This is a construction plan document prepared by CMT Technical Services for Draper City involving the Porter Rockwell Trail 1300 East UTA Bridge Crossing project in Draper, Utah. The project encompasses site improvements including demolition of existing asphalt and railroad tracks, grading, and construction of a 10-foot bicycle and pedestrian path along the Porter Rockwell Trail. The plans include an existing conditions plan (Sheet C1.0), a site plan (Sheet C2.0), and a grading plan (Sheet C3.0), with detailed specifications for pavement construction consisting of 8 inches of untreated base course and 4 inches of asphalt concrete with a 2 percent slope. The project is located in the northwest quarter of Section 4, Township 4 South, Range 1 East, Salt Lake Base and Meridian, at 1300 East, 13800 South in Draper, and involves coordination with UTA (Utah Transit Authority) regarding property restoration, railroad salvage rights, soil management, and a dust-free work environment. The contractor must comply with ADA standards, obtain a storm water permit from Draper City, contact Blue Stakes of Utah prior to construction, adhere to UTA's construction safety manual, post minimum 7-day notice of trail closures, and maintain the site through an 18-month post-completion monitoring period to ensure integrity of the right-of-way.

Key construction requirements include earthwork balance with an emphasis on on-site material management, 95 percent Modified Proctor compaction specifications, proper testing and disposal documentation for any excavated soils, and separation of ballast material from embankment soil. The contractor is responsible for all traffic control devices, repair of any damaged existing improvements including utilities and landscaping, and coordination with existing infrastructure such as light poles, fire hydrants, irrigation control valves, and telecommunications vaults that are to remain in place. UTA retains all salvage rights to track and ties, which must be severed at joint connections and neatly stacked, with notification required for scheduling of haul and salvage operations. The plans note that existing utility locations are approximate and have not been field-verified, placing full responsibility on the contractor to verify utility locations and bear any costs associated with utility conflicts or damage. Landscape and irrigation restoration is to be completed by others, with the contractor responsible only for capping impacted irrigation and providing irrigation sleeves under pavement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION

AFFECTED

DATE SHEETS C0.0 TITLE SHEET

SITE PLAN

C1.0

SHEET NO.PROJECT: FILE:

FEBRUARY 9, 2026 101049.00

DATE:

DWG/00-TITLE

NOT TO SCALE

CMT TECHNICAL SERVICES

CONTACT: JIM MILLIGAN (PROJECT ENGINEER)

AT (801) 562-2521

CONTACT: MIKE WITHERS (SURVEYOR MANAGER)

AT (801) 562-2521

C2.0

DRAPER CITY

12354 SOUTH 800 EAST

DRAPER, UT 84020

CONTACT: BRAD JENSEN

PH: (801) 576-6549

EM: BRAD.JENSEN@DRAPERUTAH.GOV

EXISTING CONDITIONS PLAN

C3.0 GRADING PLAN

PORTER ROCKWELL TRAIL

1300 EAST UTA BRIDGE CROSSING

DRAPER, UT

FEBRUARY 9, 2026

9270 SOUTH 300 WEST

S E R V I C E S

TECHNI CAL

SANDY, UT 84070

PHONE: (801) 562-2521 FAX: (801) 562-2551

NA

AH

No. 4939908-2202

IOEFRO SS

GE

I

R

ETTS A

FO UT

TS

DERE

P

R

NG

NEE

I

L E

2-9-26

JAMES J.MILLIGAN

G1.0 GENERAL NOTES

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

INDEX OF SHEETS

AutoCAD SHX Text C0.0

AutoCAD SHX Text

%%UCLIENT

AutoCAD SHX Text

%%U ENGINEER/LAND SURVEYOR

AutoCAD SHX Text

CIVIL ENGINEERING LAND SURVEYING PROJECT MANAGEMENT

AutoCAD SHX Text

GEOTECHNICAL MATERIALS TESTING INSPECTIONS

AutoCAD SHX Text

%%U VICINITY MAP

AutoCAD SHX Text LOCATED IN THE NORTHWEST QUARTER OF SECTION 4, TOWNSHIP 4 SOUTH, RANGE 1 EAST, SALT LAKE BASE AND MERIDIAN SALT LAKE CITY, UTAH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

IDAHO

AutoCAD SHX Text

WYOMING

AutoCAD SHX Text

COLORADO

AutoCAD SHX Text

ARIZONA

AutoCAD SHX Text

NEVADA

AutoCAD SHX Text

LOGAN

AutoCAD SHX Text

BRIGHAM

AutoCAD SHX Text

CITY

AutoCAD SHX Text

OGDEN

AutoCAD SHX Text

WENDOVER

AutoCAD SHX Text

GREAT

AutoCAD SHX Text

SALT

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

BEAR

AutoCAD SHX Text

TIMPANOGOS CAVE

AutoCAD SHX Text

NM

AutoCAD SHX Text

PROVO

AutoCAD SHX Text

HEBER CITY

AutoCAD SHX Text

PRICE

AutoCAD SHX Text

NEPHI

AutoCAD SHX Text

DELTA

AutoCAD SHX Text

UTAH

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

NEWFOUNDLAND

AutoCAD SHX Text

EVAPORATION

AutoCAD SHX Text

BASIN

AutoCAD SHX Text

DUCHESNE

AutoCAD SHX Text

VERNAL

AutoCAD SHX Text

FLAMING GORGE NRA

AutoCAD SHX Text

FLAMING GORGE

AutoCAD SHX Text

RESERVOIR

AutoCAD SHX Text

DUTCH

AutoCAD SHX Text

DINOSAUR NM

AutoCAD SHX Text

GREEN RIVER

AutoCAD SHX Text

JOHN

AutoCAD SHX Text

ARCHES NP

AutoCAD SHX Text

MOAB

AutoCAD SHX Text

CANYONLANDS

AutoCAD SHX Text

NP

AutoCAD SHX Text

NATURAL BRIDGES

AutoCAD SHX Text

NM

AutoCAD SHX Text

BLANDING

AutoCAD SHX Text

HOVENWEEP NM

AutoCAD SHX Text

RAINBOW BRIDGE

AutoCAD SHX Text

NM

AutoCAD SHX Text

GLEN CANYON

AutoCAD SHX Text

NRA

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

POWELL

AutoCAD SHX Text

CAPITOL

AutoCAD SHX Text

REEF NP

AutoCAD SHX Text

BOULDER

AutoCAD SHX Text

COLORADO

AutoCAD SHX Text

HANKSVILLE

AutoCAD SHX Text

PANGUITCH

AutoCAD SHX Text

BRYCE

AutoCAD SHX Text

CANYON NP

AutoCAD SHX Text

KANAB

AutoCAD SHX Text

BEAVER

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

SEVIER

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

CEDAR BREAKS NM

AutoCAD SHX Text

CEDAR CITY

AutoCAD SHX Text

ZION NP

AutoCAD SHX Text

ST. GEORGE

AutoCAD SHX Text

ESCALANTE

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

SAN

AutoCAD SHX Text

JUAN

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1300 E

AutoCAD SHX Text

PROJECT AREA

AutoCAD SHX Text

HIGHLAND DR

AutoCAD SHX Text 13800 S

AutoCAD SHX Text 13610 S

AutoCAD SHX Text

VESTRY RD

AutoCAD SHX Text

PORTER ROCKWELL TRAIL

AutoCAD SHX Text I-15

AutoCAD SHX Text 13800 S

AutoCAD SHX Text

BANGERTER HWY

AutoCAD SHX Text

HIGHLAND DR

AutoCAD SHX Text 13200 S brien.maxfield Stamp

S O

U

TH

W

ES

T S

E R

V I C

E S

T E C H N

IC

A L

SA

N

D Y, U T

PH

O N

E:

(8

) 5

-2

FA

X:

(8

) 5

-2

DEMOLITION NOTES

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH GOVERNING AGENCY STANDARDS AND

SPECIFICATIONS. IN THE ABSENCE OF PROJECT STANDARD AND SPECIFICATIONS APWA

STANDARD AND SPECIFICATIONS SHALL GOVERN.

2. CONTRACTOR SHALL RETAIN AND PROTECT ALL EXISTING IMPROVEMENTS UNLESS

OTHERWISE NOTED. CONTRACTOR IS RESPONSIBLE TO REPAIR ALL SIDEWALK,

PAVEMENT, GRAVEL, UTILITIES, LANDSCAPING, IRRIGATION, FENCING AND EXISTING

IMPROVEMENTS DAMAGED AS PART OF CONSTRUCTION.

3. SIDEWALKS AND CURBS DESIGNATED TO BE DEMOLISHED SHALL BE DEMOLISHED TO

THE NEAREST EXPANSION JOINT, MATCHING THESE PLANS AS CLOSELY AS POSSIBLE.

4. IT IS THE CONTRACTORS RESPONSIBILITY TO CONTACT BLUE STAKES OF UTAH PRIOR TO

STARTING ANY ACTIVITIES. ALL EXISTING UTILITIES SHOWN ON THE PLANS ARE

APPROXIMATIONS ONLY.

5. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR

APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME

OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE

FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE

INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO

DETERMINE THEIR EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS

OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED

AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING

UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE

BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE

CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE

CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES

AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES

OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO

DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. ENSURE ALL OSHA

STANDARDS ARE FOLLOWED.

6. CONTRACTOR IS RESPONSIBLE TO PROVIDE, INSTALL AND MAINTAIN APPROPRIATE

TRAFFIC CONTROL DEVICES, AS WELL AS ANY ADDITIONAL TRAFFIC CONTROL DEVICES

THAT MAY BE REQUIRED TO INSURE SAFE AND EFFICIENT MOVEMENT OF TRAFFIC AND

PEDESTRIANS THROUGH OR AROUND THE WORK AREA AND TO PROVIDE MAXIMUM

PROTECTION AND SAFETY TO ROAD WORKERS.

7. IF DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH

INDICATE AN UNIDENTIFIED SITUATION IS PRESENT, THE CONTRACTOR SHALL CONTACT

THE OWNER AND ENGINEER IMMEDIATELY.

SITE NOTES

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH GOVERNING AGENCY STANDARDS AND

SPECIFICATIONS. IN THE ABSENCE OF PROJECT STANDARD AND SPECIFICATIONS APWA

STANDARD AND SPECIFICATIONS SHALL GOVERN.

2. CONTRACTOR SHALL RETAIN AND PROTECT ALL EXISTING IMPROVEMENTS UNLESS

OTHERWISE NOTED. CONTRACTOR IS RESPONSIBLE TO REPAIR ALL SIDEWALK,

PAVEMENT, GRAVEL, UTILITIES, LANDSCAPING, IRRIGATION, FENCING AND EXISTING

IMPROVEMENTS DAMAGED AS PART OF CONSTRUCTION.

3. ALL CURB DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED.

4. ALL WORK SHALL COMPLY WITH THE PROJECT PLANS, PROJECT SPECIFICATIONS, AND

PROJECT GEOTECHNICAL ENGINEERING REPORT, WHICHEVER IS THE MOST STRINGENT.

5. ALL STRIPING, PAVEMENT MARKINGS, AND SIGNAGE TO COMPLY WITH THE CURRENT

M.U.T.C.D. EDITION MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES OR LOCAL CODE,

WHICHEVER IS MORE STRINGENT.

6. CONTRACTOR IS RESPONSIBLE FOR PERFORMING WORK ON OR ADJACENT TO A PUBLIC

ROAD TO PROVIDE, INSTALL, AND MAINTAIN APPROPRIATE TRAFFIC CONTROL DEVICES,

AS WELL AS ANY ADDITIONAL TRAFFIC CONTROL DEVICES THAT MAY BE REQUIRED TO

INSURE SAFE AND EFFICIENT MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR

AROUND THE WORK AREA AND TO PROVIDE MAXIMUM PROTECTION AND SAFETY TO

ROAD WORKERS.

7. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY

DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN CONTACT ENGINEER FOR

CLARIFICATION.

GRADING NOTES

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH GOVERNING AGENCY STANDARDS AND

SPECIFICATIONS. IN THE ABSENCE OF PROJECT STANDARD AND SPECIFICATIONS APWA

STANDARD AND SPECIFICATIONS SHALL GOVERN.

2. CONTRACTOR SHALL RETAIN AND PROTECT ALL EXISTING IMPROVEMENTS UNLESS

OTHERWISE NOTED. CONTRACTOR IS RESPONSIBLE TO REPAIR ALL SIDEWALK,

PAVEMENT, GRAVEL, UTILITIES, LANDSCAPING, IRRIGATION, FENCING AND EXISTING

IMPROVEMENTS DAMAGED AS PART OF CONSTRUCTION.

3. ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND SPECIFICATIONS.

4. ALL WORK SHALL COMPLY WITH THE PROJECT PLANS, PROJECT SPECIFICATIONS, AND

PROJECT GEOTECHNICAL ENGINEERING REPORT, WHICHEVER IS THE MOST STRINGENT.

5. THE CONTRACTOR SHALL STRIP AND CLEAR THE TOPSOIL, MAJOR ROOTS AND ORGANIC

MATERIAL FROM ALL PROPOSED BUILDING AND PAVEMENT AREAS PRIOR TO SITE

GRADING. (THE TOPSOIL MAY BE STOCKPILED FOR LATER USE IN LANDSCAPED AREAS.)

6. THE CONTRACTOR IS NOTIFIED THAT AN EARTHWORK BALANCE IS THE INTENT OF THIS

PROJECT.

7. THE CONTRACTOR SHALL GRADE THE PROJECT SITE TO PROVIDE A SMOOTH TRANSITION

BETWEEN NEW AND EXISTING ASPHALT, CURB AND GUTTER, AND ADJOINING SITE

IMPROVEMENTS.

8. IT IS THE CONTRACTORS RESPONSIBILITY TO CONTACT BLUE STAKES OF UTAH PRIOR TO

STARTING ANY ACTIVITIES. ALL EXISTING UTILITIES SHOWN ON THE PLANS ARE

APPROXIMATIONS ONLY.

9. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR

APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME

OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE

FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE

INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO

DETERMINE THEIR EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS

OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED

AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING

UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE

BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE

CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE

CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES

AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES

OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO

DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. ENSURE ALL OSHA

STANDARDS ARE FOLLOWED.

10. CONTRACTOR SHALL ENSURE FINISHED GRADE SLOPES AWAY FROM ALL STRUCTURES

ACCORDING TO BUILDING CODES AND AS SHOWN ON THIS PLAN.

11. CONTRACTOR SHALL PROVIDE AND MAINTAIN AT ALL TIMES AMPLE MEANS AND DEVICES

WITH WHICH TO REMOVE PROMPTLY AND TO PROPERLY DISPOSE OF ALL WATER

ENTERING THE TRENCH EXCAVATION.

UTA NOTES

1. LICENSEE OR LICENSEE’S CONTRACTOR WILL POST NOTICE TO TRAIL USERS A MINIMUM

OF 7 DAYS BEFORE ANY TRAIL CLOSURE. LICENSEE OR LICENSEE’S CONTRACTOR WILL

ALSO PROVIDE A PUBLIC RELATIONS CONTACT ON THE NOTICE FOR ANY QUESTIONS

FROM THE PUBLIC.

2. ALL SOIL HANDLING IS TO BE DUST FREE. CONTRACTOR SHALL KEEP THE EXCAVATED

SOIL WITHIN THE RIGHT OF WAY. CONTRACTOR UNDERSTANDS UTA MAY REQUIRE

EVIDENCE OF FILL BEING CERTIFIED CLEAN BEFORE ALLOWING FILL TO BE USED IN THE

RIGHT OF WAY. NO MATERIALS ARE TO BE EXPORTED. ANY AND ALL EXCESS MATERIALS

MUST BE PLACED ON SITE AS DIRECTED IN ADVANCE BY UTA.

3. CONTRACTOR SHALL NOT REMOVE SOIL FROM THE RIGHT OF WAY WITHOUT IT BEING

PROPERLY TESTED AND DISPOSED OF ALONG WITH EVIDENCE OF WHERE IT GOES AND IN

CONFORMANCE WITH ALL APPLICABLE LAWS.

4. IF SOILS ARE TO BE REMOVED, CONTRACTOR SHALL PROVIDE UTA WITH A SOIL

MANAGEMENT PLAN DETAILING THE REMOVED SOILS SHALL BE TESTED FOR METALS AND

PETROLEUM (TPH-DRO AND OIL AND GREASE), AND ALSO INDICATING WHERE THE SOILS

WILL BE APPROPRIATELY DISPOSED OF ONCE TESTING IS COMPLETED.

5. AGGREGATE/SOIL IN BALLAST SECTION WILL BE SEGREGATED AND HANDLED

SEPARATELY FROM EMBANKMENT SOIL

6. AFTER DISPOSAL, CONTRACTOR SHALL PROVIDE A COPY OF THE ACCEPTANCE TICKET

FROM THE LANDFILL OR FACILITY THAT RECEIVES THE SOILS AND EVIDENCE THE

RECEIVING PARTY WAS PROVIDED THE RESULTS AND ACCEPTED THE SOIL “AS IS”.

7. COMPACTION SHALL BE 95% MODIFIED PROCTOR

8. UTA RESERVES ALL SALVAGE RIGHTS TO TRACK AND TIES:

8.A. RAIL IS TO BE SEVERED AT THE JOINT CONNECTION AND NEATLY STACKED (THESE

ARE LIKELY TO BE 40-FOOT SECTIONS).

8.B. UTA ACKNOWLEDGES THAT BASED ON SECTION JOINT MORE RAIL AND TIES MAY

NEED TO BE REMOVED THAN IS IDENTIFIED ON THE PLAN SHEETS.

8.C. TIES ARE TO BE REMOVED AND NEATLY STACKED.

8.D. RAIL SPIKES ARE TO BE GATHERED AND CLUSTERED IN PILES.

8.E. UPON REMOVAL CONTRACTOR IS TO NOTIFY UTA FOR SCHEDULING OF

HAUL/SALVAGE.

9. CONTRACTOR WILL RESTORE UTA PROPERTY TO ORIGINAL OR BETTER CONDITION USING

LIKE MATERIAL TO FILL AND RE-ESTABLISH THE EXISTING TRAIL BED. LICENSEE OR

LICENSEE’S CONTRACTOR ALSO AGREE TO RE-INSPECT THE PROPERTY PERIODICALLY

FOR 18 MONTHS FOLLOWING THE DATE OF COMPLETION OF CONSTRUCTION TO MONITOR

IF ANY SETTLING OR EROSION HAS TAKEN PLACE. IN THE EVENT THERE IS ADDITIONAL

FILL NEEDED, LICENSEE OR LICENSEE’S CONTRACTOR AGREE TO COMPLETE THE WORK

AT LICENSEE’S SOLE COST AND EXPENSE TO ENSURE THE INTEGRITY OF THE RIGHT OF

WAY TO ITS ORIGINAL CONDITION.

10. CLEAN FILL REQUIREMENT:

10.A. IF THE PROJECT REQUIRES FILL MATERIALS OTHER THAN WHAT IS AVAILABLE ON

SITE AS PART OF THE EXCAVATION, THEN THE MATERIALS MUST BE CERTIFIED

CLEAN FILL.

11. EXCESS MATERIALS-SOILS TESTING:

11.A. IF EXCAVATED MATERIALS CANNOT BE EVENLY DISTRIBUTED AND COMPACTED

WITHIN THE CORRIDOR AND MUST BE REMOVED, THEN APPROPRIATE TESTING AND

ACCEPTANCE DOCUMENTATION MUST BE OBTAINED AND PROVIDED.

11.B. GRUBBING MATERIALS MAY BE REMOVED FROM THE SITE, SOILS SHOULD BE KEPT

AT A MINIMUM AS PART OF THE VEGETATION REMOVAL.

11.C. BALLAST/SOIL SEPARATION (SAME AS ABOVE), BALLAST MAY ALSO CONTAIN

CONTAMINANTS, MAY BE USED AS FILL MATERIAL AND EROSION CONTROL AND

DISTRIBUTED WITHIN THE CORRIDOR AND COMPACTED. OTHERWISE MUST ALSO BE

APPROPRIATELY TESTED AND CERTIFIED ACCEPTANCE.

12. DUE TO THE MINIMAL IMPACT ON UTA PROPERTY, UTA HAS WAIVED THE REQUIREMENT

OF THE CONTRACTOR OF SECURING AND EXECUTING A RIGHT OF WAY ENTRY

AGREEMENT. CONTRACTOR TO TAKE NECESSARY MEASURES TO NOT IMPACT ANY

FACILITIES OWNED AND OPERATED BY UTA.

NA

AH

No. 4939908-2202

IOEFRO SS

GE

I

R

ETTS A

FO UT

TS

DERE

P

R

NG

NEE

I

L E

2-9-26

JAMES J.MILLIGAN

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

SURVEY BY:

AutoCAD SHX Text

CHECKED BY :

AutoCAD SHX Text

SCALE :

AutoCAD SHX Text

DESIGNED BY :

AutoCAD SHX Text

DRAWN BY :

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DRAWING FILE

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

LAST REVISED

AutoCAD SHX Text

ORIG. DATE:

AutoCAD SHX Text

MATERIALS TESTING INSPECTION SERVICES LAB TESTING GEOTECHNICAL

AutoCAD SHX Text

ENVIRONMENTAL CIVIL ENGINEERING TRANSPORTATION ENGINEERING

AutoCAD SHX Text

SURVEYING CONSTRUCTION MANAGEMENT SPECIALTY LAB

AutoCAD SHX Text G1.0

AutoCAD SHX Text

AutoCAD SHX Text 101049.001

AutoCAD SHX Text

DWG\00-TITLE_NOTES

AutoCAD SHX Text

CITY

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

FEBRUARY 9, 2026

AutoCAD SHX Text

PORTER ROCKWELL TRAIL

AutoCAD SHX Text

13800 SOUTH UTA BRIDGE CROSSING

AutoCAD SHX Text 03/25

AutoCAD SHX Text

CMT CREW

AutoCAD SHX Text

MJP

AutoCAD SHX Text

MJP

AutoCAD SHX Text

JJM

AutoCAD SHX Text

DRAPER

EX. LIGHT POLE

(TO REMAIN)

EX. FIRE HYDRANT & VALVE

(TO REMAIN)

EX. IRRIGATION CONTROL VALVE

(TO REMAIN, TYP.)

EX. TELECOMM VAULTS &

ELECTRIC CABINETS

(TO REMAIN)

EX. SIDEWALK

EX. SIDEWALK

EX. R

AILS (O

UT OF SERVICE)

EX. IRRIGATION CONTROL VALVES

(TO REMAIN, TYP.)

EX. SEWER MANHOLE

(TO REMAIN)

EX. P

ORTE

R R

OCKW

ELL

TR

AIL

EX. SEWER MANHOLE

(TO REMAIN)

EX. 'STRAIGHT ONLY' SIGN

(TO REMAIN)

EX. 'SPEED LIMIT 25' SIGN

(TO REMAIN)

EX. 'TRAFFIC SIGNAL' SIGN

(TO REMAIN)

EX. 'LEFT TURN ONLY' SIGN

(TO REMAIN)

EX. LIGHT POLE

(TO REMAIN)

EX. WATER VALVE

(TO REMAIN)

EX. SIGNAL VAULT

(TO REMAIN)

EX. 'RIGHT LANE MUST

TURN RIGHT' SIGN

(TO REMAIN)

EX. 'DIRT TRAIL

ACCESS' SIGN

(TO REMAIN)

EX. TELECOMM VAULTS &

ELECTRIC CABINETS

(TO REMAIN)

EX. LIGHT POLE

(TO REMAIN)

EX. CURB INLET & STORM DRAIN MANHOLE

(TO REMAIN)

EX. CURB INLET

(TO REMAIN)

EX. 18" RCP STORM EX. CURB INLET

(TO REMAIN)

EX. CURB INLET

(TO REMAIN)

EX. CURB INLETS

(TO REMAIN)

EX. STORM DRAIN MANHOLE

(TO REMAIN)

EX. 12" P

VC

STORM

EX. B

RIDGE CROSSING

EX. P

ORTE

R R

OCKW

ELL

TR

AIL

RIG

HT-O

F-W

AY LINE

460746084609

461146

164617

46194620

46104611

EX. CONCRETE POST

(TO REMAIN)

EX. CULVERT HEADWALL

(TO REMAIN)

2 79.5'

.9

EX. TREE

(TO REMAIN, TYP.)

EX. TREES

(TO REMAIN, TYP.)

62.0'

104.5'

EX. GRASS & IRRIGATION

(TO BE RESTORED BY OTHERS)

6 92

S O

U

TH

W

ES

T S

E R

V I

C E

S T

E C

H N

IC

A

L

SA

N D

Y, U

T

PH

O

N E:

(8

) 5

-2

FA

X:

(8

) 5

-2

LEGEND

EXISTING CURB & GUTTER

EXISTING FENCEX X X

EXISTING EDGE OF ASPHALT

EXISTING 5' CONTOUR4600

EXISTING 1' CONTOUR4601

EXISTING SIDEWALK

RIGHT OF WAY

DEMOLITION NOTES

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH

GOVERNING AGENCY STANDARDS AND SPECIFICATIONS.

IN THE ABSENCE OF PROJECT STANDARD AND

SPECIFICATIONS APWA STANDARD AND SPECIFICATIONS

SHALL GOVERN.

2. CONTRACTOR SHALL RETAIN AND PROTECT ALL EXISTING

IMPROVEMENTS UNLESS OTHERWISE NOTED.

CONTRACTOR IS RESPONSIBLE TO REPAIR ALL SIDEWALK,

PAVEMENT, GRAVEL, UTILITIES, LANDSCAPING,

IRRIGATION, FENCING AND EXISTING IMPROVEMENTS

DAMAGED AS PART OF CONSTRUCTION.

3. SIDEWALKS AND CURBS DESIGNATED TO BE DEMOLISHED

SHALL BE DEMOLISHED TO THE NEAREST EXPANSION

JOINT, MATCHING THESE PLANS AS CLOSELY AS

POSSIBLE.

4. IT IS THE CONTRACTORS RESPONSIBILITY TO CONTACT

BLUE STAKES OF UTAH PRIOR TO STARTING ANY

ACTIVITIES. ALL EXISTING UTILITIES SHOWN ON THE PLANS

ARE APPROXIMATIONS ONLY.

5. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS

ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED

UPON RECORD INFORMATION AVAILABLE AT THE TIME OF

PREPARATION OF THESE PLANS. LOCATIONS MAY NOT

HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS

MADE AS TO THE ACCURACY OR COMPLETENESS OF THE

INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR TO DETERMINE THEIR EXISTENCE

AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS

OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY

ADDITIONAL COSTS INCURRED AS A RESULT OF THE

CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF

EXISTING UTILITIES PRIOR TO THE BEGINNING OF

CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY

THE CONTRACTOR AND ASSUMED INCLUDED IN THE

CONTRACT. THE CONTRACTOR IS TO VERIFY ALL

CONNECTION POINTS WITH THE EXISTING UTILITIES. THE

CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED

TO THE EXISTING UTILITIES AND UTILITY STRUCTURES

THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING

UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE

ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF

ANY FIELD ADJUSTMENTS SHOULD BE MADE. ENSURE ALL

OSHA STANDARDS ARE FOLLOWED.

6. CONTRACTOR IS RESPONSIBLE TO PROVIDE, INSTALL AND

MAINTAIN APPROPRIATE TRAFFIC CONTROL DEVICES, AS

WELL AS ANY ADDITIONAL TRAFFIC CONTROL DEVICES

THAT MAY BE REQUIRED TO INSURE SAFE AND EFFICIENT

MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR

AROUND THE WORK AREA AND TO PROVIDE MAXIMUM

PROTECTION AND SAFETY TO ROAD WORKERS.

7. IF DURING THE CONSTRUCTION PROCESS, CONDITIONS

ARE ENCOUNTERED WHICH INDICATE AN UNIDENTIFIED

SITUATION IS PRESENT, THE CONTRACTOR SHALL

CONTACT THE OWNER AND ENGINEER IMMEDIATELY.

NA

AH

No. 4939908-2202

IOEFRO SS

GE

I

R

ETTS A

FO UT

TS

DERE

P

R

NG

NEE

I

L E

2-9-26

JAMES J.MILLIGAN

KEYNOTE LEGEND

EX. ASPHALT

(TO BE REMOVED, HATCHED AREA)

EX. FENCE

(TO BE REMOVED)

EX. RAILROAD TRACKS

(TO BE REMOVED PER UTA

REQUIREMENTS, HATCHED AREA)

EX. CONCRETE POST

(TO BE REMOVED)

EXTENT OF FENCE REMOVAL

EX. TREE

(TO BE REMOVED)

PROPOSED SAWCUT

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text

ST

AutoCAD SHX Text

ST

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text L

AutoCAD SHX Text 1300 E

AutoCAD SHX Text

HIGHLAND DR

AutoCAD SHX Text 13800 S

AutoCAD SHX Text 1300 E

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

SURVEY BY:

AutoCAD SHX Text

CHECKED BY :

AutoCAD SHX Text

SCALE :

AutoCAD SHX Text

DESIGNED BY :

AutoCAD SHX Text

DRAWN BY :

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DRAWING FILE

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

LAST REVISED

AutoCAD SHX Text

ORIG. DATE:

AutoCAD SHX Text

MATERIALS TESTING INSPECTION SERVICES LAB TESTING GEOTECHNICAL

AutoCAD SHX Text

ENVIRONMENTAL CIVIL ENGINEERING TRANSPORTATION ENGINEERING

AutoCAD SHX Text

SURVEYING CONSTRUCTION MANAGEMENT SPECIALTY LAB

AutoCAD SHX Text C1.0

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 101049.001

AutoCAD SHX Text

DWG\01-DEMO

AutoCAD SHX Text

CITY

AutoCAD SHX Text

EXISTING CONDITIONS

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text -20

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FEBRUARY 9, 2026

AutoCAD SHX Text

PORTER ROCKWELL TRAIL

AutoCAD SHX Text

13800 SOUTH UTA BRIDGE CROSSING

AutoCAD SHX Text 03/25

AutoCAD SHX Text

CMT CREW

AutoCAD SHX Text

MJP

AutoCAD SHX Text

MJP

AutoCAD SHX Text

JJM

AutoCAD SHX Text

DRAPER

EX. P

ORTE

R R

OCKW

ELL

TR

AIL

EX. P

ORTE

R R

OCKW

ELL

TR

AIL

RIG

HT-O

F-W

AY LINE

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

R20' R20'

R2' R5'

R80'

R200'

R5'

R5'

R200'R2'

R70'

R60'

R5'

10.0'

10.0'

10.0'

CAP ANY IMPACTED IRRIGATION & PROVIDE

IRRIGATION SLEEVES UNDER PAVEMENT. LANDSCAPE

& IRRIGATION RESTORATION TO BE DONE BY OTHERS.

IRR

IRR

R100'

R30'

EX. R

AILS (O

UT OF SERVICE)

R70'

R60'

10.0'

S O

U

TH

W

ES

T S

E R

V I

C E

S T

E C

H N

IC

A

L

SA

N D

Y, U

T

PH

O

N E:

(8

) 5

-2

FA

X:

(8

) 5

-2

KEYNOTE LEGEND

ASPHALT PAVEMENT REQ'D

(SEE DETAIL-1, THIS SHEET)

POST & RAIL FENCE

(TO BE INSTALLED BY CITY)

BUCK & RAIL FENCE

(TO BE INSTALLED BY CITY)

LEGEND

EXISTING CURB & GUTTER

EXISTING FENCEX X X

EXISTING EDGE OF ASPHALT

PROPOSED EDGE OF ASPHALT

EXISTING SIDEWALK

RIGHT OF WAY

SITE NOTES

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH GOVERNING AGENCY

STANDARDS AND SPECIFICATIONS. IN THE ABSENCE OF PROJECT

STANDARD AND SPECIFICATIONS APWA STANDARD AND SPECIFICATIONS

SHALL GOVERN.

2. CONTRACTOR SHALL RETAIN AND PROTECT ALL EXISTING IMPROVEMENTS

UNLESS OTHERWISE NOTED. CONTRACTOR IS RESPONSIBLE TO REPAIR

ALL SIDEWALK, PAVEMENT, GRAVEL, UTILITIES, LANDSCAPING, IRRIGATION,

FENCING AND EXISTING IMPROVEMENTS DAMAGED AS PART OF

CONSTRUCTION.

3. ALL WORK SHALL COMPLY WITH THE PROJECT PLANS, PROJECT

SPECIFICATIONS, DRAPER CITY STANDARDS, AND UTA REQUIREMENTS,

WHICHEVER IS THE MOST STRINGENT.

4. CONTRACTOR IS RESPONSIBLE FOR PERFORMING WORK ON OR ADJACENT

TO A PUBLIC ROAD TO PROVIDE, INSTALL, AND MAINTAIN APPROPRIATE

TRAFFIC CONTROL DEVICES, AS WELL AS ANY ADDITIONAL TRAFFIC

CONTROL DEVICES THAT MAY BE REQUIRED TO INSURE SAFE AND

EFFICIENT MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR

AROUND THE WORK AREA AND TO PROVIDE MAXIMUM PROTECTION AND

SAFETY TO ROAD WORKERS.

5. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED

FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN

CONTACT ENGINEER FOR CLARIFICATION.

6. DUE TO THE FACT THAT THE SITE IS UNDER 1 ACRE, A FORMAL SWPPP WITH

NOI IS NOT REQUIRED. HOWEVER, THE CONTRACTOR SHALL PROVIDE A

PLAN SHOWING BMP'S AND IDENTIFY MEASURES TO CONTROL MUD, DUST,

AND DEBRIS AND APPLY FOR A STORM WATER PERMIT WITH DRAPER CITY

AT WWW.DRAPERUTAH.GOV/290/PERMITS-~APPLICATIONS . THE

CONTRACTOR SHALL SECURE THE PERMIT AND IMPLEMENT THE BMP'S

PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES.

7. CONTRACTOR SHALL EXECUTE UTA'S AGREEMENT WITH CONTRACTOR

FORM AND PROVIDE REQUIRED PROOF OF INSURANCE PRIOR TO ENTRY

UPON UTA PROPERTY. CONTRACTOR AND SUBCONTRACTORS SHALL

ADHERE TO THE CURRENT UTA CONSTRUCTION SAFETY MANUAL.

NA

AH

No. 4939908-2202

IOEFRO SS

GE

I

R

ETTS A

FO UT

TS

DERE

P

R

NG

NEE

I

L E

2-9-26

JAMES J.MILLIGAN

PROPOSED SAWCUT

TRAIL SECTION

DETAIL-1

(NOT TO SCALE)

PROPOSED FENCEX X X

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text

ST

AutoCAD SHX Text

ST

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text L

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

SURVEY BY:

AutoCAD SHX Text

CHECKED BY :

AutoCAD SHX Text

SCALE :

AutoCAD SHX Text

DESIGNED BY :

AutoCAD SHX Text

DRAWN BY :

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DRAWING FILE

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

LAST REVISED

AutoCAD SHX Text

ORIG. DATE:

AutoCAD SHX Text

MATERIALS TESTING INSPECTION SERVICES LAB TESTING GEOTECHNICAL

AutoCAD SHX Text

ENVIRONMENTAL CIVIL ENGINEERING TRANSPORTATION ENGINEERING

AutoCAD SHX Text

SURVEYING CONSTRUCTION MANAGEMENT SPECIALTY LAB

AutoCAD SHX Text C2.0

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 101049.001

AutoCAD SHX Text

DWG\02-SITE

AutoCAD SHX Text

CITY

AutoCAD SHX Text

SITE

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text -20

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FEBRUARY 9, 2026

AutoCAD SHX Text

PORTER ROCKWELL TRAIL

AutoCAD SHX Text

13800 SOUTH UTA BRIDGE CROSSING

AutoCAD SHX Text 03/25

AutoCAD SHX Text

CMT CREW

AutoCAD SHX Text

MJP

AutoCAD SHX Text

MJP

AutoCAD SHX Text

JJM

AutoCAD SHX Text

DRAPER

AutoCAD SHX Text 1300 E

AutoCAD SHX Text

HIGHLAND DR

AutoCAD SHX Text 13800 S

AutoCAD SHX Text

10' BICYCLE/ PEDESTRIAN PATH

AutoCAD SHX Text

CLEAR AND GRUB PATH COMPACT SUBGRADE

AutoCAD SHX Text

8" UNTREATED BASE COURSE (1.5" MAX.) REQ'D.

AutoCAD SHX Text

4" ASPHALT CONCRETE (1/2" MAX. DENSE GRADED)

AutoCAD SHX Text

SL = 2%

AutoCAD SHX Text

6:1 MAX.

AutoCAD SHX Text

6:1 MAX.

AutoCAD SHX Text

DRAPER CITY

AutoCAD SHX Text

GUARD RAIL

EX. P

ORTE

R R

OCKW

ELL

TR

AIL

EX. P

ORTE

R R

OCKW

ELL

TR

AIL

RIG

HT-O

F-W

AY LINE

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

TA=4611.47

(MATCH EX.)

TA=4611.63

(MATCH EX.)

TA=4610.86

(MATCH EX.)

TA=4610.98

(MATCH EX.)

TA=4612.05

(MATCH EX.)

TA=4612.25

(MATCH EX.)

TA=4613.82

(MATCH EX.)

TA=4614.01

(MATCH EX.)

TA=4603.09

(MATCH EX.)

TA=4602.26

(MATCH EX.)

TA=4612.54

TA=4612.81

TA=4612.73

TA=4613.01

TA=4611.75

TA=4611.55

TA=4614.35

TA=4614.55

TA=4615.49

TA=4615.29

TA=4620.81

TA=4621.01

TA=4621.90

TA=4621.70

TA=4621.50

TA=4621.70

TA=4620.45

TA=4620.65

TA=4620.00

TA=4620.20

TA=4619.64

TA=4619.84

TA=4618.67

TA=4618.47

TA=4618.27

TA=4618.47

TA=4617.81

TA=4617.61

TA=4609.34

TA=4609.14

TA=4603.53

TA=4603.73

TA=4616.59

TA=4616.39

TA=4614.32

TA=4614.52

TA=4614.10

TA=4614.30

TA=4612.89

TA=4612.69

2.0%

2.0%

2.0%

2.0%

2.0%

2.0%

2.0%

2.0%

2.0%

2.0%

2.0%

2.0% 2.

0%

2.0%

2.0%

2.0%

2.0%

2.0%

2.

0%

2.0%

2.0%

4.4 4%

4.90%

4.56%

4.90%

0.50%

1.00%

1.00%

1.

4.7 5%

2.0

2.

4.

1.80%

1.79%

4618 4619 4620 4621

2:1 GRADING

2:1 GRADING

2:1 GRADING

4.00%

2.0%

4.5 0%

4.90%

3.09%

2.65%

1.0 0%1.1

4%

4.

1.0 1%

3.5%

5.8

3.9

6.2%

2.0%

8.2% 9.0%

4.2%

2.

0%

TA=4613.30

TA=4613.10

9.0 %9.0

4603 4604

24 46

25 46

8.0%

6.0%

46184619

4619 4620

3:1 G

RADIN

G

10.8%

4.8%

10.0%

2:1 GRADING

4:

GR

AD

IN

G

4:1 GRADING

3:

G

RA

DI

NG

4:1 G

RADING

3:1 GRADING

3:1 GRADING

4:1 GRADING

4:1 GRADING

4:

G

RA

DI

NG

4:1 G

RADIN

G

4:1 G

RADIN

G

S O

U

TH

W

ES

T S

E R

V I

C E

S T

E C

H N

IC

A

L

SA

N D

Y, U

T

PH

O

N E:

(8

) 5

-2

FA

X:

(8

) 5

-2

LEGEND

EXISTING CURB & GUTTER

EXISTING FENCEX X X

EXISTING EDGE OF ASPHALT

PROPOSED 5' CONTOUR

PROPOSED 1' CONTOUR

PROPOSED EDGE OF ASPHALT

EXISTING 5' CONTOUR4600

EXISTING 1' CONTOUR4601

EXISTING SIDEWALK

RIGHT OF WAY

GRADING NOTES

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH GOVERNING AGENCY STANDARDS AND SPECIFICATIONS. IN THE

ABSENCE OF PROJECT STANDARD AND SPECIFICATIONS APWA STANDARD AND SPECIFICATIONS SHALL GOVERN.

2. CONTRACTOR SHALL RETAIN AND PROTECT ALL EXISTING IMPROVEMENTS UNLESS OTHERWISE NOTED.

CONTRACTOR IS RESPONSIBLE TO REPAIR ALL SIDEWALK, PAVEMENT, GRAVEL, UTILITIES, LANDSCAPING, IRRIGATION, FENCING AND EXISTING IMPROVEMENTS DAMAGED AS PART OF CONSTRUCTION.

3. MAIN TRAIL MUST COMPLY WITH ADA STANDARDS AND SPECIFICATIONS.

4. ALL WORK SHALL COMPLY WITH THE PROJECT PLANS, PROJECT SPECIFICATIONS, DRAPER CITY STANDARDS, AND

UTA REQUIREMENTS, WHICHEVER IS THE MOST STRINGENT.

5. THE CONTRACTOR SHALL STRIP AND CLEAR THE TOPSOIL, MAJOR ROOTS AND ORGANIC MATERIAL FROM ALL PROPOSED PAVEMENT AREAS PRIOR TO SITE GRADING. (THE TOPSOIL MAY BE STOCKPILED FOR LATER USE IN

LANDSCAPED AREAS.)

6. THE CONTRACTOR IS NOTIFIED THAT AN EARTHWORK BALANCE IS THE INTENT OF THIS PROJECT. SEE UTA NOTES

ON SHEET G1.0 REGARDING THE MANAGEMENT OF ONSITE MATERIALS.

7. THE CONTRACTOR SHALL GRADE THE PROJECT SITE TO PROVIDE A SMOOTH TRANSITION BETWEEN NEW AND

EXISTING ASPHALT, CURB AND GUTTER, AND ADJOINING SITE IMPROVEMENTS.

8. IT IS THE CONTRACTORS RESPONSIBILITY TO CONTACT BLUE STAKES OF UTAH PRIOR TO STARTING ANY

ACTIVITIES. ALL EXISTING UTILITIES SHOWN ON THE PLANS ARE APPROXIMATIONS ONLY.

9. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THEIR EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. ENSURE ALL OSHA STANDARDS ARE FOLLOWED.

10. CONTRACTOR SHALL PROVIDE AND MAINTAIN AT ALL TIMES AMPLE MEANS AND DEVICES WITH WHICH TO REMOVE

PROMPTLY AND TO PROPERLY DISPOSE OF ALL WATER ENTERING THE TRENCH EXCAVATION.

11. DUE TO THE FACT THAT THE SITE IS UNDER 1 ACRE, A FORMAL SWPPP WITH NOI IS NOT REQUIRED. HOWEVER, THE CONTRACTOR SHALL PROVIDE A PLAN SHOWING BMP'S AND IDENTIFY MEASURES TO CONTROL MUD, DUST, AND DEBRIS AND APPLY FOR A STORM WATER PERMIT WITH DRAPER CITY AT

WWW.DRAPERUTAH.GOV/290/PERMITS-~APPLICATIONS . THE CONTRACTOR SHALL SECURE THE PERMIT AND

IMPLEMENT THE BMP'S PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES.

12. DUE TO THE MINIMAL IMPACT ON UTA PROPERTY, UTA HAS WAIVED THE REQUIREMENT OF THE CONTRACTOR OF SECURING AND EXECUTING A RIGHT OF WAY ENTRY AGREEMENT. CONTRACTOR TO TAKE NECESSARY MEASURES

TO NOT IMPACT ANY FACILITIES OWNED AND OPERATED BY UTA.

NA

AH

No. 4939908-2202

IOEFRO SS

GE

I

R

ETTS A

FO UT

TS

DERE

P

R

NG

NEE

I

L E

2-9-26

JAMES J.MILLIGAN

PROPOSED SAWCUT

PROJECT BENCHMARK

EX. SEWER MANHOLE

RIM = 4598.82

PROPOSED FENCEX X X

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text

ST

AutoCAD SHX Text

ST

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text L

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

SURVEY BY:

AutoCAD SHX Text

CHECKED BY :

AutoCAD SHX Text

SCALE :

AutoCAD SHX Text

DESIGNED BY :

AutoCAD SHX Text

DRAWN BY :

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DRAWING FILE

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

LAST REVISED

AutoCAD SHX Text

ORIG. DATE:

AutoCAD SHX Text

MATERIALS TESTING INSPECTION SERVICES LAB TESTING GEOTECHNICAL

AutoCAD SHX Text

ENVIRONMENTAL CIVIL ENGINEERING TRANSPORTATION ENGINEERING

AutoCAD SHX Text

SURVEYING CONSTRUCTION MANAGEMENT SPECIALTY LAB

AutoCAD SHX Text C3.0

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 101049.001

AutoCAD SHX Text

DWG\03-GRADE

AutoCAD SHX Text

CITY

AutoCAD SHX Text

GRADING

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text -20

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FEBRUARY 9, 2026

AutoCAD SHX Text

PORTER ROCKWELL TRAIL

AutoCAD SHX Text

13800 SOUTH UTA BRIDGE CROSSING

AutoCAD SHX Text 03/25

AutoCAD SHX Text

CMT CREW

AutoCAD SHX Text

MJP

AutoCAD SHX Text

MJP

AutoCAD SHX Text

JJM

AutoCAD SHX Text

DRAPER

AutoCAD SHX Text 1300 E

AutoCAD SHX Text

HIGHLAND DR

AutoCAD SHX Text 13800 S

AutoCAD SHX Text 1300 E

00-title-C0.0
C0.0
00-title_notes-G1.0
G1.0
01-demo-C1.0
C1.0
02-site-C2.0
C2.0
03-grade-C3.0
C3.0

File details come from the government source that posted it. Updated .