement between the Owner and Contractor.
§ 6.3 Submittals § 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect:
.1 a designation of the Work to be performed with the Bidder's own forces;
.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and
.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.
AIA Document A701� � 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved. The
�American Institute of Architects,� �AIA,� the AIA Logo, and �AIA Contract Documents� are registered trademarks and may not be used without permission. This draft was produced by AIA software at 13:45:41 ET on 10/04/2021 under Order No.9144871668 which expires on 09/15/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (1883797840)
§ 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.
§ 6.3.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder�s option, withdraw the Bid or submit an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or Alternate
Bid to account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited.
§ 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Architect.
ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND
§ 7.1 Bond Requirements § 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the
Contract and payment of all obligations arising thereunder.
§ 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum.
§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.
§ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of the
Contract Sum.
(If Payment or Performance Bonds are to be in an amount other than 100% of the Contract Sum, indicate the dollar amount or percentage of the Contract Sum.)
§ 7.2 Time of Delivery and Form of Bonds § 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to commence sooner in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Section 7.2.1.
§ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment
Bond.
§ 7.2.3 The bonds shall be dated on or after the date of the Contract.
§ 7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix to the bond a certified and current copy of the power of attorney.
ARTICLE 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS
§ 8.1 Copies of the proposed Contract Documents have been made available to the Bidder and consist of the following documents:
.1 AIA Document A101��2017, Standard Form of Agreement Between Owner and Contractor, unless otherwise stated below.
(Insert the complete AIA Document number, including year, and Document title.)
.2 AIA Document A101��2017, Exhibit A, Insurance and Bonds, unless otherwise stated below.
AIA Document A701� � 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved. The
�American Institute of Architects,� �AIA,� the AIA Logo, and �AIA Contract Documents� are registered trademarks and may not be used without permission. This draft was produced by AIA software at 13:45:41 ET on 10/04/2021 under Order No.9144871668 which expires on 09/15/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (1883797840)
(Insert the complete AIA Document number, including year, and Document title.)
.3 AIA Document A201��2017, General Conditions of the Contract for Construction, unless otherwise stated below.
(Insert the complete AIA Document number, including year, and Document title.)
.4 AIA Document E203��2013, Building Information Modeling and Digital Data Exhibit, dated as indicated below:
(Insert the date of the E203-2013.)
.5 Drawings
Number Title Date See Title Sheet
.6 Specifications
Section Title Date Pages
See Project Manual
.7 Addenda:
Number Date Pages
.8 Other Exhibits:
(Check all boxes that apply and include appropriate information identifying the exhibit where required.)
[ « » ] AIA Document E204��2017, Sustainable Projects Exhibit, dated as indicated below:
(Insert the date of the E204-2017.)
[ « » ] The Sustainability Plan:
Title Date Pages
[ « » ] Supplementary and other Conditions of the Contract:
Document Title Date Pages
.9 Other documents listed below:
(List here any additional documents that are intended to form part of the Proposed Contract Documents.)
NCC Bldg Police Wing
Base Bid Breakdown Form
(bidder shall fill out all applicable line items for their scope of work/contract)
Contract Description Total GC General Construction
Selective Building Demolition $ - Concrete $ - Masonry $ - Metals $ - Rough Carpentry/Insulation/Drywall $ - Finish Carpentry & Millwork $ - Roofing/Flashing/Roof Accessories $ - Joint Sealants/Waterproofing $ - Doors/Frames/Hardware $ - Windows/Glass/Glazing $ - Finish Flooring $ - Painting $ - Acoustical Ceilings $ - Specialties/Toilet Accessories/Signage $ - Furnishings/Window Treatments $ - Elevator $ - Fire Protection System $ -subtotal: $ -
Supervision/General Conditions/OH/Profit $ - Gen Requirements/Cleanup/Dumpsters $ - Permits/Inspections $ - Performance & Payment Bond $ -subtotal: $ -
GC Bid Total: $ -
BIDDER:
DATE SUBMITTED:
General Construction (GC) Bid Breakdown Form 00 30 02 - 1
NCC Building Police Wing
Base Bid Breakdown Form
(bidder shall fill out all applicable line items for their scope of work/contract)
Contract Description Total
MC HVAC Construction Equipment & Rigging $ - Piping & Insulation $ - Ductwork & Insulation $ - Air Devices $ - BAS/Controls $ - Startup/Testing/Balancing $ -subtotal: $ - Supervision/General Conditions/OH/Profit $ - Gen Requirements/Cleanup $ - Permits/Inspections $ - Performance & Payment Bond $ -subtotal: $ -
MC Bid Total: $ -
BIDDER:
Mechanical Construction (MC) Bid Breakdown Form 00 30 04 - 1
VISITORS CENTER AND MUSEUM
NCC Building Police Wing
Base Bid Breakdown Form
(bidder shall fill out all applicable line items for their scope of work/contract)
Contract Description Total
EC Electrical Switchgear $ - Distribution Feeders/Panels $ - Power: Branch circuits and receptacles $ - Power: HVAC Power $ - Lighting: Branch Circuits & Controls $ - Light Fixtures $ - Voice/Data $ - Fire Alarm System $ -subtotal: $ - Supervision/General Conditions/OH/Profit $ - Gen Requirements/Cleanup $ - Permits/Inspections $ - Performance & Payment Bond $ -subtotal: $ -
EC Bid Total: $ -
BIDDER:
Electrical Construction (EC) Bid Breakdown Form 00 30 06 - 1
NCC Building Police Wing
Base Bid Breakdown Form
(bidder shall fill out all applicable line items for their scope of work/contract)
Contract Description Total PC Plumbing
Sanitary System Piping/Fittings/Insulation $ - Domestic Water System Piping/Fittings/Insulation $ - Roof Drainage System Piping/Fittings/Insulation $ - Natural Gas System Equipment/Piping/Fittings $ - Plumbing Fixtures $ - Equipment/Pumps $ - Fire Protection (Wet System) $ - Fire Protection (Dry System) $ - Fire Protection (FM200 System) $ -subtotal: $ - Supervision/General Conditions/OH/Profit $ - Gen Requirements/Cleanup $ - Permits/Inspections $ - Performance & Payment Bond $ -subtotal: $ -
PC Bid Total: $ -
BIDDER:
Plumbing Construction (PC) Bid Breakdown Form 00 30 08 - 1
BID DOCUMENT CHECKLIST 00 41 00 - 1
SECTION 00 41 00 - BID DOCUMENT CHECKLIST
ITEM READ, SIGNED
AND SUBMITTED
Completed Form for Bid with Add Alternates __________
Completed Contractor’s Qualification Statement AIA A305. __________
(include references and list of similar project completed and Status of Present Contracts)
Completed Bid Bond AIA - A310 with Power of Attorney __________
Completed Affidavit of Non-Collusion, (00 53 10) __________
Unexecuted AIA – A312 Performance and Payment Bonds or __________
Proof of Bonding / Consent of Surety
Proof of Insurance (in amounts requested in specs) on Insurer’s Standard Forms __________
Contractor’s Waiver of Right to File Mechanic’s Liens (00 53 20) * __________
Contractor’s Affidavit of Release of Liens (G706A) * __________
Additional Notes:
For corporate bidders, corporate resolution authorizing the Bid are attached to Proposal Pages. For joint venture bidders, separate Ownership Disclosure Statements are included in the Proposal Pages for each member.
Evidence, in the case of a corporation organized under the laws of any other state, that the bidder has been issued a certificate of authority to transact business in this State.
* These will be required by the successful bidder at contract signing.
END OF SECTION 00 41 00
.FORM FOR GENERAL BID CONTRACT #1 00 41 01 - 1
SECTION 00 41 01 - FORM FOR BIDCONTRACT #1 - GENERAL BUILDING CONSTRUCTION
A. The undersigned, having carefully examined the premises and the Drawings and Project Manual, and having fully informed himself as to all laws, ordinances, and regulations affecting the work, will furnish all labor and materials and perform all work required for the construction of:
Pocono Township NCC Building - Police Wing in accordance with the Drawings and Specifications prepared by Kimmel Architecture, Reuther Bowen, and BSEG Engineering for the Contract Price specified below, subject to additions and deductions according to the terms of the Project Manual.
B. This bid includes addenda numbered (if none, so state).
C. The proposed Contract Price (Base Bid); price to include PennBid fee (1/3 of 1% = .0033):
is________________________________________dollars.
Base bid valid for 90 days and as per the Bid Advertisement.
D. The proposed price for the following Deduct Alternates:
Alternate #1
Deduct alternate for Pocono Township to self-perform installation of interior finishes, see Alternate Spec for add’l info.
Alternate #1: Delete __________________________________________ dollars
Alternate #2
Deduct alternate for Pocono Township to self-perform installation of casework in certain rooms, see Alternate Spec for add’l info.
Alternate #2: Delete __________________________________________ dollars
E. The proposed price for the following Additional Alternates:
Alternate #3
.FORM FOR GENERAL BID CONTRACT #1 00 41 01 - 2
Add alternate for Pocono Township to paint entire exterior stucco finish, rather than paint only at necessary patches as identified in base bid. Extents of paint would be within full perimeter extents of renovation.
Alternate #3: Add __________________________________________ dollars
F. Upon opening of bids, the apparent low bidder will be notified by the Owner of the intent of the Owner to award the Contract to the low bidder. If the undersigned is notified of such intent, he agrees to submit the required payment and performance bonds in satisfactory form. The undersigned agrees to provide the necessary insurance certificate within 10 days of notice of intent to award the Contract.
G. The undersigned agrees, if awarded the Contract, to begin work immediately upon receipt of the notice to proceed. Notice will not be issued to the Contractor until after the Contractor has delivered the necessary certificate of insurance to the Owner. The Contractor agrees to complete the entire work to the satisfaction and approval of the Owner and Architect within the contracted time frame as described in Section 00 42 50 – Liquidated Damages.
H. If the Owner accepts this proposal, the undersigned agrees to submit, within ten (10) business days, a Construction Schedule as specified in Section 01-3200 of these construction documents.
I. The undersigned agrees, that if he is selected as a Contractor, he will within 15 days, Saturdays, Sundays and Legal Holidays excluded, after presentation thereof by the Owner, execute a contract in accordance with terms of this bid.
J. The Contractor in charge of the General Construction of this project shall have direct control and management of all the construction operations and shall be responsible for the satisfactory overall performance of all his suppliers and subcontractors, as well as coordination of work performed.
K. The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work.
L. In the event that changes are required in the work, including increases or decreases in the amount of items shown in the contract drawings, that adjustment shall be made according to Article 12 of the General Conditions of the Contract for Construction.
M. The undersigned agrees that time is of the essence in this Contract and that great energy and diligence shall characterize all operations carried out under this Contract.
By: _______________________________________ Date: _____________________________ (Signature)
(Name and Title) ______________________________________________________
(Name of Organization) ______________________________________________________
(Business Address) ______________________________________________________
(Corporate Seal)
.FORM FOR GENERAL BID CONTRACT #1 00 41 01 - 3
Note: If the bidder is a corporation, indicate State of incorporation under signature and affix corporate seal; if a partnership, give full names and residential addresses of all partners; and if an individual, give residential address if different from business address.
END OF SECTION…