5. Sample Subcontract.docx
DOCX document 94 KB Posted
- Attached to
- New Clinical Office Medical Equipment & Supplies
- Solicitation number
- JG-2025-01
- Issued by
-
Department of Energy
About this file
This document is a Sample Subcontract between The Regents of the University of California Lawrence Berkeley National Laboratory and an unspecified subcontractor for medical equipment and supplies for a new Health Services Clinic. The subcontract involves procuring medical equipment with two key delivery schedules: one lot to be delivered to a warehouse by 7-1-2026 and another lot to be delivered to the lab for installation by 10-1-2026. The total contract is for medical equipment and supplies, with specific requirements including NRTL certification for electrical equipment, FOB Destination shipping terms, and delivery to Lawrence Berkeley National Laboratory in Berkeley, CA.
The subcontract is issued under DOE Prime Contract No. DE-AC02-05CH11231 and includes comprehensive requirements for insurance (with minimum $1M commercial general liability coverage), safety assurances, site access protocols, and environmentally preferable products. The subcontractor must comply with various sustainability initiatives, including minimizing toxic waste, using e-waste certified recyclers, and delivering energy-efficient products. Invoicing is specified with net 15 days for small businesses and net 30 for large businesses, with strict documentation requirements and a 180-day submission deadline for final invoices.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SUBCONTRACT | NO. XXXXXXX | The Regents of the University of California | Lawrence Berkeley National Laboratory | One Cyclotron Road | Berkeley, CA 94720 | |||||||||
| Subcontractor: | Name: | Attention: | Address | Address | Phone: | Fax: | E-Mail: | University Procurement Representative: | Name: Jane Graves | Phone: | 630/301-0510 | E-Mail: JEGraves@lbl.gov |
Introduction This is a subcontract (hereinafter "Subcontract") for , as further described herein. The North American Industry Classification System (NAICS) for this acquisition is .
This Subcontract is between The Regents of the University of California, (hereinafter "University") and the party identified above as the "Subcontractor".
This Subcontract is issued under Prime Contract No. DE-AC02-05CH11231 between the University and the United States Government (hereinafter "U.S. Government"), represented by the Department of Energy (hereinafter "DOE") for the management and operation of the Lawrence Berkeley National Laboratory (hereinafter "LBNL") and the performance of certain research and development work.
Agreement The parties agree to perform their respective obligations in accordance with the terms, conditions, and provisions of the attached SCHEDULE OF ARTICLES and the documents referenced or incorporated therein, which together with this Signature Page shall collectively constitute the entire Agreement and shall supersede all prior negotiations, representations, or agreements, whether verbal or written.
| LBNL TEMPORARY VENDOR | THE REGENTS OF THE | UNIVERSITY OF CALIFORNIA | ||
| By: | By: | |||
| Name: | Name: | |||
| Title: | Title: | |||
| Date: | Date: |
SCHEDULE OF ARTICLES
ORDERED ITEMS
Description The Subcontractor shall furnish and deliver the following ordered item(s), in accordance with this Subcontract:
| Item # | Description | Quantity | Price | Amount | UOM | Delivery | Schedule: |
| 1 | Medical Equipment and Supplies per the incorporated Statement of Work (SOW) and Equipment List. | 1.00 | $0.00 | $0.00 | LOT | 7-1-2026 to Warehouse | |
| 2 | Medical Equipment and Supplies delivery to the Lab | 1.00 | $0.00 | $0.00 | LOT | 10-1-26 to Lab for installation |
TOTAL $
The above installation schedule identifies the date(s) by which the specified item(s) shall be installed at the following location(s):
Subcontractor shall furnish all personnel, supervision, materials, supplies, equipment, tools, facilities, transportation, testing, and other incidental items and services necessary for performance of the work, except for U.S. Government Property specified herein to be furnished by the University. The Supplies shall conform to the original manufacturer's specifications. The Supplies and other incidental items furnished by the Subcontractor shall meet nationally recognized safety standards or have been tested and found safe for use.
Acceptance Acceptance of the items described above is based upon successful completion of the acceptance test plan as described in the Statement of Work incorporated into this Subcontract.
Electrical Device Certification Requirement All electrical equipment, components, conductors and other items delivered to the University, or to any subcontractor facility or remote work location, of the type requiring testing by a Nationally Recognized Testing Laboratory (NRTL) recognized by the Occupational Safety and Health Administration (OSHA) shall be NRTL listed, labeled, and certified in accordance with Part 1910, Occupational Safety and Health Standards, of Title 29 of the Code of Federal Regulations (29 CFR 1910). The Subcontractor shall notify the , , in writing, of any item to be delivered that does not meet this requirement. The University reserves the right to refuse delivery of or return any such items. Information on required NRTL testing is available at https://www.osha.gov/nationally-recognized-testing-laboratory-program.
ARTICLE 2 - PRICE AND PAYMENT
Fixed Price The Subcontractor shall furnish, deliver and install the ordered item(s) for the total fixed price of $.
Sales or Use Tax Items purchased by the University hereunder are treated as for resale, per the University's California State Resale Permit No. SR-CH 21-835970 for LBNL, and shall not be subject to any California or other State sales or use tax if shipped to California. Any items furnished hereunder for rentals or leases are subject to California State sales or use tax, and such tax is included in the fixed prices/rates stated herein.
The University of California State Resale Permit No. SR-CH 21-835970 for LBNL is available at: http://procurement.lbl.gov/supplier-forms/.
Invoices The Subcontractor shall email invoice(s) directly to the LBNL Accounts Payable Office at APInvoice@lbl.gov, within thirty days of the acceptance of the item(s) performance of ordered services. The "subject" line of the email shall state the Subcontractor's name and the Subcontract number. If final invoices are not submitted within 180 days of performance of the ordered services, then any amounts paid by the University to that point will represent satisfaction in full by LBNL under this Subcontract and an Accord and Satisfaction. This means that LBNL will not be obligated to make any further payments under this Subcontract.
To avoid delays in processing and payment, Subcontractors should include only one attachment per email. Multiple invoices should be combined and attached as a single portable document format (PDF) or Microsoft Word or rich text format (RTF) file (up to 30 individual invoices per attachment) or emailed separately (one attachment per email). Do not include icons/pictures in the email (logos, etc.) and ensure only one subcontract number is listed on the invoice.
Invoice(s) shall state: the Subcontract number; the Subcontractor (including business heading or logo); bill to address (same address as above); invoice date; unique invoice number; remittance address; sufficiently identify the items/services being invoiced; and identify any separately payable freight charges (with receipts if available) and taxes. Invoice(s) in a spreadsheet format are not acceptable, but a spreadsheet can be used to support an invoice. The Subcontractor shall maintain records which support all invoiced amounts, and provide them to the University Procurement Representative upon request.
Payment Terms All invoices except the final invoice shall be payable within 15 days (small businesses) and Net 30 days (large businesses) of receipt if the invoice submission is complaint with the subcontractor requirements for invoicing; provided, however, that payments made thereafter shall not be subject to any penalty, interest, or late charges. Only those items/services identified in this Subcontract or a Subcontract Modification will be considered for payment. Payment amounts may be adjusted for any applicable credits, offsets, or withholds. Full payment shall not be due until any final acceptance requirements of this Subcontract have been satisfied. For inquiries about the status of an invoice, call (510) 486-6954 or aphelp@lbl.gov.
ARTICLE 3 - SUBCONTRACT ADMINISTRATION
Notices, Requests, and Modifications The Subcontractor shall submit all notices and requests for approval by email to the University Procurement Representative indicated on the signature page.
Only the University Procurement Representative is authorized to modify the terms, conditions, and requirements of this Subcontract, including any changes to the description of the work, and to issue any notices and approvals required by this Subcontract. Certain changes to this subcontract may be made only by the University Procurement Representative without subcontractor agreement or negotiation prior to the change. Such changes may include: changes of an administrative nature, directed changes pursuant to the clause incorporated herein entitled: “CHANGES,” unilateral modifications authorized by clauses other than the Changes clause, and termination notices. Apart from the University Procurement Representative’s authority to issue unilateral changes, the parties may mutually agree to make changes in the work ordered, or modify any other term or condition of the subcontract, resulting in an amendment to the subcontract, but only by a written modification signed by the authorized representatives of both parties.
is the for this Subcontract. This individual is designated to monitor performance of the work and to interpret and clarify the technical requirements, but is not authorized to make changes to the work or to modify any of the terms and conditions of this Subcontract, including those related to the completion schedule or pricing.
Closeout The Subcontractor shall, as a condition of full payment, assist the University after the completion of the work in accomplishing the administrative closeout of this Subcontract, including, as necessary or required, the furnishing of documentation and reports, the disposition of property, the disclosure of any inventions, the execution of any required documents (including an Assignment and Release form if this form is an incorporated document), the performance of any audits, and the settlement of any interim or disallowed costs.
ARTICLE 4 - FURNISHED AND ACQUIRED PROPERTY
The University will not furnish any U.S. Government Property for use under this . The Subcontractor is not authorized to acquire, fabricate, or provide any tangible personal property items for use under this without the University Procurement Representative's advanced written approval via modification. The Subcontractor is required to notify the University prior to purchasing any Subcontractor Acquired Property and assumes the risk of not being reimbursed for property if approvals are not provided by the University in advance via modification.
ARTICLE 5 - SHIPPING REQUIREMENTS
Shipping Terms The shipping terms are FOB Destination, freight included. All shipments shall be shipped via the Subcontractor's vehicles or a licensed common carrier selected by the Subcontractor, at the Subcontractor's expense.
High Value Items The Subcontractor is required to declare the full value of the item(s) when shipped.
Shipping Address All shipments shall be shipped to the following address:
Lawrence Berkeley National Laboratory For the U.S. Department of Energy One Cyclotron Road, Building 69 Berkeley, CA 94720
Shipping Point
1. The shipping point is: ___________ (City, State or Foreign country). (factory shipping point to warehouse.)
2. Medical equipment shipping point: from Bay Area warehouse to Lab for installation.
ARTICLE 6 - LBNL SITE ACCESS REQUIREMENTS
All individuals assigned to work on this by the Subcontractor (including lower-tier subcontractors) who require access to any LBNL-controlled facility or site are subject to DOE access approvals. Any questions should be directed to either the designated or Procurement Representative.
Subcontractor shall call 911 for any situation that requires immediate assistance from the police, fire department or ambulance. Subcontractor shall call the Site Operations Center (SOC) at 510-486-6999 for the below situations, further detailed in the notify.lbl.gov webpage. Subcontractor is required to review this webpage for further detail about required notifications. If the Subcontractor is unable or unsure whether to call, the individual is required to reach out to their supervisor or team lead for guidance. Subcontractor shall flow down this requirement to all lower tier subcontractors performing work onsite at a LBNL location.
Any injuries while performing work for Berkeley Lab Unplanned or Suspected Exposure Unplanned Overpressurization Property, vehicle, or equipment damage Damaged or Broken Utilities Safety systems that fail or malfunction Receipt of a notice of regulatory violation Any unplanned release/discharge or spill in a building or to the environment Chemical Spill Discovery of a hazardous chemical that requires EHS assistance Safeguards and security incident Fumes and Odors Hazardous wildlife and insects
Subcontractor acknowledges that foreign national (non-U.S. citizen) individuals assigned to work on (including lower-tier subcontractors) or other foreign national individuals required to work at any LBNL-controlled facility or site who were born in, are citizens of, are employed or sponsored by or represent a government, company, institution, or other organization based in a country on the Department of State's List of State Sponsors of Terrorism (https://www.state.gov/state-sponsors-of-terrorism/) must obtain written approval from DOE Headquarters prior to accessing LBNL-controlled facilities or sites that are subject to DOE access approvals. Requests for access must be submitted to LBNL Foreign Visits and Assignments Office (FVA@lbl.gov) at least 180 days in advance to allow time for approval from the DOE, in accordance with DOE Order 142.3B Unclassified Foreign National Access Program, with no guarantee of approval.
The University is also required by DOE to document all foreign nationals working on this who were born in, are citizens of, are employed or sponsored by or represent a government, company, institution or organization based in a foreign country and who require access to an LBNL-controlled facility or site. To obtain site access, all foreign national individuals assigned to this (including lower-tier subcontractors) must provide LBNL with their place of birth and citizenship. Requests for access must be submitted to LBNL Foreign Visits and Assignments Office (FVA@lbl.gov) at least 180 days in advance to allow time for approval from the DOE, in accordance with DOE Order 142.3B, with no guarantee of approval. Subcontractor is to advise all individuals (including lower-tier subcontractors) assigned to work on this of these requirements.
ARTICLE 7 - SUBCONTRACTOR SAFETY ASSURANCE
The Subcontractor shall sufficiently prepare, and provide sufficiently trained personnel and resources, to perform the work in a safe manner, and shall comply with DOE Acquisition Regulation (DEAR) 970.5223-1, Integration of Environment, Safety, and Health into Work Planning and Execution.
Upon award of the Subcontract, the Subcontractor shall complete and submit on-line a Subcontractor Job Hazard Analysis and Work Authorization Form For Non-Construction (sJHA) for all Services to be performed at any LBNL site, utilizing an internet link provided by the , unless the University accepts an existing sJHA for the Services. Instructions for completing the online sJHA are at http://sjha.lbl.gov/.
The Subcontractor shall not commence the work at any LBNL site until the or a designee reviews the sJHA with the Subcontractor and approves the sJHA, authorizing commencement of the work. For hazardous work, the University may require additional authorizations before allowing performance of work at an LBNL site. The Subcontractor may proceed with all other work required by the Subcontract in preparation for performance of the work at an LBNL site.
The Subcontractor shall also ensure that all personnel who will perform the work at an LBNL site review the brochure entitled EH&S Orientation for Non-Construction Subcontractors, Vendors, and Affiliates, which is available at https://drive.google.com/file/d/1xswAn7dVveOhHaO7fPImZI-r5PtpDV-q/view?usp=drive_link.
The University's review and approval of the sJHA and issuance of work authorizations will satisfy the requirement of DEAR 970.5223-1 for the Subcontractor to submit documentation of a safety management system that identifies, analyzes, and establishes controls for the hazards associated with the work; however, it shall not be considered a determination of the adequacy of the Subcontractor's protections. Ensuring the adequacy of the protections for personnel at the work site, the public, and the environment shall at all times remain the responsibility of the Subcontractor.
article 8 - insurance
University Requirements
Types of Coverage The Subcontractor shall obtain, keep in force, and maintain insurance to cover its performance under this of the types and in the amounts set forth below. Such insurance shall be maintained in full force and effect during the performance of work required by this . The stipulation of required coverage and limits of insurance shall not in any way limit the liability of the Subcontractor.
| Commercial General Liability Insurance | Minimum Limit |
| Per Occurrence | $1,000,000 |
| Products/Completed Operations Aggregate | $2,000,000 |
| Personal and Advertising Injury | $1,000,000 |
| General Aggregate | $2,000,000 |
| Business Automobile Liability Insurance | Minimum Limit |
| Per Occurrence | $1,000,000 |
The automobile liability insurance shall cover liability to third parties related to the Subcontractor's use of any autos, including the Subcontractor's use of, and any resulting loss or destruction of, or damage to, University-furnished U.S. Government owned vehicles.
Workers' Compensation as required under California or other applicable State Law for any work not performed in California, and Employer's Liability Insurance with a minimum limit of $1,000,000 per accident and employee.
University Insurance Certificate Requirements
Waiver of Subrogation Endorsement The general and auto liability insurance shall include a waiver of subrogation in favor of the University and the U.S. Government. Statements on the certificate will not suffice. Submit a copy of the policy with the blanket coverage, or provide, an endorsement to the policy providing the required coverage, or an endorsement that provides a waiver of subrogation where required by contract or agreement.
Additional Insured Endorsement The general and auto liability insurance shall provide additional insured coverage. Submit a copy of the policy with the blanket coverage, or provide an endorsement to the policy that designates "The Regents of the University of California and the U.S. Government" as additional insureds, or an endorsement that designates additional insured coverage where required by contract or agreement. An endorsement naming additional insureds, as shown above, is required for umbrella policies when the underlying liability policies do not meet the stated requirements listed above. However, if the umbrella policy expressly states it is "follow form" of the underlying policies, an additional insured endorsement for the umbrella policy is not required if the certificate states the umbrella policy is follow form. Statements on the certificate will not suffice. Submit a copy of the policy with the blanket coverage, or provide an endorsement to the policy providing the required coverage.
Primary and Noncontributory Endorsement The general liability insurance coverage shall be primary and noncontributory and shall not participate with or be in excess over any other valid collectible insurance or program of self-insurance of the University or the U.S. Government. Statements on the certificate will not suffice. Submit a copy of the policy with the blanket coverage, or provide an endorsement to the policy providing the required coverage, or an endorsement that states that the subcontractor's insurance will be primary where required by contract or agreement.
Certificate Holder The Certificate Holder shall be listed as follows.
The Regents of the University of California and the U.S. Government Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA 94720
Rating The required insurance shall be obtained from insurance companies authorized to do business in California that have an A.M. Best rating of A: VII or better, or an equivalent Standard & Poor's rating of AA or better or Moody's rating of Aa or better; or that are acceptable to the University.
Deductible The certificate must state the deductible for the General Liability and Automobile Liability policies.
Self-Insurance Retention/Deductible The insurance shall not be subject to a self-insurance retention (SIR) or deductible of $250,000 or more without the written approval of the University Procurement Representative. Prerequisite to obtaining written approval of self-insurance retention (SIR) or deductible of $250,000 or more, Subcontractor shall submit to the University Procurement Representative a Certificate of Self Insurance, and a copy of the subcontractor's independent recent CPA audited or reviewed set of financial statements, including a balance sheet with the CPA's report, each acceptable to the University. If any of the insurance is written on a claims-made form, it shall continue for three years following completion or termination of this and provide for a retroactive date of placement prior to or coinciding with the effective date of this .
Applicability The insurance certificates submitted may be able to be applied to future LBNL s, and it is preferred that it not be made applicable, or reference, a specific .
Notification The Subcontractor or its insurers shall provide written notification to the University Procurement Representative at least 30 days in advance of any modification, change, or cancellation of any of the insurance coverage.
Lower-Tier Subcontractor Insurance The Subcontractor shall require its lower-tier subcontractors performing work at the worksite to maintain general, automobile, and employer's liability insurance with a minimum per-occurrence or aggregate limit of $1,000,000, as well as Workers' Compensation insurance at the statutory limits, and to confirm the required coverage before allowing the work at the worksite to commence.
Certificate Submission The University shall verify the Subcontractor's compliance with the insurance requirements contained in the .
The University will correspond directly with the Subcontractor to convey insurance deficiencies, and any other insurance documentation that may be lacking in order to establish full compliance with the University's insurance requirements.
Prior to commencing any Services at a location other than the Subcontractor's or lower-tier subcontractor's facilities, the Subcontractor shall provide certificate(s) of insurance (and insurance certificate renewals) confirming the required insurance coverage, by submitting them to the University at:
| Recipient | |
| Jane Graves | JEGraves@lbl.gov |
| Requester Name | test@test.com |
| Name – Post Award Subcontract Administrator | Insurance_Certificates@lbl.gov |
ARTICLE 9 - ENVIRONMENTALLY PREFERABLE PRODUCTS AND SERVICES
General The Laboratory is subject to several interacting initiatives and federal and DOE requirements related to sustainability, including waste reduction, Recycled Content Products (EPA Designated Products), Biobased, (BioPreferred®), energy efficient products (EnergyStar®), environmentally preferable and energy efficient electronics (EPEAT® and Federal Energy Management Program (FEMP) Designated Products), Non-Ozone Depleting Alternative Products (SNAP) and Water Efficient Plumbing Products (EPA Watersense®). The Laboratory also implements State of California requirements on packaging and electronic waste recycling.
The subcontractor must deliver products and services in compliance with this article which implements the requirements of DOE’s Sustainable Acquisition Program, as well as other federal- and state-mandated sustainability requirements.
In the performance of this , the Subcontractor must specify, furnish, and use environmentally preferable products and services (i.e., products and services with a lesser or reduced effect on human health and the environment), to the maximum possible extent consistent with the requirements herein, the General Provisions, and the intended end use of the products or services. The Laboratory generally considers the requirements practicable unless a specific program exception applies. Refer to SFTool.gov/Vendor Resources for links to sustainability resources and information on environmental programs the Laboratory and its suppliers/subcontractors are required to comply with, including exceptions.
DOE Order 436.1.A. In addition to the above programs, DOE Order 436.1.A requires:
The subcontractor must maximize, to the extent feasible, the procurement of materials and operations with lower embodied emissions and alternatives to ozone-depleting substances and high global warming potential hydrofluorocarbons.
The subcontractor must minimize, to the extent feasible, the supply of products and services determined by the EPA to be contaminants of emerging concern (CEC), including pharmaceuticals and personal care products and CECs found therein. The subcontractor shall provide Safer Choice labeled products under this subcontract, as applicable. The subcontractor is encouraged to visit https://www.epa.gov/saferchoice for updated lists of qualifying products.
The subcontractor must minimize the supply of products with toxic and hazardous characteristics, and minimize the generation of toxic and hazardous waste, to the maximum extent practicable.
E-Waste Recycling Requirements. All recyclers of electronic equipment must be e-Steward certified by the Basel Action Network (BAN).
For any equipment removed by the subcontractor and scheduled to be refurbished or recycled, the subcontractor must attest that those actions will be handled by a refurbisher or recycler that is third-party certified to one of the known electronics recycling certification programs that is used in the United States, the Responsible Recycling Standard (R2) or the E-Stewards Standard.
Information on environmentally preferable products and services is also available at: https://www.epa.gov/contracts/greening-government-procurement. State of California sustainable procurement information can be found at: https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html
Questions regarding these sustainable acquisition requirements may be directed to the Laboratory Sustainable Procurement Representative (Business-Assurance_Sustainable@lbl.gov
Packaging
The subcontractor must minimize the supply of single use items including single-use plastic foodware (e.g., plates, cups, utensils, beverage bottles and bags).
The subcontractor must make good faith efforts to utilize smart-size packing; to customize box sizes in order to reduce packaging waste, and to minimize the number of shipments per order. Recycling practices and methods should be used to minimize the adverse effects on the environment. The subcontractor must use every reasonable effort to use cardboard and paper-based packaging materials for shipments to the Laboratory.
Packaging Requirements
All packaging must be compliant with the California Toxics in Packaging Prevention Act (California AB 455). and must meet all additional standards and requirements set forth in the UC Sustainable Practices Policy. In addition, the Laboratory requires that all packaging meet at least one of the criteria listed below:
Uses bulk packaging;
Uses reusable packaging (e.g. totes reused by delivery service for next delivery);
Uses innovative packaging that reduces the weight of packaging, reduces packaging waste, or utilizes packaging that is a component of the product;
Maximizes recycled content and/or meets or exceeds the minimum post-consumer content level for packaging in the U.S. Environmental Protection Agency Comprehensive Procurement Guidelines;
Uses locally recyclable or certified compostable material.
Foam packaging is prohibited as follows:
Foam Ban – Food Service Packaging - The Laboratory does not allow packaging foam or expanded polystyrene (EPS) for takeaway containers or other food service items, in any University-owned or -operated food service facility.
Foam Ban – Product Packaging - The Laboratory prohibits all subcontracted and non-subcontracted suppliers from selling or distributing packaging foam (other than that utilized for laboratory supply or medical packaging) to the Laboratory. Packaging foam is defined as any open or closed cell, solidified, polymeric foam used for cushioning or packaging, including but not limited to: low-density polyethylene foam, polypropylene foam, polystyrene foam (i.e. EPS), polyurethane foam, polyethylene foam, polyvinyl chloride (PVC) foam, and microcellular foam. Not included in this ban are easily biodegradable, plant-based foams such as those derived from corn or mushrooms.
Energy-Consuming Products The Subcontractor must ensure that energy-consuming products are energy efficient.
"Energy efficient product" means a product that (i) meets the criteria for use of the Energy Star® trademark label, or (ii) is in the upper 25 percent of efficiency for all similar products as designated by the DOE Federal Energy Management Program (FEMP).
ENERGY STAR®: http://www.energystar.gov/products FEMP: https://www.energy.gov/eere/femp/energy-efficient-products-and-energy-saving-technologies SFTool.gov/Vendor Resources provides links to sustainability resources and information on environmental programs the Laboratory and its suppliers/subcontractors are required to comply with, including energy consuming products.
Reporting Requirements Energy Star® and FEMP Designated Products
The subcontractor must submit quarterly reports of products provided that are subject to Energy Consuming Products (Energy Star® and FEMP) by the 15th of January, April, July and October, and annual reports by October 15 in a format approved by the Laboratory Sustainable Procurement Representative.
Reports must be submitted to the University Procurement Representative, with a copy to the Laboratory Sustainable Procurement Representative (Business-Assurance-Sustainable@lbl.gov.
ARTICLE 10 - INCORPORATED DOCUMENTS
The following documents are hereby incorporated as a part of this . The order of precedence for each document must be as specified in the Entire Agreement and Order of Precedence clause in the General Provisions. Any other documents not incorporated herein by specific reference are excluded from this . The documents marked with an asterisk are available at http://procurement.lbl.gov/supplier-forms/.
Insurance Certificate Instructions, dated 5/28/21*
Statement of Work for Health Services Clinic Medical Equipment & Supplies, dated 09.02.25
Attachment A – Equipment & Supplies List dated 09.02.25
ARTICLE 11 - GENERAL PROVISIONS
The following General Provisions are incorporated by reference into this and are available at: http://procurement.lbl.gov/welcome-to-procurement-property/become-a-supplier/general-provisions/.
General Provisions for Commercial Supplies & Services, dated 01.31.25
The clauses listed in the referenced General Provisions shall be applicable to this Subcontract, based on the value of the Subcontract, the status of the Subcontractor, or the nature and location of the Services, as indicated in the General Provisions.
The following clauses are hereby added to the Clauses Incorporated by Reference clause of the General Provisions:
DEAR 952.223-78 SUSTAINABLE ACQUISITION PROGRAM (OCT 2010)
DEAR 970.5227-1 RIGHTS IN DATA-FACILITIES (DEC 2000)
(END OF SCHEDULE OF ARTICLES)
Subcontract No. XXXXXXX Page 1 image1.png
File details come from the government source that posted it. Updated .