SF-30 - Amendment 1 - Additional Drawings.pdf

PDF 538 KB Posted

Attached to
Kitchen Refurbishment - Chief of Mission Residence
Solicitation number
19P05025Q0010
Issued by

About this file

This Standard Form 30 (SF-30) Amendment A0001 adds two attachments to Solicitation 19P05025Q0010 for the U.S. Embassy Lisbon's Chief of Mission Residence Kitchen Renovation Project. The amendment includes detailed drawings for the kitchen and laundry/pantry areas, specifically Attachment #10 - Kitchen Furniture Layout and Attachment #11 - Laundry Pantry Layout. The kitchen layout diagram shows a 38.6m2 space with equipment including a gas stove, multiple refrigerators, dishwasher, sinks, and various benches and cabinets. The laundry/pantry layout depicts shelving units and refrigeration equipment. The amendment was issued on 04/14/2025 by Contracting Officer Jonathan Nwosu, with no changes to the existing solicitation terms and conditions.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO.

A0001

3. EFFECTIVE DATE

04/14/2025

4. REQUISITION/PURCHASE REQ. NO.

PR15180404

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE

7. ADMINISTERED BY (If other than Item 6)

CODE

AMERICAN EMBASSY LISBON

AV. DAS FORCAS ARMADAS, ATTN: GSO/PROCUREMENT

LISBOA 1649-044

PORTUGAL

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)

9a. AMENDMENT OF SOLICITATION NO.

19P05025Q0010

Prospective Offerors

9b. DATED (SEE ITEM 11) 04/01/2025

10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ ] is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _______ copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [X ] is required to sign this document and return __1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to share additional drawings:

Attachment # 10 – Kitchen Furniture Layout Attachment # 11 – Laundry Pantry Layout Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME OF CONTRACTING OFFICER

Jonathan Nwosu

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C.DATE

SIGNED

16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C.DATE SIGNED

NSN 7540-01-152-8070 Standard Form 30 (revised 10/83) Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243

E l e v a t o r

D u m b w a i t e r

GAS HOVEN

with STOVE

ELECT. FRYER

M U

L T

I P

U R

P O

S E

G R

I L L E

H O

T

P

L A

T

S

T O

V E

BIG SINK

DOUBLE SINK

CABINETS

C A

B I N

E T

S

B E

N C

H

W

I T

H

C

A B

I N

E T

S

BENCH WITH CABINETS

TABLE

BENCH

R E

F R

I G

E R

A T

O R

Dish

Washer

R E

F R

I G

E R

A T

O R

BENCH WITH CABINETS

BENCH WITH CABINETS

Views

ACTUAL KITCHEN LAYOUT

Kitchen Area: 38.6m2

Circulation Area: 21m2

Ocupied Area: 15m2

US EMBASSY LISBON

CMR KITCHEN RENOVATION PROJECT

Actual Equipment LayoutDRAWING:

DATE: NUMBER:

DRAFTED:

January 2025

Coelho Claudio

R

F R

I G

E R

A T

O R

R E

F R

I G

E R

A T

O R

R E

F R

I G

E R

A T

O R

R E

F R

I G

E R

A T

O R

R E

F R

I G

E R

A T

O R

US EMBASSY LISBON

CMR KITCHEN RENOVATION PROJECT

Act. Laundry/Pantry Equipment LayoutDRAWING:

DATE: NUMBER:

DRAFTED:

January 2025

Coelho Claudio

ACTUAL PANTRY / LAUNDRY LAYOUT

Views

SF-30 - Amendment 1 - Additional Drawings
10 - Kitchen Furniture Layout
Sheets and Views
Model
11 - Laundry Pantry Layout
Sheets and Views
Model
2025-04-14T14:52:46+0100
Jonathan C Nwosu

File details come from the government source that posted it. Updated .