5. Subcontractor Periodic Payment Confirmation.pdf

PDF 71 KB Posted

Attached to
Construction of Widefield Community Park - Crews Gulch Regional Trail Phase II
Solicitation number
25-046
Issued by
El Paso County, Colorado

About this file

The document is a Subcontractor Periodic Payment Confirmation form from the El Paso County Department of Public Works, designed to track and verify payments to subcontractors on a construction project. The form is specifically related to the Widefield Community Park - Crews Gulch Regional Trail Phase II project, which involves constructing an eight-foot wide concrete trail, installing three ADA-compliant pedestrian concrete curb ramps, and implementing crosswalk stripes on Widefield Boulevard, along with associated mobilization, traffic control, and temporary stormwater control measures.

The form provides a detailed mechanism for prime contractors to report subcontractor invoices, payment amounts, payment dates, work completion status, and requires signed declarations from both the prime and subcontractor representatives. The document includes multiple rows to track multiple subcontractor payments, with checkboxes to indicate work completion, exception requests, and payment verification. There are specific instructions regarding timely payment to subcontractors, with potential consequences for delayed or inaccurate reporting, including potential withholding of future payments by the county and liability for interest payments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COUNTY USE ONLY

Periodic

Final

2 Invoice

Amount

4 Payment

Date

5 Exception

Requested

6 Work

Completed 7 Sub Initials

$ / / Y N Y N

$ / / Y N Y N

$ / / Y N Y N

$ / / Y N Y N

$ / / Y N Y N

$ / / Y N Y N

$ / / Y N Y N

$ / / Y N Y N

$ / / Y N Y N

$ / / Y N Y N

$ / / Y N Y N

$ / / Y N Y N

Date

Date

* Submit a signed copy of this form to the Project Engineer. Frequency will be determined at the preconstruction meeting.

More frequent submittals may be requested by the County at any time.

2 List the amount of the subcontractor invoice and 3 payment to the subcontractor

1 Accurately describe the work performed / supplies provided by the subcontractor.

For the Periodic report, summarize the subcontractor participation during the reporting period.

For the Final report, summarize all subcontractor participation on the contract. Attach additional pages as necessary.

4 Provide the date that the subcontractor was paid.

3 Payment

Amount

~ Failure to timely complete this form will result in delay of your next payment from the County.

Failure to accurately complete this form could result in the delay of future payments from the County.

7 Subcontractor shall provide initials indicating receipt of payment.

6 Mark whether subcontractor has completed all work specified in the subcontractor purchase order

5 Mark whether you have requested approval of a good cause exception. A good cause exception is required if you did not pay your subcontractor within seven days of receipt of payment from the County.

1 Work Performed /

Supplies Provided

Project Name / #:

Date EPC Received:

Prime Contractor:

Subcontractor:

EL PASO COUNTY

DEPARTMENT OF PUBLIC WORKS

SUBCONTRACTOR PERIODIC

PAYMENT CONFIRMATION Through Pay Estimate / Invoice #Project Start Date:

Title

TitleSignature

Prime Contractor Representative Name

Subcontractor Representative Name

Signature

RELEASE RETAINAGE

(Final Report Only)

I declare under penalty of perjury in the second degree and any other applicable state or federal laws that the statements made in this document are complete, true and accuarate and that my company has complied with El Paso County specifications and all other relevant contract provisions.

I acknowledge that if payment has not been made consistent with the representations herein, my company may be liable for interest pursuant to the Contract and the County may withhold payments to my company until all required payment have been made to subcontractors.

(created 3/26/15)

File details come from the government source that posted it. Updated .