5-GC Exhibit H5-Demolition Early-Work Documents.pdf
PDF 5 MB Posted
- Solicitation number
- RFP: LEAD/OPS -GC444/RFP001/2026/27
- Issued by
- Davidson County, Tennessee
About this file
Summary
This is a demolition scope narrative and early-work documents package for LEAD Public Schools, a Nashville, Tennessee-based public school system, in conjunction with MZA Architecture & Interiors serving as the architect. The document establishes the demolition scope for two buildings—Building A (446 Metroplex Drive, 12,380 square feet per floor) and Building B (1221 Antioch Pike, 17,800 square feet per floor)—as part of a broader redevelopment of the Metroplex office campus into a school and organizational campus. Building B will serve as the primary K-5 academic facility with instructional spaces and cafeteria, while Building A will house administrative offices, NEST services, community spaces, and professional development facilities. The demolition work comprises selective interior demolition of non-structural components including interior walls, doors, windows, finishes, ceilings, fixtures, and ductwork while preserving all structural elements, roof assemblies, exterior envelopes, utilities, and life-safety systems. LEAD seeks to select a Construction Manager (CM) to validate demolition scope, competitively procure qualified demolition subcontractors, analyze bids, recommend award, and manage work execution. The RFP is limited to demolition and early-work services unless LEAD separately authorizes additional construction services. Permit tracking numbers T2026063342 (446 Metroplex Drive) and T2026063343 (1221 Antioch Pike) have been submitted to Metro for review, with debris management and noise mitigation plans required for each permit.
The selected CM must coordinate a pre-demolition asbestos survey, develop comprehensive subcontractor bid packages incorporating demolition drawings, utility requirements, and logistics constraints, obtain competitive bids from qualified demolition contractors, prepare bid analysis with scope clarifications, and provide written award recommendations to LEAD before subcontract execution. Building access and demolition sequencing will be phased based on LEAD's occupancy coordination and tenant turnover, with no demolition authorized in occupied or unreleased areas without written LEAD approval. Site logistics, staging, access constraints, and contractor working-hour restrictions must be identified during preconstruction review. Proposers should identify the earliest feasible mobilization date and anticipated demolition duration for each building, with critical dependencies including permit approvals, asbestos clearance, tenant turnover, utility shutdowns, and design clarifications. Upon completion, each demolition area shall be left broom-clean, secure, and ready for renovation, with closeout documentation including debris-management records, permit documentation, photographic evidence, utility capping documentation, and subcontractor closeouts. No pricing, contract terms, or specific award dates are provided in this demolition scope document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEAD PUBLIC SCHOOLS
EXHIBIT H7
Demolition Scope Narrative - Draft for RFP
Buildings B and A | 1221 Antioch Pike / 446 Metroplex Drive | Nashville, Tennessee
1. PROJECT OVERVIEW
LEAD Public Schools is advancing the redevelopment of the existing Metroplex office campus into a school and organizational campus. Building B is planned as the primary academic building for the K-5 program, including supporting instructional and student-service spaces and the cafeteria/kitchen. Building A is planned for office, NEST, community, professional-development, meeting and other program uses, with final programming continuing to be coordinated as design advances. The demolition work is being advanced as an early-work package to create schedule flexibility and prepare both buildings for the subsequent renovation program.
This RFP is intended to select a Construction Manager (CM) for the demolition/early-work phase.
The selected CM will work with LEAD and the design team to validate the demolition scope, competitively procure qualified demolition subcontractor(s), level bids, recommend award, and manage execution of the work. This engagement is limited to the demolition/early-work scope unless LEAD separately authorizes additional services or construction work.
2. BASIS OF DEMOLITION SCOPE
The demolition scope shall be based primarily on the current architectural demolition drawings for
Buildings A and B, together with field verification and any subsequent clarifications or addenda issued by LEAD or the design team. The drawings govern the location and extent of demolition.
The narrative below is intended to supplement the drawings and establish the CM responsibilities and project assumptions for procurement and execution.
3. BASE DEMOLITION SCOPE
Perform selective interior demolition in Buildings A and B as indicated on the demolition drawings, including removal of existing interior construction, finishes, fixtures and building systems designated for removal.
Remove demolished materials from the site and legally dispose of or recycle debris in accordance with applicable requirements and the Metro debris-management process.
Sawcut, cap, disconnect, safe-off and otherwise prepare existing services and systems where demolition interfaces with construction that will remain.
Protect all structure, roof assemblies, exterior envelope components, utilities, equipment, life-safety systems and other existing conditions designated to remain.
Maintain the buildings in a weather-tight and secure condition throughout demolition, including temporary closures or protection at openings created by the work.
Coordinate demolition limits with the anticipated subsequent renovation so that work does not create unnecessary replacement, patching or rework.
Provide temporary protections, dust/debris control, access control, housekeeping and safety measures appropriate to the work and any adjacent occupied or active areas.
4. BUILDING SYSTEMS, UTILITIES AND ITEMS TO REMAIN
Existing-condition information indicates that both buildings contain rooftop/split HVAC equipment, plumbing systems, electrical service and distribution, and life-safety systems;
Building B also contains an existing hydraulic elevator. The condition assessment is informational only and does not direct demolition. The demolition drawings and design-team direction shall establish what is removed, retained, protected or temporarily maintained.
5. HAZARDOUS MATERIALS / ASBESTOS
A pre-demolition asbestos survey is required before demolition may proceed. If the survey is not available at the time the CM RFP is issued, LEAD intends to provide it when available and/or by addendum. The CM shall coordinate the demolition bid package around the final survey results and shall identify any required abatement as a separate, clearly defined scope. No suspect material shall be disturbed contrary to the final hazardous-material requirements.
6. SITE ACCESS, OCCUPANCY AND LOGISTICS
LEAD is actively coordinating turnover and vacancy of the existing buildings. Building access and the ability to perform demolition may therefore be phased. The CM shall develop a demolition logistics and sequencing plan that accommodates the actual release of space by
LEAD and protects any remaining occupants, adjacent tenants, public access and property that is not part of the demolition scope.
No demolition shall begin in an occupied or unreleased area without written authorization from LEAD.
The CM shall coordinate temporary barriers, safe egress, utility continuity, deliveries, staging, dumpsters and debris removal around any remaining occupancy or adjacent operations.
The CM shall identify any site-access, staging, laydown, dumpster or working-hour constraints that could affect pricing or schedule during its preconstruction review and subcontractor procurement.
7. PERMITTING AND DEBRIS MANAGEMENT
Architectural demolition drawings for both buildings have been submitted to Metro for permit review. Current permit tracking numbers are T2026063342 for 446 Metroplex Drive and
T2026063343 for 1221 Antioch Pike. The selected CM shall coordinate with LEAD and the
Architect regarding permit comments and information required from the demolition contractor.
A Debris Management Review is required for each permit. The selected contractor shall complete and submit the required debris-management information/forms for each building and provide supporting documentation as required.
A Noise Mitigation Plan is required for each permit. The selected contractor shall complete and submit the required noise mitigation form for each building and provide supporting documentation as required.
The CM shall track permit comments affecting demolition and promptly coordinate responses with the Architect/design team and LEAD.
The CM shall not proceed with work requiring permit approval until the applicable authorization has been obtained.
8. CM PRECONSTRUCTION AND TRADE PROCUREMENT RESPONSIBILITIES
Immediately upon selection, the CM will be expected to move the demolition package quickly from permit drawings to executable trade contracts. At a minimum, the CM shall:
Conduct a field walk with LEAD and the design team and reconcile visible existing conditions with the demolition drawings.
Prepare a complete demolition subcontractor bid package incorporating the drawings, this narrative, asbestos information, utility/retention requirements, logistics requirements and schedule.
Competitively solicit qualified demolition subcontractors and obtain a sufficient bid pool to support a clear market comparison.
Prepare a bid tab/leveling analysis identifying scope gaps, exclusions, assumptions, alternates and schedule differences.
Provide LEAD with a written award recommendation before executing or authorizing the demolition subcontract.
Manage subcontractor mobilization, permitting coordination, demolition execution, inspections, debris management, noise mitigation, safety, schedule, cost control and closeout.
9. SCHEDULE OBJECTIVE
LEAD intends to advance demolition as early as practical in order to create additional schedule flexibility for the broader renovation. Proposers should identify the earliest feasible mobilization date and anticipated demolition duration for each building, together with any critical dependencies including permits, asbestos clearance, tenant turnover, utility shutdowns and design clarifications.
The selected CM will be expected to update and manage this schedule immediately after award.
10. DEMOLITION COMPLETION / TURNOVER
At completion of demolition, each released area shall be left broom-clean, safe, secure and ready for subsequent renovation work. Closeout shall include, as applicable, final debris-management documentation, required inspections/permit records, photographs of completed demolition, documentation of capped or retained utilities, subcontractor closeout, final invoices and lien waivers, and a turnover walk with LEAD and the design team.
11. SCOPE CLARIFICATION
The demolition drawings are the primary technical basis of scope. This narrative is intended to supplement those drawings and define the CM procurement and execution responsibilities. Where the drawings, existing conditions or this narrative are unclear or inconsistent, the CM shall identify the issue promptly and obtain written direction before including an assumption in a subcontract award or proceeding with demolition.
12. Site Logistics:
Detailed site access, staging, demolition sequencing, temporary protections, and contractor logistics will be developed collaboratively with LEAD and the design team following CM selection. Proposers should identify any material site-access assumptions that affect their proposed fee, staffing, or schedule.
EXISTING BUILDING LOCATION
VICINITY MAP
OWNER:
LEAD PUBLIC SCHOOLS
121 NEELY'S BEND ROAD
MADISON, TN 37115
615.236.6532
CONTACT:
DR. TONY MAJORS
TONY.MAJORS@LEADPUBLICSCHOOLS.ORG
ARCHITECT:
MZA ARCHITECTURE & INTERIORS
516 HAGAN STREET, SUITE 100
NASHVILLE, TN 37203
615.256.2880
CONTACT:
MARK BIXLER
MBIXLER@MZARCH.COM
CHRIS RILEY
CRILEY@MZARCH.COM
R E
V
IS
IO
N
LEAD BLDG A
446 METROPLEX DRIVE
DEMOLITION DRAWINGS08-03-26
26055
2026063342
ACTUAL FLOOR AREA: PER FLOOR 12,380SF
TOTAL ALLOWABLE AREA PER FLOOR 25,375SF
ALLOWABLE AREA INCREASE FOR FRONTAGE 0.75 IBC 506.3
ALLOWABLE AREA PER FLOOR 14,500SF IBC TABLE 506.2
ACTUAL HEIGHT 28'-0"
ALLOWABLE HEIGHT 75' IBC TABLES 504.3, 504.4
USE GROUP EDUCATION (E) IBC CHAPTER 3
CONSTRUCTION TYPE III-B IBC TABLE 601
DESCRIPTION REQUIREMENTS SECTION
GENERAL BUILDING HEIGHTS AND AREAS
615-236-6532
TONY.MAJORS@LEADPUBLICSCHOOLS.ORG
OWNER CONTACT DR. TONY MAJORS
OWNER ADDRESS 1251 NEELY'S BEND ROAD, MADISON, TN 37115
OWNER NAME LEAD PUBLIC SCHOOLS
BUILDING INFORMATION
ROOF CONSTRUCTION 0HR
FLOOR CONSTRUCTION 0HR
INTERIOR NON-BEARING WALLS 0HR
INTERIOR BEARING WALLS 0HR
OCCUPANCY GROUP: E 0HR
FIRE SEPARATION DISTANCE +30', TYP.
EXTERIOR NON-BEARING WALLS
EXTERIOR BEARING WALLS 2HR (N/A)
IBC TABLES
601, 602, UL
PRIMARY STRUCTURAL FRAME 0HR
CONSTRUCTION TYPE III-B RATING UL # SECTION
RATING REQUIREMENTS FOR BUILDING ELEMENTS
PROVIDED PARKING: TBD TOTAL TBD STANDARD/ TBD ACCESSIBLE
REQUIRED ACCESSIBLE PARKING TBD
PARKING REQUIRED: TBD
PARKING REQUIREMENTS
ACTUAL ISR EXISTING - NO CHANGE
MAX. ISR 0.90
ACTUAL FAR EXISTING - NO CHANGE
MAX. FAR 0.60
SITE AREA TBD AC. ( TBC SF )
HEIGHT CONTROL PLANE SLOPE = 1.5 TO 1
MAX. HEIGHT AT SETBACK LINE 30'
MIN. SIDE SETBACK N/A
MIN. REAR SETBACK 20'
USE: [FUTURE] EDUCATION PERMITTED
SITE ZONING CS
PARCEL ID 13400023500
ADDRESS 446 METROPLEX DRIVE, NASHVILLE, TN 37211
SITE INFORMATION
INTERIOR DEMOLITION OF AN EXISTING, TWO STORY BUILDING'S NON-STRUCTURAL COMPONENTS.
DEMO SCOPE INCLUDES INTERIOR WALLS, DOORS, WINDOWS, FINISHES, CEILINGS, SOFFITS,
LIGHTING AND PLUMBING FIXTURES, AND INTERIOR DUCTWORK.
DESCRIPTION
PLUS LOCAL AMENDMENTS BL2025-1004
INTERNATIONAL EXISTING BUILDING CODE 2024
INTERNATIONAL FIRE CODE 2024
NATIONAL ELECTRICAL CODE 2023
INTERNATIONAL FUEL GAS CODE 2024
INTERNATIONAL MECHANICAL CODE 2024
INTERNATIONAL PLUMBING CODE 2024
ICC/ANSI A-A117.1 ACCESSIBLE AND USABLE
BUILDINGS AND FACILITIES
INTERNATIONAL ENERGY CONSERVATION CODE 2024
INTERNATIONAL RESIDENTIAL CODE 2024
INTERNATIONAL BUILDING CODE 2024
GENERAL BUILDING CODES
8.12.26
446 METROPLEX DR. NASHVILLE, TN 37211
LEAD BLDG A - SELECTIVE DEMOLITION
UP
DN
DEMO CODED NOTE LEGEND
REMOVE EXISTING PLUMBING FIXTURES. DEMO VENTS FROM FIXTURES
TO BE REMOVED, DEMO SANITARY SEWER AT LEVEL 1 FIXTURE
LOCATIONS AND CAP AT FLOOR, AND CAP ALL DOMESTIC WATER
LINES AT SOURCE.
INTERIOR ROOF DRAINS MAY BE PRESENT BEHIND EXISTING
CONSTRUCTION, AND IF SO THESE DRAINS SHOULD REMAIN - ENSURE
CARE WHEN REMOVING MATERIAL AROUND COLUMNS AND OTHER
LOCATIONS LIKELY TO CONTAIN ROOF DRAINS. NOTIFY ARCHITECT IF
EXISTING, INTERIOR ROOF DRAINS ARE ENCOUNTERED DURING
DEMOLITION, AND NOTE THEIR LOCATION(S).
GENERAL DEMO SCOPE -
INTERIOR STRUCTURAL COMPONENTS, EXTERIOR WALLS AND ROOF, AND
OTHER ELEMENTS ON THE BUILDING'S EXTERIOR ARE TO REMAIN. SCOPE
INCLUDES FULL INTERIOR DEMOLITION OF NON-STRUCTURAL COMPONENTS.
DASHED LINES ON PLAN REPRESENT THOSE ITEMS TO BE DEMOLISHED. UNLESS
OTHERWISE NOTED BELOW OR ON DRAWINGS, DEMO INCLUDES INTERIOR
WALLS, DOORS, WINDOWS, FINISHES, CEILINGS, SOFFITS, LIGHTING AND
PLUMBING FIXTURES, AND INTERIOR DUCTWORK.
1. REMOVE EXISTING CONSTRUCTION AS NOTED. TYPICAL WALL REMOVAL
INCLUDES FINISHES, DOORS, DOOR FRAMES, WINDOWS AND WINDOW
FRAMES, CASEWORK AND FIXTURES AS
REQUIRED.
2. DURING DEMOLITION, CONTRACTOR SHALL BRACE AND SUPPORT ALL
EXISTING STRUCTURES TO MAINTAIN BUILDING'S STRUCTURAL INTEGRITY. JOB
SITE SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
3. DO NOT CUT STRUCTURAL WORK IN ANY MANNER WHICH RESULTS IN A
REDUCTION OF LOAD CARRYING CAPACITY. NOTIFY ARCHITECT OF ALL
STRUCTURAL CUTS PRIOR TO EXECUTION.
4. DEMOLISHED MATERIAL, NOT OTHERWISE DESIGNATED BY THE DRAWINGS
OR OWNER'S REPRESENTATIVE, SHALL BE CONSIDERED PROPERTY OF THE
CONTRACTOR AND SHALL BE COMPLETELY REMOVED FROM THE JOB SITE AND
DISPOSED OF IN A LAWFUL MANNER.
5. IN THE EVENT OF DEMOLITION OF ITEMS NOT SCHEDULED TO BE
DEMOLISHED, PROMPTLY REPLACE SUCH ITEMS AT NO ADDITIONAL COST TO
THE OWNER.
6. WHEN REMOVING EXISTING FLOOR MATERIALS, CLEAN EXPOSED SLABS OF
ADHESIVES, GROUT, ETC.
7. NOTIFY THE ARCHITECT OF EXISTING CONDITIONS AS THEY BECOME VISIBLE
DURING DEMOLITION: SEE DRAWING NOTES.
8. THESE DRAWINGS HAVE BEEN DEVELOPED FROM RECORD DRAWINGS AND
MAY NOT REFLECT EXISTING FIELD CONDITIONS. THE CONTRACTOR SHALL
VERIFY THESE DRAWINGS WITH FIELD CONDITIONS AND SHALL NOTIFY THE
ARCHITECT IN WRITING OF ANY INCONSISTENCIES BETWEEN THE DRAWINGS
AND ACTUAL CONDITIONS.
9. NOTIFY THE ARCHITECT IN WRITING OF ANY WORK DESCRIBED IN THE
CONTRACT DOCUMENTS WHICH CANNOT BE PERFORMED DUE TO EXISTING
FIELD CONDITIONS.
10. IF EXISTING FIREPROOFING OR FIRE ASSEMBLIES TO REMAIN ARE
DAMAGED DURING DEMOLITION, THEY SHALL BE REPAIRED TO MEET
ORIGINAL FIRE PROTECTION REQUIREMENTS.
11. DEMOLITION OF THE WORK SHALL BE EXECUTED IN CONFORMANCE WITH
APPLICABLE BUILDING CODES AND REGULATIONS.
12. MAKE PROVISIONS TO DISCOURAGE WATER BUILDUP AT EXPOSED SLABS
AND STRUCTURE TO REMAIN.
13. COORDINATE ANY NECESSARY DISRUPTION OF UTILITIES WITH THE OWNER'S
REPRESENTATIVE.
14. OBTAIN ALL PERMITS REQUIRED FOR EXECUTION OF THE WORK.
15. THESE DEMOLITION DOCUMENTS ANTICIPATE THAT NO ASBESTOS WILL BE
ENCOUNTERED. IN THE EVENT ASBESTOS IS ENCOUNTERED, NOTIFY THE
ARCHITECT IMMEDIATELY.
DEMO GENERAL NOTES
3 3
4 4
ALL COLUMNS TO
REMAIN, TYP.
ALL COLUMNS TO REMAIN, TYP.
3 3
4 4
ALL COLUMNS TO
REMAIN, TYP.
ALL COLUMNS TO REMAIN, TYP.
SHEET NO:
DATE:
DRAWN BY:
PROJECT NO:
REVISIONS:
PERMIT NO:N
O
T F
O R
C O
N S
T R
U C
TI
O
N
SHEET TITLE:
THIS DRAWING IS THE PROPERTY OF
MANUEL ZEITLIN ARCHITECTS (MZA).
ANY UNAUTHORIZED REPRODUCTION
OR USAGE WITHOUT THE PRIOR
EXPRESSED WRITTEN CONSENT OF
MZA IS PROHIBITED.
516 HAGAN STREET, SUITE 100
NASHVILLE, TN 37203
WWW.MZARCH.COM
615.256.2880
MZA
ARCHITECTURE
& INTERIORS
D101
DEMOLITION DRAWINGS
08-03-26
MZA
26055
L E
A D
B L
D G
A
2026063342
M
E T
R O
P
LE
X D
R
IV
E
DEMOLITION
PLANS
1/8" = 1'-0"
DEMO PLAN - LEVEL 1
1/8" = 1'-0"
DEMO PLAN - LEVEL 2
0 8' 20'
1/8" = 1'-0"
12'4'
8.12.26
N
AS
H
VI
LL
E, T N
S
EL
EC
TI
VE
D
EM
O
LI
TI
O
EXISTING BUILDING LOCATION
VICINITY MAP
OWNER:
LEAD PUBLIC SCHOOLS
121 NEELY'S BEND ROAD
MADISON, TN 37115
615.236.6532
CONTACT:
DR. TONY MAJORS
TONY.MAJORS@LEADPUBLICSCHOOLS.ORG
ARCHITECT:
MZA ARCHITECTURE & INTERIORS
516 HAGAN STREET, SUITE 100
NASHVILLE, TN 37203
615.256.2880
CONTACT:
MARK BIXLER
MBIXLER@MZARCH.COM
CHRIS RILEY
CRILEY@MZARCH.COM
R E
V
IS
IO
LEAD BLDG B
1221 ANTIOCH PIKE, NASHVILLE
DEMOLITION DRAWINGS08-03-26
26055
2026063343
DEMOLITION OF NON-STRUCTURAL COMPONENTS OF AN EXISTING, TWO STORY BUILDING.DEMO
INCLUDES ALL EXISTING WALLS, DOORS, WINDOWS, FINISHES, CEILINGS, SOFFITS, LIGHTING AND PLUMBING FIXTURES, AND INTERIOR DUCTWORK. STRUCTURAL COMPONENTS - COLUMNS, BEAMS, JOISTS, FLOORS, ROOF - ARE TO REMAIN.
DESCRIPTION
615-236-6532
TONY.MAJORS@LEADPUBLICSCHOOLS.ORG
OWNER CONTACT DR. TONY MAJORS
OWNER ADDRESS 1251 NEELY'S BEND ROAD, MADISON, TN 37115
OWNER NAME LEAD PUBLIC SCHOOLS
BUILDING INFORMATION
PROVIDED PARKING: TBD TOTAL TBD STANDARD/ TBD ACCESSIBLE
REQUIRED ACCESSIBLE PARKING TBD
PARKING REQUIRED: TBD
PARKING REQUIREMENTS
ACTUAL ISR EXISTING - NO CHANGE
MAX. ISR 0.90
ACTUAL FAR EXISTING - NO CHANGE
MAX. FAR 0.60
SITE AREA TBD AC. ( TBC SF )
HEIGHT CONTROL PLANE SLOPE = 1.5 TO 1
MAX. HEIGHT AT SETBACK LINE 30'
MIN. SIDE SETBACK N/A
MIN. REAR SETBACK 20'
USE: [FUTURE] EDUCATION PERMITTED
SITE ZONING CS
PARCEL ID 13400030700
ADDRESS 1221 ANTIOCH PIKE, NASHVILLE, TN 37211
SITE INFORMATION
PLUS LOCAL AMENDMENTS BL2025-1004
INTERNATIONAL EXISTING BUILDING CODE 2024
INTERNATIONAL FIRE CODE 2024
NATIONAL ELECTRICAL CODE 2023
INTERNATIONAL FUEL GAS CODE 2024
INTERNATIONAL MECHANICAL CODE 2024
INTERNATIONAL PLUMBING CODE 2024
ICC/ANSI A-A117.1 ACCESSIBLE AND USABLE
BUILDINGS AND FACILITIES
INTERNATIONAL ENERGY CONSERVATION CODE 2024
INTERNATIONAL RESIDENTIAL CODE 2024
INTERNATIONAL BUILDING CODE 2024
GENERAL BUILDING CODES
ACTUAL FLOOR AREA: PER FLOOR 17,800SF
TOTAL ALLOWABLE AREA PER FLOOR 25,375SF
ALLOWABLE AREA INCREASE FOR FRONTAGE 0.75 IBC 506.3
ALLOWABLE AREA PER FLOOR 14,500SF IBC TABLE 506.2
ACTUAL HEIGHT 28'-0"
ALLOWABLE HEIGHT 75' IBC TABLES 504.3, 504.4
USE GROUP EDUCATION (E) IBC CHAPTER 3
CONSTRUCTION TYPE III-B IBC TABLE 601
DESCRIPTION REQUIREMENTS SECTION
GENERAL BUILDING HEIGHTS AND AREAS
ROOF CONSTRUCTION 0HR
FLOOR CONSTRUCTION 0HR
INTERIOR NON-BEARING WALLS 0HR
INTERIOR BEARING WALLS 0HR
OCCUPANCY GROUP: E 0HR
FIRE SEPARATION DISTANCE +30', TYP.
EXTERIOR NON-BEARING WALLS
EXTERIOR BEARING WALLS 2HR (N/A)
IBC TABLES
601, 602, UL
PRIMARY STRUCTURAL FRAME 0HR
CONSTRUCTION TYPE III-B RATING UL # SECTION
RATING REQUIREMENTS FOR BUILDING ELEMENTS
8.12.26
LEAD BLDG B - SELECTIVE DEMOLITION
1221 ANTIOCH PIKE NASHVILLE, TN 37211
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
3 3
4 4 4
D102
D102
D102
D102
ALL COLUMNS TO REMAIN, TYP.
ALL COLUMNS TO REMAIN, TYP.
DEMO CODED NOTE LEGEND
1 ANALYZE EXISTING ELEVATOR, SHAFT, AND MACHINE ROOM AND
VERIFY WHETHER THESE ITEMS MAY BE SALVAGED AND REUSED. NOTIFY
ARCHITECT AND OWNER'S REPRESENTATIVE OF FINDINGS BEFORE
REMOVING ELEVATOR, MACHINE ROOM, SHAFT, OR RELATED
COMPONENTS.
REMOVE EXISTING CMU AND CONCRETE WRAP TO EXPOSE EXISTING
STEEL COLUMNS, TYP. DISCONTINUE COLUMN DEMO AND NOTIFY
ARCHITECT AND OWNER'S REP IMMEDIATELY IF 1) STEEL COLUMNS ARE
NOT PRESENT BELOW WRAP 2) IF THERE ARE STRUCTURAL CONCERNS
WITH THE EXPOSED COLUMN.
REMOVE EXISTING PLUMBING FIXTURES. DEMO VENTS FROM FIXTURES
TO BE REMOVED, DEMO SANITARY SEWER AT LEVEL 1 FIXTURE
LOCATIONS AND CAP AT FLOOR, AND CAP ALL DOMESTIC WATER
LINES AT SOURCE.
INTERIOR ROOF DRAINS MAY BE PRESENT BEHIND EXISTING
CONSTRUCTION, AND IF SO THESE DRAINS SHOULD REMAIN - ENSURE
CARE WHEN REMOVING MATERIAL AROUND COLUMNS AND OTHER
LOCATIONS LIKELY TO CONTAIN ROOF DRAINS. NOTIFY ARCHITECT IF
EXISTING, INTERIOR ROOF DRAINS ARE ENCOUNTERED DURING
DEMOLITION, AND NOTE THEIR LOCATION(S).
REMOVE EXISTING RAILING.
REMOVE EXISTING RAMP AND ASSOCIATED STRUCTURE AND RAILINGS.
REMOVE EXISTING STAIRS, RAILINGS, WALLS, AND FOOTINGS. REMOVE
ROOFING OVER STAIR TO MATCH PRIMARY ROOF EAVES.
REMOVE EXISTING SOFFITS, WALLS, AND NON-STRUCTURAL FRAMING.
REMOVE EXISTING, NON-STRUCTURAL WALLS, DOORS, AND GLAZING.
GENERAL DEMO SCOPE -
STRUCTURAL COMPONENTS - COLUMNS, BEAMS, JOISTS, FLOORS, ROOF - ARE
TO REMAIN. ALL ITEMS ABOVE ROOF AND INCLUDING EXISTING ROOF
INSULATION AND FINISHES ARE TO REMAIN UNLESS NOTED OTHERWISE.
DASHED LINES ON PLAN REPRESENT THOSE ITEMS TO BE DEMOLISHED. UNLESS
OTHERWISE NOTED BELOW OR ON DRAWINGS, DEMO INCLUDES ALL EXISTING
WALLS, DOORS, WINDOWS, FINISHES, CEILINGS, SOFFITS, LIGHTING AND
PLUMBING FIXTURES, AND INTERIOR DUCTWORK.
1. REMOVE EXISTING CONSTRUCTION AS NOTED. TYPICAL WALL REMOVAL
INCLUDES FINISHES, DOORS, DOOR FRAMES, WINDOWS AND WINDOW
FRAMES, CASEWORK AND FIXTURES AS
REQUIRED.
2. DURING DEMOLITION, CONTRACTOR SHALL BRACE AND SUPPORT ALL
EXISTING STRUCTURES TO MAINTAIN BUILDING'S STRUCTURAL INTEGRITY. JOB
SITE SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
3. DO NOT CUT STRUCTURAL WORK IN ANY MANNER WHICH RESULTS IN A
REDUCTION OF LOAD CARRYING CAPACITY. NOTIFY ARCHITECT OF ALL
STRUCTURAL CUTS PRIOR TO EXECUTION.
4. DEMOLISHED MATERIAL, NOT OTHERWISE DESIGNATED BY THE DRAWINGS
OR OWNER'S REPRESENTATIVE, SHALL BE CONSIDERED PROPERTY OF THE
CONTRACTOR AND SHALL BE COMPLETELY REMOVED FROM THE JOB SITE AND
DISPOSED OF IN A LAWFUL MANNER.
5. IN THE EVENT OF DEMOLITION OF ITEMS NOT SCHEDULED TO BE
DEMOLISHED, PROMPTLY REPLACE SUCH ITEMS AT NO ADDITIONAL COST TO
THE OWNER.
6. WHEN REMOVING EXISTING FLOOR MATERIALS, CLEAN EXPOSED SLABS OF
ADHESIVES, GROUT, ETC.
7. NOTIFY THE ARCHITECT OF EXISTING CONDITIONS AS THEY BECOME VISIBLE
DURING DEMOLITION: SEE DRAWING NOTES.
8. THESE DRAWINGS HAVE BEEN DEVELOPED FROM RECORD DRAWINGS AND
MAY NOT REFLECT EXISTING FIELD CONDITIONS. THE CONTRACTOR SHALL
VERIFY THESE DRAWINGS WITH FIELD CONDITIONS AND SHALL NOTIFY THE
ARCHITECT IN WRITING OF ANY INCONSISTENCIES BETWEEN THE DRAWINGS
AND ACTUAL CONDITIONS.
9. NOTIFY THE ARCHITECT IN WRITING OF ANY WORK DESCRIBED IN THE
CONTRACT DOCUMENTS WHICH CANNOT BE PERFORMED DUE TO EXISTING
FIELD CONDITIONS.
10. IF EXISTING FIREPROOFING OR FIRE ASSEMBLIES TO REMAIN ARE
DAMAGED DURING DEMOLITION, THEY SHALL BE REPAIRED TO MEET
ORIGINAL FIRE PROTECTION REQUIREMENTS.
11. DEMOLITION OF THE WORK SHALL BE EXECUTED IN CONFORMANCE WITH
APPLICABLE BUILDING CODES AND REGULATIONS.
12. MAKE PROVISIONS TO DISCOURAGE WATER BUILDUP AT EXPOSED SLABS
AND STRUCTURE TO REMAIN.
13. COORDINATE ANY NECESSARY DISRUPTION OF UTILITIES WITH THE OWNER'S
REPRESENTATIVE.
14. OBTAIN ALL PERMITS REQUIRED FOR EXECUTION OF THE WORK.
15. THESE DEMOLITION DOCUMENTS ANTICIPATE THAT NO ASBESTOS WILL BE
ENCOUNTERED. IN THE EVENT ASBESTOS IS ENCOUNTERED, NOTIFY THE
ARCHITECT IMMEDIATELY.
DEMO GENERAL NOTES
D102
D102
D102
D102
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
3 3
4 4 4
5ALL COLUMNS TO REMAIN, TYP.
EXISTING BREEZEWAY
CONCRETE, DECK,
AND STRUCTURE TO
REMAIN
EXISTING BREEZEWAY
CONCRETE, DECK,
AND STRUCTURE TO
REMAIN
EXISTING BREEZEWAY
CONCRETE, DECK,
AND STRUCTURE TO
REMAIN
EXISTING BREEZEWAY
CONCRETE, DECK,
AND STRUCTURE TO
REMAIN
ALL COLUMNS TO REMAIN, TYP.
SHEET NO:
DATE:
DRAWN BY:
PROJECT NO:
REVISIONS:
PERMIT NO:N
O
T F
O R
C O
N S
T R
U C
TI
O
N
SHEET TITLE:
THIS DRAWING IS THE PROPERTY OF
MANUEL ZEITLIN ARCHITECTS (MZA).
ANY UNAUTHORIZED REPRODUCTION
OR USAGE WITHOUT THE PRIOR
EXPRESSED WRITTEN CONSENT OF
MZA IS PROHIBITED.
516 HAGAN STREET, SUITE 100
NASHVILLE, TN 37203
WWW.MZARCH.COM
615.256.2880
MZA
ARCHITECTURE
& INTERIORS
D101
DEMOLITION DRAWINGS
08-03-26
MZA
26055
L E
A D
B L
D G
B
2026063343
A
N T
IO
C
H P
IK
E
, N A
S H
V
IL
LE
DEMOLITION
PLANS
1/8" = 1'-0"
DEMO PLAN - LEVEL 1
1/8" = 1'-0"
DEMO PLAN - LEVEL 2
0 8' 20'
1/8" = 1'-0"
12'4'
8.12.26
S
EL
EC
TI
VE
D
EM
O
LI
TI
O N
TN
DEMO CODED NOTE LEGEND
1 ANALYZE EXISTING ELEVATOR, SHAFT, AND MACHINE ROOM AND
VERIFY WHETHER THESE ITEMS MAY BE SALVAGED AND REUSED. NOTIFY
ARCHITECT AND OWNER'S REPRESENTATIVE OF FINDINGS BEFORE
REMOVING ELEVATOR, MACHINE ROOM, SHAFT, OR RELATED
COMPONENTS.
REMOVE EXISTING CMU AND CONCRETE WRAP TO EXPOSE EXISTING
STEEL COLUMNS, TYP. DISCONTINUE COLUMN DEMO AND NOTIFY
ARCHITECT AND OWNER'S REP IMMEDIATELY IF 1) STEEL COLUMNS ARE
NOT PRESENT BELOW WRAP 2) IF THERE ARE STRUCTURAL CONCERNS
WITH THE EXPOSED COLUMN.
REMOVE EXISTING PLUMBING FIXTURES. DEMO VENTS FROM FIXTURES
TO BE REMOVED, DEMO SANITARY SEWER AT LEVEL 1 FIXTURE
LOCATIONS AND CAP AT FLOOR, AND CAP ALL DOMESTIC WATER
LINES AT SOURCE.
INTERIOR ROOF DRAINS MAY BE PRESENT BEHIND EXISTING
CONSTRUCTION, AND IF SO THESE DRAINS SHOULD REMAIN - ENSURE
CARE WHEN REMOVING MATERIAL AROUND COLUMNS AND OTHER
LOCATIONS LIKELY TO CONTAIN ROOF DRAINS. NOTIFY ARCHITECT IF
EXISTING, INTERIOR ROOF DRAINS ARE ENCOUNTERED DURING
DEMOLITION, AND NOTE THEIR LOCATION(S).
REMOVE EXISTING RAILING.
REMOVE EXISTING RAMP AND ASSOCIATED STRUCTURE AND RAILINGS.
REMOVE EXISTING STAIRS, RAILINGS, WALLS, AND FOOTINGS. REMOVE
ROOFING OVER STAIR TO MATCH PRIMARY ROOF EAVES.
REMOVE EXISTING SOFFITS, WALLS, AND NON-STRUCTURAL FRAMING.
REMOVE EXISTING, NON-STRUCTURAL WALLS, DOORS, AND GLAZING.
GENERAL DEMO SCOPE -
STRUCTURAL COMPONENTS - COLUMNS, BEAMS, JOISTS, FLOORS, ROOF - ARE
TO REMAIN. ALL ITEMS ABOVE ROOF AND INCLUDING EXISTING ROOF
INSULATION AND FINISHES ARE TO REMAIN UNLESS NOTED OTHERWISE.
DASHED LINES ON PLAN REPRESENT THOSE ITEMS TO BE DEMOLISHED. UNLESS
OTHERWISE NOTED BELOW OR ON DRAWINGS, DEMO INCLUDES ALL EXISTING
WALLS, DOORS, WINDOWS, FINISHES, CEILINGS, SOFFITS, LIGHTING AND
PLUMBING FIXTURES, AND INTERIOR DUCTWORK.
1. REMOVE EXISTING CONSTRUCTION AS NOTED. TYPICAL WALL REMOVAL
INCLUDES FINISHES, DOORS, DOOR FRAMES, WINDOWS AND WINDOW
FRAMES, CASEWORK AND FIXTURES AS
REQUIRED.
2. DURING DEMOLITION, CONTRACTOR SHALL BRACE AND SUPPORT ALL
EXISTING STRUCTURES TO MAINTAIN BUILDING'S STRUCTURAL INTEGRITY. JOB
SITE SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
3. DO NOT CUT STRUCTURAL WORK IN ANY MANNER WHICH RESULTS IN A
REDUCTION OF LOAD CARRYING CAPACITY. NOTIFY ARCHITECT OF ALL
STRUCTURAL CUTS PRIOR TO EXECUTION.
4. DEMOLISHED MATERIAL, NOT OTHERWISE DESIGNATED BY THE DRAWINGS
OR OWNER'S REPRESENTATIVE, SHALL BE CONSIDERED PROPERTY OF THE
CONTRACTOR AND SHALL BE COMPLETELY REMOVED FROM THE JOB SITE AND
DISPOSED OF IN A LAWFUL MANNER.
5. IN THE EVENT OF DEMOLITION OF ITEMS NOT SCHEDULED TO BE
DEMOLISHED, PROMPTLY REPLACE SUCH ITEMS AT NO ADDITIONAL COST TO
THE OWNER.
6. WHEN REMOVING EXISTING FLOOR MATERIALS, CLEAN EXPOSED SLABS OF
ADHESIVES, GROUT, ETC.
7. NOTIFY THE ARCHITECT OF EXISTING CONDITIONS AS THEY BECOME VISIBLE
DURING DEMOLITION: SEE DRAWING NOTES.
8. THESE DRAWINGS HAVE BEEN DEVELOPED FROM RECORD DRAWINGS AND
MAY NOT REFLECT EXISTING FIELD CONDITIONS. THE CONTRACTOR SHALL
VERIFY THESE DRAWINGS WITH FIELD CONDITIONS AND SHALL NOTIFY THE
ARCHITECT IN WRITING OF ANY INCONSISTENCIES BETWEEN THE DRAWINGS
AND ACTUAL CONDITIONS.
9. NOTIFY THE ARCHITECT IN WRITING OF ANY WORK DESCRIBED IN THE
CONTRACT DOCUMENTS WHICH CANNOT BE PERFORMED DUE TO EXISTING
FIELD CONDITIONS.
10. IF EXISTING FIREPROOFING OR FIRE ASSEMBLIES TO REMAIN ARE
DAMAGED DURING DEMOLITION, THEY SHALL BE REPAIRED TO MEET
ORIGINAL FIRE PROTECTION REQUIREMENTS.
11. DEMOLITION OF THE WORK SHALL BE EXECUTED IN CONFORMANCE WITH
APPLICABLE BUILDING CODES AND REGULATIONS.
12. MAKE PROVISIONS TO DISCOURAGE WATER BUILDUP AT EXPOSED SLABS
AND STRUCTURE TO REMAIN.
13. COORDINATE ANY NECESSARY DISRUPTION OF UTILITIES WITH THE OWNER'S
REPRESENTATIVE.
14. OBTAIN ALL PERMITS REQUIRED FOR EXECUTION OF THE WORK.
15. THESE DEMOLITION DOCUMENTS ANTICIPATE THAT NO ASBESTOS WILL BE
ENCOUNTERED. IN THE EVENT ASBESTOS IS ENCOUNTERED, NOTIFY THE
ARCHITECT IMMEDIATELY.
DEMO GENERAL NOTES
LEVEL 1
515'-9 1/2"
LEVEL 2
527'-9 1/2"
BABBBCBDBE BB.1BC.1
EXISTING ROOF AND
FASCIA TO REMAIN.
EXISTING ROOF AND
FASCIA TO REMAIN.
LEVEL 1
515'-9 1/2"
LEVEL 2
527'-9 1/2"
B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11
7 EXISTING ROOF
AND FASCIA TO
REMAIN.
LEVEL 1
515'-9 1/2"
LEVEL 2
527'-9 1/2"
BA BB BC BD BEBB.1 BC.1
EXISTING ROOF AND
FASCIA TO REMAIN.
EXISTING ROOF AND
FASCIA TO REMAIN.
LEVEL 1
515'-9 1/2"
LEVEL 2
527'-9 1/2"
B1B2B3B4B5B6B7B8B9B10B11
7 EXISTING ROOF
AND FASCIA TO
REMAIN.
SHEET NO:
DATE:
DRAWN BY:
PROJECT NO:
REVISIONS:
PERMIT NO:N
O
T F
O R
C O
N S
T R
U C
TI
O
N
SHEET TITLE:
THIS DRAWING IS THE PROPERTY OF
MANUEL ZEITLIN ARCHITECTS (MZA).
ANY UNAUTHORIZED REPRODUCTION
OR USAGE WITHOUT THE PRIOR
EXPRESSED WRITTEN CONSENT OF
MZA IS PROHIBITED.
516 HAGAN STREET, SUITE 100
NASHVILLE, TN 37203
WWW.MZARCH.COM
615.256.2880
MZA
ARCHITECTURE
& INTERIORS
D102
DEMOLITION DRAWINGS
08-03-26
MZA
26055
L E
A D
B L
D G
B
2026063343
A
N T
IO
C
H P
IK
E
, N A
S H
V
IL
LE
DEMOLITION
ELEVATIONS
1/8" = 1'-0"
DEMO ELEVATION - NORTH
0 8' 20'
1/8" = 1'-0"
12'4'
1/8" = 1'-0"
DEMO ELEVATION - EAST
1/8" = 1'-0"
DEMO ELEVATION - SOUTH
1/8" = 1'-0"
DEMO ELEVATION - WEST
8.12.26
S
EL
EC
TI
VE
D
EM
O
LI
TI
O N
TN
SLAB
OWNER
WILL BE
OWNER &
| Sheets |
| D100 - DEMO COVER SHEET |
| D101 - DEMOLITION PLANS |
| Sheets |
| D100 - DEMO COVER SHEET |
| D101 - DEMOLITION PLANS |
| D102 - DEMOLITION ELEVATIONS |
File details come from the government source that posted it. Updated .