5. Price Breakdown Worksheet Blank.docx

DOCX document 24 KB Posted

Attached to
Z2DA-- Install Fall Protection | Project #570-21-109 |Fresno VA Medical Center
Solicitation number
36C26125R0030
Issued by

About this file

The provided file is a Price Breakdown Worksheet for Solicitation No. 36C26125R0030, a construction project to install fall protection at the Fresno VA Medical Center. The worksheet details cost breakdown across multiple construction divisions including General Requirements, Existing Conditions, Metals, Wood/Plastics/Composites, Thermal and Moisture Protection, and Finishes. The pricing template requires vendors to complete cost estimates for materials, labor, equipment, and other expenses for a base offer and three deduct alternate offers involving modifications to guardrail installations.

The associated federal contract opportunity is a firm-fixed price construction services project with a 330-calendar day performance period. The project requires vendors to provide comprehensive services including materials, labor, tools, equipment, transportation, supervision, project management, and specialized expertise for fall protection installation. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration, located in Fresno, California. Proposals are due by 4/14/2025 at 12:00pm (PT), to be submitted via email to Mr. Rosario Chaidez (Contract Specialist) and Mr. Daniel Jhun (Contracting Officer).

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 36C26125R0030 Attachment - Price Breakdown Worksheet

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL

Division 01 -General Requirements

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 02 – Existing Conditions
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 05 – Metals
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 06- Wood, Plastics and Composites
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 07- Thermal and Moisture Protection
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 07- Finishes
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
SUB TOTAL
$
$
$
$
$
Overhead
$
$
$
$
$
Profit
$
$
$
$
$
Bonds and Insurance
$
$
$
$
$
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
Total Proposal Base Offer =
$
$
$
$
$
Deduct Alternate No. 1 Offer = Base offer except change select guardrails at Building 1 & Building 24 from stainless steel to galvanized steel.
$
$
$
$
$

Deduct Alternate No. 2 Offer = Base offer except remove select guardrails (northside of breezeway) at Building 24.

$
$
$
$
$

Deduct Alternate No. 3 Offer = Base offer except remove guardrails at bridge between Building 1 & Building 32.

$
$
$
$
$

NOTE: All other costs may be included as a separate item and must be specified in this breakdown. Fill out worksheet completely, including base offer and all the deduct Alternates offers 1 thru 3.

See Solicitation Provision VAAR 852.236-92 and Instructions to Offerors regarding additive and deduct bid line items.

File details come from the government source that posted it. Updated .