5-Exhibit C Specifications Plans.pdf
PDF 5 MB Posted
- Attached to
- 9 Park Lane Demolition
- Solicitation number
- 2026-15
- Issued by
- Barnwell County, South Carolina
About this file
This document is a specification and planning exhibit for a demolition project prepared by Hord Coplan Macht, an architecture firm, on behalf of the Town of Hilton Head Island for the complete demolition and removal of the former Nick's Steak and Seafood restaurant building located at 9 Park Lane, Hilton Head Island, South Carolina 29928. The scope of work requires contractors to remove all above-grade building components, foundations, structures, the exterior service yard with below-grade structures, below-grade grease trap and associated piping, on-surface concrete sidewalks, below-grade plumbing and electrical services, a metal shed, on-site monument signs and lighting, tree-mounted light fixtures and power connections, and all dead trees on the site. The contractor must coordinate with the Town of Hilton Head Island, Palmetto Electric Cooperative, Inc., and South Island Public Service District regarding utility disconnection and capping. The specifications include detailed requirements for sediment barriers, tree protection fencing, site grading, fill materials, topsoil application, and hydroseeding of disturbed areas. The contractor is responsible for all means and methods related to demolition sequencing, safety procedures, proper disposal and recycling of materials, hazardous materials coordination, and final site restoration to a clean, grassed condition with proper drainage.
The contractor must comply with all applicable OSHA, South Carolina Department of Environmental Services, Town of Hilton Head Island, and other regulatory agency requirements. The Town will provide a hazardous materials report, with any discovered hazardous materials to be removed under separate contract. All salvageable systems or components become contractor property and must be disposed of through legal means. A statement of refrigerant recovery signed by the responsible technician must be provided, confirming EPA-compliant recovery procedures. The contractor must provide a new as-built survey identifying capped utility locations and other important site features upon project completion and must include costs for temporary construction fencing for the duration of work. Existing asphalt paved areas, pole-mounted lights, concrete edging, vehicle wheel stops, and curbs must remain and be protected from damage, while only trees identified for removal on the demolition drawings are to be removed with all others protected from damage.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. DO NOT SCALE DRAWINGS. USE DIMENSIONS INDICATED ON DRAWINGS FOR LAYOUT OF WORK.
2. CONTRACTOR SHALL COORDINATE AND VERIFY ALL DIMENSIONS AND ELEVATIONS SHOWN
HEREIN WITH PLANS, SECTIONS, AND DETAILS PRIOR TO CONSTRUCTION OR MATERIAL
PURCHASE AND SHALLL NOTIFY ARCHITECT IN WRITING OF DISCREPANCIES.
3. ALL WORK SHALL BE DONE IN ACCORDANCE WITH LISTED BUILDING CODES AND WITH THE MOST
STRINGENT BEING ENFORCED WHERE A CONFLICT ARISES.
4. THE HOURS AND DAYS OF OPERATION SHALL CONFORM TO TOWN'S REQUIREMENTS.
5. DEMOLITION CONTRACTOR TO PROVIDE NEW SITE AS-BUILT SURVEY IDENTIFYING LOCATIONS OF
CAPPED UTILITIES AND OTHER IMPORTANT SITE FEATURES AT THE COMPLETION OF THE WORK.
6. DEMOLITION CONTRACTOR TO INCLUDE COST FOR TEMPORARY CONSTRUCTION FENCING FOR
DURATION OF THE WORK.
GENERAL NOTES
NAME OF PROJECT:
ADDRESS:
OWNER:
PROJECT TEAM
9 Park Lane Building Demolition
9 Park Lane; Hilton Head Island, South Carolina 29928
Town of Hilton Head Island
DISCIPLINE
ARCHITECT:
DESIGNER
Hord Coplan Macht
CONTACT
Barry H. Taylor, AIA, LEED AP
PHONE NUMBER
843-785-2199
Neal Eike, Senior Project Manager 843-715-8243
SHEET
NUMBER
TITLE
G.001 COVER SHEET
AS-101 OVERALL SITE PLAN, NOTES AND DETAILS
AD-101 SITE DEMOLITION PLAN
A-101 EXISTING BUILDING FLOOR PLAN & EXTERIOR PHOTOS
DRAWING SHEET INDEX
AS-102 SITE STORM DRAINAGE PROTECTION PLAN
T H
E L
IN
E
S H
O W
N A
B O
V E
IS
X
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T H
S
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
A
B
C
D
1 2 3 4 5
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
C
K
A N
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Drawing
ARCHITECT
THESE RECORD DRAWINGS HAVE BEEN PREPARED, IN
PART, ON THE BASIS OF INFORMATION COMPILED AND
FURNISHED BY OTHERS. THE ARCHITECT WILL NOT BE
RESPONSIBLE FOR ANY ERRORS OR OMMISIONS WHICH
HAVE BEEN INCORPORATED INTO THIS DOCUMENT AS A
RESULT
Project Number:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
DATE DESCRIPTION∆
5/
/2
4:
:2
P
M
9 PARK LANE DEMOLITION
TOWN OF HILTON HEAD ISLAND
9 PARK LANE
HILTON HEAD ISLAND, SC 29928
PROJ: 226117
Barry H. Taylor
G.001
COVER SHEET
P
A R
K L
A N
E
H
IL
T O
N H
E A
D
IS
LA
N
D , S
C
P
A R
K L
A N
E D
E M
O L
IT
IO
N
ARCH: 03735
T O
W N
O F
H
IL
T O
N H
E A
D
IS
LA
N
D
226117
2026-05-20
KEN
DS
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
10 PALMETTO BUSINESS PARK
HILTON HEAD ISLAND, SC 29928
843.785.2199
HORD COPLAN MACHT
2026-05-20 ISSUED FOR PERMITTING
Exhibit C
IFB 2026-15
1. REGULATORY REQUIREMENTS: COORDINATE WITH THE TOWN OF HILTON HEAD ISLAND (TOWN)
AND COMPLY WITH GOVERNING NOTIFICATION REGULATIONS BEFORE BEGINNING ANY
DEMOLITION. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING
JURISDICTION.
2. THE TOWN ASSUMES NO RESPONSIBILITY FOR BUILDINGS AND STRUCTURES TO BE
DEMOLISHED.
a. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSE WILL BE
MAINTAINED BY THE TOWN AS FAR AS PRACTICAL.
3. REFER TO THE “DEMOLITION NOTES” ON THE DRAWINGS. CONTRACTOR IS TO COORDINATE ALL
DEMOLITION WORK CALLED FOR ON THE DRAWINGS.
4. CONTRACTOR TO INSTALL “SEDIMENT BARRIERS” AND “TREE PROTECTION FENCE” IN
APPROXIMATE LOCATIONS AS SHOWN ON THESE DRAWINGS AND COORDINATE EXACT
LOCATION AND REVIEW WITH TOWN STAFF PRIOR TO BEGINNING ANY DEMOLITION WORK.
5. ONLY TREES IDENTIFIED TO BE REMOVED ON THE DEMOLITION DRAWINGS ARE TO BE
REMOVED. ALL OTHER TREES ARE TO REMAIN AND BE PROTECTED FROM DAMAGE.
6. ALL LANDSCAPE MATERIAL AND SHRUBS THAT ARE WITHIN 10’-0” OF THE BUILDING EDGE ARE
TO BE REMOVED EXCEPT AS OTHERWISE NOTED.
7. THE EXISTING ASPHALT PAVED AREAS ARE TO REMAIN. CONTRACTOR IS TO PROTECT THE
PAVING FROM DAMAGE DURING ALL DEMOLITION WORK.
8. THE EXISTING POLE MOUNTED LIGHTS IN THE ASPHALT PAVED AREAS ARE TO REMAIN. POWER
IS TO BE REMOVED FROM BASE OF POLE TO POWER SOURCE.
9. THE TOWN WILL PROVIDE A COPY OF THE HAZARDOUS MATERIALS REPORT FOR THE EXISTING
BUILDING TO THE CONTRACTOR. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS
MATERIALS ARE ENCOUNTERED, DO NOT DISTURB AND IMMEDIATELY NOTIFY THE TOWN. ANY
HAZARDOUS MATERIALS WILL BE REMOVED BY THE TOWN UNDER A SEPARATE CONTRACT.
10. THE CONTRACTOR IS TO COORDINATE THE DISCONNECTION OF ELECTRICAL SERVICES TO THE
BUILDING WITH THE TOWN AND PALMETTO ELECTRIC COOPERATIVE, INC. (PECI) PRIOR TO
BEGINNING ANY SITE DEMOLITION WORK. ALL EXISTING EXTERIOR TRANSFORMERS, METERS,
AND RELATED EQUIPMENT BELONGING TO PECI ARE TO BE REMOVED BY PECI, IF REQUIRED,
AND REVIEWED BY THE TOWN.
11. THE CONTRACTOR IS TO COORDINATE THE DISCONNECTION OF WATER AND SEWER SERVICES
TO THE BUILDING WITH THE TOWN AND SOUTH ISLAND PUBLIC SERVICE DISTRICT (SIPSD)
PRIOR TO BEGINNING ANY SITE DEMOLITION WORK. ALL WATER AND SEWER LINES ARE TO BE
CAPPED AND MARKED AS DIRECTED BY SIPSD.
12. THE CONTRATOR IS TO REMOVE THE EXISTING GREASE TRAP, FILL THE HOLE CREATED BY
REMOVAL OF THE GREASE TRAP, AND COMPACT FILL TO LEVEL GRADE OF ADJACENT AREA.
TOP 12" OF FILL SHALL BE TOPSOIL.
13. DISPOSAL OF DEMOLISHED MATERIALS:
a. REMOVE DEMOLITION WASTE MATERIALS FROM PROJECT SITE AND LEGALLY DISPOSE OF
THEM IN AN EPA-APPROVED LANDFILL ACCEPTABLE TO AUTHORITIES HAVING
JURISDICTION.
b. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE OR BE BURIED ON SITE.
c. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ONTO
ADJACENT SURFACES AND AREAS.
d. DO NOT BURN DEMOLISHED MATERIALS.
e. RETURN ADJACENT AREAS TO CONDITION EXISTING BEFORE BUILDING DEMOLITION
OPERATIONS BEGAN.
f. CLEAN ROADWAYS OF DEBRIS CAUSED BY DEBRIS TRANSPORT.
14. UNLESS OTHERWISE INDICATED, ANY SALVAGEABLE SYSTEMS OR COMPONENTS WITHIN THE
BUILDING WHEN REMOVED WILL BE THE PROPERTY OF THE CONTRACTOR AND SHALL BE
REMOVED AND DISPOSED OF BY LEGAL MEANS BY THE CONTRACTOR.
15. PROVIDE STATEMENT OF REFRIGERANT RECOVERY. STATEMENT SHALL BE SIGNED BY
REFRIGERANT RECOVERY TECHNICIAN RESPONSIBLE FOR RECOVERING REFRIGERANT,
STATING THAT ALL REFRIGERANT THAT WAS PRESENT WAS RECOVERED AND THAT RECOVERY
WAS PERFORMED ACCORDING TO EPA REGULATIONS. INCLUDE NAME AND ADDRESS OF
TECHNICIAN AND DATE REFRIGERANT WAS RECOVERED.
16. REMOVE ALL CONCRETE SIDEWALKS, DRIVES, AND PADS EXCEPT AS OTHERWISE NOTED.
SIDEWALKS ARE TO BE REMOVED SO AS NOT TO IMPACT EXISTING ASPHALT PAVING. ALL
ASPHALT PAVING IS TO REMAIN UNLESS NOTED OTHERWISE.
17. ALL EXISTING FLUSH TO GRADE CONCRETE DIVIDER STRIPS AT PERVIOUS PARKING AREAS ARE
TO REMAIN EXCEPT AS OTHERWISE NOTED.
18. ALL EXISTING CONCRETE VEHICLE WHEEL STOPS AND/OR CURBS ARE TO REMAIN UNLESS
OTHERWISE NOTED.
19. REMOVE ALL SERVICE AREA SCREEN WALLS, GATES, STRUCTURAL MEMBERS, AND ALL
ASSOCIATED FOOTINGS AND FOUNDATIONS. FILL AREA CREATED BY REMOVAL OF SUCH
ELEMENTS AND COMPACT FILL TO LEVEL GRADE OF ADJACENT AREA. TOP 12" OF FILL SHALL
BE TOPSOIL.
20. REMOVE EXTERIOR GROUND, POST, AND TREE MOUNTED ELECTRICAL RECEPTICLES. REMOVE
ELECTRICAL WIRE BACK TO PANELS.
21. REMOVE IRRIGATION SPRINKLER HEADS AND PIPING TO MINIMUM 12" BELOW GRADE.
22. FINAL SITE GRADING:
a. AFTER BUILDING SITE AND SIDEWALK DEMOLITION WORK IS COMPLETE THE SITE IS TO BE
GRADED AND CROWNED FROM THE FORMER BUILDING CENTER AND GRADUALLY SLOPED
DOWN TO MATCH THE EXISTING, ADJACENT GRADE ELEVATIONS. GRADE SITE SURFACE
TO PREVENT FREESTANDING SURFACE WATER.
1. BELOW GRADE AREAS: COMPLETELY FILL BELOW GRADE AREAS AND VOIDS
RESULTING FROM BUILDING DEMOLITION OPERATIONS WITH SATISFACTORY SOIL
MATERIALS.
b. SUBSOIL MATERIALS:
1. FILL MATERIAL: BORROW ONSITE AND IMPORTED.
1. CONSIST OF CLEAN, FREE DRAINING GRANULAR SOILS.
2. FREE OF LUMPS LARGER THAN 3 INCHES, ROCKS LAGER THAN 2 INCHES,
ORGANICS, AND OTHER DEBRIS.
3. READILY SHAPED AND COMPACTED TO 95% DENSITY.
4. PLASTICITY INDEX OF LESS THAN 10.
5. LIQUID LIMIT OF LESS THAN 30.
6. SOILS CLASSIFIED AS SW, SP, SM, SC, OR SM-SP WITH A MAXIMUM 15% PASSING #
200 SIEVE IS ACCEPTABLE.
c. TOPSOIL MATERIALS:
1. TOPSOIL: ON-SITE AND IMPORTED.
1. EXCAVATED, REUSED MATERIAL, AND FRIABLE LOAM.
2. GRADED.
3. REASONABLY FREE OF ROOTS, ROCKS LARGER THAN 1/2 INCH, SUBSOIL, DEBRIS,
LARGE WEEDS AND FOREIGN MATTER.
4. ACIDITY RANGE (PH) OF 5.5 TO 7.5.
5. CONTAINING MINIMUM OF 4 PERCENT AND MAXIMUM OF 25 PERCENT INORGANIC
MATTER.
6. CONFORMING TO ASTM D2487 GROUP SYMBOL OH OR PT.
d. ALL AREAS DISTURBED BY DEMOLITION WORK ARE TO BE HYDROSEEDED.
1. HYDROSEEDING: MIX CENTIPEDE SEED, SLOW-RELEASE FERTILIZER, AND FIBER
MULCH IN WATER, USING EQUIPMENT SPECIFICALLY DESIGNED FOR HYDROSEED
APPLICATION. CONTINUE MIXING UNTIL UNIFORMLY BLENDED INTO HOMOGENEOUS
SLURRY SUITABLE FOR HYDRAULIC APPLICATION.
1. MIX SLURRY WITH FIBER-MULCH MANUFACTURER'S RECOMMENDED TACKIFIER.
2. SPRAY-APPLY SLURRY UNIFORMLY TO ALL AREAS TO BE SEEDED IN A ONE STEP
PROCESS. APPLY SLURRY AT A RATE SO THAT MULCH COMPONENT IS
DEPOSITED AT NOT LESS THAN 1500-LB/ACRE WEIGHT, AND SEED COMPONENT IS
DEPOSITED AT NOT LESS THAN THE SPECIFIED SEED-SOWING RATE. (15.6-
KG/92.9 SQ. M)RETAIN THIS ARTICLE IF HYDROSEEDING IS PERMITTED.
21. CONTRACTOR IS TO LEAVE THE DEMOLITION AREA IN CLEAN, NEAT, AND GRASSED CONDITION.
GENERAL NOTES
TEMPORARY CONSTRUCTION FENCING &
SEDIMENT BARRIER - COORDINATE EXACT
LOCATION WITH THE TOWN
SEE DRAWING SHEET AD-101 FOR TREES TO BE PROTECTED
THIS PROJECT IS TO DEMOLISH AND REMOVE AN EXISTING FACILITY FORMERLY USED AS A
RESTAURANT. THE FACILITY IS NOW OWNED BY THE TOWN OF HILTON HEAD ISLAND.
THESE DOCUMENTS HAVE BEEN PREPARED TO ASSIST PROPSECTIVE BIDDERS BY PROVIDING
INFORMATION ON THE SIZE, ASSEMBLIES, CONSTRUCTION MATERIALS, AND SPECIAL
CIRCUMSTANCES THAT EXIST. THESE DOCUMENTS SHALL NOT BE INTERPRETED TO DIRECTLY OR INDIRECTLY PROVIDE GUIDANCE ON THE MEANS AND METHODS TO BE USED, AS THIS IS SOLELEY
THE RESPONSIBILITY OF THE SUCCESSFUL BIDDER.
CONTAINED HEREIN ARE KEY NOTES TO ASSIST IN THE DETERMINATION OF EXISTING SCOPE AND
CONDITIONS TO PROVIDE A COMPETITIVE BID.
THE SUCCESSFUL BIDDER IS TO COMPLETELY REMOVE THE EXISTING FACILITY. THIS EFFORT IS TO
INCLUDE:
- ALL ABOVE GRADE BUILDING COMPONENTS
- ALL BUILDING FOUNDATIONS AND STRUCTURE
- EXTERIOR SERVICE YARD IN ITS ENTIRETY, INCLUDING BELOW GRADE STRUCTURES
- BELOW GRADE GREASE TRAP AND ALL CONNECTIONS AND PIPING TO AND FROM
- ALL ON SURFACE CONCRETE SIDEWALKS
- ALL BELOW GRADE PLUMBING AND ELECTRICAL SERVICES AT THE BUILDING
- METAL SHED
- ON SITE MONUMENT SIGNS AND LIGHTING
- ALL TREE MOUNTED LIGHT FIXTURES AND POWER
- ALL DEAD TREES ON SITE
SCOPE OF WORK
T
H E
L
IN
E S
H O
W N
A B
O V
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
A
B
C
D
1 2 3 4 5
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Drawing
ARCHITECT
THESE RECORD DRAWINGS HAVE BEEN PREPARED, IN
PART, ON THE BASIS OF INFORMATION COMPILED AND
FURNISHED BY OTHERS. THE ARCHITECT WILL NOT BE
RESPONSIBLE FOR ANY ERRORS OR OMMISIONS WHICH
HAVE BEEN INCORPORATED INTO THIS DOCUMENT AS A
RESULT
Project Number:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
DATE DESCRIPTION∆
5/
/2
4:
:2
P
M
Barry H. Taylor
AS-101
OVERALL SITE PLAN,
NOTES AND DETAILS
P
A R
K L
A N
E
H
IL
T O
N H
E A
D
IS
LA
N
D , S
C
P
A R
K L
A N
E D
E M
O L
IT
IO
N
ARCH: 03735
T O
W N
O F
H
IL
T O
N H
E A
D
IS
LA
N
D
226117
2026-05-20
KEN
DS
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
10 PALMETTO BUSINESS PARK
HILTON HEAD ISLAND, SC 29928
843.785.2199
HORD COPLAN MACHT
NTSAS-101
B1 ARCHITECTURAL SITE PLAN
NTSAS-101
A1 Sediment Barriera Detail
NTSAS-101
A2 Tree Protection Fence Detail
2026-05-20 ISSUED FOR PERMITTING
PROVIDE SILT BARRIER PROTECTION AT
ALL STORM SEWER INLETS DURING
DEMOLITION WORK
STORM DRAIN INLET (TYPICAL)
T H
E L
IN
E
S H
O W
N A
B O
V
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
A
B
C
D
1 2 3 4 5
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Drawing
ARCHITECT
THESE RECORD DRAWINGS HAVE BEEN PREPARED, IN
PART, ON THE BASIS OF INFORMATION COMPILED AND
FURNISHED BY OTHERS. THE ARCHITECT WILL NOT BE
RESPONSIBLE FOR ANY ERRORS OR OMMISIONS WHICH
HAVE BEEN INCORPORATED INTO THIS DOCUMENT AS A
RESULT
Project Number:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
DATE DESCRIPTION∆
5/
/2
4:
:3
P
M
Barry H. Taylor
AS-102
SITE STORM
DRAINAGE
PROTECTION PLAN
P
A R
K L
A N
E
H
IL
T O
N H
E A
D
IS
LA
N
D , S
C
P
A R
K L
A N
E D
E M
O L
IT
IO
N
ARCH: 03735
T O
W N
O F
H
IL
T O
N H
E A
D
IS
LA
N
D
226117
2026-05-20
KEN
DS
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
10 PALMETTO BUSINESS PARK
HILTON HEAD ISLAND, SC 29928
843.785.2199
HORD COPLAN MACHT
NTSAS-102
A1 SITE DEMOLITION PLAN
1. CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS RELATED TO THE DEMOLITION
SEQUENCE AND MAINTAINING SAFETY PROCEDURES TO COMPLY WITH ALL APPLICABLE OSHA,
SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES (SCDES), TOWN OF HILTON
HEAD ISLAND, AND OTHER REGULATORY AGENCY REGULATIONS AND REQUIREMENTS.
2. DEMOLISH AND/OR DECONSTRUCT BUILDING COMPONENETS AND REMOVE FROM SITE.
CONTRACTOR IS RESPONSIBLE FOR PROPER DISPOSAL AND/OR RECYCLING OF ALL REMOVED
MATERIALS.
3. ALL BUILDING MECHANICAL AND ELECTRICAL EQUIPMENT TO BE REMOVED INCLUDING PIPING
AND FOUNDATION PADS
4. DEMOLISH AND REMOVE ALL EXISTING MASONRY SCREEN WALLS, COLUMNS, POSTS,
FOUNDATIONS WALLS, AND ASSOCIATED FOOTINGS.
DEMOLITION NOTES
INSTALL SEDIMENT BARRIERS -
COORDINATE EXACT LOCATION
WITH TOWN STAFF
ALL ASPHALT
PARKING
AREAS ARE
TO REMAIN
PROVIDE TREE PROTECTION
TO PROTECT EXISTING
TREES TO REMAIN
INSTALL SEDIMENT BARRIERS -
COORDINATE EXACT LOCATION
WITH TOWN STAFF
INSTALL SEDIMENT
BARRIERS - COORDINATE
EXACT LOCATION WITH
TOWN STAFF
REMOVE BUILDING IN ITS
ENTIRETY, INCLUDING
UNDERGROUND FOOTINGS,
PLUMBING, ELECTRICAL, AND
OTHER SERVICES
REMOVE UNDERGROUND GREASE
TRAP IN THIS APPROXIMATE
LOCATION IN ITS ENTIRETY,
INCLUDING ALL UNDERGROUND
SERVICE LINES
PROVIDE TREE
PROTECTION TO
PROTECT
EXISTING TREES
TO REMAIN ALL EXISTING PARKING
AREAS TO REMAIN
REMOVE THREE SAGO
PALMS AT FRONT OF
BUILDING
STRUCTURAL AND/OR BUILDING ELEMENT TO BE REMOVED
IN ITS ENTIRETY, INCLUDING UNDERGROUND FOOTINGS,
PLUMBING, ELECTRICAL, AND OTHER SERVICES
CONCRETE SIDEWALK AND/OR CURB TO BE REMOVED IN ITS
ENTIRETY
TREE TO BE PROTECTED - PROVIDE TREE PROTECTION PER
DETAILS ON AS-101 - COORDINATE EXACT LOCATION WITH
TOWN STAFF
DEAD TREE TO BE REMOVED
EXISTING POLE MOUNTED LIGHT TO REMAIN - REMOVE ALL
POWER CONDUIT AND WIRING BETWEEN BASE OF POLE AND
POWER SOURCE
EXISTING GROUND OR TREE MOUNTED LIGHT TO BE
REMOVED - REMOVE ALL POWER CONDUIT AND WIRING BACK
TO POWER SOURCE
EXISTING GROUND OR TREE MOUNTED ELECTRICAL
JUNCTION BOX TO BE REMOVED - REMOVE ALL POWER
CONDUIT AND WIRING BACK TO POWER SOURCE
EXISTING TRANSFORMER ON
CONCRETE PAD TO REMAIN -
PROTECT FROM DAMAGE
REMOVE DEAD TREE
TREE TO REMAIN -
PROVIDE TREE
PROTECTION
REMOVE DEAD TREE
POLE MOUNTED
LIGHT FIXTURE
TO REMAIN
REMOVE EXISTING TREE IN THIS
LOCATION - DIAMETER SMALLER THAN
REQUIRED TO BE SHOWN ON SURVEY
REMOVE
EXISTING
CONCRETE
PAVERS/CURB
REMOVE EXISTING TREE
MOUNTED LIGHT, TYP.
REMOVE DEAD TREE
REMOVE DEAD TREE
REMOVE MONUMENT
SIGN AND LIGHTING IN
THEIR ENTIRETY
REMOVE MONUMENT
SIGN AND ANY LIGHTING
IN THEIR ENTIRETYREMOVE MONUMENT
SIGN AND LIGHTING IN
THEIR ENTIRETY
REMOVE GROUND
MOUNTED JUNCTION BOX
REMOVE EXISTING CONCRETE CURB
REMOVE PVC DRAINAGE PIPING
REMOVE TREE
MOUNTED LIGHT
FIXTURE
CONCRETE
PAVEMENT
EDGING TO
REMAIN
POLE MOUNTED LIGHT
FIXTURE TO REMAIN
REMOVE CONCRETE SLAB,
SURROUNDING WALLS AND
STRUCTURE AND ALL
ELEMENTS WITHIN SERVICE
YARD AREA
REMOVE EXISTING SHED
STRUCTURE
REMOVE ALL CONCRETE
SIDEWALKS, TYP.
POLE MOUNTED LIGHT
FIXTURE TO REMAIN
REMOVE TREE
MOUNTED LIGHT
FIXTURE
REMOVE
JUNCTION BOX
REMOVE POST MOUNTED FAN, POST,
AND ALL POWER BACK TO SOURCE AT
THIS APPROXIMATE LOCATION
REMOVE POND AND ALL
RELATED COMPONENTS,
INCLUDING POWER SOURCE
REMOVE ALL TREE MOUNTED
LIGHT FIXTURES, TYPICAL
INSTALL SEDIMENT BARRIERS -
COORDINATE EXACT LOCATION
WITH TOWN STAFF
REMOVE EXISTING TREE IN
THIS LOCATION - DIAMETER
SMALLER THAN REQUIRED TO
BE SHOWN ON SURVEY
T H
E L
IN
E
S H
O W
N A
B O
V
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
A
B
C
D
1 2 3 4 5
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Drawing
ARCHITECT
THESE RECORD DRAWINGS HAVE BEEN PREPARED, IN
PART, ON THE BASIS OF INFORMATION COMPILED AND
FURNISHED BY OTHERS. THE ARCHITECT WILL NOT BE
RESPONSIBLE FOR ANY ERRORS OR OMMISIONS WHICH
HAVE BEEN INCORPORATED INTO THIS DOCUMENT AS A
RESULT
Project Number:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
DATE DESCRIPTION∆
5/
/2
4:
:3
P
M
Barry H. Taylor
AD-101
SITE DEMOLITION
PLAN
P
A R
K L
A N
E
H
IL
T O
N H
E A
D
IS
LA
N
D , S
C
P
A R
K L
A N
E D
E M
O L
IT
IO
N
ARCH: 03735
T O
W N
O F
H
IL
T O
N H
E A
D
IS
LA
N
D
226117
2026-05-20
KEN
DS
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
10 PALMETTO BUSINESS PARK
HILTON HEAD ISLAND, SC 29928
843.785.2199
HORD COPLAN MACHT
NTSAD-101
A1 SITE DEMOLITION PLAN
REMOVE MONUMENT SIGN AND
LIGHTING IN THEIR ENTIRETY,
INCLUDING FOOTING AND
POWER BACK TO SOURCE
REMOVE MEDIA DISTRIBUTION BOXES
REMOVE MONUMENT SIGN IN ITS ENTIRETY
REMOVE MONUMENT SIGN AND LIGHTING IN
THEIR ENTIRETY, INCLUDING FOOTING AND
POWER BACK TO SOURCE
REMOVE EXISTING CONCRETE PAVERS /
CURB WITHIN PARKING AREA
EXISTING CONCRETE EDGING TO REMAIN
TREES TO REMAIN - PROTECT FROM DAMAGE
TREE TO BE REMOVED
LIGHT ON POLE TO REMAIN - REMOVE POWER TO SOURCE
TREE TO REMAIN -
PROTECT FROM
DAMAGE
REMOVE CONCRETE PAVERS
SERVICE YARD WALL
TO BE DEMOLISHED
TREE TO REMAIN -
PROTECT FROM DAMAGE
GREASE TRAP AND ALL UNDERGROUND
CONNECTIONS TO BE REMOVED
TRANSFORMER AND TELEPHONE BOX
TO REMAIN - PROTECT FROM DAMAGE
GREASE TRAP BEHIND TRANSFORMER
TO BE REMOVED
BUILDING AND SERVICE YARD
WALL TO BE DEMOLISHED
TREES TO REMAIN - PROTECT FROM DAMAGE
TREES TO REMAIN - PROTECT
FROM DAMAGE
REMOVE EXISTING METAL SHED
REMOVE EXISTING TREE
AGAINST METAL SHED
EXISTING TREES TO
REMAIN - PROTECT
FROM DAMAGE
EXISTING LIGHT FIXTURE AND
POLE TO REMAIN - REMOVE
POWER BACK TO SOURCE
REMOVE EXISTING
FOUNDATION
LANDSCAPING
REMOVE
EXISTING
TREE
REMOVE EXISTING
PLASTIC DRAINAGE
PIPING
REMOVE ALL
EXISTING IRRIGATION
HEADS AND PIPING TO
BELOW GRADE
REMOVE ALL EXISTING
IRRIGATION HEADS AND
PIPING TO BELOW GRADE
FOUNDATION LANDSCAPING TO BE REMOVED
PLASTIC DRAINAGE PIPING TO BE REMOVED
TREE TO REMAIN -
PROTECT FROM
DAMAGE
FOUNDATION
LANDSCAPING
TO BE REMOVED
TREES TO REMAIN - PROTECT FROM DAMAGE
REMOVE DECORATIVE LIGHTING FROM ALL TREES ONSITE
REMOVE THREE SAGO PALMS AS PART OF DEMOLION WORK
FAN AND POST TO BE REMOVED IN
THEIR ENTIRETY INCLUDING POWER
BACK TO SOURCE
PICNIC TABLE AND BIKE
RACK TO BE REMOVED
FOUNDATION LANDSCAPING
TO BE REMOVED
THIS PROJECT IS TO DEMOLISH AND REMOVE AN EXISTING FACILITY FORMERLY USED AS A
RESTAURANT. THE FACILITY IS NOW OWNED BY THE TOWN OF HILTON HEAD ISLAND.
THESE DOCUMENTS HAVE BEEN PREPARED TO ASSIST PROPSECTIVE BIDDERS BY PROVIDING
INFORMATION ON THE SIZE, ASSEMBLIES, CONSTRUCTION MATERIALS, AND SPECIAL
CIRCUMSTANCES THAT EXIST. THESE DOCUMENTS SHALL NOT BE INTERPRETED TO DIRECTLY OR INDIRECTLY PROVIDE GUIDANCE ON THE MEANS AND METHODS TO BE USED, AS THIS IS SOLELEY
THE RESPONSIBILITY OF THE SUCCESSFUL BIDDER.
CONTAINED HEREIN ARE KEY NOTES TO ASSIST IN THE DETERMINATION OF EXISTING SCOPE AND
CONDITIONS TO PROVIDE A COMPETITIVE BID.
THE SUCCESSFUL BIDDER IS TO COMPLETELY REMOVE THE EXISTING FACILITY. THIS EFFORT IS TO
INCLUDE:
- ALL ABOVE GRADE BUILDING COMPONENTS
- ALL BUILDING FOUNDATIONS AND STRUCTURE
- EXTERIOR SERVICE YARD IN ITS ENTIRETY, INCLUDING BELOW GRADE STRUCTURES
- BELOW GRADE GREASE TRAP AND ALL CONNECTIONS AND PIPING TO AND FROM
- ALL ON SURFACE CONCRETE SIDEWALKS
- ALL BELOW GRADE PLUMBING AND ELECTRICAL SERVICES AT THE BUILDING
- METAL SHED
- ON SITE MONUMENT SIGNS AND LIGHTING
- ALL TREE MOUNTED LIGHT FIXTURES AND POWER
- ALL DEAD TREES ON SITE
SCOPE OF WORK
1. CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS RELATED TO THE DEMOLITION
SEQUENCE AND MAINTAINING SAFETY PROCEDURES TO COMPLY WITH ALL APPLICABLE OSHA,
SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES (SCDES), TOWN OF HILTON
HEAD ISLAND, AND OTHER REGULATORY AGENCY REGULATIONS AND REQUIREMENTS.
2. DEMOLISH AND/OR DECONSTRUCT BUILDING COMPONENETS AND REMOVE FROM SITE.
CONTRACTOR IS RESPONSIBLE FOR PROPER DISPOSAL AND/OR RECYCLING OF ALL REMOVED
MATERIALS.
3. ALL BUILDING MECHANICAL AND ELECTRICAL EQUIPMENT TO BE REMOVED INCLUDING PIPING
AND FOUNDATION PADS
4. DEMOLISH AND REMOVE ALL EXISTING MASONRY SCREEN WALLS, COLUMNS, POSTS,
FOUNDATIONS WALLS, AND ASSOCIATED FOOTINGS.
DEMOLITION NOTES
T H
E L
IN
E
S H
O W
N A
B O
V
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
A
B
C
D
1 2 3 4 5
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Drawing
ARCHITECT
THESE RECORD DRAWINGS HAVE BEEN PREPARED, IN
PART, ON THE BASIS OF INFORMATION COMPILED AND
FURNISHED BY OTHERS. THE ARCHITECT WILL NOT BE
RESPONSIBLE FOR ANY ERRORS OR OMMISIONS WHICH
HAVE BEEN INCORPORATED INTO THIS DOCUMENT AS A
RESULT
Project Number:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
DATE DESCRIPTION∆
5/
/2
4:
:4
P
M
Barry H. Taylor
A-101
EXISTING BUILDING
FLOOR PLAN &
EXTERIOR PHOTOS
P
A R
K L
A N
E
H
IL
T O
N H
E A
D
IS
LA
N
D , S
C
P
A R
K L
A N
E D
E M
O L
IT
IO
N
ARCH: 03735
T O
W N
O F
H
IL
T O
N H
E A
D
IS
LA
N
D
226117
2026-05-20
KEN
DS
NTSA-101
A1 EXISTING BUILDING FLOOR PLAN & EXTERIOR PHOTOS
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
10 PALMETTO BUSINESS PARK
HILTON HEAD ISLAND, SC 29928
843.785.2199
HORD COPLAN MACHT
| Sheets |
| A-101 - EXISTING BUILDING FLOOR PLAN & EXTERIOR PHOTOS |
| AD-101 - SITE DEMOLITION PLAN |
| AS-101 - OVERALL SITE PLAN, NOTES AND DETAILS |
| AS-102 - SITE STORM DRAINAGE PROTECTION PLAN |
| G.001 - COVER SHEET |
File details come from the government source that posted it. Updated .