4-BID SCHED PRT 1300 UTA Bridge.xls
XLS spreadsheet 31 KB Posted
- Solicitation number
- CIP-25-21
- Issued by
- Salt Lake County, Utah
About this file
This is a bid schedule for construction services submitted by Draper City, Utah, for the Porter Rockwell Trail - 1300 East UTA Bridge Crossing project located at 1300 East Highland Drive, Draper, Utah. The project encompasses nine line items across site preparation, infrastructure removal, and pathway construction. Work includes storm water pollution prevention, clearing and grubbing with fencing and tree removal, asphalt removal with saw cutting, railroad track and tie removal and salvage (170 linear feet), railroad ballast removal (2,200 square feet), earthwork, installation of 4-inch future-use conduit (35 linear feet), construction of a 4-inch asphalt path with 8-inch base course (10,165 square feet), and native hydroseed application (3,282 square yards). The bid schedule was prepared as of April 29, 2026, for competitive sealed proposals from qualified, licensed contractors.
The bid schedule presents all line items with zero dollar amounts for both unit prices and total costs, indicating this is a blank template document prepared for contractor bidding rather than a completed proposal with pricing information. No pricing terms, payment schedules, contract duration, renewal options, funding sources, or award details are specified within this bid schedule document. Additional contract documents such as the scope of work, specifications, and general conditions would contain information regarding project timelines, bidding deadlines, site visit requirements, and other salient contractual terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
| Porter Rockwell Trail - 1300 East UTA Bridge Crossing | |||||
| Construction Document Bid Schedule | |||||
| April 29, 2026 Bid Tabulation | |||||
| Base Bid | |||||
| BID ITEM | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL |
| 1 | Storm Water Pollution Prevention | 1 | LS | $0.00 | |
| 2 | Clearing and Grubbing (including fencing, post, & tree removal) | 1 | LS | $0.00 | |
| 3 | Asphalt Removal (including saw cut) | 18 | CY | $0.00 | |
| 4 | Railroad Track, Ties, and Spikes Removal and Salvage | 170 | LF | $0.00 | |
| 5 | Railroad Ballast Removal | 2200 | SF | $0.00 | |
| 6 | Earthwork | 1 | LS | $0.00 | |
| 7 | 4" Future Use Conduit | 35 | LF | $0.00 | |
| 8 | Asphalt Path - 4" thick w/ 8" UBC | 10,165 | SF | $0.00 | |
| 9 | Native Hydroseed | 3,282 | SY | $0.00 | |
| Bid Grand Total | $0.00 |