This is a plumbing bid permit set for the Pocono Township Municipal Complex Police Wing renovation project located in Tannersville, Pennsylvania. The plumbing scope of work encompasses the complete design and installation of sanitary drainage systems, domestic water supply systems, and vent piping for the police station renovation. The project requires the plumbing contractor to provide all necessary permits and approvals from authorities having jurisdiction and to furnish and install all equipment and materials in strict accordance with the Pennsylvania Uniform Construction Code and the 2021 International Plumbing Code. Key fixtures include multiple water closets, urinals, lavatories, kitchen sinks, showers, floor drains, and specialized equipment such as an oil/water separator, water cooler, ice maker box, and mop sinks. The drawings include a demolition plan identifying existing plumbing systems to be removed, sanitary and vent piping plans, domestic water supply plans, and riser diagrams showing fixture connections and pipe routing. The sealed bid submission deadline is November 12 at 1:00 PM through PennBid, with a mandatory pre-bid conference scheduled for October 14 at 10:00 AM at the Pocono Township Administration Building, followed by a site tour. Bid documents became available for download on October 7 at 9:00 AM.
The plumbing contractor must provide a one-year unconditional guarantee on all materials, equipment, and workmanship from the date of owner acceptance and is responsible for all permit fees, inspections, and utility company charges. Bid security in the amount of 10% of the base bid is required in the form of a certified check, bank cashier's check, letter of credit, or bid bond. The project is subject to the Pennsylvania Prevailing Wage Act and the Steel Products Procurement Act. All items of labor, material, and equipment necessary for completion of the work, whether specifically described or not, are considered included in the contract without extra cost. The contractor must coordinate plumbing work with all other trades, maintain safe work areas compliant with OSHA standards, carry appropriate liability and property damage insurance, and provide as-built drawings and operation and maintenance manuals upon project completion. No requests for information will be considered after seven days prior to the bid submission deadline.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P ro gr es s P rin ts
R ev is io ns
C he ck ed
B y:
D ra w n
B y:
C on st ru ct io n Is su e
D at e:
S ca le : A
S N
O
TE
D
PO
C O
N O
T O
W N S H
IP
M U N
IC
IP
A L
C O
M
PL
EX
N C
C B
U
IL
D
IN
G O
LD
M
IL
L
R O
A D
TA
N N
ER
S V
IL
LE
P
A
BSEG Project No: 24.0112.000
4949 Liberty Lane, Suite 115, Allentown, PA 18106 P: 610-351-8225 F: 610-351-8210 www.bseg-ce.com
B u i l d i n g S y s t e m s E n g i n e e r i n g G r o u p
C O
P Y
R
IG
H T
K
IM
M
E L A
R C
H
IT
E C
T U
R E
IN
C c
A L
R
IG
H T
S R
E
SE
R V
E D
P H
O N
E .8
.7
P
IT
T S
B U
R G
H O
F F
IC
E
L
IB
E R
T Y
A V
E N
U E U
N
IT
P
IT
T
SB
U R
G H
P A
P H
IL
A
D E
L P
H
IA
O F
F
IC
E
N
O R
R
IS
T O
W N
R O
A D
SU
IT
E
B L U
E B
E L L P A
.2
4.
0%
S E
T
.3 0.
B
ID
/P
E R
M
IT
S E
T
P
LU
M B
IN
G
IN
FO
R M
A
TI
O N
S H
E E
T D
M R R A
S
P0.0
1. PLUMBING CONTRACTOR (PC) SHALL PROVIDE A COMPLETE AND WORKING SYSTEM WITH ALL
NECESSARY PERMITS AND APPROVALS FROM AUTHORITIES HAVING JURISDICTION.
2. FURNISH AND INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH THE
PENNSYLVANIA UNIFORM CONSTRUCTION CODE, 2021 INTERNATIONAL PLUMBING CODE, ALL
PERTINENT CODES, LAWS, ORDINANCES, REGULATIONS, AND RESPECTIVE MANUFACTURER'S WRITTEN
INSTRUCTIONS.
3. COORDINATE PLUMBING WORK WITH THE WORK OF ALL OTHER TRADES AND OWNER.
4. PLUMBING DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE DRAWINGS MUST BE FOLLOWED AS CLOSELY AS CIRCUMSTANCES PERMIT AND ACTUAL LINE LOCATIONS SHALL BE DETERMINED BY THE PC IN THE FIELD. HOWEVER, THE PC WILL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION OF ALL MATERIALS AND EQUIPMENT REQUIRED FOR A COMPLETE INSTALLATION WITHIN THE INTENT AND
MEANING OF THE CONTRACT DOCUMENTS.
5. PC SHALL ARRANGE THE PROGRESS OF THEIR WORK SO AS TO CONFORM TO THE PROGRESS OF THE TRADES AND SHALL COMPLETE THE ENTIRE INSTALLATION AS SOON AS THE CONDITION OF THE
PROJECT WILL PERMIT.
6. ALL ITEMS OF LABOR, MATERIAL, AND EQUIPMENT NOT SPECIFICALLY DESCRIBED HEREIN NOR DETAILED ON THE DRAWINGS BUT INCIDENTAL TO OR NECESSARY FOR THE COMPLETION OF THE
WORK, SHALL BE CONSIDERED AS INCLUDED WITHOUT EXTRA COST.
7. PROVIDE NECESSARY SUPPORTS, HANGERS AND HARDWARE TO PROPERLY SECURE PIPING AND
EQUIPMENT TO BUILDING STRUCTURE.
8. FURNISH AND INSTALL ACCESS PANELS WHERE REQUIRED FOR ACCESS TO ALL CONCEALED VALVES, TRAPS OR EQUIPMENT WHERE NO OTHER MEANS IS PROVIDED. COORDINATE ACCESS LOCATIONS WITH
ARCHITECT AND GC.
9. DO NOT INSTALL PIPING OR ANY OTHER PLUMBING EQUIPMENT OVER ELECTRICAL PANELS. MAINTAIN
A MINIMUM OF 36" CLEAR IN FRONT OF ELECTRICAL PANELS. COORDINATE WITH EC.
10. PC SHALL PROVIDE INSTRUCTIONS TO THE OWNER FOR EACH SYSTEM INSTALLED AND THE OPERATION
OF ALL EQUIPMENT IN THEIR CONTRACT.
11. CHECK AND VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AT THE SITE. FAILURE TO VISIT AND INSPECT THE EXISTING CONDITIONS SHALL NOT BE VALID REASON FOR AUTHORIZATION OF A CHANGE
ORDER.
12. PC SHALL UNCONDITIONALLY GUARANTEE IN WRITING ALL MATERIALS, EQUIPMENT, AND
WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE BY OWNER.
13. PROVIDE SHOCK ABSORBING DEVICES WHICH WILL PROTECT WATER SUPPLY PIPING FROM WATER HAMMER. REFER TO PLUMBING EQUIPMENT SCHEDULE FOR TYPES. LOCATE AT THE ENDS OF ALL
BRANCH PIPING RUNS.
14. PC SHALL SUBMIT TO THE ARCHITECT/ENGINEER AS-BUILT DRAWINGS AND OPERATION AND
MAINTENANCE MANUALS INCLUDING ALL NAME PLATE DATA, WIRING DIAGRAMS, MAINTENANCE
INSTRUCTIONS, AND PARTS LIST UPON PROJECT COMPLETION.
15. EXTERIOR BELOW GROUND PIPING SHALL BE BURIED BELOW THE LOCAL FROST LINE.
16. INTERIOR ABOVE GROUND DRAINAGE AND VENT PIPING SHALL BE CONCEALED IN WALLS AND ABOVE SUSPENDED CEILINGS WHERE POSSIBLE. VERTICAL STACKS AND RAIN WATER CONDUCTORS SHALL BE
PROVIDED WITH ACCESSIBLE CLEAN OUTS AT THEIR BASE.
17. PC SHALL MAINTAIN A CLEAN AND SAFE WORK AREA AT ALL TIMES. ALL SAFETY PROCEDURES AND ENFORCEMENT IS THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL CONFORM TO
ALL OSHA STANDARDS.
18. BACK FLOW PREVENTERS AND/OR VACUUM BREAKERS SHALL BE INSTALLED WHERE REQUIRED TO
PREVENT CONTAMINATION OF POTABLE WATER SYSTEM.
19. SUBMIT SHOP DRAWINGS AND PRODUCT DATA GROUPED TO INCLUDE COMPLETE SUBMITTALS OF
RELATED SYSTEMS, PRODUCTS, AND ACCESSORIES IN A SINGLE SUBMITTAL.
20. CONTRACTOR SHALL PAY FOR AND OBTAIN ALL FEES, PERMITS AND INSPECTIONS. ALL CHARGES BY
UTILITY COMPANIES SHALL BE PAID BY THIS CONTRACTOR.
21. FOR ALL NEW AND EXISTING PEX, CPVC, PVC, DWV, AND ABS PIPING IN RETURN AIR PLENUMS, PROVIDE
3M FIRE BARRIER PLENUM WRAP 5A OR EQUAL. INSTALL PER MANUFACTURER'S WRITTEN
INSTRUCTIONS.
22. VISIBLE PATCHING IN FINISHED SPACES SHALL BE PERFORMED BY G.C. EXCEPT WHERE OTHERWISE INDICATED, ALL CUTTING, EXCAVATION, AND FILL REQUIRED FOR THE PLUMBING WORK SHALL BE BY
THE PC. DO NOT CUT STRUCTURAL MEMBERS.
23. PC SHALL CARRY AND DOCUMENT LIABILITY, ACCIDENT, AND PROPERTY DAMAGE INSURANCE IN
ACCORDANCE WITH THE OWNER'S REQUIREMENTS.
24. PC SHALL EXERCISE EXTREME CARE IN PROTECTING AREAS ADJACENT TO CONSTRUCTION AREAS, SHALL
FULLY PROTECT THE AREAS FROM ANY DAMAGE RESULTING FROM CONTRACTOR'S WORKMEN,
SUBCONTRACTORS OR AGENTS, AND SHALL BE RESPONSIBLE FOR REPAIRING, CLEANING OR REPLACING
AND SUCH DAMAGE.
25. ALL DIMENSIONS GIVEN ARE FINISH DIMENSIONS UNLESS OTHERWISE NOTED. DO NOT SCALE
DRAWINGS.
26. PC SHALL FOLLOW MANUFACTURERS DIRECTIONS, INSTRUCTIONS AND RECOMMENDATIONS FOR ALL MATERIALS AND PROCESSES USED IN THIS CONTRACT UNLESS SPECIFICALLY NOTED OTHERWISE.
27. UPON COMPLETION OF PROJECT, SUBMIT A COPY OF THE APPROVED PERMIT SET TO THE OWNER.
28. NOTIFY BUILDING OWNER AND TENANTS AT LEAST 48 HOURS PRIOR TO DEMOLITION WORK OR BUILDING SERVICE SHUT DOWNS. SHUT DOWNS SHALL BE PERFORMED AT DESIGNATED TIMES UNDER BUILDING OWNERS SUPERVISION AND ONLY WITH THEIR APPROVAL. ANY SHUT DOWN COSTS SHALL BE
INCLUDED IN THE PLUMBING CONTRACT.
29. ALL FIXTURES, EQUIPMENT, PIPING, ETC. TO BE REMOVED SHALL BE DISPOSED OF, RELOCATED, TURNED OVER TO THE OWNER OR SALVAGED AS DIRECTED BY THE ARCHITECT.
30. UPON COMPLETION OF NEW WORK ALL ABANDONED PIPING SHALL BE REMOVED.
31. EXISTING SYSTEMS SHALL BE LEFT IN PERFECT WORKING ORDER UPON COMPLETION OF ALL NEW
WORK.
32. LOCATIONS AND SIZES OF EXISTING PIPING ARE APPROXIMATE. FIELD VERIFY EXACT LOCATIONS AND
SIZES OF ALL EXISTING PIPING.
33. REMOVED PIPING, FITTINGS, VALVES, FIXTURES, ETC. SHALL NOT BE REUSED UNLESS SPECIFICALLY
NOTED OR APPROVED BY THE ENGINEER.
34. REFER TO ARCHITECTURAL DRAWINGS FOR ALL CEILING HEIGHTS.
PLUMBING GENERAL NOTES: MISCELLANEOUS SYMBOLS
DIRECTION OF VIEW
OR DETAIL IS SHOWN
OR DETAIL IS TAKEN
DRAWING FROM WHICH SECTION
DETAIL OR SECTION NUMBERX
X
SECTION NUMBER
DRAWING ON WHICH SECTION
X X
REVISION SYMBOLX
DRAWING NOTE SYMBOLX
POINT OF CONNECTION-NEW TO EXISTING
NOTE:
NOT ALL ABBREVIATIONS AND SYMBOLS
INDICATED MAY APPEAR ON THESE
CONTRACT DRAWINGS. THIS IS FOR
REFERENCE ONLY.
ABV ABOVE
ABV CLG ABOVE CEILING
AC AQUATICS CONTRACTOR
AD1 AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AMP AMPERE
AP ACCESS PANEL
APPROX. APPROXIMATE
AVG AVERAGE
BFF BELOW FINISHED FLOOR
BFG BELOW FINISHED GRADE
BFP1 REDUCED PRESSURE BACKFLOW PREVENTER
BOJ BOTTOM OF JOIST
BOP BOTTOM OF PIPE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BACK PRESSURE
BSMT BASEMENT
BTU BRITISH THERMAL UNITS
BWV1 BACK WATER VALVE
CFH CUBIC FEET PER HOUR
CI CAST IRON
CL CENTER LINE
CLG CEILING
CO CLEANOUT
COL COLUMN
CONC CONCRETE OR CONCENTRIC
CONN CONNECT
CONT CONTINUATION
CW COLD WATER
CF1 DRINKING FOUNTAIN
DEPT DEPARTMENT
DFU DRAINAGE FIXTURE UNIT
DIA, Ø DIAMETER
DIP DUCTILE IRON PIPE
DN DOWN
DN1 DOWN SPOUT NOZZLE
DW1 DISHWASHER
EC ELECTRICAL CONTRACTOR
ECO1 EXTERIOR CLEANOUT
ED1 EMERGENCY OVERFLOW DRAIN
EL ELEVATION
ABBREVIATIONS
ESP1 ELEVATOR SUMP PUMP
EX EXISTING
FCO1 FLOOR CLEANOUT
FD1 FLOOR DRAIN
FFD1 FUNNELED FLOOR DRAIN
FF ELEV FINISHED FLOOR ELEVATION
FSC FOOD SERVICE CONTRACTOR
FS1 FLOOR SINK
FLA FULL LOAD AMPS
FL FLOOR
FPM FOOT/FEET PER MINUTE
FPS FOOT/FEET PER SECOND
FRM FROM
FT FOOT/FEET
GAL GALLONS
GB1 GARBAGE DISPOSAL
GC GENERAL CONTRACTOR
GND GROUND
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR1 GAS PRESSURE REGULATOR
GPS GALLONS PER SECOND
GS1 GLASS FILLER
GSV GAS SOLENOID VALVE
GT1 GREASE TRAP
HB1 HOSE BIBB
HC HVAC CONTRACTOR
HEWC1 HANDICAP ELECTRIC WATER COOLER
HGT HEIGHT
HP HORSE POWER
HLAV1 HANDICAP LAVATORY
HS1 HAND SINK
HSH1 HANDICAP SHOWER
HUR1 HANDICAP URINAL
HWC1 HANDICAP WATER CLOSET
HW HOT WATER
HWR HOT WATER RETURN
IB1 ICE MAKER BOX
ID INSIDE DIAMETER
INV INVERT OF PIPE
KD1 KITCHEN DRAIN
KS1 KITCHEN SINK
KW KILOWATT
LAV1 LAVATORY
MAX MAXIMUM
MBH THOUSAND BTU'S PER HOUR
MH MANHOLE
MIN MINIMUM
MS1 MOP SINK
MTD MOUNTED
NA, N/A NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OS&Y OUTSIDE STEM AND YOKE
PC PLUMBING CONTRACTOR
PRV PRESSURE REDUCING VALVE
PT1 PLASTER TRAP
PVC POLY VINYL CHLORIDE
RD1 ROOF DRAIN
RPM REVOLUTIONS PER MINUTE
RWC RAINWATER CONDUCTOR
SAN SANITARY
SE1 SEWAGE EJECTOR
SH1 SHOWER
SS1 SERVICE SINK
STM STORM
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP1 TRAP PRIMER
TUB1 TUB/SHOWER
TYP TYPICAL
UR1 URINAL
WB1 WASHER BOX
W WASTE
W/ WITH
W/O WITHOUT
WC1 WATER CLOSET
WCO1 WALL CLEAN OUT
WFSU WATER FIXTURE SUPPLY UNITS
WHA1 WATER HAMMER ARRESTER
WH1 NON-FREEZE WALL HYDRANT
WPV1 WHIRLPOOL VALVE
WSV WATER SOLENOID VALVE
V VENT
VTR VENT THROUGH ROOF
PLUMBING DRAWING LIST
P0.0 PLUMBING INFORMATION SHEET
P1.1 PLUMBING GROUND FLOOR POLICE WING DEMO PLAN
P2.1 PLUMBING GROUND FLOOR PLAN POLICE WING - SANITARY/VENT
P2.2 PLUMBING GROUND FLOOR PLAN POLICE WING - DOMESTIC WATER
P3.1 PLUMBING RISER DIAGRAM SHEET
P4.1 PLUMBING DETAILS SHEET
PLUMBING EQUIPMENT SCHEDULE
SYMBOL FIXTURE TYPE MANUFACTURER MODEL NO. FAUCET/
VALVE
ANSI/ASME
APPROVALS
MOUNTING/
SUPPORT
*MINIMUM BRANCH PIPE SIZES DFU
WSFU
ELECTRIC
**** NOTES
HW CW SAN TRAP VENT
AD1 AREA DRAIN JAY R. SMITH 2142 A112.6.3-2001 4" 4" 2" 0.0 PROVIDE WITH SEDIMENT BUCKET, DEEP SEAL TRAP AND
PROSET SURE SEAL TRAP GUARD
FD1 FLOOR DRAIN JAY R. SMITH 2005-A A112.6.3-2001 2" 2" 11
2" 0.0 PROVIDE WITH DEEP SEAL TRAP AND PROSET SURE SEAL
TRAP GUARD
FD2 LIGATURE RESISTANT
FLOOR DRAIN ZURN Z415LR A112.6.3-2001 2" 2" 11
2" 0.0 PROVIDE WITH DEEP SEAL TRAP AND PROSET SURE SEAL
TRAP GUARD
FCO1 FLOOR CLEAN OUT JAY R. SMITH 4031 A112.21.1M FLOOR 4" INSTALL FLUSH AND LEVEL WITH FLOOR
HB1 HOSE BIBB PRIER C-168NP.75 ASSE STD 1011 3
4"
PROVIDE COMPLETE WITH DOUBLE CHECK VACUUM
BREAKER, ANTI-SIPHON, CHROME PLATED. MOUNT 24"
ABOVE FINISHED FLOOR.
HEWC1 ADA WATER COOLER WITH
BOTTLE FILL STATION ELKAY LZSTL8WS NSF 61
SECTION 9 WALL BRACKET 1
2" 11
2" 11 2" 11
2" 1.0 0.5 115V, 5.0A INSTALL IN ACCORDANCE WITH MANUFACTURERS
INSTRUCTIONS FOR ADA COMPLIANCE
HKS1 ADA DOUBLE BOWL
KITCHEN SINK
ELKAY
"LUSTERTONE" LRAD25055
MOEN "ALDER"
87233
PULL DOWN FAUCET
A112.19.3M COUNTER 1
2" 1 2" 11
2" 11 2" 11
2" 2.0 1.4
1.5 GPM, PROVIDE WITH P-TRAP AND TAILPIECE, PULL
DOWN SWIVEL FAUCET, ELKAY MODEL LKPD1 PERFECT
DRAINS W/STRAINERS, LKADOS TAILPIECE CLIPS MODEL
LKUCLIP8. ADA COMPLIANT WHEN TOP OF BOWL IS
INSTALLED AT 34" AFF.
HLAV1 ADA COUNTERTOP SINK KOHLER "CAXTON" K-2209-0
SLOAN OPTIMA
ETF-880-4-BOX-ADM-C
P-0.5GPM-MLM-IR-FCT
A112.19.2M/
A117.1 UNDERMOUNT 1
2" 1 2" 11
2" 11 2" 11
2" 2.0 2.0 24 VAC BOX
TRANSFORMER
INSTALL IN ACCORDANCE WITH MANUFACTURERS
INSTRUCTIONS FOR ADA COMPLIANCE. PROVIDE
COMPLETE WITH P-TRAP, TAILPIECE, GRID STRAINER, 0.5
GPM, AND SENSOR OPERATED FAUCET.
HSH1 ADAPTABLE SHOWER REFER TO ARCHITECTURAL DRAWINGS FOR
ENCLOSURE
MOEN "DURA"
T8342EP15 A11.19.1M/A117.1 FLOOR 1
2" 1 2" 2" 2" 11
2" 2.0 1.4
PROVIDE WITH SIOUX CHIEF MODEL 825-29-PVC
SHOWER DRAIN STAINLESS STEEL STRAINER. BLOCKING,
1.5 GPM SHOWER HEAD, HAND HELD SHOWER, SINGLE
LEVER HANDLE CONTROLS. NOTE 7
HUR1 ADA URINAL KOHLER
"BARDON" K-4991-ET SLOAN "ROYAL"
186 ESS-0.5-TMO-HW
A112.19.2M/
A112.19.6M/A117.1
WALL/JAY R. SMITH
MODEL 0637
CARRIER
4" 2" 2" 2.0 5.0 24 VAC BOX
TRANSFORMER
0.5 GPF, VITREOUS CHINA, SENSOR OPERATED FLUSH
VALVE w/MANUAL OVERRIDE (MOUNT RIM 17-19" AFF)
HARD WIRED SENSOR FLUSH VALVE
HWC1 ADA WATER CLOSET KOHLER
"KINGSTON" K-4325 SLOAN "ROYAL II"
111 ESS-1.6-OR
A112.19.2M/
A112.19.6M/A117.1
WALL/JAY R SMITH
MODEL 0210
CARRIER
1" 4" 2" 4.0 10.0 24 VAC BOX
TRANSFORMER
1.28 GPF, VITREOUS CHINA, ELONGATED BOWL, SENSOR
OPERATED FLUSH VALVE w/MANUAL OVERRIDE (MOUNT
RIM 17-19" AFF FOR ADA INSTALLATION). BEMIS
1955-SSC ELONGATED OPEN FRONT SEAT.
HWC2 ADA ANTI-LIGATURE
COMBINATION FIXTURE
ACORN
"PENAL-WARE" 1418FA-CT-2-04-M-1.28-FV ADA PUSH BUTTON
FLUSH VALVE
A112.19.2M/
A112.19.6M/A117.1
FLOOR MOUNTED
BACK OUTLET 1" 4" 2" 4.0 10.0
1.28 GPF, STAINLESS STEEL, ELONGATED BOWL, MANUAL
ADA FLUSH VALVE TOILET WITH PUSH BUTTON
ACTIVATION (INTEGRAL SEAT RIM 18" AFF FOR ADA
INSTALLATION).
IB1 ICE MAKER BOX OATEY 38687 A112.18.1 RECESSED IN WALL 1
2"
MS1 MOLDED STONE
MOP SINK FIAT MSB2424
24"x24"x10"
MOEN
8124 FLOOR 3
4" 3
4" 3" 3" 2" 3.0 3.0 SEE NOTE 6
OW1 OIL/WATER SEPARATOR MONARCH
PRECAST
315 GAL. OIL/WATER
SEPARATOR 4" 2"
PROVIDE 315 GALLON OIL/WATER SEPARATOR,
EQUIPPED WITH INSPECTION PORTS AND VAPOR VENT.
PROVIDE EXTENSION COLLARS AS NECESSARY.
UR1 URINAL KOHLER
"BARDON" K-4991-ET SLOAN "ROYAL"
186 ESS-0.5-TMO-HW
A112.19.2M/
A112.19.6M/A117.1
WALL/JAY R. SMITH
MODEL 0637
CARRIER
4" 2" 2" 2.0 5.0 24 VAC BOX
TRANSFORMER
0.5 GPF, VITREOUS CHINA, SENSOR OPERATED FLUSH
VALVE w/MANUAL OVERRIDE (MOUNT RIM 15" AFF)
HARD WIRED SENSOR FLUSH VALVE
SS1 UTILITY SERVICE SINK AMERICAN STANDARD LAKEWALL
7692008.008
AMERICAN STANDARD
8340.243 A112.19.1 FLOOR 1
2" 1 2" 2" 2" 11
2" 2.0 3.0
PROVIDE WITH STANDARD 2" CAST IRON P-TRAP AND
STRAINER. INSTALL IN ACCORDANCE TO
MANUFACTURERS WRITTEN INSTRUCTIONS
WC1 WATER CLOSET KOHLER
"KINGSTON" K-4325-0 SLOAN "ROYAL II"
111 ESS-1.6-OR
A112.19.2M/
A112.19.6M/A117.1
WALL/JAY R SMITH
MODEL 0210
CARRIER
1" 4" 2" 4.0 10.0 24 VAC BOX
TRANSFORMER
1.6 GPF, VITREOUS CHINA, ELONGATED BOWL, SENSOR
OPERATED FLUSH VALVE w/MANUAL OVERRIDE (MOUNT
RIM 15" AFF). BEMIS 1955-SSC ELONGATED OPEN FRONT
SEAT.
WCO1 WALL CLEAN OUT JAY R. SMITH 4720 A112.36.2M WALL 4"
WH1 FREEZE PROOF
WALL HYDRANT JAY R. SMITH 5609QT A112.21.3M WALL 3
4" MOUNT MIN 24" AFG
WHA1 WATER HAMMER
ARRESTER JAY R. SMITH 5000 SERIES A112.26.1M
WSFU 1-11:PDI-A; WSFU 12-32:PDI-B;
WSFU 33-60:PDI-C; WSFU 61-113:PDI-D;
WSFU 114-154:PDI-E; WSFU 155-330:PDI-F
* MINIMUM SANITARY/VENT PIPE SIZE BELOW SLAB IS 2".
** VALUES TAKEN FROM TABLES 709.1 AND E103.3(2) FROM THE CURRENT ADOPTED IPC 2018.
*** PROVIDE TAILPIECE AND P-TRAP WITH GRID STRAINER AT ALL LAVATORY SINKS, MCGUIRE OR APPROVED EQUAL.
**** PLUMBING CONTRACTOR IS RESPONSIBLE TO PROVIDE THE TRANSFORMER AND ELECTRIC CONTRACTOR TO INSTALL, ALL LOW VOLTAGE WIRING FROM THE TRANSFORMER TO THE FIXTURE SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR.
NOTES:
1. ALL FIXTURES TO BE SUPPLIED WHITE UNLESS OTHER WISE NOTED OR AS DIRECTED BY ARCHITECT.
2. ALL EXPOSED PIPING, P-TRAPS AND STOP VALVES TO BE CHROME PLATED BRASS 1/4 TURN LOCKABLE. PROVIDE MIXING VALVE POWER HYDROGAURD MODEL LFE480 OR EQUAL (SET TEMPERATURE TO 105°F)
3. PROVIDE "TRUEBRO" PRE-FORMED INSULATION KIT, WHITE IN COLOR ON ALL EXPOSED PIPING FOR HANDICAP FIXTURES INCLUDING IN THE BASE CABINETRY.
4. PROVIDE STOP VALVES AT EACH FIXTURE.
5. PROVIDE WITH 8" TRIM PLACE, BOX TRANSFORMER POWER SUPPLY, BELOW DECK THERMOSTATIC MIXING VALVE, POLISHED CHROME FINISH, 0.5 GPM, MULTI-LAMINAR SPRAY, INFRARED SENSOR, SMART FAUCET, OPTIMA HARDWIRED POWERED, DECK MOUNTED LOW INTEGRATED BASE BODY FAUCET.
6. PROVIDE WITH FIAT STAINLESS STEEL BUMPER GUARDS E-88-A AND MSG SERIES WALL GUARDS CAULKED WITH 833AA, HOSE AND BRACKET MODEL 832AA, MOP BRACKET MODEL 889CC MOUNTED ABOVE SINK.
7. PROVIDE COMPLETE WITH PRESSURE BALANCING CYCLE VALVE WITH 1/4 TURN STOPS, 3 FUNCTION TRANSFER VALVE, 1/2" CC CONNECTIONS, SHOWER ARM AND 1/2" IPS MALE THREAD, SHOWER HEAD, HAND-HELD SHOWER WITH NON-POSITIVE PAUSE , 69" METAL HOSE, 30" SLIDE BAR, DROP ELL, VACUUM BREAKER, MOUNTING HARDWARE, VANDAL RESISTANT SCREWS, QUICK CLEANING RUBBER NOZZLE, TEMPERATURE AND TRANSFER VALVE HAVE ADA COMPLIANT LEVER HANDLES, HANDLE OPERATES COUNTERCLOCKWISE THROUGH A 270°F ARC, ADJUSTABLE TEMPERATURE LIMIT STOP, PRESSURE BALANCING MECHANISM MAINTAINS SELECTED DISCHARGE TEMPERATURE TO ±2°F, TRANSFER VALVE OPERATES 3 DISTINCT FUNCTIONS, AND WATERSENSE CERTIFIED. ADA SHOWERS SHALL BE ADAPTABLE: SHOWER SEAT, GRAB BARS NOT REQUIRED AS PART OF INITAIL INSTALLATION, CURTAIN ROD, AND SOAP DISH BY G.C.
PLUMBING SYMBOLS
DOMESTIC COLD WATER
110°F HOT WATER
110°F HOT WATER RETURN
140°F HOT WATER
TEPID WATER (80°F-85°F)
SANITARY - ABOVE FLOOR
SANITARY - BELOW FLOOR
GREASE LADEN WASTE - ABOVE FLOOR
GREASE LADEN WASTE - BELOW FLOOR
RAINWATER CONDUCTOR - ABOVE FLOOR
RAINWATER CONDUCTOR - BELOW FLOOR
VENT
NATURAL GAS
EXISTING TO REMAIN
EXISTING TO BE REMOVED
GATE VALVE
BALL VALVE
BUTTERFLY VALVE
GAS VALVE
GAS PRESSURE REGULATOR
CHECK VALVE
MIXING VALVE
OS&Y VALVE
PRESSURE REDUCING VALVE
WATER HAMMER ARRESTER
BACKFLOW PREVENTER
SOLENOID VALVE
BALANCING VALVE
PRESSURE GAUGE WITH SHUT-OFF VALVE
WATER METER
PUMP
STRAINER WITH HOSE BIBB
PIPE CAP
PIPE RISE
PIPE DROP
PIPE THRU WITH BOTTOM TAP
UNION
ELBOW
TEE
ACCESS PANEL
ELECTRICAL PANEL BY EC
PRESSURE & TEMPERATURE RELIEF VALVE
THERMOMETER
VACUUM RELIEF VALVE
AQUASTAT
CW
HW
HWR
140HW
T
SAN
SAN
OW
OW
RWC
RWC
V
G
(E)
M
AP
lgamble Snapshot
2 2
4" SAN(E) 4" SAN(E)
2" SAN
4" SAN(E)
2" SAN
WH(E)
4" VTR(E)
3" V(E)
2" CW(E)
2" CW(E)2" CW(E)2" CW(E)
2" CW(E)
2" CW(E) UP
FRM CRAWL
SPACE BELOW
EWH(E), EX 80
GALLON ELECTRIC
WATER HEATER
(2) 4.5 KW ELEMENTS
CP(E), EX
RE-CIRC PUMP
4" HWR
1" HW125(E)
1" CW
4" HWR(E)
1" HW(E)
4" SAN(E)
1" CW(E)
4" HWR(E)
1" HW(E)
4" SAN(E)
1" CW(E)
FCO(E)
2" CW(E)
10 10 10
2" CW(E)
VTR(E)
4" SAN(E)
4" SAN(E)
4" SAN(E) U/G
EXISTING BILCO
DOORS TO WATER
UTILITY ROOM BELOW
14 15
P ro gr es s P rin ts
R ev is io ns
C he ck ed
B y:
D ra w n
B y:
C on st ru ct io n Is su e
D at e:
S ca le : A
S N
O
TE
D
PO
C O
N O
T O
W N S H
IP
M U N
IC
IP
A L
C O
M
PL
EX
N C
C B
U
IL
D
IN
G O
LD
M
IL
L
R O
A D
TA
N N
ER
S V
IL
LE
P
A
KEY PLAN
PROJECT
NORTH
PROJECT
NORTH
BSEG Project No: 24.0112.000
4949 Liberty Lane, Suite 115, Allentown, PA 18106 P: 610-351-8225 F: 610-351-8210 www.bseg-ce.com
B u i l d i n g S y s t e m s E n g i n e e r i n g G r o u p
C O
P Y
R
IG
H T
K
IM
M
E L A
R C
H
IT
E C
T U
R E
IN
C c
A
H T
S R
E
SE
R V
E D
P H
O N
E .8
.7
P
IT
T S
B U
R G
H O
F F
IC
E
L
IB
E R
T Y
A V
E N
U E U
N
IT
P
IT
T
SB
U R
G H
P A
P H
IL
A
D E
L P
H
IA
O F
F
IC
E
N
O R
R
IS
T O
W N
R O
A D
SU
IT
E
B L U
E B
E L L P A
.2
4.
0%
S E
T
.3 0.
B
ID
/P
E R
M
IT
S E
T
P
LU
M B
IN
G
G R
O U
N D
F
LO
O R
D M
R R A
S
P1.1
PLUMBING GROUND FLOOR DEMO PLAN (POLICE WING)
SCALE: 1/8" = 1'-0"
P O
LI
C
E W
IN
G
D E
M O
P
LA
N
CONTRACTOR SHALL REMOVE EXISTING COLD WATER PIPING BACK TO POINT SHOWN. VALVE
AND TEMPORARILY CAPPED FOR FUTURE CONNECTION. CONTRACTOR SHALL FIELD VERIFY
EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING COLD WATER PIPING PRIOR TO
ANY DEMOLITION.
CONTRACTOR SHALL REMOVE EXISTING WATER CLOSET, TOILET FLANGE, ASSOCIATED VALVES,
SANITARY PIPING, CW PIPING, ETC. REMOVE SANITARY AND CW PIPING BACK TO POINT
SHOWN ON PLAN AND CAP. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING,
INVERT, AND SIZE OF PIPING AND FIXTURE PRIOR TO ANY DEMOLITION.
CONTRACTOR SHALL REMOVE EXISTING VENT PIPING BACK TO POINT SHOWN BELOW ROOF
AND TEMPORARILY CAP FOR FUTURE CONNECTION. CONTRACTOR SHALL FIELD VERIFY EXACT
LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING VENT PIPING PRIOR TO ANY DEMOLITION.
CONTRACTOR SHALL REMOVE EXISTING URINAL, CARRIER, FLUSH VALVE, SANITARY PIPING, CW
PIPING, ETC. REMOVE SANITARY AND CW PIPING BACK TO POINT SHOWN ON PLAN AND CAP.
CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF PIPING
AND FIXTURE PRIOR TO ANY DEMOLITION.
CONTRACTOR SHALL REMOVE EXISTING THERMOSTATIC MIXING VALVE, COLD AND HOT
WATER PIPING IN IT'S ENTIRETY. CONTRACTOR SHALL FILED VERIFY EXACT LOCATION,
ROUTING, INVERT, AND SIZE OF VALVE AND PIPING PRIOR TO ANY DEMOLITION.
CONTRACTOR SHALL REMOVE EXISTING COLD WATER PIPING BACK TO POINT SHOWN. VALVE
AND CAP PIPING IN CRAW SPACE. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION,
ROUTING, INVERT, AND SIZE OF EXISTING COLD WATER PIPING PRIOR TO ANY DEMOLITION.
CONTRACTOR SHALL REMOVE EXISTING SANITARY PIPING BACK TO POINT SHOWN IN CRAWL
SPACE AND TEMPORARILY CAP. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING SANITARY PIPING PRIOR TO ANY DEMOLITION.
CONTRACTOR SHALL REMOVE EXISTING BI-LEVEL ELECTRIC WATER COOLER, ASSOCIATED
VALVES, COLD WATER PIPING, P-TRAP, TAILPIECE, COLD WATER PIPING, CARRIER, IN IT'S
ENTIRETY. CONTRACTOR SHALL REMOVE EXISTING SANITARY PIPING BACK TO POINT SHOWN
AND CAP. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF
EXISTING ELECTRIC WATER COOLER AND PIPING PRIOR TO ANY DEMOLITION.
CONTRACTOR SHALL REMOVE EXISTING LAUNDRY SERVICE SINK, ASSOCIATED VALVES, P-TRAP, TAILPIECE, FAUCET, VENT PIPING, COLD AND HOT WATER PIPING, ETC. IN IT'S ENTIRETY.
CONTRACTOR SHALL REMOVE EXISTING SANITARY PIPING BACK TO POINT SHOWN AND CAP.
CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING
LAUNDRY SERVICE SINK AND PIPING PRIOR TO ANY DEMOLITION.
EXISTING COLD WATER PIPING RUNNING IN CRAWL SPACE BELOW.
CONTRACTOR SHALL REMOVE EXISTING LAVATORY SERVICE SINK, ASSOCIATED VALVES, P-TRAP, TAILPIECE, FAUCET, VENT PIPING, COLD AND HOT WATER PIPING, ETC. IN IT'S ENTIRETY.
CONTRACTOR SHALL REMOVE EXISTING SANITARY PIPING BACK TO POINT SHOWN AND CAP.
CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING
LAVATORY SINK AND PIPING PRIOR TO ANY DEMOLITION.
CONTRACTOR SHALL FLUSH, CLEAN, AND/OR REPLACE ELEMENTS AS NECESSARY.
CONTRACTOR SHALL REMOVE EXISTING HAND SINK, ALL ASSOCIATED VALVES, P-TRAP,
TAILPIECE, FAUCET, VENT PIPING, COLD AND HOT WATER PIPING, ETC. IN IT'S ENTIRETY BACK
TO ADJACENT MAINS IN CEILING AND CAP. CONTRACTOR SHALL REMOVE EXISTING SANITARY
PIPING BACK TO MAIN UNDER SLAB AND CAP. CONTRACTOR SHALL FIELD VERIFY EXACT
LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING LAVATORY SINK AND PIPING PRIOR TO
ANY DEMOLITION. CONTRACTOR SHALL SAW CUT AND EXCAVATE EXISTING FLOOR SLAB AS
REQUIRED TO ACCESS EXISTING SANITARY PIPING, BACKFILL AND PATCH SLAB TO MATCH
EXISTING.
CONTRACTOR SHALL REMOVE EXISTING KITCHEN SINK, ALL ASSOCIATED VALVES, P-TRAP,
TAILPIECE, FAUCET, VENT PIPING, COLD AND HOT WATER PIPING, ETC. IN IT'S ENTIRETY BACK
TO WALL SPACE BEHIND SINK AND CAP IN WALL. CONTRACTOR SHALL FIELD VERIFY EXACT
LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING KITCHEN SINK AND PIPING PRIOR TO ANY
DEMOLITION.
CONTRACTOR SHALL REMOVE EXISTING THREE-COMPARTMENT SINK, ALL ASSOCIATED VALVES,
P-TRAP, TAILPIECE, FAUCET, VENT PIPING, COLD AND HOT WATER PIPING, ETC. IN IT'S ENTIRETY
BACK TO ADJACENT MAINS IN CEILING AND CAP. CONTRACTOR SHALL FIELD VERIFY EXACT
LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING LAVATORY SINK AND PIPING PRIOR TO
ANY DEMOLITION.
CONTRACTOR SHALL REMOVE EXISTING RECESSED GREASE TRAP, FLOOR SINK, ALL ASSOCIATED
SANITARY AND VENT PIPING BACK TO MAINS AND CAP. CONTRACTOR SHALL SAW CUT AND
EXCAVATE EXISTING FLOOR SLAB AS REQUIRED TO ACCESS EXISTING SANITARY PIPING,
BACKFILL AND PATCH SLAB TO MATCH EXISTING.
CONTRACTOR SHALL REMOVE EXISTING FLOOR SINK, ALL ASSOCIATED SANITARY AND VENT
PIPING BACK TO MAINS AND CAP. CONTRACTOR SHALL SAW CUT AND EXCAVATE EXISTING
FLOOR SLAB AS REQUIRED TO ACCESS EXISTING SANITARY PIPING, BACKFILL AND PATCH SLAB
TO MATCH EXISTING.
CONTRACTOR SHALL REMOVE ALL EXISTING PROPANE PIPING SERVING EXISTING COOKING
EQUIPMENT BACK TO MAIN IN CEILING SPACE AND PROVIDED VALVED AND CAPPED
CONNECTION FOR FUTURE USE. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING PROPANE PIPING PRIOR TO ANY DEMOLITION.
NOTES BY SYMBOL:
(THIS DRAWING ONLY)
N.I.C.
B F
D F
N.I.C.
4" VTR(E)
3" V(E)
4" SAN(E)
FCO(E)
VTR(E)
4" SAN(E)
4" SAN(E)
4" SAN(E) U/G
WCO2
HKS1
HKS1
4" VTR
3" V UP
HWC1HSH1
MS1
HLAV1
2" V UP,
2" W DN
2" V
2" SAN
4" SAN
3" V 3" V
2" V UP,
2" W DN
2" SAN
2" V
4" SAN
WCO1
FD1
HKS1
2" V
3" V
FD2
FD2
FD2
HWC2
HWC2
HWC2
SS1
4" SAN4" SAN(E)
FD1
HUR1 UR1
HLAV1
FD1
FD1
WC1
HWC1
WC1HSH1
2" SAN
1 1
HWC1
HLAV1
HEWC1
2" V
2" V 2" SAN
4" SAN
AD1 AD1 ECO1
MINIMUM
INVERT =
-3'-0' BFG
ECO1
OW1
OIL/WATER
SEPARATOR (OW1),
REFER TO DETAIL
REFER TO CIVIL
PLANS FOR
CONTINUATION
4" SAN
2" V
2" SAN
2" V
2" V
2" V
2" V
3" SAN
4" OW 4" OW
4" SAN
2" V U/G
2" V UP
TO 3" VTR
2" V UP
TO 3" VTR
2" V U/G
2" V U/G
SLAB ON GRADE CRAWL SPACE
SLAB ON GRADE CRAWL SPACE
2" V
WCO2
SALLY PORT
HALL
STORAGE
122B
H.C.
H.C.
H.C.
POLICE
LOBBY
INTERVIEW
INTERVIEW
HALL
GEAR
ROOM
TRAINING
ROOM
CORRIDOR
EVIDENCE
ROOM
L.T. STORAGE
EVIDENCE
INTK
ARMORY/
STORAGE
VEST.
DET
OFFICE
DET
OFFICE
HALL
CPL.
OFFICE
CPL.
OFFICE
CPL.
OFFICE
DET. SGT.
OFFICE
DET
OFFICE
CPL.
OFFICE
RECEP. SEC/
MAIL ROOM
STORAGE
FORENSIC
PROCESSING
PATROL
SGT.
CHIEF'S
OFFICE
HALL
PATROL
ROOM
MECH.
INTERVIEW
LOBBY
SECURITY
CORRIDOR
BREAK
ROOM
KITCHEN
TOILET
STORAGE
WOMENS
RESTROOM
WOMENS
LOCKERS
CLOSET
MENS
LOCKERS
MENS
RESTROOM
J/C
CORRIDOR
P ro gr es s P rin ts
R ev is io ns
C he ck ed
B y:
D ra w n
B y:
C on st ru ct io n Is su e
D at e:
S ca le : A
S N
O
TE
D
PO
C O
N O
T O
W N S H
IP
M U N
IC
IP
A L
C O
M
PL
EX
N C
C B
U
IL
D
IN
G O
LD
M
IL
L
R O
A D
TA
N N
ER
S V
IL
LE
P
A
KEY PLAN
PROJECT
NORTH
PROJECT
NORTH
BSEG Project No: 24.0112.000
4949 Liberty Lane, Suite 115, Allentown, PA 18106 P: 610-351-8225 F: 610-351-8210 www.bseg-ce.com
B u i l d i n g S y s t e m s E n g i n e e r i n g G r o u p
C O
P Y
R
IG
H T
K
IM
M
E L A
R C
H
IT
E C
T U
R E
IN
C c
A
H T
S R
E
SE
R V
E D
P H
O N
E .8
.7
P
IT
T S
B U
R G
H O
F F
IC
E
L
IB
E R
T Y
A V
E N
U E U
N
IT
P
IT
T
SB
U R
G H
P A
P H
IL
A
D E
L P
H
IA
O F
F
IC
E
N
O R
R
IS
T O
W N
R O
A D
SU
IT
E
B L U
E B
E L L P A
.2
4.
0%
S E
T
.3 0.
B
ID
/P
E R
M
IT
S E
T
D M
R R A
S
P2.1
PLUMBING GROUND FLOOR PLAN (POLICE WING) - SANITARY/VENT
SCALE: 1/8" = 1'-0"
CONTRACTOR SHALL CONNECT NEW 4" SANITARY PIPING INTO EXISTING 4" SANITARY PIPING.
CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING
SANITARY PIPING PRIOR TO ANY NEW WORK. CONTRACTOR SHALL SAWCUT EXISTING SLAB
AND EXCAVATE AS REQUIRED TO ACCESS EXISTING PIPING. BACKFILL AND PATCH SLAB TO
MATCH EXISTING.
CONTRACTOR SHALL CONNECT NEW 3" VENT PIPING INTO EXISTING TEMPORARILY CAPPED 3"
VENT PIPING. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE
OF EXISTING VENT PIPING PRIOR TO ANY NEW WORK.
CONTRACTOR SHALL CONNECT NEW SANITARY PIPING INTO EXISTING TEMPORARILY CAPPED
4" SANITARY PIPING. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING SANITARY PIPING PRIOR TO ANY NEW WORK.
CONTRACTOR SHALL CONNECT NEW 2" VENT PIPING INTO EXISTING VENT PIPING IN THIS AREA.
CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING
VENT PIPING PRIOR TO ANY NEW WORK.
CONTRACTOR SHALL SAWCUT EXISTING SLAB AND EXCAVATE AS REQUIRED TO ACCESS
EXISTING PIPING. BACKFILL AND PATCH SLAB TO MATCH EXISTING.
NOTES BY SYMBOL:
(THIS DRAWING ONLY)
P
LU
M B
IN
G
G R
O U
N D
F
LO
O R
P
LA
N P
O
LI
C E
W
IN
G
S A
N
IT
A R
Y /V
E N
T
N.I.C.
B F
D F
N.I.C.
WH(E)
2" CW(E)
2" CW(E)2" CW(E)
2" CW(E) UP
FRM CRAWL
SPACE BELOW
EWH(E), EX 80
GALLON ELECTRIC
WATER HEATER
(2) 4.5 KW ELEMENTS
CP(E), EX
RE-CIRC PUMP
4" HWR
1" HW125(E),
1" CW(E)
4" HWR(E)
1" HW(E)
1" CW(E)
4" HWR(E)
1" HW(E)
1" CW(E)
2" CW(E)
5 5
2" CW(E)
EXISTING BILCO
DOORS TO WATER
UTILITY ROOM BELOW
SS1HKS1
HKS1
MS1
TMV1
1" HW140
1" HW125
4" HWR110
4" HWR
4" HWR
1" HW
2" HW
2" CW
2" CW
2" HWR
4" HWR
1" HW
4" CW
4" HWR
1" HW
4" HWR
1" HW
HSH1
HWC2
WH1
WH1
4" CW
4" CW
4" CW
RUN 3 4" CW
DN ALONG
WALL w/SHUT-
OFF BALL VALVE
RUN 3 4" CW
DN ALONG
WALL w/SHUT-
OFF BALL VALVE
1" CW
4" HW
2" HWR
WH1
1" HW
2" CW
4" CW
HKS1
IB1
4" CW
HEWC1
HLAV1HWC1
HWC2
HWC2
HSH1
2" HWR
2" HW
4" CW
4" CW
2" CW
2" CW
SHUT-OFF VALVE (TYP)
BALANCING VALVE (TYP)
CHECK VALVE (TYP)
2" CW
2" HWR
2" CW
HUR1 UR1
HWC1
WC1
HLAV1
HLAV1HLAV1
WC1
4" CW
2" HW
1" HW
2" CW
HWC1
WHA1
WHA1
SALLY PORT
HALL
STORAGE
122B
H.C.
H.C.
H.C.
POLICE
LOBBY
INTERVIEW
INTERVIEW
HALL
GEAR
ROOM
TRAINING
ROOM
CORRIDOR
EVIDENCE
ROOM
L.T. STORAGE
EVIDENCE
INTK
ARMORY/
STORAGE
VEST.
DET
OFFICE
DET
OFFICE
HALL
CPL.
OFFICE
CPL.
OFFICE
CPL.
OFFICE
DET. SGT.
OFFICE
DET
OFFICE
CPL.
OFFICE
RECEP. SEC/
MAIL ROOM
STORAGE
FORENSIC
PROCESSING
PATROL
SGT.
CHIEF'S
OFFICE
HALL
PATROL
ROOM
MECH.
INTERVIEW
LOBBY
SECURITY
CORRIDOR
BREAK
ROOM
103KITCHEN
TOILET
STORAGE
WOMENS
RESTROOM
112WOMENS
LOCKERS
CLOSET
120 MENS
LOCKERS
MENS
RESTROOM
J/C
CORRIDOR
SLAB ON GRADE CRAWL SPACE
SLAB ON GRADE CRAWL SPACE
2" CW
P ro gr es s P rin ts
R ev is io ns
C he ck ed
B y:
D ra w n
B y:
C on st ru ct io n Is su e
D at e:
S ca le : A
S N
O
TE
D
PO
C O
N O
T O
W N S H
IP
M U N
IC
IP
A L
C O
M
PL
EX
N C
C B
U
IL
D
IN
G O
LD
M
IL
L
R O
A D
TA
N N
ER
S V
IL
LE
P
A
KEY PLAN
PROJECT
NORTH
PROJECT
NORTH
BSEG Project No: 24.0112.000
4949 Liberty Lane, Suite 115, Allentown, PA 18106 P: 610-351-8225 F: 610-351-8210 www.bseg-ce.com
B u i l d i n g S y s t e m s E n g i n e e r i n g G r o u p
C O
P Y
R
IG
H T
K
IM
M
E L A
R C
H
IT
E C
T U
R E
IN
C c
A
H T
S R
E
SE
R V
E D
P H
O N
E .8
.7
P
IT
T S
B U
R G
H O
F F
IC
E
L
IB
E R
T Y
A V
E N
U E U
N
IT
P
IT
T
SB
U R
G H
P A
P H
IL
A
D E
L P
H
IA
O F
F
IC
E
N
O R
R
IS
T O
W N
R O
A D
SU
IT
E
B L U
E B
E L L P A
.2
4.
0%
S E
T
.3 0.
B
ID
/P
E R
M
IT
S E
T
D M
R R A
S
P2.2
PLUMBING GROUND FLOOR PLAN (POLICE WING) - DOMESTIC WATER
SCALE: 1/8" = 1'-0"
CONTRACTOR SHALL CONNECT NEW 3/4" HWR PIPING INTO EXISTING HWR PIPING PRIOR TO
EXISTING HOT WATER RE-CIRC PUMP. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION,
ROUTING, INVERT, AND SIZE OF EXISTING HWR PIPING PRIOR TO ANY NEW WORK.
CONTRACTOR SHALL CONNECT NEW 1" HW PIPING INTO EXISTING HOT WATER PIPING FOR
EXISTING WATER HEATER AND PROVIDE SHUT-OFF VALVE. CONTRACTOR SHALL FIELD VERIFY
EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING HW PIPING PRIOR TO ANY NEW
WORK. CONTRACTOR SHALL VERIFY TEMPERATURE OF EXISTING WATER HEATER AND PROVIDE
NEW THERMOSTATIC MIXING VALVE TMV1.
CONTRACTOR SHALL CONNECT NEW 1" HW PIPING INTO EXISTING HOT WATER PIPING FOR
EXISTING WATER HEATER AND PROVIDE SHUT-OFF VALVE. CONTRACTOR SHALL FIELD VERIFY
EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING HW PIPING PRIOR TO ANY NEW
WORK.
CONTRACTOR SHALL CONNECT NEW 2" CW PIPING INTO EXISTING CW PIPING IN CRAWL
SPACE. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF
EXISTING CW PIPING PRIOR TO ANY NEW WORK.
CONTRACTOR SHALL VERIFY THE LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING CW
PIPING IN CRAWL SPACE PRIOR TO ANY NEW WORK.
CONTRACTOR SHALL CONNECT NEW 3/4" CW PIPING INTO EXISTING TEMPORARILY CAPPED
3/4" CW PIPING. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND
SIZE OF EXISTING CW PIPING PRIOR TO ANY NEW WORK.
CONTRACTOR SHALL DROP DOWN AND PROVIDE 2" CW AND 1" HW HEADER IN CHASE TO
SUPPLY EACH FIXTURE. PROVIDE WATER HAMMER ARRESTOR (WHA1) BETWEEN THE LAST
TWO FIXTURES.
PROVIDE HB1 MOUNTED UNDER SINK.
CONTRACTOR SHALL EXTEND 2" CW UP IN CHASE TO SUPPLY BATHROOM FIXTURES.
CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, INVERT, AND SIZE OF EXISTING
CW PIPING PRIOR TO ANY NEW WORK.
NOTES BY SYMBOL:
(THIS DRAWING ONLY)
P
LU
M B
IN
G
G R
O U
N D
F
LO
O R
P
LA
N P
O
LI
C E
W
IN
G
D O
M E
S
TI
C W
A
TE
R
FLOOR
ROOF
GROUND
SANITARY AND VENT RISER DIAGRAM
NO SCALE
-MINIMUM PIPE SIZE BELOW SLAB IS 2"
-DRAINAGE FIXTURE UNITS (0.0), SEE IPC TABLE 709.01
-ALL FIXTURES TO BE TRAPPED AND VENTED
-MINIMUM PIPE SLOPE:
3" PIPE SIZE OR MORE = 1 8"/FT
2" PIPE SIZE OR LESS = 1 4"/FT
-ALL VTR'S TO BE LOCATED A MINIMUM OF 10'
FROM ANY HVAC UNIT AND/OR FRESH AIR INTAKE
4"(E) (54.0)
4" VTR(E)
3"(E)
REFER TO FLOOR
PLAN FOR
CONTINUATION
2"
HKS1
(2.0)
2"
2" (1.0)
2"
HLAV1
(1.0)
2"
2" (1.0) 4" (4.0)
2"
HWC1
(4.0) 11
2"
HEWC1
(1.0)
2"
2" (1.0)
MS1
(2.0)
3" (2.0)
2"
2"
HKS1
(2.0)
2"
2" (2.0) 4" (4.0)
2"
HWC1
(4.0)
FD1
(0.0)
2" (0.0)
HSH1
(2.0)
2" (2.0) 4" (4.0)
2"
HWC1
(4.0)
FD1
(0.0)
2" (0.0)
2"
HLAV1
(1.0)
2"
2" (2.0)
HLAV1
(1.0)
2"
2" (2.0)
FD1
(0.0)
2" (0.0)
HSH1
(2.0)
2" (2.0)
2" (2.0)
2" (2.0)
2"
HUR1
(2.0)
2" (2.0)
2"
HUR1
(2.0)
2" (4.0) 4" (10.0)
4" (4.0)
2"
HWC1
(4.0)
4" (4.0)
2"
HWC1
(4.0)
FD1
(0.0)
2" (0.0)
2"
HLAV1
(1.0)
2"
2" (2.0)
HLAV1
(1.0)
2" 11
2"
HKS1
(2.0)
2"
2" (2.0)
FD1
(0.0)
2" (0.0) 4" (4.0)
2"
HWC2
(4.0)
FD1
(0.0)
2" (0.0) 4" (4.0)
2"
HWC2
(4.0)
WCO1
4"
2"
SS1
(2.0)
2"
2" (1.0)
FD1
(0.0)
2" (0.0) 4" (4.0)
2"
HWC2
(4.0) WCO1
4" 4"
FCO(E)
4" (7.0) 3" (2.0) 4" (10.0)
2" (2.0)
2"
4" (8.0)
WCO1
2"2"
2"
2"2"2"3"2"
4" VTR
3"
2" 2"3" 3"
4" (5.0)
4" (5.0)4" (13.0)4" (15.0)4" (25.0)4" (29.0)4" (31.0)4" (33.0)4" (43.0)4" (45.0)
4"(E)(47.0)
4"(E)(47.0)
EXISTING
80 GALLON
ELECTRIC
WATER
HEATER,
EWH(E)
1" CW(E)
1" HW(E)
2" CW(E)
2" CW(E)
4" HWR(E)
1" CW(E)
1" HW(E)
THERMOSTATIC
MIXING VALVE,
TMV1
1" HW140(E)
1" CW(E)
1" HW125
4" HWR
1" HW
RE-CIRC PUMP(E)
4" HWR(E)
2" CW(E)
IN CRAWL
SPACE
1" CW(E)
1" HW(E)
4" HWR(E)
WH1
4"
FLOOR
ROOF
GROUND HKS1
2"1
2"
HWC1
1"
HEWC1
2"
HKS1
2"1
2"
IB1
2"
HLAV1
UNDERSINK MIXING
VALVE, WATTS
MODEL LFM495 OR
EQUAL (TYP.)
2" HWR
2" HW
2" CW
SHUT-OFF VALVE (TYP)
BALANCING VALVE (TYP)
CHECK VALVE (TYP)
HWC1
1"
WC1
1"
HUR1
4"
HUR1
4"
HSH1 1
2"
2"HWC1
1"
WC1
1"
WHA1
HLAV1HLAV1
HSH1
2"1
2"
MS1
4"3
4"
HLAV1HLAV1
WH(E)
4"
HKS1
2"1
2"
HWC2
1"1 2" 1"1
2"
SS1
2"
HWC2
1"1 2"1
2"
4" 3
4"
REFER TO FLOOR PLAN
FOR CONTINUATION
DOMESTIC WATER RISER DIAGRAM
NO SCALE
2" CW(E)
IN CRAWL
SPACE
2" CW(E)
IN CRAWL
SPACE
2" CW(E)
IN CRAWL
SPACE
WH1 WH1HWC2
WHA1
1" 2" 3 4"3
4"
4"
4" HWR
1" HW
1" CW
2" CW
2" HW
4" HWR
1" HW
1" CW
2"
4" HWR
1" HW
4" CW
2" CW
2" CW HEADER
IN CHASE
2" CW HEADER,
1" HW HEADER
IN CHASE
4" HWR
1" HW
1" CW
4" HWR
1" HW
P ro gr es s P rin ts
R ev is io ns
C he ck ed
B y:
D ra w n
B y:
C on st ru ct io n Is su e
D at e:
S ca le : A
S N
O
TE
D
PO
C O
N O
T O
W N S H
IP
M U N
IC
IP
A L
C O
M
PL
EX
N C
C B
U
IL
D
IN
G O
LD
M
IL
L
R O
A D
TA
N N
ER
S V
IL
LE
P
A
BSEG Project No: 24.0112.000
4949 Liberty Lane, Suite 115, Allentown, PA 18106 P: 610-351-8225 F: 610-351-8210 www.bseg-ce.com
B u i l d i n g S y s t e m s E n g i n e e r i n g G r o u p
C O
P Y
R
IG
H T
K
IM
M
E L A
R C
H
IT
E C
T U
R E
IN
C c
A
H T
S R
E
SE
R V
E D
P H
O N
E .8
.7
P
IT
T S
B U
R G
H O
F F
IC
E
L
IB
E R
T Y
A V
E N
U E U
N
IT
P
IT
T
SB
U R
G H
P A
P H
IL
A
D E
L P
H
IA
O F
F
IC
E
N
O R
R
IS
T O
W N
R O
A D
SU
IT
E
B L U
E B
E L L P A
.2
4.
0%
S E
T
.3 0.
B
ID
/P
E R
M
IT
S E
T
PL
UM
BI
NG
R
IS
ER
D
IA
G
RA
M
S
SH
EE
T
D M
R R A
S
P3.1
P ro gr es s P rin ts
R ev is io ns
C he ck ed
B y:
D ra w n
B y:
C on st ru ct io n Is su e
D at e:
S ca le : A
S N
O
TE
D
PO
C O
N O
T O
W N S H
IP
M U N
IC
IP
A L
C O
M
PL
EX
N C
C B
U
IL
D
IN
G O
LD
M
IL
L
R O
A D
TA
N N
ER
S V
IL
LE
P
A
BSEG Project No: 24.0112.000
4949 Liberty Lane, Suite 115, Allentown, PA 18106 P: 610-351-8225 F: 610-351-8210 www.bseg-ce.com
B u i l d i n g S y s t e m s E n g i n e e r i n g G r o u p
C O
P Y
R
IG
H T
K
IM
M
E L A
R C
H
IT
E C
T U
R E
IN
C c
A
H T
S R
E
SE
R V
E D
P H
O N
E .8
.7
P
IT
T S
B U
R G
H O
F F
IC
E
L
IB
E R
T Y
A V
E N
U E U
N
IT
P
IT
T
SB
U R
G H
P A
P H
IL
A
D E
L P
H
IA
O F
F
IC
E
N
O R
R
IS
T O
W N
R O
A D
SU
IT
E
B L U
E B
E L L P A
.2
4.
0%
S E
T
.3 0.
B
ID
/P
E R
M
IT
S E
T
P
LU
M B
IN
G
D E
TA
IL
S S
H E
E T
D M
R R A
S
P4.1
REDUCE IF REQUIRED (ANY
INCREASE IN THE SIZE OF THE
VENT SHALL BE MADE INSIDE
THE STRUCTURE A MIN. OF 1
FOOT BELOW THE ROOF
NO SCALE
VENT PIPE THROUGH FLAT ROOF DETAIL
NOTES:
1. AN OPEN VENT TERMINAL FROM A DRAINAGE SYSTEM SHALL NOT BE LOCATED
DIRECTLY BENEATH ANY DOOR, OPERABLE WINDOW, OR OTHER INTAKE OPENINGS
OF THE BUILDING OR OF AN ADJACENT BUILDING, AND ANY SUCH VENT TERMINAL
SHALL NOT BE WITHIN 10 FEET HORIZONTALLY OF SUCH AN OPENING UNLESS IT IS
AT LEAST 2 FEET ABOVE THE TOP OF SUCH OPENING.
2. FOLLOW ROOF MANUFACTURER'S FLASHING INSTRUCTIONS WHERE REQUIRED
MANUFACTURER'S WARRANTY.
" M
IN
IM
U M
, V
ER
IF
Y w /A
U
TH
O
RI
TY
H
AV
IN
G
JU
RI
SD
IC
TI
O N
E.P.D.M.
ROOF
VENT PIPE SIZE TO
BE A MIN. OF 3"Ø
(SEE DRAWINGS
FOR EXACT SIZE)
MAKE SEAL WATERTIGHT
BY AN APPROVED
FLASHING (BLACK FINISH)
FLASHING
COLLAR
INSULATION
REQUIRED SIZE
(SEE DRAWINGS
FOR EXACT SIZE)
WOOD JOIST
TRAP/SUPPLY GUARD FOR ADA ACCESSIBILITY - DETAIL
NO SCALE
FLANGE WITH
ESCUTCHEON
PLATE
SUPPLY TUBE
COVER WITH
INTERNAL TRIM
GROOVES
SUPPLY KIT WITH
BRASS STOPS
AND FULL TURN
BRASS STEMS
INTERNAL
FASTENER
(TYP.)
GRID DRAIN
WITH OVERFLOW
RUBBER WASHER
FRICTION WASHER
TAILPIECE
OFFSET
IF REQUIRED
TAILPIECE COVER
INTERNAL RIBS,
CUSHIONING AND
THERMAL RESISTANT
SLIP NUT (TYP.)
P-TRAP
J-BENT COVER
VENT HOLE
CLEANOUT
WASTE ARM
COVER WITH
INTERNAL TRIM
GROOVES
VENT
SLOTS
WHEEL
HANDLE OR
QUARTER
TURN BALL
VALVE
TYPICAL FLOOR DRAIN INSTALLED IN EXISTING FLOOR - DETAIL
NO SCALE
P-TRAP
THREADED, CAULKED
OR NO-HUB
CONNECTION
CAPPED TRAP PRIMER CONNECTION
PROVIDE SURE SEAL TRAP
GUARD OR EQUAL IN LIEU OF
TRAP PRIMER IF APPROVED
BY AUTHORITY HAVING JURISDICTION
OR APPROPRIATE CODE
PROVIDE A METAL SUPPORT PLATE
WHEN DRAIN IS INSTALLED IN AN
EXISTING FLOOR - CAULK
AROUND DRAIN PRIOR TO RE-GROUTING
FLASHING CLAMP w/WEEP HOLES
LOOSE GRAVEL AT
WEEP HOLESFINISHED FLOOR
CONCRETE
FLOOR
ADJUSTABLE STRAINER HEAD
REMOVE AND REPLACE CONCRETE
SLAB AS REQ'D TO INSTALL
NEW FLOOR DRAIN
CL
TYPICAL FLOOR CLEANOUT - DETAIL
NO SCALE
FLANGED WITH
FLASHING COLLAR
AS REQUIRED
FINISHED FLOOR
HEAVY DUTY TOP
FOR HIGH TRAFFIC
AREAS
CENTER
SECURING SCREW
THREADED
PLUG
FITTING TYPE
AS REQUIRED
TO SUIT
CL
JAY R SMITH FIG. 4500
CLEANOUT TEE WITH PLUG AND
COVER OR APPROVED EQUAL
NOTE: TYPICAL FOR CLEANOUT IN SOIL/WASTE/RAINWATER CONDUCTORS
FINISHED
FLOOR
AS
R
EQ
'D
BY
C
O
DE
ACCESS DOOR
INSULATION
AS SPECIFIED
SANITARY
PIPE
CASE
OR WALL
WALL CLEANOUT IN SANITARY - DETAIL
NO SCALE
HOSE
BRACKET
30" HOSE
NOTE: ALL FAUCETS SHALL BE PROVIDED WITH EITHER INTERNAL CHECK STOPS
OR CHECK VALVES ON WATER LINES TO PREVENT CROSSFLOW
MOP BASIN WITH FAUCET -DETAIL
NO SCALE
3" SANITARY DRAIN
FINISHED FLOOR
APPLY SILICONE SEALANT
AROUND TOP AND SIDES
OF BASIN AT WALLS AND
FLOOR
MOP BASIN
QUICK DRAIN
CONNECTOR
MOP (BY OTHERS)
SERVICE SINK FAUCET
w/INTERNAL CHECK STOPS
VACUUM BREAKER
MOP HANGER
4" HW
& CW
WALL
WATER HAMMER
ARRESTOR (TYP.)
NO SCALE
PIPE SLEEVE THRU WALL DETAIL
SHEET METAL SLEEVE
(MIN. 22 GAUGE)
ZERO CLEARANCE
CONTINUOUS FLANGE
FULL FORMED
FIBERGLASS ROPE (1000°F)
MIN. IF 3 WRAPS REQUIRED
FRICTION FIT BETWEEN
PIPE AND SLEEVE
SHEET METAL ANGLE
RING (MIN. 22 GAUGE)
SECURE TO SLEEVE
INSULATION
(WHERE REQ'D)
METAL STUD
ESCUTCHEON PLATE ON
BOTH SIDES WHERE
PIPING IS EXPOSED
PIPE
2A MODIFIED STONE
COMPACTED IN 8" LAYERS
2A MODIFIED
STONE COMPACTED
IN 4" LAYERS
UNDISTURBED
EARTH
12"
4" MIN TO
BARREL
TRENCH WIDTH AS
REQUIRED
#4 REINFORCING ROD 18" O.C.,
GROUTED MIN 6" INTO EXISTING SLAB
WITH NON-SHRIINK GROUT
NO SCALE
SANITARY PIPE IN EXISTING SLAB TRENCH DETAIL
TYPICAL FLOOR DRAIN IN WOOD FLOOR DETAIL
NO SCALE
DEEP SEAL TRAP
PROVIDE SURE SEAL TRAP
GUARD OR EQUAL IN LIEU OF
TRAP PRIMER IF APPROVED
OR APPROPRIATE CODE
ANCHOR FLANGE
ATTACHED TO FLOOR,
SEALED WATERTIGHT
ADJUSTABLE STRAINER
REFER TO DRAIN MANUFACTURER'S WRITTEN
INSTRUCTIONS FOR EXACT INSTALLATION REQUIREMENTS
WOOD SUPPORT
BLOCKING
WOOD SUBFLOOR
THREADED, CAULKED OR NO-HUB
CONNECTION
FINISHED FLOOR
CL
CLEVIS HANGER
NO VAPOR
BARRIER INSULATION
FOR STEEL
PIPE HANGER (WOOD) DETAIL
NO SCALE
WOOD BEAM
OR JOIST
MALLEABLE IRON
SIDE BEAM
CONNECTION
WOOD DRIVE SCREWS
NUT AND WASHER
ADJUST & POSITION
WITHIN SLOT
PIPE SIZES
2", 3 4", & 1"
SUSPENSION PIPE
CLAMP, TOP JOIST
MOUNT
WOOD BEAM
OR JOIST
SUSPENSION PIPE
CLAMP, TOP JOIST
MOUNT
PIPE SIZES
2", 3 4", & 1"
PIPE SIZES
2", 3 4", & 1"
SUSPENSION PIPE
CLAMP, TOP JOIST
MOUNT
WOOD BEAM
OR JOIST
MODEL #B-LINE FIG.
3100 STANDARD
CLEVIS HANGER OR
APPROVED EQUAL
ALL THREADED ROD
NOTES:
1. PIPE HANGERS AND ROD SHALL BE GALVANIZED STEEL EXCEPT
HANGERS FOR COPPER PIPING SHALL BE COPPER COATED.
2. FOR COPPER TUBING USE PLASTIC COATED B3100C OR APPROVED
EQUAL.
3. COORDINATE SLOT LOCATION WITH HANGERS.
PIPE RING
CROSS BRACE
PIPE
OPTION #1
OPTION #2
CAPPED TRAP PRIMER CONNECTION
6" 48" x 48" 6"
60" x 60
6"
8"
8"
4" INLET
4" OUTLET
MOLDED
POLYETHYLENE
BAFFLES (TYP.)
SEAL PIPE
WATERTIGHT
(TYP.)
4" INSPECTION PORTS
w/TRAFFIC RATED
CLEANOUTS FLUSH WITH
GRADE (TYP. OF 2)
FINISHED GRADE
24" DIA. HEAVY DUTY
TRAFFIC RATED
C.I. FRAME AND COVER
FLUSH WITH GRADE
24" DIA. CONCRETE
ADJUSTING RINGS
2" VAPOR VENT, INSTALL
ABOVE WATER LINE
SECTION VIEW
PLAN VIEW
OIL/WATER INTERCEPTOR (OW1) DETAIL
NO SCALE
| Sheets and Views |
| 24.0112_P0.0-P0.0 |
| 24.0112_P1.1-P1.1 |
| 24.0112_P2.1-P2.1 |
| 24.0112_P2.2-P2.1 |
| 24.0112_P3.1-P3.1 |
| 24.0112_P4.1-P4.1 |
File details come from the government source that posted it. Updated .