5. Schedule of Material Submittals QUUG 25-1010.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Repair Roofs for Multiple Buildings at Moron Air Base, Spain
Solicitation number
FA557525B0016
Issued by

About this file

The document is a Schedule of Material Submittals for Project QUUG 25-1010, a roof repair project at Moron Air Base in Spain. The solicitation (FA557525B0016) covers repair work for multiple buildings with a project value between $500,000 and $1,000,000 and a 310-day performance period. The comprehensive submittal schedule details 46 specific material and documentation requirements across multiple contract sections, including warranty letters, construction schedules, work plans, environmental protection plans, demolition documentation, concrete testing, material certifications, and technical specifications for roofing, electrical, and structural components.

Key procurement details include a pre-proposal conference/site visit on 6 August 2025, with questions due by 12 August 2025 and bids required by 29 August 2025 at 10:00 hours local time. The solicitation is exclusively for local sources licensed and registered to conduct construction business in Spain, with potential contractors required to meet Spanish legislative requirements for government works. The project is funded by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa, with fund availability uncertain, and the government reserves the right to cancel the solicitation through 31 December 2025.

View the file

Other files

File Type Posted
Questions and Answers.pdf PDF
4. Cost Estimate Blank QUUG 25-1010.xlsx XLSX spreadsheet
3. SOW (Spa) QUUG 25-1010.pdf PDF
Solicitation - FA557525B0016.pdf PDF
1. Drawings QUUG 25-1010.pdf PDF
2. SOW (Eng) QUUG 25-1010.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 25-1010PROJECT TITLE
RPR Roof, Multi.SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 01
01Warranty letter1Aceptance + 15
02Construction Schedule1CA + 7
03Progress Schedule1CA + 10
04Work Plan1CA + 7
05Mobility Plan1CA + 15
06Quality Control Plan1CA + 15
07Environmental Protection Plan1CA + 15
08Waste & construction debris management1Prior to FI
09As-Built drawings1FI + 15
10Spatial Data1As Built + 10
11Key Staff1CA + 15
12Health and safety Plan1CA + 15
SECTION 02 41 01
13Program and schedule of the works1CA+10
14Demolition plan1CA+10
15Management & disposal plan of the waste from demolition1CA+10
16Manager of waste from demolition & construction1CA+10
17Authorized dump or treatment & recovery plant1CA+10
18Delivery & disposal of waste1CA+10
7Local laboratory certificate of accreditation asbestos test.1CA+10
8Footbridge scaffolding and plattforms11CA+10
SECTION 03 30 00.00 20
9Concrete batch plant1
10Concrete Control Test Program1
11Results of the Concrete Control Tests1
12Assembly of ironworks1
13Polypropylene fiber1
SECTION 04 22 00.00 40
14Brick and clayblock to be used11
SECTION 05 12 00
15Erection Plan1
16Welding procedures and qualifications1
17Steel manufacturer certification1
18Welding equipment1
19Expendable material for welding1
20Stainless steel manufacturer and alloy composition.1
SECTION 07 55 00
21Vapor barrier11CA+15
22Lightweight concrete111CA+15
23Protective fleece layer1111CA+15
24Waterproof membrane11111CA+15
25Filtering tile1111CA+15
26Flashing11CA+15
27Chemical welding compounds111CA+15
28Mastic111CA+15
29Sealant for expansion joints111CA+15
30Gutters and downspouts11CA+15
31Fall arresting system11CA+15
SECTION 07 92 00
32Sealants, primers and bond breakers111
SECTION 09 90 00
33Each type of coating and/or product furnished11CA+15
34Delivery tickets from coating provider1Final Inspection
SECTION 26 20 00
35RMC Conduit and fittings, 1 x type1
36Junction and pull boxes1
37Outlet boxes and covers1
38Wires and cables1
391000-Volt wiring test1Facility Acceptance -5
40Active electrical equipment O&M Manuals1
SECCIÓN 26 56 00
41LED Luminaires1
42LED Drivers1
43Lighting fixtures1
43Photocell1
44Test Report1
45Luminaire Useful Life Certificate1
46Luminaire Warranty1

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N