5. Price Breakdown Worksheet Blank.docx
DOCX document 24 KB Posted
- Solicitation number
- 36C26125R0030
About this file
The provided file is a Price Breakdown Worksheet for Solicitation No. 36C26125R0030, a construction project to install fall protection at the Fresno VA Medical Center. The worksheet details cost breakdown across multiple construction divisions including General Requirements, Existing Conditions, Metals, Wood/Plastics/Composites, Thermal and Moisture Protection, and Finishes. The pricing template requires vendors to complete cost estimates for materials, labor, equipment, and other expenses for a base offer and three deduct alternate offers involving modifications to guardrail installations.
The associated federal contract opportunity is a firm-fixed price construction services project with a 330-calendar day performance period. The project requires vendors to provide comprehensive services including materials, labor, tools, equipment, transportation, supervision, project management, and specialized expertise for fall protection installation. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration, located in Fresno, California. Proposals are due by 4/14/2025 at 12:00pm (PT), to be submitted via email to Mr. Rosario Chaidez (Contract Specialist) and Mr. Daniel Jhun (Contracting Officer).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Part II RFI Responses - Install Fall Protection Fresno.pdf | ||
| 570-20-109 Install Fall Protection_Plans_ASI 001.pdf | ||
| 36C26125R0030 0005.docx | DOCX document | |
| 36C26125R0030 0004.docx | DOCX document | |
| Updated Clauses and Provisions Amendment P0003.pdf | ||
| 36C26125R0030 0003.docx | DOCX document | |
| DBA WD CA20250018 3 21 25.pdf | ||
| VHA ICRA - sample template.docx | DOCX document | |
| RFI Responses Install Fall Protection Fresno.pdf | ||
| 36C26125R0030 0003 RFI Responses.docx | DOCX document | |
| VA Fresno ACM Survey Asbestos Study 2012.pdf | ||
| 36C26125R0030 0002.docx | DOCX document | |
| 36C26125R0030 0001.docx | DOCX document | |
| Site Visit Sign-in Sheet 3 20 2025.pdf | ||
| 6. Request for Information Form Blank.docx | DOCX document | |
| 1. Drawings - 570 21 109.pdf | ||
| 4. DBA WD CA20250018 3 7 2025.pdf | ||
| 36C26125R0030_Solictation.docx | DOCX document | |
| 7. Pre-Proposal Site Visit Information.pptx | PPTX presentation | |
| 2. Specifications -570 21 109.pdf | ||
| 3. 100CD Basis of Design - Install Fall Protection.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C26125R0030 Attachment - Price Breakdown Worksheet
| DESCRIPTION |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
Division 01 -General Requirements
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 02 – Existing Conditions |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 05 – Metals |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 06- Wood, Plastics and Composites |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 07- Thermal and Moisture Protection |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 07- Finishes |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| SUB TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| Overhead |
| $ |
| $ |
| $ |
| $ |
| $ |
| Profit |
| $ |
| $ |
| $ |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| $ |
| $ |
| $ |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| Total Proposal Base Offer = |
| $ |
| $ |
| $ |
| $ |
| $ |
| Deduct Alternate No. 1 Offer = Base offer except change select guardrails at Building 1 & Building 24 from stainless steel to galvanized steel. |
| $ |
| $ |
| $ |
| $ |
| $ |
Deduct Alternate No. 2 Offer = Base offer except remove select guardrails (northside of breezeway) at Building 24.
| $ |
| $ |
| $ |
| $ |
| $ |
Deduct Alternate No. 3 Offer = Base offer except remove guardrails at bridge between Building 1 & Building 32.
| $ |
| $ |
| $ |
| $ |
| $ |
NOTE: All other costs may be included as a separate item and must be specified in this breakdown. Fill out worksheet completely, including base offer and all the deduct Alternates offers 1 thru 3.
See Solicitation Provision VAAR 852.236-92 and Instructions to Offerors regarding additive and deduct bid line items.
File details come from the government source that posted it. Updated .