12-Addendum 1.pdf

PDF 5 MB Posted

Attached to
Pocono Township Renovations to Police Wing 24-055
Solicitation number
US.257063
Issued by
Monroe County, Pittsburgh City, Pennsylvania

About this file

This Addendum No. 1 modifies the construction documentation for the Pocono Township Police Wing Renovations project prepared by Kimmel Architecture, issued November 2, 2026, with bids due November 12, 2026. The addendum incorporates changes to specifications and architectural drawings, including modifications to the Table of Contents with new sections on Time for Completion, RACP Compliance Guidelines, Multiple Contract Summary, and Prime Contractor Checklist. Architectural drawing revisions address code sheets, demolition plans, tile wall extents, roller shades, solid surface/quartz language, door changes, and finish plans across multiple sheets. The project involves renovation of a police wing within an existing municipal complex in Pocono Township, Pennsylvania, with work encompassing general construction, mechanical, electrical, and plumbing trades. The contract duration is nine months from the Notice to Proceed. Bid security of 10% of the Base Bid is required in the form of certified check, cashier's check, letter of credit, or bid bond acceptable to the Township.

The project is subject to Pennsylvania Prevailing Wage Act requirements, the Steel Products Procurement Act restricting foreign steel products from specified countries, and compliance with the Reciprocal Limitations Act. All steel products must be certified as domestically produced or comply with established exemption procedures outlined in RACP guidelines. The project qualifies as a RACP (Redevelopment Assistance Capital Program) project requiring minimum three written bids for all contracted construction work. Contractors must provide 100% payment and performance bonds, maintain comprehensive general liability insurance with minimum coverage of $250,000 per person and $1,000,000 per occurrence, and comply with ADA regulations. Change orders are permitted for work within the RACP scope if less than 20% of the total contract value. Time extensions may be granted only upon written request to the Architect and approval by the Township, provided the contractor is without fault and delays result from unforeseeable causes beyond the contractor's control or other specified conditions.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM TO CONSTRUCTION DOCUMENTATION

ADDENDUM NO. 1

PROJECT: Pocono Township – Police Wing Renovations

DATE ISSUED: November 2, 2026

PREPARED BY: Kimmel Architecture

BIDS DUE: November 12, 2026

I. GENERAL

This Addendum is hereby included in and made part of the contract drawings and specifications, whether or not attached thereto. All requirements of the original specifications and drawings shall remain in force except as modified by this Addendum.

II. CHANGES TO THE SPECIFICATIONS

The following changes have been made to the written specifications and are incorporated in this Addendum.

Changes to modifications of existing sections are in yellow highlight.

1. Modifications to ToC to add section

2. 00 20 15 Time for Completion

3. 01 10 01 RACP Compliance Guidelines

4. 01 12 00 Multiple Contract Summary

5. 01 12 01 Prime Contractor Checklist

6. 08 87 00 Window Film

III. CHANGES TO THE ARCHITECTURAL DRAWINGS

The following changes have been made to the Drawings for the Building Project and are incorporated in this

Addendum.

1. A0.2 – Code Sheet rated wall callout, clean-up site context plan

2. A1.1 – Demo Plan, modifications/clarifications to completed demolition

3. A5.1 – Clarifying extent of tile on walls

4. A5.2 – Clarifying extent of tile on walls.

5. A6.1 – Added Roller Shades to RCP

6. A9.1 – Modify language of solid surface/quartz

7. A9.2 – Modify language of solid surface/quartz

8. A9.3 – Modify language of solid surface/quartz and adjust kitchen elevation

9. A10.1 – Door change

10. A11.1 – Finish plan changes

11. A11.2 – Finish schedule changes

IV. ANSWERS TO QUESTIONS / RFI’s

Refer to the PennBid website for clarifications and responses.

482 Norristown Road, Suite 200

Blue Bell, PA 19422

Phone: 610.834.7805

Fax: 610.834.7815

E-mail architects@kimmel-bogrette.com

VI. ACKNOWLEDGE OF RECIPIENTS – Addendum #1

Acknowledge receipt of this Addendum in the space below and return only this page with your Bid

Form. Failure to do so may subject the Company to disqualification.

ACKNOWLEDGEMENT: ________________________________________

Contractor Name

Authorized Signature

Kimmel Architecture

Pocono Township

Renovations to Police Wing

TABLE OF CONTENTS 00 01 10-1

Table of Contents

Division Section Title Pages

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 03

00 11 00

00 21 00

00 30 02

00 30 04

00 30 06

00 30 08

00 41 00

00 41 01

00 41 02

00 41 03

00 41 04

00 42 50

00 52 20

00 52 60

00 52 70

00 53 10

00 53 20

00 54 00

00 60 00

ADVERTISEMENT FOR BID

TIME FOR COMPLETION

INSTRUCTIONS TO BIDDERS A701

GENERAL CONSTRUCTION BID BREAKDOWN

MECHANICAL CONSTRUCTION BID BREAKDOWN

ELECTRICAL CONSTRUCTION BID BREAKDOWN

PLUMBING CONSTRUCTION BID BREAKDOWN

BID DOCUMENT CHECKLIST

GC BID FORM

MC BID FORM

EC BID FORM

PC BID FORM

LIQUIDATED DAMAGES

A201 SUPPLEMENTARY CONDITIONS

AIA A310 BID BOND

PERFORMANCE AND PAYMENT BONDS

NON COLLUSION

WAIVER OF LIENS

PREVAILING WAGE RATES

ELECTRONIC FILE TRANSFER

SPECIFICATIONS GROUP

General Requirements Subgroup

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00

01 10 01

01 10 50

01 12 00

01 12 01

SUMMARY

RACP COMPLIANCE GUIDELINES

SUPPLEMENTARY CONDITIONS

MULTIPLE CONTRACT SUMMARY

PRIME CONTRACT CHECKLIST

01 22 00 UNIT PRICES

01 23 00 ALTERNATES

01 25 00 SUBSTITUTION PROCEDURES

01 31 00 PROJECT MANAGEMENT AND COORDINATION

TABLE OF CONTENTS 00 01 10-2

01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION

01 33 00 SUBMITTAL PROCEDURES

01 40 00 QUALITY REQUIREMENTS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 39

01 78 46

PROJECT RECORD DOCUMENTS

ATTIC STOCK

01 79 00 DEMONSTRATION AND TRAINING

Facility Construction Subgroup

DIVISION 02 - EXISTING CONDITIONS

02 41 19 SELECTIVE DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 35 43 POLISHED CONCRETE FINISHING

DIVISION 04 - MASONRY

04 22 00 CONCRETE UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL FRAMING

05 21 00 STEEL JOIST FRAMING

05 31 00 STEEL DECKING

05 40 00 COLD-FORMED METAL FRAMING

05 52 13 PIPE AND TUBE RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 16 00

06 20 23

SHEATHING

INTERIOR FINISH CARPENTRY

06 41 16 LAMINATE CABINETS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 20 UNDERSLAB VAPOR BARRIER

07 13 26 SELF-ADHERED WATERPROOFING

07 21 00 THERMAL INSULATION

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 54 23

07 59 00

THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING

EXPANSION JOINTS

07 62 00 SHEET METAL FLASHING AND TRIM

07 72 00 ROOF ACCESSORIES

07 91 00 PREFORMED JOINT SEALANTS

07 92 00 JOINT SEALANTS

TABLE OF CONTENTS 00 01 10-3

DIVISION 08 - OPENINGS

08 11 13

08 11 16.13

HOLLOW METAL DOORS AND FRAMES

ALUMINUM INTERIOR DOORS AND FRAMES

08 14 16 FLUSH WOOD DOORS

08 33 00 OVERHEAD DOORS AND MOTORIZED OPERATORS

08 56 53 TRANSACTION WINDOWS

08 80 00 GLAZING

08 83 00 MIRRORS

08 87 00 WINDOW FILM BALLISTIC

DIVISION 09 - FINISHES

09 22 16

09 29 00

NON-LOD BEARING FRAMING

GYPSUM WALLBOARD

09 30 13 CERAMIC TILING

09 51 23

09 65 00

ACOUSTICAL TILE CEILINGS

RESILIENT FLOORING

09 65 13 RESILIENT BASE AND ACCESSORIES

09 68 13 TILE CARPETING

09 77 00 FRP

09 91 33 PAINTING

DIVISION 10 -

10 21 10

DIVISION 13

13 47 13

TOILET COMPARTMENTS

BULLET RESISTANT PANELS

TABLE OF CONTENTS 00 01 10-4

TIME FOR COMPLETION 00 20 15-1

SECTION 00 20 15 - TIME FOR COMPLETION

PART 1 - GENERAL

1.1 COMPLETION

A. It is hereby understood and mutually agreed by and between the Contractors and Pocono

Township that the date of beginning and the time for completion as specified in the Contract of work to be done hereunder are ESSENTIAL CONDITIONS of this contract;

and it is further mutually understood and agreed that the work embraced in this contract shall be commenced on a date to be specified in the Notice to Proceed and duration shall be 9 months from NTP.

B. The Contractors agrees that said work shall be prosecuted regularly, diligently and without interruption at such rate of progress as will insure full completion thereof within the time specified. It is expressly understood and agreed by and between the Contractors and Pocono Township that the time for the completion of the work described herein is a reasonable time for the completion of the same, taking consideration the average climatic range and usual industrial conditions prevailing in this locality.

C. It is further agreed that time is of the essence for each and every portion of this contract and for the specifications wherein a definite and certain length of time is fixed for the performance of any act whatsoever; and where under the contract an additional time is allowed for the completion of any work. A request for an extension of time shall be submitted to the Architect in writing. If approved, a Change Order will be issued to reflect the specific amount of time that the contract will be extended. The new time limit fixed by such extension shall be of the essence of this contract; Provided, the Township determines that (1) the Contractor is without fault and (2) the Contractor’s reasons for the time extension are acceptable to the Township or (3) the delay in the work is due:

1. To any preference, priority or allocation order duly issued by the Government;

2. To unforeseeable cause beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God or the public enemy, acts of the Owner, acts of another Contractor in the performance of contract with Pocono Township, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes and severe weather; and

3. To any delays of subcontractors or suppliers occasioned by any of the causes specified in subsections (1) and (2) of this article; Provided further, that the Contractor shall within ten (10) days from the beginning of such delay, unless the Montgomery County shall grant a further period of time prior to the date of final settlement of the contract, notify the Montgomery County in writing of the cause of delay, who shall ascertain the facts and extent of the delay and notify the Contractor within a reasonable time of its decision in the matter.

D. Pocono Township reserves the right to withhold payments due under the Contract if the work of the Contractor is significantly behind the CPM schedule agreed upon by the each

TIME FOR COMPLETION 00 20 15-2

Contractor. Any such payments so withheld shall be promptly paid to the Contractor when the work is substantially back on schedule.

END OF SECTION 00 02 15

Kimmel Architecture Pocono Township

RACP KEY COMPLIANCE GUIDELINES 01 10 01-1

SECTION 01 10 01 – RACP KEY COMPLIANCE GUIDELINES

Compliance with all RACP requirements, including the key items in these guidelines will be monitored frequently throughout the construction phase of your project and will be reviewed once more during the legislatively mandated close-out audit.

COMPETITIVE BIDDING REQUIREMENTS

The sole and exclusive bidding requirement for RACP projects is in the Capital Facilities Debt Enabling Act (Act 67 of 2004), which states "Notwithstanding any other provision of law, the solicitation of a minimum of three written bids for all contracted construction work on redevelopment assistance capital projects shall be the sole requirement for the composition, solicitation, opening and award of bids on such projects.” Unless the terms of the law change, the Office of the Budget cannot grant waivers for bidding requirements to Grantees. RACP projects are not subject to separation of trades.

You are REQUIRED to solicit a minimum of three (3) bids for "all generally contracted work" being performed within the RACP defined scope of work. You are not required to receive three (3) bid responses. However, you should provide documentation to prove that at least three bids were solicited by providing copies of the solicitation letters (preferably on letterhead of the bidding entity) used in the bidding process. You are not required to select the lowest bidder, but if you do not, you will have to provide a brief written justification for your selection.

Note: there is NO threshold level under the RACP program regardless of the size or dollar amount associated with the work to be performed. You need to show that you solicited a minimum of three

(3) bids for any contract to be eligible for RACP. Bidding is acceptable at either the general contractor level (described in option a. below) or at the subcontractor level (described in option b. below):

• General Contractor (GC) Level - If you chose to bid at the GC level, please note that the bid should encompass the entire RACP scope of work to be performed including all associated construction work. The dollar amount bid on the project must include 100% of the work to be performed by the GC and the sub-contractors. Bidding at the GC level will require submission of bidding and construction related documents at the GC level only (see Sub-Contractor level below for a distinction)

• Sub-Contractor Level - If you choose not to solicit three bids for a General Contractor, then you are required to solicit a minimum of three bids for EACH Sub-Contractor covering all trades involved in the project. Note that any self-performed work by a non-bid GC is NOT an eligible cost for reimbursement OR match purposes. Bidding at the Sub-Contractor level will require submission of bidding and construction related documents at the sub level…meaning proof of RACP (version 6-9- 2023) bidding, construction contracts, payment and performance bonds, insurance etc. will need to be provided for every sub-contractor in the RACP scope.

Professional Services: Professional services associated with the project are not required to be bid as these associated costs are only eligible as match. Change Orders: Grantees and/or Sub-Grantees are not required to competitively bid out change orders as long as the work was within the RACP scope of the original bid and is less than 20% of the total contract. If a change order is for work beyond the RACP scope of work originally bid, the Grantee will be required to competitively bid out the new scope of work in order to be considered RACP eligible.

PENNSYLVANIA STEEL PRODUCTS PROCUREMENT ACT

RACP KEY COMPLIANCE GUIDELINES 01 10 01-2

The Office of the Budget (OB) cannot grant waivers to the Pennsylvania Steel Products Procurement Act (SPPA) unless the terms of the law change. All RACP Grantees must comply with the SPPA. If a Grantee/RACP project fails to abide by the SPPA, it does so at its own risk. A full explanation on the RACP steel requirements is available as a PDF download. Up to 2011, OB only accepted the ST-4 Form (justification for the use of foreign steel) that the Department of General Services (DGS) had exclusively devised to address exceptions linked to the requirements of the SPPA, when it was necessary. Since 2011, OB has approved the acceptability of two more DGS ST Forms (ST-2, ST-3) with some caveats, providing that the forms are properly filled out. The ST-1 Form will not be accepted by OB. It is not necessary for the ST-2, ST-3, and ST-4 Forms to be notarized. Effective January 1, 2013, OB began utilizing the DGS Exempt Machinery and Equipment Steel Products listings (2023, 2022, 2021) as part of our steel policy. DGS published a Statement of Policy- Steel products procurement in the Pennsylvania Bulletin Volume 43, Number 6 dated February 9, 2013 (See PA Bulletin #43, pages 85-86) that discussed the exemption of certain steel products, based on their analysis of ST-4 forms submitted that list products not produced domestically in sufficient quantity. DGS publishes an updated "Exemption List" annually. Please be aware that ST forms are acceptable only in cases where nonstructural steel needs to be addressed. The DGS ST forms do not replace the steel certification forms associated with structural steel. OB will continue to require the submission of steel mill certifications to demonstrate compliance with the steel requirements for structural steel. The PDF copies of the three acceptable ST Forms for RACP listed below can be obtained from the RACP website:

• ST-2 Steel Origin Certification: Non-Identifiable, Non-Structural Steel

• ST-3 75% U.S. Manufacture Certification

• ST-4 Not Domestically Manufactured: Prime Contractor (only to be used when requesting items to be exempted that are not found on the current year's List of Exempt Machinery and Equipment Steel Products)

It is suggested that the certifications be collected at the time any steel for the project is purchased and delivered to ease the collection process. Be advised that OB DOES NOT need to approve the ST forms prior to the start of the construction period. The ST forms need to be submitted to demonstrate that compliance, when and where necessary, has been met. We shall deem as ineligible all contracts that are unable to demonstrate compliance via the submission of steel certifications for Structural Steel and for Non-structural Steel the submission of steel certifications and/or ST forms and/or DGS Exempt Machinery and Equipment Steel Products List. Therefore, the value of construction contracts associated with non-compliant steel will be removed (both materials and labor costs) from the scope of the project, which may in turn affect the project's ability to leverage their full grant amount (project may not receive its full grant). Recycled products, melted from previously used steel, are acceptable, providing that adequate documentation from the supplier has been furnished. The supplier shall certify that the recycled steel product was produced in the USA.

TRADE PRACTICES ACT

In accordance with the Trade Practices Act of July 23, 1968, P.L. 686 (71 P.S. § 773.101 et seq.), the Grantee cannot and shall not use or permit to be used in the work any aluminum or steel products made in a foreign country which is listed below as a foreign country which discriminates against aluminum or steel products manufactured in Pennsylvania. The countries of Argentina, Brazil, South Korea, and Spain have been found to discriminate against certain products manufactured in Pennsylvania. Therefore, the purchase or use of those countries' products, as listed below, is not

RACP KEY COMPLIANCE GUIDELINES 01 10 01-3

permitted:

• Argentina: carbon steel wire rod and cold-rolled carbon steel sheet.

• Brazil: welded carbon steel pipes and tubes; carbon steel wire rod; tool steel; certain stainless steel products, including hot-rolled stainless steel bar; stainless steel wire rod and cold-formed stainless steel bar; pre-stressed concrete steel wire strand; hot-rolled carbon steel plate in coil; hot-rolled carbon steel sheet; and cold-rolled carbon steel sheet.

• South Korea: welded carbon steel pipes and tubes; hot-rolled carbon steel plate; hot-rolled carbon steel sheet; and galvanized steel sheet.

• Spain: certain stainless steel products, including stainless steel wire rod, hot-rolled stainless steel bars; and cold-formed stainless steel bars; pre-stressed concrete steel wire strand; and certain steel products, including hot-rolled steel plate, cold-rolled carbon steel plate, carbon steel structural shapes; galvanized carbon steel sheet, hot-rolled carbon steel bars, and coldformed carbon steel bars.

Penalties for violation of the above paragraphs may be found in the Trade Practices Act, which penalties include becoming ineligible for public works contracts for a period of three years. This provision in no way relieves the Grantee of responsibility to comply with those provisions which prohibit the use of foreign-made steel and cast iron products.

PUBLIC WORKS CONTRACTORS’ BOND LAW (PAYMENT & PERFORMANCE BONDS)

The requirement for 100% payment and performance (P&P) bonds is a state law; the Office of the Budget cannot waive this requirement. A performance bond must be obtained at 100% of the contract amount, conditioned upon the faithful performance of the contract in accordance with the plans, specifications, and conditions of the contract. Such bond shall be solely for the protection of the contracting body which awarded said contract. A payment bond must be obtained at 100% of the contract amount. Such bond shall be solely for the protection of claimants supplying labor or materials to the Grantee, its contractor or to any of its subcontractors, in the prosecution of the work provided for in such contract, and shall be conditioned for the prompt payment of all such material furnished or labor supplied or performed in the prosecution of the work. "Labor or materials" shall include public utility services and reasonable rentals of equipment, but only for periods when the equipment rented is actually used at the site.

PA PREVAILING WAGE ACT (PWA)

The Office of the Budget cannot grant waivers for the PA Prevailing Wage Act. All Grantees must comply with the act. Grantees that fail to abide by the Prevailing Wage Act do so at their own risk.

Please do not assume that PA Prevailing Wage is always consistent with your local union wages. All projects should apply for a wage determination letter prior to the start of construction by registering the project with the PA Department of Labor and Industry to obtain the prevailing wage rates relevant to your project. This determination sheet will provide the necessary trade classifications for the project, along with their corresponding hourly wage and hourly fringe rates that are required for the certified payrolls required as part of RACP. The wage determination should be obtained within 120 days of the award of construction contracts. If necessary, the Department of Labor and Industry can issue determinations letters after construction has begun. The prevailing wage information and forms can be found on the PA Department of Labor & Industry website.

AMERICANS WITH DISABILITIES ACT (ADA)

Typically your architect should provide a letter stating the plans and specs are in compliance with

RACP KEY COMPLIANCE GUIDELINES 01 10 01-4

ADA regulations. Additionally, the Grantee agrees to comply with the General Prohibitions Against Discrimination, 28 C.F.R. § 35.130, and all other regulations promulgated under Title II of The Americans with Disabilities Act which are applicable to all benefits, services, programs, and activities provided by the commonwealth through contracts.

FIDELITY BONDS

The Grantee shall procure and furnish evidence to OB of fidelity bonds with coverage to be maintained under the administrative title of the position in amounts and for such positions as are reasonably determined by OB. Fidelity Bonding is also commonly known as "Employee Dishonesty Insurance." The minimum level of coverage should equal the average monthly RACP reimbursement amount based on the total grant amount.

INSURANCE REQUIREMENTS

• Worker’s Compensation Insurance - The Grantee shall provide Worker's Compensation Insurance where required, and shall accept full responsibility for the payment of premiums for Worker's Compensation Insurance and Social Security, as well as income tax withholding and any other taxes or payroll deductions required by law for its employees who are performing services related to the project.

• General Liability & Property Damage Insurance - The Grantee will provide and maintain comprehensive general liability and property damage insurance in the minimum amount of $250,000.00 per person for injury and death in a single occurrence; $1,000,000.00 per occurrence for injury or death of more than one (1) person in a single occurrence; and $500,000.00 for a single occurrence of property damage, and which shall be endorsed to protect the commonwealth.

• Flood Insurance – If the project is wholly or partially within a floodplain, proof of sufficient flood insurance coverage must be provided. In any case, a project is required to provide a copy of a floodplain map of the project area, with the project site being delineated thereon. Identify Commonwealth as Additional Insured: The commonwealth shall be listed on the above insurance policies as an additional insured. Upon request, the Grantee shall furnish proof of insurance as required by this section to OB.

RESTRICTIONS ON GOVERNMENTAL ENTITIES SELLING RACP PROJECTS

Article 8 of the RACP Grant Agreement spells out sale price restrictions for a governmental entity that sells property that was acquired and/or improved with RACP funds. The restrictions are required to insure that the Grantees CANNOT sell the property for a net gain or even recoup the value of the grant in the sale price. A PDF download is available that contains more information on Article 8

GUIDANCE ON STEEL CERTIFICATION RELATIVE TO THE

RACP KEY COMPLIANCE GUIDELINES 01 10 01-5

REDEVELOPMENT ASSISTANCE CAPITAL PROGRAM

(RACP)

The following guidance is a clarification from the Office of the Budget (OB) regarding the requirements associated with the Pennsylvania Steel Products Procurement Act

(SPPA) relative to the RACP program whose statutes are regulated under Act 1 of

1999, as amended. In the past, many a grantee has inquired about specific cases and we were able to provide each individual project with specific directions. Additionally, we had only accepted the ST-4 form that the Department of General Services (DGS) had exclusively devised to address exceptions linked to the requirements of the SPPA in the handling of special cases or exceptions. Please note that cost consideration (or convenience) is not an acceptable justification that the ST-4 form can address. Filled out ST-4 forms premised on cost consideration will not be accepted by OB.

Effective immediately, OB will accept two more DGS ST forms (ST-2, ST-3) with some caveats, providing that the forms are properly filled out. The ST-1 form is NOT a valid option and shall NOT be accepted by OB. It is not necessary for the ST-2, ST-3, and

ST-4 forms to be notarized. Please, be advised that this guidance is specifically tailored to suit the published and programmatic needs of OB as the overseer of RACP program. This is not a commonwealth-wide policy. Any attempt to impose this guidance on other state agencies is strongly discouraged.

Please, be aware that the aforementioned ST forms are acceptable only in cases where non-structural steel needs to be addressed. The DGS ST forms do not replace the steel certification forms associated with structural steel. It remains the responsibility of the project representatives to provide documented evidence that a non-structural steel product is not domestically produced in sufficient quantities.

OB shall continue to require that steel mill certifications be submitted to demonstrate compliance with the steel requirements. Please, be further advised that OB DOES

NOT need to approve the ST forms prior to the start of the construction period. The ST forms need to be submitted to demonstrate that compliance, when and where necessary, has been met. The ST forms exceptions are displayed below. Please, contact us if you have any questions.

It is suggested that the certifications be collected at the time any steel for the project is purchased and delivered to ease the collection process.

Effective January 1, 2013 OB began utilizing the DGS Exempt Machinery and

Equipment Steel Products listings as part of the RACP steel policy. DGS published a

Statement of Policy - Steel Products Procurement in the Pennsylvania Bulletin

Volume 43, Number 6 dated February 9, 2013 (See PA Bulletin #43, pages 85-86) that discussed their production of an annual list, based on their analysis of submitted

ST-4 forms, which exempts certain steel products not produced domestically in sufficient quantity.

No other changes in RACP steel policy resulted from this new adjustment;

RACP KEY COMPLIANCE GUIDELINES 01 10 01-6

consequently, the use of steel certificates for structural steel will still be required.

Please note that the use of ST 2, 3, and 4, as requested for other steel products, will still be utilized unless an exemption based on the list has been formulated and forwarded to OB.

RACP Policy for Compliance with the Steel Products Procurement Act:

Two distinct approaches are presented below:

Structural Steel Products

Pursuant to the SPPA, OB will require a mill certificate containing the statement "milled, melted, and manufactured in the USA" for all structural steel products used on

RACP projects. We shall deem as ineligible all contracts that are unable to demonstrate compliance via the submission of steel certifications. Therefore, the value of construction contracts associated with non-compliant steel will be removed (both materials and labor costs) from the scope of the project.

Non-Structural Steel Products

Pursuant to the SPPA, OB will require, either, a mill certificate containing the statement "milled, melted, and manufactured in the USA" or the appropriate ST form or an Exemption Request to utilize the DGS current years' Final List of

Exempt Machinery and Equipment Steel Products to demonstrate compliance associated with the non-structural steel products used on RACP projects. OB shall deem as ineligible all contracts that are unable to demonstrate compliance via the submission of steel certifications /ST forms/Exemption Request based on the

DGS Exempt Machinery and Equipment Steel Products listing. Therefore, the value of construction contracts associated with non-compliant steel will be removed (both materials and labor costs) from the scope of the project.

Recycled products, melted from previously used steel, are acceptable, providing that adequate documentation from the supplier has been furnished. The supplier shall certify that the recycled steel product was produced in the USA.

Furthermore, the burden of proof for all non-structural steel products not produced domestically in sufficient quantities is still the project's responsibility to provide.

Please be aware that the acceptance of ST forms is contingent upon the form being fully filled- in and compliant with the submission guidelines for steel certifications for DGS projects (see attached) with the following exceptions:

A. It is not necessary for the forms to be notarized; however, all ST forms must be signed. Original signatures or electronic signatures through Adobe fill/sign, DocuSign, or Nuance (program which allows electronic signature similar to

RACP KEY COMPLIANCE GUIDELINES 01 10 01-7

Adobe fill/sign) are acceptable.

B. Any questions regarding steel certification submissions and/or compliance with the Act shall be submitted to OB (Scott Bowman -scotbowman@pa.gov).

C. The Steel certification forms do NOT need to be submitted and approved by OB before the steel product arrives on site so as not to interfere with the project construction schedule.

D. OB assumes responsibility for acceptance of the DGS ST forms in accordance with this policy.

Completion of the ST-2, ST-3, and ST-4 forms shall follow the DGS directions attached to the form with the following exceptions:

ST forms do NOT need to be submitted and approved by OB before the steel product arrives on site so as not to interfere with the construction schedule.

o RACP ME# assigned to the project shall be inserted in all areas requiring the DGS contract number (Line#5).

o RACP official project name shall be inserted in all areas requiring the contract title (Line #6).

Note:

Acceptance of each ST form shall be determined by OB at its sole discretion. All documents and other information to be delivered in order to demonstrate compliance with the steel requirements shall be and are, in form, content and substance, subject to the approval of OB, which approval may be withheld or delayed at OB's discretion. OB reserves the right to reject all improperly filled out or unsupported ST forms.

Below are links to PDF copies of the three acceptable ST Forms that can be obtained from the RACP website:

• ST-2 Steel Origin Certification: Non-Identifiable, Non-Structural Steel

• ST-3 75% U.S. Manufacture Certification

• ST-4 Not Domestically Manufactured: Prime Contractor (only to be used when the items requested to be exempted are not found on the appropriate year's List of Exempt Machinery and Equipment Steel Products [see section below entitled "Year of DGS Exemption Listing to Use"])

To implement the RACP policy on Non-structural Steel Exemption Request utilizing the DGS's current years' Final List of Exempt Machinery and Equipment Steel

Products, referred to as the "Exemption List", please follow the below requirements:

1. The Project must be under "active" construction (workers on site) on or AFTER 1/01/2013 (RACP effective date) to use the "Exemption

List".

2. "Active" construction does not include performance of just "punch list" items.

https://www.budget.pa.gov/Programs/RACP/Documents/ST-2%20fillable.pdf https://www.budget.pa.gov/Programs/RACP/Documents/ST-3%20fillable.pdf https://www.budget.pa.gov/Programs/RACP/Documents/ST-4%20fillable.pdf

RACP KEY COMPLIANCE GUIDELINES 01 10 01-8

3. Effective date is based on the "active" construction date and not the date the machinery and equipment were purchased.

4. There is no retroactive application of utilization of the "Exemption List".

5. No ST-4 form is required for a RACP Exemption Request based on the "Exemption List".

6. RACP Exemption Request (to utilize the "Exemption List") must come from a contractor involved in the construction of the project and be:

• On Construction Company Letterhead.

• Dated and Signed by appropriate company official (does not need to be notarized).

• Should be addressed to Office of Budget

• Should contain RACP project name and/or ME #

• Lists any/all machinery and equipment that the Company is requesting to have exempted from ST-4 documentation.

• All items listed on RACP Exemption Request letter must clearly match-up to an item on the appropriate year's "Exemption List" and the Exemption List year should be notated for each item.

• There can/may be multiple construction company RACP Exemption

Request letters utilized for various machinery and equipment, as applicable, per project.

• Exemption Request can be submitted directly by the project to OB or through the State Assigned Consultant for their project.

• Any questions regarding the exemption request submission and/or compliance with the SPPA shall also be submitted to OB, to the attention of Scott Bowman, Scotbowman@pa.gov

Year of DGS Exemption Listing to Use:

A project should be using the exemption listing for when they are in active construction. For example, if construction was active (and complete) in 2019 they would use the 2019 listing. If a project overlaps a calendar year, they should use the latest listing in which construction is active. For example, if construction is active in 2019 and 2020, they would use the 2020 listing.

If a project is phased, they should use the listing for the year they are in active construction for each phase. For example, if the first phase starts and ends in

2020 whereas the second phase starts and ends in 2021, the first phase would use the 2020 listing while the second phase would use the 2021 listing. If a phase overlaps a calendar year, follow the 1st paragraph above.

Among other items, the DGS web page for Steel Products Procurement Act information includes links for a copy of the Act; the current year's Final List of

Exempt Machinery and Equipment Steel Products; the PA Bulletin's Steel

Products Procurement Act Statement of Policy; and Frequently Asked Questions.

mailto:Scotbowman@pa.gov

RACP KEY COMPLIANCE GUIDELINES 01 10 01-9

Certain prior years DGS Exemption Lists are downloadable from the RACP website.

Please be aware that all other steel items not specifically exempted or that may require any type of interpretation would be discretionary to OB's policy. Be reminded that this exemption listing is not effective for structural steel.

Note:

Acceptance of each Exemption Request shall be determined by OB at its sole discretion. All documents and other information to demonstrate compliance with the steel requirements shall be in form, content, and substance, subject to the approval of OB, which approval may be withheld or delayed at OB's discretion.

OB reserves the right to reject all improperly filled out or unsupported

Exemption Request.

END OF SECTION

MULTIPLE CONTRACT SUMMARY 01 12 00-1

SECTION 01 12 00 - MULTIPLE CONTRACT SUMMARY

1.GENERAL

1. RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

2. SUMMARY

A. Section includes a summary of each contract, including responsibilities for coordination and temporary facilities and controls.

B. Specific requirements for Work of each contract are also indicated in individual Specification Sections and on Drawings.

C. Related Requirements:

1. Section 01 10 00 "Summary" for the Work covered by the Contract Documents, restrictions on use of Project site, phased construction, coordination with occupants, and work restrictions.

2. Section 01 31 00 "Project Management and Coordination" for general coordination requirements.

3. Section 01 12 01 - "Prime Contractor Checklist" for additional coordination items and scope delineations between prime contracts.

3. DEFINITIONS

A. Permanent Enclosure: As determined by Architect, the condition at which roofing is insulated and weathertight; exterior walls are insulated and weathertight; and all openings are closed with permanent construction or substantial temporary closures equivalent in weather protection to permanent construction.

4. PROJECT COORDINATOR

A. Project coordinator (which is the General Construction Contractor) shall be responsible for coordination between the General Construction Contract, Plumbing Contract, HVAC Contract, and Electrical Contract.

5. COORDINATION ACTIVITIES

A. Coordination activities of Project coordinator include, but are not limited to, the following:

MULTIPLE CONTRACT SUMMARY 01 12 00-2

1. Provide overall coordination of the Work.

2. Coordinate shared access to workspaces.

3. Coordinate product selections for compatibility.

4. Provide overall coordination of temporary facilities and controls.

5. Coordinate, schedule, and approve interruptions of permanent and temporary utilities, including those necessary to make connections for temporary services.

6. Coordinate construction and operations of the Work with work performed by each

Contract and separate contracts.

7. Prepare coordination drawings in collaboration with each contractor to coordinate work by more than one contract.

8. Coordinate sequencing and scheduling of the Work. Include the following:

a. Initial Coordination Meeting: At earliest possible date, arrange and conduct a meeting with contractors for sequencing and coordinating the Work;

negotiate reasonable adjustments to schedules.

b. Prepare a combined contractors' construction schedule for entire Project.

Base schedule on preliminary construction schedule. Secure time commitments for performing critical construction activities from contractors.

Show activities of each contract on a separate sheet. Prepare a simplified summary sheet indicating combined construction activities of contracts.

1) Submit schedules for approval.

2) Distribute copies of approved schedules to contractors.

9. Provide photographic documentation.

10. Provide quality-assurance and quality-control services specified in Section

014000 "Quality Requirements."

11. Coordinate sequence of activities to accommodate tests and inspections, and coordinate schedule of tests and inspections.

12. Provide information necessary to adjust, move, or relocate existing utility structures affected by construction.

13. Locate existing permanent benchmarks, control points, and similar reference points, and establish permanent benchmarks on Project site.

14. Provide field surveys of in-progress construction and site work and final property survey.

15. Provide progress cleaning of common areas and coordinate progress cleaning of areas or pieces of equipment where more than one contractor has worked.

16. Coordinate cutting and patching.

17. Coordinate protection of the Work.

18. Coordinate firestopping.

19. Coordinate completion of interrelated punch list items.

20. Coordinate preparation of Project record documents if information from more than one contractor is to be integrated with information from other contractors to form one combined record.

21. Print and submit record documents if installations by more than one contractor are indicated on the same contract drawing or shop drawing.

22. Collect record Specification Sections from contractors, collate Sections into numeric order, and submit complete set.

MULTIPLE CONTRACT SUMMARY 01 12 00-3

23. Coordinate preparation of operation and maintenance manuals if information from more than one contractor is to be integrated with information from other contractors to form one combined record.

B. Responsibilities of Project coordinator for temporary facilities and controls include, but are not limited to, the following:

1. Provide common-use field office for use by all personnel engaged in construction activities.

2. Provide telephone service for common-use facilities.

3. Provide wireless internet for common-use services.

6. GENERAL REQUIREMENTS OF CONTRACTS

A. Extent of Contract: Unless the Agreement contains a more specific description of the Work of each Contract, requirements indicated on Drawings and in Specification Sections determine which contract includes a specific element of Project.

1. Unless otherwise indicated, the work described in this Section for each contract shall be complete systems and assemblies, including products, components, accessories, and installation required by the Contract Documents.

2. Trenches and other excavation for the work of each contract shall be the work of each contract for its own work.

3. Blocking, backing panels, sleeves, and metal fabrication supports for the work of each contract shall be the work of each contract for its own work.

4. Furnishing of access panels for the work of each contract shall be the work of each contract for its own work. Installation of access panels shall be the work of the General Construction Contract.

5. Equipment pads for the work of each contract shall be the work of each contract for its own work.

6. Roof-mounted equipment curbs for the work of each contract shall be the work of the General Construction Contract.

7. Painting for the work of each contract shall be the work of the General Construction Contract.

8. Cutting and Patching: Each contract shall perform its own cutting; patching shall be under the General Construction Contract.

9. Through-penetration firestopping for the work of each contract shall be provided by each contract for its own work.

10. Contractors' Startup Construction Schedule: Within five working days after startup horizontal bar-chart-type construction schedule and preliminary network diagram submittal has been received from Project coordinator, submit a matching startup horizontal bar-chart schedule and startup network diagram showing construction operations sequenced and coordinated with overall construction.

B. Substitutions: Each contractor shall cooperate with other contractors involved to coordinate approved substitutions with remainder of the work.

1. The General Construction Contract shall coordinate substitutions.

MULTIPLE CONTRACT SUMMARY 01 12 00-4

C. Temporary Facilities and Controls: In addition to specific responsibilities for temporary facilities and controls indicated in this Section and in Section 01 50 00 "Temporary Facilities and Controls," each contractor is responsible for the following:

1. Installation, operation, maintenance, and removal of each temporary facility necessary for its own normal construction activity, and costs and use charges associated with each facility, except as otherwise provided for in this Section.

2. Plug-in electric power cords and extension cords, supplementary plug-in task lighting, and special lighting necessary exclusively for its own activities.

3. Its own field office, complete with necessary furniture, utilities, and telephone service.

4. Its own storage and fabrication sheds.

5. Temporary enclosures for its own construction activities.

6. Staging and scaffolding for its own construction activities.

7. General hoisting facilities for its own construction activities, up to 2 tons (2000 kg).

8. Waste disposal facilities, including collection and legal disposal of its own hazardous, dangerous, unsanitary, or other harmful waste materials.

9. Progress cleaning of work areas affected by its operations on a daily basis.

10. Secure lockup of its own tools, materials, and equipment.

11. Construction aids and miscellaneous services and facilities necessary exclusively for its own construction activities.

D. Temporary Heating, Cooling, and Ventilation: The General Construction Contract is responsible for temporary heating, cooling, humidity control and ventilation before weathertight enclosure of building is complete. The HVAC Contract is responsible for temporary heating, cooling, humidity control and ventilation after permanent enclosure of building is complete and Owner will pay utility-use charges.

7. GENERAL CONSTRUCTION CONTRACT

A. Work in the General Construction Contract includes, but is not limited to, the following:

1. Remaining work not identified as work under other contracts.

2. Site preparation, including clearing, building demolition and relocations, and earthwork.

3. Site improvements, including roadways, parking lots, pedestrian paving, site development furnishings and equipment, and landscaping.

4. Tunnels for site utilities.

5. Selective demolition.

6. Foundations, including footings, foundation walls.

7. Slabs-on-grade, including earthwork, subdrainage systems, and insulation.

8. Below-grade building construction, including excavation, backfill, and thermal and moisture protection.

9. Superstructure, including floor and roof construction sprayed fire-resistive materials and board fire protection.

10. Exterior closure, including walls, parapets, doors, windows, and louvers.

11. Roofing, including coverings, flashings roof specialties and glazed openings.

MULTIPLE CONTRACT SUMMARY 01 12 00-5

12. Interior construction, including partitions, doors, interior glazed openings, and fittings.

13. Fire-protection specialties.

14. Stairs, including railings and finishes.

15. Interior finishes architectural woodwork and built-in casework.

16. Miscellaneous items, including painting of mechanical and electrical work.

17. Conveying systems, including elevators.

18. Equipment, including the following:

a. Projection screens.

b. Residential appliances, as furnished by the owner

19. Furnishings, including casework, window treatments, and floor grilles and mats.

20. Installation of site utilities outside of the 5’ building perimeter as described in the Prime Contractor Checklist 01 12 01.

a. Sanitary piping

b. Water service fire and domestic

c. Gas piping

B. Temporary facilities and controls in the General Construction Contract include, but are not limited to, the following:

1. Temporary facilities and controls that are not otherwise specifically assigned to the Plumbing Contract, HVAC Contract, and Electrical Contract.

2. Sediment and erosion control.

3. Unpiped sewers and drainage, including drainage ditches, dry wells, stabilization ponds, and containers.

4. Stormwater control.

5. Unpiped temporary toilet fixtures, wash facilities, and drinking water facilities, including disposable supplies.

6. Temporary enclosure for building exterior, except as indicated.

7. Temporary roads and paved areas.

8. Dewatering facilities and drains.

9. Excavation support and protection, unless required solely for the Work of another contract.

10. Special or unusual hoisting requirements for construction activities, including hoisting loads in excess of 2 tons (2000 kg), hoisting material or equipment into spaces below grade, and hoisting requirements outside building enclosure.

11. Project identification and temporary signs.

12. General waste disposal facilities.

13. Pest control.

14. Temporary stairs.

15. Temporary fire-protection facilities.

16. Barricades, warning signs, and lights.

17. Site enclosure fence.

18. Covered walkways.

MULTIPLE CONTRACT SUMMARY 01 12 00-6

19. Security enclosure and lockup.

20. Environmental protection.

21. Restoration of Owner's existing facilities used as temporary facilities, including site areas used for temporary facilities by the owner or contractor.

8. PLUMBING CONTRACT

A. Work in the Plumbing Contract includes, but is not limited to, the following:

1. Site water supply and distribution.

2. Site sanitary sewerage.

3. Site storm drainage.

4. Site fuel distribution.

5. Site special plumbing systems.

6. Plumbing fixtures.

7. Domestic water distribution.

8. Sanitary waste.

9. Stormwater drainage.

10. Special plumbing systems, including the following:

a. Natural gas.

11. Fire-suppression systems.

12. Special fire-suppression systems, including the following:

a. Foam fire-extinguishing systems.

b. Clean-agent extinguishing systems.

13. Plumbing connections to equipment furnished by the General Construction Contract, Plumbing Contract, HVAC Contract, and Electrical Contract.

B. Temporary facilities and controls in the Plumbing Contract include, but are not limited to, the following:

1. Piped sewerage and drainage.

2. Piped gas service.

3. Piped water service.

4. Piped temporary toilet fixtures, wash facilities, and drinking water facilities.

5. Plumbing connections to existing systems and temporary facilities and controls furnished by the General Construction Contract, Plumbing Contract, HVAC Contract, and Electrical Contract.

9. HVAC CONTRACT (MECHANICAL)

A. Work in the HVAC Contract includes, but is not limited to, the following:

1. Energy supply, including gas supply systems.

2. HVAC systems and equipment.

MULTIPLE CONTRACT SUMMARY 01 12 00-7

3. HVAC instrumentation and controls including low voltage power for HVAC equipment and controls.

4. HVAC testing, adjusting, and balancing.

5. Building automation system.

6. Mechanical connections to equipment furnished by the General Construction

Contract, Plumbing Contract, and Electrical Contract.

B. Temporary facilities and controls in the HVAC Contract include, but are not limited to, the following:

1. HVAC Contract is responsible for temporary heating, cooling, humidity control and ventilation after permanent enclosure of building is complete. The new HVAC systems may be used for temporary HVAC as per the specification. Owner will pay utility-use charges.

10. ELECTRICAL CONTRACT

A. Work in the Electrical Contract includes, but is not limited to, the following:

1. Site electrical distribution.

2. Site lighting.

3. Site communications and security.

4. Electrical service and distribution.

5. Exterior and interior lighting and light pole bases (including foundations).

6. Communication and security.

7. All low voltage wiring

8. Special electrical systems, as indicated in the drawings

9. Electrical connections to equipment furnished by the General Construction Contract, Plumbing Contract, HVAC Contract, and Electrical Contract.

B. Temporary facilities and controls in the Electrical Contract include, but are not limited to, the following:

1. Electric power service and distribution.

2. Lighting, including site lighting.

3. Electrical connections to existing systems and temporary facilities and controls furnished by the General Construction Contract, Plumbing Contract, HVAC Contract, and Electrical Contract.

2.PRODUCTS (Not Used)

3.EXECUTION (Not Used)

END OF SECTION 01 12 00

PRIME CONTRACTOR CHECKLIST 01 12 01 - 1

SECTION 01 12 01 – PRIME CONTRACTOR

CHECKLIST PART I - GENERAL

1. RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

2. SUMMARY

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

B. Related Requirements:

1. Section 01 10 00 "Summary" for work restrictions and limitations on utility interruptions.

2. Section 01 12 00 “Multiple Contract Summary

3. DEFINITIONS

A. General Contractor designation (GC)

B. Mechanical (HVAC) contractor designation (MC)

C. Electrical Contractor designation (EC)

D. Plumbing Contractor designation (PC)

E. ‘X’ under “Furnish” or “Install Contractor” indicates…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .