This is a technical drawing/isometric site plan for a Combined Heat and Power (CHP) Plant facility at Yokota Air Force Base in Japan. The document was designed by the 374 Civil Engineer Squadron (374 CES/CENME) and issued for construction on May 21, 2021, with a contract number of 693664.
The drawing depicts the overall site layout and operational lines of demarcation for the CHP plant, organized by entity and shop responsibility. Key systems and components shown include six packaged AC units, distributed dry-pack step-down transformers, a reactor, ammonia storage tank and loading/delivery system, boiler systems with exhaust silencers and bypass stacks, chillers with bypass dampers and exhaust branching, HRSG (Heat Recovery Steam Generator) units with associated air fans and controls, main exhaust stacks, condensate sampling systems, and tank deaerator components. The plan identifies multiple operational shops with defined areas: Structure Shop, Electrical Shop, Power Production Shop, Boiler Shop, HVAC Shop, and WFSM Shop. The legend indicates responsibility assignments, including shared safety responsibilities across all operators, and notes that operational assignments between government parties and shops are subject to reassignment and changes. Electrical vaults connecting new west substation Building 532 and the CHP site are also identified. The site includes site fencing with electrical grounding/bonding systems, perimeter pole and bollard lighting, potable water correction systems, fresh/waste oil tanks, and natural gas isolation means with conditioning and compression equipment.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L I C
I T
A T
I O
N
N
O
F I L E
N
A M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F I L
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
P
L O
T
D
A T
E
D A
T E
C O
N T
R A
C T
SHEET
IDENTIFICATION
P A
C I F
I
R
F
R
C E
S
Y O
K O
F
R
B
S
E
J A
P A
N
C
E S
C
E N
M E
Y O
K O
B
S
E
B L
D G
F U
S S
A C
I T
Y
T
O K
Y
H O
W N
F O
U O
Y O
K O
H P
777 MAIN ST.
FORT WORTH, TX. 76102
M
Y
M a y
A N
S I
D
M d w g
C
F A
R R
B
H A
L L
M
R E
H F
E L D
T B
R
O M
E R
O
TEXAS REGISTERED
ENGINEERING FIRM F-2966
BRET M. ROMERO
102361
05/21/2021
ISSUED FOR CONSTRUCTION MBOW 2 THROUGH 7
M-200
O V
E R
A L L
S
I T
E
I S
O M
E T
R I C
V I E
W
TRUE
NORTH
TOP VIEW
SOUTHWEST VIEW SOUTHEAST VIEW
TRUE
NORTH
Contractor
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box Site Natural Gas Isolation Means, Natural Gas Conditioning Skid, Natural Gas Compression Skid
SESA399002
Text Box Fresh/Waste Oil Tanks & Oil Pumps
SESA399002
Rectangle
SESA399002
Text Box PECM and Associated Switchgear, Site Electrical Isolation Means
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box Electrical Shop
SESA399002
Text Box Power Pro. Shop
SESA399002
Rectangle
SESA399002
Text Box Air Compressors and Instrument Air Conditioning/Storage Skids
SESA399002
Rectangle
SESA399002
Text Box Boiler Shop
SESA399002
Rectangle
SESA399002
Text Box Site Perimeter Pole and Bollard Lights, TYP
SESA399002
Rectangle
SESA399002
Text Box Shared Responsibility: All Operators (SAFETY)
SESA399002
Rectangle
SESA399002
Text Box
CEMS
System
SESA399002
Text Box pH Correction Skid
SESA399002
Text Box Safety Shower
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box Boiler Chemical Skids
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box Site Effluent and Sump Tank/Pit
SESA399002
Text Box HRSG Boiler, Condensate Tank, Deaerator Tank, Blowdown Tank, Steam & Condensate Sampling
SESA399002
Rectangle
SESA399002
Text Box Main Exhaust Stack
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box Reactor
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box PPE & and Spill Kit Mats
SESA399002
Rectangle
SESA399002
Text Box Process SCADA
SESA399002
Text Box Elec. SCADA
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box Distributed dry-pack stepdown transformers
SESA399002
Text Box Site Fenceline & Electrical grounding/bonding system
SESA399002
Text Box 3.3kV Siemens Switchgear
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box Aisle Flood Lights, TYP
SESA399002
Rectangle
SESA399002
Text Box Bypass Dampers, Seal Air Fans/Dampers, Exhaust Breaching
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Line
SESA399002
Text Box Augmenting Air Fan
SESA399002
Text Box Exhaust Silencers, Bypass Stacks, and Dampers
SESA399002
Text Box CHP Plant Operation Lines of Demarcation by Entity/Shop (Updated: 4-9-2024)
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box HRSG Duct Burner & Controls
SESA399002
Text Box Exhaust Silencers, Bypass Stacks, and Dampers
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box
REG-3
SESA399002
Text Box Ammonia Piping & Delivery to Each Engine (Typ. 4)
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box HVAC Shop
SESA399002
Rectangle
SESA575837
Rectangle
SESA575837
Text Box
FA & UPS
Systems
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box WFSM Shop
SESA399002
Text Box Steam Shop
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box Packaged 6-ton AC Units (Typ. 3)
SESA399002
Rectangle
SESA399002
Text Box VFD's within PECM
SESA399002
Text Box Combustion Air Fan & HRSG Ducts
SESA399002
Text Box Ammonia Loading, Storage Tank, and Delivery Skids
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box Potable Water Service & BFP
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box
REG-4
SESA399002
Text Box
REG-2
SESA399002
Text Box
REG-1
SESA399002
Text Box Htg Network Lines/Vaults, to Airlift Ave
SESA399002
Rectangle
SESA399002
Text Box Steam + Condensate Isolation Valves
SESA399002
Rectangle
SESA399002
Rectangle
SESA399002
Text Box Electrical Vaults: Underground Manholes & Utilidor connecting New West Substation Bldg 532 and CHP Site
SESA399002
Text Box Note: No boxes drawn for the following distributed items:
1. Structure Shop will assess & address exterior paint touch up & pipe cladding/insulation repairs
2. Contractor will support various shops with distributed CHP equipment instrumentation, as part of the 12 month directive Note: Operational Assignments between Govt parties (Shops) are subject to re-assignment and changes, for clarification or additional tasks
SESA399002
Text Box
LEGEND
Untitled
File details come from the government source that posted it. Updated .