2. Crews Gulch Regional Trail Phase II Project-Singed Plan.pdf

PDF 1 MB Posted

Attached to
Construction of Widefield Community Park - Crews Gulch Regional Trail Phase II
Solicitation number
25-046
Issued by
El Paso County, Colorado

About this file

These engineering design plans for the Widefield Community Park - Crews Gulch Regional Trail Phase II Project are prepared by El Paso County Parks and Community Services in Colorado Springs, Colorado. The project involves constructing an eight-foot wide concrete trail over an existing crusher fine surface trail along Widefield Boulevard, including three ADA-compliant pedestrian concrete curb ramps, crosswalk striping, and associated infrastructure improvements. The trail will traverse through the Crews Gulch area, with specific design details including new sidewalks, pedestrian intersection ramps, vehicle tracking requirements, and stormwater Best Management Practices (BMPs).

The design documents specify detailed technical requirements for concrete construction, including sidewalk specifications, expansion and contraction joint details, and stormwater management strategies. Concrete specifications include a minimum of five-inch thickness, Class 6 base course, and specific compaction requirements. The project includes inlet protections, sediment control logs, and stabilized staging areas to manage environmental impacts. The engineering plans are dated 4/10/25 and include comprehensive technical drawings covering plan views, enlarged plans, concrete details, vehicle tracking requirements, and stormwater management strategies, with the work to be completed in accordance with current El Paso County standards and specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .