5 - Light Circuit Actual V1.pdf

PDF 30 KB Posted

Attached to
Kitchen Refurbishment - Chief of Mission Residence
Solicitation number
19P05025Q0010
Issued by

About this file

The document is an electrical circuit diagram for the US Embassy Lisbon's kitchen renovation project. The schematic shows the detailed lighting and electrical circuit layout, including on/off switches, ceiling lights, and connection boxes. The drawing indicates that all conduits will run in the false ceiling in a cable tray. The diagram is labeled as version 3 of the CMR Kitchen Renovation Project and was drafted in February 2025 by Coelho Claudio, specifically detailing the actual electrical and lighting circuits for the project.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text Elevator

AutoCAD SHX Text Dumbwaiter

AutoCAD SHX Text C01

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

DRAFTED:

AutoCAD SHX Text February 2025

AutoCAD SHX Text Coelho Claudio

AutoCAD SHX Text 2.2

AutoCAD SHX Text

LC01

AutoCAD SHX Text Main Light Fixtures

AutoCAD SHX Text 10A

AutoCAD SHX Text Lighting Circuit

AutoCAD SHX Text ON/OFF switch (LED over the W. bench)

AutoCAD SHX Text

L1+N+PE

AutoCAD SHX Text All the conduits run in the false ceiling in a cable tray

AutoCAD SHX Text Connection Box

AutoCAD SHX Text Electrical Circuit

AutoCAD SHX Text

DRAWING:

AutoCAD SHX Text

US EMBASSY LISBON

AutoCAD SHX Text

CMR KITCHEN RENOVATION PROJECT V.3

AutoCAD SHX Text Circ.

AutoCAD SHX Text Amp.

AutoCAD SHX Text Equipment Connected

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text

IR

AutoCAD SHX Text Heating Lights

AutoCAD SHX Text

IR

AutoCAD SHX Text Ceiling Lights

AutoCAD SHX Text Actual Circuit

Sheets and Views
Model

File details come from the government source that posted it. Updated .