5-JF27-010-IFB Annual Contract Hazardous Material Disposal Sump Pumping.pdf
PDF 227 KB Posted
- Solicitation number
- JF27-010-IFB
- Issued by
- Salt Lake County, Utah
About this file
This Invitation for Bids (IFB) document is issued by the Granite School District's Purchasing & Warehouse Department to procure annual hazardous material disposal and sump pumping services on an as-needed basis across multiple district locations throughout Utah. The contractor will be responsible for removing and disposing of various hazardous and non-hazardous materials, including paint, solvents, fluorescent tubes, batteries, science chemicals, formaldehyde, mercury thermometers, and electronics waste, as well as performing sump pumping services for kitchen grease sumps and science neutralization tanks. The contractor must respond to service requests within 3 calendar days and provide site visits, work measurements, and written price quotations at no additional charge for each job. No pre-bid conference is scheduled. The contract is anticipated to be effective from August 1, 2026 through June 30, 2027, with up to four one-year renewal options extending through June 30, 2031. The district intends to make a single award to the lowest cost responsive and responsible bidder based on past performance history, organization, equipment, and demonstrated ability to complete work in a professional and timely manner.
Pricing will be submitted using the provided JF27-010-IFB Bid Form with a Job Costing Form detailing costs for specific services such as annual sump tests, sump pumping for various gallon capacities, hazardous and non-hazardous material removal by ton/pound/gallon, new drums, and hazmat technician hourly rates. Individual projects must not exceed $50,000; projects exceeding this threshold will be published as separate public bids. Mileage charges, office time, fuel surcharges, and other overhead fees are not permitted. Pricing is valid for one year, with any price adjustment requests for renewals requiring thirty days' notice and substantial documentation. The contractor must maintain $1 million per occurrence and $3 million general aggregate liability insurance, comply with all federal and state laws including E-Verify requirements, maintain current Utah licensing, and adhere to strict standards of conduct on school property. Payments will be issued as lump sums upon project completion and final inspection approval, with no prepayments or partial progress payments allowed unless specified. Sales to Utah school districts are exempt from sales tax.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JF27-010-IFB
Purchasing & Warehouse Department
Julie Fisher, CPPB, Manager/Buyer
SPECIFICATIONS
1. GENERAL
Specifications for an annual contract for Hazardous Materials Disposal and Sump Pumping Services on an “as needed basis” at any of the locations throughout Granite School District (GSD). Please see https://www.graniteschools.org/schools/ for potential locations. Bidders must meet or exceed all specifications and requirements as set forth in this document and all other information posted on the Utah Public Procurement Place (hereafter referred to as U3P).
Contractor must furnish all equipment/parts, materials, labor, tools, transportation, supplies, and incidentals necessary to complete the work as described in the specifications.
2. CONTACT & ACCESS TO SITE
Access to locations for site inspections and/or for project completion must be arranged through the Contract Coordinators, Jeremy Casper, Granite School District Environmental Safety/Fire Marshal (385) 646-7020 and Ben Holt, Granite School District Environmental Safety Specialist (385) 646-5695. (Do not contact staff listed during the bidding process. Questions must be published in the U3P Q & A section. Answers will be provided in the same manner.)
3. AMENDMENTS TO INVITATION FOR BID
Any changes in quantity, specifications, schedules, opening date, corrections, clarifications, etc. will be in the form of an addendum.
Addenda will be posted at U3P. It is the responsibility of the bidder to obtain addenda. Bid submittal constitutes implied acknowledgment of all addenda.
4. BID SECURITY
N/A
5. BONDS
6. CHANGE ORDERS
No payments will be made to the contractor for additional work or materials https://www.graniteschools.org/schools/ unless a change order has been signed and executed by GSD Purchasing. Any change order which increases the contract amount shall be subject to prior written certification that the change order is within the determined project or contract budget.
7. CONFLICT WITH SUBMITTALS/INCONSISTENCIES IN TERMS &
CONDITIONS
In the event of conflict with submittals from bidders or inconsistencies in bidding documents, this bid document will take precedence.
8. CONSIDERATION, AWARD AND REJECTION OF BIDS
All bidders must be able to demonstrate that they are responsible, competent contractors with the resources to complete a project of this type and magnitude and must be prepared to provide documented proof of such upon request including references and financial statements. The contractor's past performance history, organization, equipment and demonstrated ability to perform and complete their contracts in the manner and within the time limit specified will be elements along with the dollar amount of the bid which will be considered by GSD in the vetting of the contractor. It is anticipated, GSD will award to a single vendor to meet the needs. Award will be made in accordance with Utah Code 63G-6a-606 responsive and responsible bidder will be awarded a contract. GSD reserves the right to reject any and all bids by reason of this paragraph and according to Utah Procurement Code. Bids shall be irrevocable for a period of 60 days from the bid due date. GSD intends to make a single award.
a) Any contractor that does not perform in an exemplary professional manner for GSD or if their work quality is less than exceptional will be notified of the problem and will not be invited to quote or bid on any additional GSD jobs or perform any additional work for GSD until they have demonstrated to GSD’s satisfaction that the cause of the problem(s) has been corrected.
b) Any contractor that has not performed up to our high standards in the past for GSD will not be allowed to bid on this contract.
c) If a contractor is awarded this contract but then fails to perform, GSD reserves the right to award the contract to the next low bidder.
9. CONTRACT DATES/DEADLINES
It is anticipated the first year of the contract will be effective 8/01/2026 through 6/30/2027. Subsequent contract periods will be 7/01 through 6/30. With maximum renewal options through 6/30/2031.
Projects will be completed dependent on receipt of a signed purchase order.
Equipment, delivery lead time, and work shall be coordinated with the GSD contact listed in paragraph 2 “Contact & Access to Site”.
The hours of operation shall be coordinated with the GSD contact listed in Paragraph 2 “Contact & Access to Site”.
10. CONTRACT CLAUSES
Any contract arising from this Invitation to Bid will include the following:
a) The unilateral right of GSD to order written changes in the work and/or time of performance (Changes Clause);
b) Suspension of Work Clause;
c) Price Adjustment Clause;
d) Claims Based on a Procurement Officer’s Actions or Omissions Clause;
e) Default Delay – Time Extension Clause
f) Remedies Clause - Any dispute arising under or out of this contract is subject to the provisions of Part H (Legal and Contractual Remedies) of the Utah Procurement Code;
g) Liquidated damages as appropriate;
h) Specific excusable delays are as follows: if the contractor is delayed by GSD or architect or by change orders.
i) GSD may terminate the contract for any reason at any time if the contractor fails to perform (default) or if it is in the best interest of GSD (Convenience Clause).
11. INSPECTIONS
Contractor must be prepared, willing and accommodating to on-site inspection of all work, at any time, by a GSD representative, during job progress.
12. INSURANCE/LIABILITY/SAFETY/SECURITY
The contractor must secure and maintain liability insurance (general and auto) of one million dollars each occurrence and three million dollars General Aggregate (or more as may be required in the Project Manual on contract) against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder. The contractor’s commercial general liability policy must include builders risk insurance and completed operations coverage to guarantee recovery of damages to the work in progress during construction. Insurance must be maintained for the duration of the project. Contractor must provide proof of insurance (policy or endorsement) upon demand by GSD and agrees to, at all times, protect, indemnify, defend and hold harmless GSD and GSD employees from any and all claims.
GSD will assume no liabilities for the contractor including any of the contractor’s representatives, employees or properties.
Contractor shall, at all times, maintain safeguards for safety and protection and keep the work area in a neat, clean, safe and secure condition to avoid injury, risk of loss, theft, vandalism or sabotage.
Any damages occurring during the completion of this project, incidental or otherwise, to GSD or adjacent properties must be repaired, at the contractors expense, to the owner’s satisfaction.
13. LAWS/CODES
Contractor must abide by all federal, state and local laws including, but not limited to employment laws such as the Americans with Disabilities Act and E- Verify and meet or exceed all applicable building codes and Utah State Energy Code requirements. Undocumented (illegal immigrant) labor will not be allowed to work on GSD property. Any contract that might arise from this Invitation for Bid will be governed by Utah State Laws.
14. LICENSING
Bidders must meet all current licensing requirements of the City, County and State of Utah to do the type of work required under this bid including the proper license classifications with a sufficient monetary limit as established and issued by the Utah Division of Occupational and Professional Licensing, State Department of Commerce, as legally required by State Code Title 58, Chapter
55. Licensing must be current and valid at the date of bid opening and remain so for the duration of the contract/project(s)
15. LIQUIDATED DAMAGES
N/A
16. NOTICE TO PROCEED
Notice to proceed will be in the form of a signed Purchase Order from the GSD Purchasing Department issued each fiscal year. Do not proceed without written communicated from the person listed in paragraph 2 “Contact & Access to Site”.
17. PAST PERFORMANCE
Any contractor that does not perform in an exemplary professional manner for
GSD or if their work quality is less than exceptional will be notified of the problem and will not be invited to quote or bid on any additional GSD jobs or perform any additional work for GSD until they have demonstrated to GSD’s satisfaction that the cause of the problem(s) has been corrected.
Any contractor that has not performed up to our high standards on past GSD jobs will not be awarded a contract under this bid.
18. PAYMENT
In most cases, payments will be a "lump sum" amount made at the completion and clean-up of each project and will not be made until a final inspection and approval. "Draws", prepayments, or partial progress payments will not be allowed unless specified.
19. PRE-BID CONFERENCE
N/A
20. SALES TAX
Please note that sales made to Utah school districts are exempt from sales tax (Utah Code 59-12-104). Tax exemption certificate can be provided upon request.
21. SUBCONTRACTORS
GSD reserves the right to reject any subcontractor. GSD may withhold awarding the contract to a bidder if any of the proposed subcontractors are considered by GSD to be unqualified. Subcontractors must be held, by the General, to all requirements listed herein. A list of subcontractors and their licensing classification will be required. Bidder shall certify that all subcontractors are licensed as required by State law. It is anticipated the work described in the specifications will be self-performed by the contractor and not subcontracted.
22. SUBMITTALS
Submit bids as per instructions on U3P. Additional attached or enclosed materials, not requested and not required, will be discarded and may cause bid rejection if the attachments are attempts to alter or amend the bid specifications and/or requirements. Additional or alternate terms or proposals will not be accepted.
23. SUBSTITUTE PRODUCTS
24. TECHNICAL SPECIFICATIONS
a) Items to be removed and disposed of may include:
• Paint
• Solvents (Cleaners)
• Lacquer thinner
• Fluorescent tubes
• Ballasts
• Science chemicals
• Lab specimens
• Formaldehyde
• Batteries (Lead Acid)
• Batteries (Lithium)
• Science neutralization tanks
• Limestone replacement for neutralization tanks
• Radioactive exit signs
• Dirt remediation
• Mercury thermometers and thermostats
• Kitchen sumps (grease)
• Hand Sanitizers
• Electronics waste
b) Response Time must be within 3 calendar days.
c) Services must meet “Industry Standard” requirements. Contractor must provide GSD with proper documentation and comply with all local, state and federal regulations pertaining to the transportation and disposal of regulated materials.
d) GSD will require a site visit, work measurement and written price quotation
(job costing form) for each job, at no additional charge. No payments will be made for more than is listed on the Job Costing form without a change order. Change Orders must be approved and signed by GSD, prior to the commencement of additional work.
e) Mileage charges, office time, fuel charges, trip charges or any other additional overhead charges will not be allowed.
f) Contract covers individual projects with an estimated cost of less than
$50,000. If a project will exceed this amount, it will be published as a public bid opportunity.
g) GSD will issue a purchase order each fiscal year. The contractor will receive approval to commence work for individual projects from the Planning & Boundaries Department and will submit invoices towards the annual purchase order at the contracted rate (s).
h) The use of alcohol, tobacco (including smokeless or chewing tobacco) or e-cigarettes on GSD property is prohibited.
25. TERMS AND CONDITIONS
The terms and conditions attached to the solicitation and contract will govern any purchases made under this contract.
Any terms and conditions attached to a contractor’s quote will not be considered.
26. WARRANTY
Contractor warrants all equipment, materials, and labor furnished or performed will be free from defects for a minimum period of twelve (12) months (unless longer as listed in the Technical Specifications or Drawings) from date of discovery (or when discovery should have been made).
Upon notice from GSD of any defect during the applicable warranty period, the affected item, parts or work shall be redone, redesigned, repaired or replaced by the contractor (at the contractor’s expense) at a time acceptable to GSD.
27. STANDARDS OF CONDUCT
Contractor must not have direct, unsupervised contact with students. In addition to ensuring compliance with GSD’s tobacco, drug, and alcohol-free workplace requirements, Contractor shall be responsible for ensuring that its employees, agents, sub-contractors, and anyone directly or indirectly employed by any of them, are appropriately identified at all times while performing work, and refrain from the following prohibited conduct:
a) any fraternization or inappropriate interactions of any nature whatsoever with GSD students, employees, and patrons, including talking, touching, staring, or otherwise contributing to a hostile or offensive environment for GSD’s students, employees, and patrons;
b) criminal conduct;
c) possession of drug paraphernalia;
d) sale, misuse or unauthorized use/possession of prescription drugs;
e) carrying weapons (except to the extent allowed by law with a valid concealed weapons permit);
f) the use of profanity or other offensive language;
g) inappropriate dress (e.g., lewd, offensive, alcohol/tobacco/drug-related t-shirts, hats, or other clothing);
h) parking anywhere except in expressly designated parking areas (violators may be towed at Contractor’s expense); and
i) accessing areas of GSD’s property that are unnecessary to the performance of the Work.
Violation of these conduct standards shall result in immediate removal of the offending individual from all work on any of GSD’s properties. Repeated minor violations resulting in removal of Contractor’s forces, or one serious infraction (as determined within the discretion of GSD) shall constitute a substantial breach of contract and constitute grounds for termination.
28. COST & CONTRACT PERIOD
Cost will be submitted using the “JF27-010-IFB_Bid Form”
Contract will be for a one-year period and will include up to four, one year renewal options for a maximum contract length of five years.
Pricing is valid for one year. Following the one-year period, any requests for price adjustments must be for an equal guarantee period and must be made at least thirty (30) days prior to the renewal of the contract. Requests for price increase will be considered only for extreme changes in market conditions and must include enough documentation to support the request. Any adjustment or amendment to the contract will not be effective unless approved by GSD purchasing. Costs may not exceed the amounts listed in the prevailing consumer price index (CPI) or producer price index (PPI).
(Sample) JOB COSTING FORM
*SEE BID FORM
Job Location: Date:
Scope of work (description): Attach drawings, detailed plans or expanded description if necessary.
Anticipated date of job completion:
Description Quantity U of M X Amount
Annual test/sump EACH X $ Pump Sump – 500-gallon sump
EACH X $
Pump Sump – 1,000-gallon sump
EACH X $
Non-hazardous material removal and disposal
TON X $
Non-hazardous material removal and disposal
LB X
Non-hazardous material removal and disposal
GAL X
Hazardous material removal and disposal
TON X
Hazardous material removal and disposal
LB X
Hazardous material removal and disposal
GAL X
New 55-gallon drum EACH X 4’ cardboard drums for fluorescent tubes
EACH X
Sewer spill cleanup HOUR X
Hazmat Technician HOUR X
Total Cost of Job: $