570-20-109 Install Fall Protection_Plans_ASI 001.pdf
PDF 2 MB Posted
- Solicitation number
- 36C26125R0030
About this file
These architectural drawings are for a Fall Protection Installation project at the Fresno VA Medical Center. The drawings cover multiple buildings (Buildings OPC, 01, 02, 22, 03, 24, 28, 31, and 32), providing reflected ceiling plans, roof plans, and typical construction details for installing fall protection systems. The plans include specific instructions for removing and patching various ceiling types (acoustical tiles, gypsum board, plaster) to accommodate guardrail and tie-down anchorage installations.
Key technical specifications include detailed notes about protecting existing infrastructure, verifying roof deck heights, and carefully removing and reinstalling ceiling materials. The drawings reference multiple applicable standards, including the 2021 International Building Code, 2021 NFPA 101 Life Safety Code, OSHA Standards, and VA Design Documents. The project involves precise ceiling modifications across different building sections to implement fall protection measures, with careful attention to maintaining the existing architectural finishes and functional integrity of the spaces.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Part II RFI Responses - Install Fall Protection Fresno.pdf | ||
| 36C26125R0030 0005.docx | DOCX document | |
| 36C26125R0030 0004.docx | DOCX document | |
| Updated Clauses and Provisions Amendment P0003.pdf | ||
| 36C26125R0030 0003.docx | DOCX document | |
| DBA WD CA20250018 3 21 25.pdf | ||
| VHA ICRA - sample template.docx | DOCX document | |
| RFI Responses Install Fall Protection Fresno.pdf | ||
| 36C26125R0030 0003 RFI Responses.docx | DOCX document | |
| VA Fresno ACM Survey Asbestos Study 2012.pdf | ||
| 36C26125R0030 0002.docx | DOCX document | |
| 36C26125R0030 0001.docx | DOCX document | |
| Site Visit Sign-in Sheet 3 20 2025.pdf | ||
| 6. Request for Information Form Blank.docx | DOCX document | |
| 1. Drawings - 570 21 109.pdf | ||
| 4. DBA WD CA20250018 3 7 2025.pdf | ||
| 36C26125R0030_Solictation.docx | DOCX document | |
| 7. Pre-Proposal Site Visit Information.pptx | PPTX presentation | |
| 5. Price Breakdown Worksheet Blank.docx | DOCX document | |
| 2. Specifications -570 21 109.pdf | ||
| 3. 100CD Basis of Design - Install Fall Protection.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPLICABLE STANDARDS:
VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
2021 International Building Code (IBC) (Only when specifically referenced in VA Design Documents, see notes below)
2021 NFPA 101 Life Safety Code
2022 NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations
2018 NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
Occupational, Safety and Health Administration (OSHA) Standards
2019 VA Seismic Design Requirements, H-18-8
2020 National Electrical Code (NEC) (NFPA 70)
2018 International Plumbing Code (IPC)
2019 Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.
2023 ASME Boiler and Pressure Vessel Code
ASME Code for Pressure Piping
2015 Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)
Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)
Energy policy Act of 2005 (EPAct)
DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High- Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)
Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01 00 00 of the VA Master Construction Specification.
Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2016.
Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2016.
UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN
THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF PROJECT SUBMISSION (U.N.O.)
AB
A
ANCHOR BOLT
AD AREA DRAIN
ADDL ADDITIONAL
ADH
ADDITIONAL
ADHESIVE
ADJ
AFF
ADJACENT
AFG
ABOVE FINISH FLOOR
AFS
ABOVE FINISH GRADE
ABOVE FINISH SLAB
ALUM
ALT
ALUMINUM
ALTERNATE
APPROX
ARCH
APPROXIMATE(LY)
ARCHITECT(URAL)
ASPH ASPHALT
AVG AVERAGE
B
BD BOARD
BTWN
BLDG
BETWEEN
BUILDING
BM
BOT
BENCHMARK
BOTTOM
BITUM BITUMINOUS
BOS BOTTOM OF STEEL
C
CEM CEMENT, CEMENTITIOUS
CJ CONTROL JOINT
CL
CLG
CLR
CMU
COL
CONC
CONN
CONSTR
CONT
CONTR
CORR
CU
CW
CENTER LINE
CEILING
CLEAR
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CORRUGATED
CUBIC
COLD WATER
D
D
DEPTH
DBL DOUBLE
DEG DEGREE
DEMO DEMOLISH
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIM PT DIMENSION POINT
DIST DISTANCE
DN DOWN
DR DRAIN
DS DOWNSPOUT
DWG DRAWING
DWGS DRAWINGS
(E)
E
EXISTING
EA EACH
EDR EQUIPMENT DRAWING
EIFS EXTERIOR INSULATION FINISH SYSTEM
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EOS EDGE OF SLAB
EP ELECTRICAL PANEL
EPB ELECTRICAL PANEL BOARD
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
EST ESTIMATE(D)
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
FXTR FIXTURE
G
G
GAS
H
H
HIGH
GA GAUGE, GAGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GL GLASS
GLU LAM GLUE LAMINATED
GLZ GLAZING
GR GRADE OR GRADING
ID
I
INSIDE DIAMETER
J
L
L
LENGTH, LONG
M
M
METERS
(N)
N
NEW
P
Q
R
R
RISER
S SOUTH
T
W
W
WEST
XFMR
X
TRANSFORMER
YD
Y
YARD
HDW HARDWARE
HGT HEIGHT
HNDRL HANDRAIL
HORIZ HORIZONTAL
HPT HIGH POINT
HVAC HEATING-VENTILATION-AIR CONDITIONING
IN INCH
INCL INCLUDE, INCLUDING
INFO INFORMATION
INSUL INSULATION
INTR INTERIOR
JST JOIST
JT JOINT
LB POUND
LF LINEAR FOOT
LG LENGTH
LIN LINEAR
LPT LOW POINT
LT LIGHT
LTG LIGHTING
LVR LOUVER
HW HOT WATER
S
MACH MACHINE
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MM MILLIMETERS
MOD MODULE, MODULAR
MTD MOUNTED
MTG MOUNTING
MVBL MOVABLE
NA NOT APPLICABLE
NE NORTHEAST
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOICE REDUCTION COEFFICIENT
NTS NOT TO SCALE
NW NORTHWEST
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
PNL BD PANEL BOARD
PNT PAINT
PR PAIR
PRCST PRECAST
PREP PREPARATION
PREFAB PREFABRICATION
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTN PARTITION
PVG PAVING
PVMT PAVEMENT
PWR POWER
QTR QUARTER
QTY QUANTITY
RAD RADIUS
RD ROOF DRAIN
RECT RECTANGULAR
REF REFERENCE
REINF REINFORCE (D) (ING) (MENT)
REQD REQUIRED
REQT REQUIREMENT
RET RETURN
REV REVISION
RHMS ROUND HEAD MACHINE SCREW
RHWS ROUND HEAD WOOD SCREW
RM ROOM
RND ROUND
SCHED SCHEDULE
SCRN SCREEN
SE SOUTHEAST
SECT SECTION
SEG SEGMENT
SEP SEPARATION OR SEPARATE
SEP JT SEPARATION JOINT
SHT SHEET, SHEETING
SIM SIMILAR
SMS SHEET METAL SCREW
SP SPACE, SPACED, SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SST STAINLESS STEEL
ST STREET
STAG STAGGERED
STC SOUND TRANSMISSION COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
STS SELF-TAPPING STEEL
SUSP SUSPENDED
SVCE SERVICE
SW SOUTHWEST
SYMM SYMMETRICAL
SYST SYSTEM
T&B TOP AND BOTTOM
TC TOP OF CONCRETE, TOP OF CURB
TEL TELEPHONE
TEMP TEMPORARY
THERM THERMAL
THK THICK, THICKNESS
THRES THRESHOLD
THRU THROUGH
TMPD GL TEMPERED GLASS
TO TOP OF
TOR TOP OF RAILING
TOS TOP OF STEEL
TOT TOTAL
TOW TOP OF WALL
TP TOP OF PAVEMENT
TTB TELEPHONE TERMINAL BOARD
U
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTABLE POWER SUPPLY
UTIL UTILITY
W/ WITH
W/O WITHOUT
WD WOOD
WDW WINDOW
WGL WIRE GLASS
WM WIRE MESH
WO WHERE OCCURS
WPT WORKING POINT
WR WATER RESISTANT
WSCT WAINSCOT
WSP WET STANDPIPE
WT WEIGHT
WTHPRF WEATHERPROOF
WTRPRF WATERPROOF
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
BUR BUILT UP ROOFING SYSTEM
F
FA FIRE ALARM
FAS FIRE ALARM STATION
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FF FINISH FACE
FHMS FLAT HEAD MACHINE SCREW
FHWS FLAT HEAD WOOD SCREW
FLAM FLAMMABLE
FLASH FLASHING
FLEX FLEXIBLE
FO FACE OF
FSTNR FASTENER
FT FOOT, FEET
OC
O
ON CENTER
PA PUBLIC ADDRESS
OA OVERALL
OD OUTSIDE DIAMETER
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
OVHD OVERHEAD
PART PARTIAL
PCF POUNDS PER CUBIC FOOT
PCI POUNDS PER CUBIC INCH
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PI POINT OF INTERSECTION
PL PLATE
P
V
VB VALVE BOX
VERT VERTICAL
VIT VITREOUS
VP VENT PIPE
VOL VOLUME
ABBREVIATIONS
SYMBOLS
ANGLE
@ AT
C CENTER LINEL
Ø DIAMETER
= EQUAL
> GREATER THAN
< LESS THAN
± PLUS OR MINUS (TOLERANCE)
# POUND(S)
' FOOT OR FEET
" INCH OR INCHES
FOF FACE OF FINISH
HSS HOLLOW STRUCTURAL STEEL
SYMBOLS LEGEND
N
SHEET
NORTH IDENTIFIER
ELEVATION
IDENTIFIER
KEY NOTE TAG
CALL-OUT IDENTIFIER
? PHOTOGRAPH
LOCATIONS
SHEET #
REF # ON SHEET
TPO T.P.O ROOFING
GENERAL NOTES:
1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED BY
THE "INDEX OF DRAWINGS".
2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE
DRAWINGS OF ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE – REFER
TO THE "SHEET INDEX".
3. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE
INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND
ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
THIS PROJECT AND ALL PARTS OF THE WORK ASSOCIATED WITH THE PROJECT -
INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC - SHALL COMPLY WITH ALL
APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND LAWS OF ALL
FEDERAL, STATE, DISTRICT, TERRITORIAL, AND LOCAL GOVERNMENT AUTHORITIES HAVING
JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,
WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT.
NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE NOR
PERMIT WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION,
ORDINANCE, OR LAW.
4. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT
ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS.
5. SCHEDULE & COORDINATE CONSTRUCTION WORK HOURS TO ACCOMMODATE THE
OPERATION OF THE FACILITY.
6. THE ARCHITECTURAL DRAWINGS ARE A PART OF A LARGER SET OF DRAWINGS WHICH,
WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE
SET OF DRAWINGS, WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE "SHEET
INDEX". PARTIAL SETS OF DRAWINGS ARE INCOMPLETE.
THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND
ELEVATIONS ILLUSTRATE THE DESIGN INTENT. THE ARCHITECTURAL DRAWINGS
ESTABLISH AND COORDINATE THE FINISHED APPEARANCE AND LOCATION OF MANY, BUT
NOT ALL, EXPOSED ELEMENTS OF THE WORK. THE STRUCTURAL, MECHANICAL,
ELECTRICAL, PLUMBING, OTHER DRAWINGS, AND JOB SPECIFICATIONS ARE
SUPPLEMENTARY TO THE ARCHITECTURAL WORKING DRAWINGS.
THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY
THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURER
INSTALLATION REQUIREMENTS. SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH
OTHER, BIDS SHALL BE BASED ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND
QUANTITY OF WORK INDICATED. ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL
BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER FOR
CLARIFICATION.
7. THE SPECIFICATIONS ARE INTENDED TO COMMUNICATE THE DETAILED PROPERTIES AND
QUALITY OF THE INDIVIDUAL MATERIALS, ASSEMBLIES, AND SYSTEMS THAT COMPRISE THE
WORK; THE FUNCTIONAL AND PERFORMANCE REQUIREMENTS FOR THE INDIVIDUAL PARTS
OF THE WORK; AND THE FABRICATION AND INSTALLATION REQUIREMENTS FOR INDIVIDUAL
PARTS OF THE WORK - THE SPECIFICATIONS TAKE PRECEDENCE OVER THE DRAWINGS
WITH RESPECT TO INFORMATION OF THIS NATURE.
8. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
A. ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT
OR ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE
MANUFACTURES AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR
ASSEMBLY ILLUSTRATED BY THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR
ASSEMBLY.
B. THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN
LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY THE
CONTRACTING OFFICER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE (AT NO
ADDITIONAL EXPENSE TO THE GOVERNMENT) FOR ALL COORDINATION AND
REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME
FUNCTIONAL AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE "BASIS OF
DESIGN" SHOWN IN THE CONTRACT DOCUMENTS.
C. THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS
VARY FROM THAT SHOWN BY THE DRAWINGS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE COORDINATION OF THE WORK OF THE TRADES,
SUBCONTRACTORS, AND MATERIAL SUPPLIERS
GENERAL NOTES CONTINUED:
9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH ALL REQUIREMENTS OF THE
CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT
ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE
REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK
OF THAT PARTY.
CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES
NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,
DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED
IN THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, OR PATCHING
THAT MAY BE REQUIRED TO COMPLETE WORK OR TO MAKE ITS SEVERAL PARTS FIT
TOGETHER.
10. THE CONTRACTOR SHALL, IN ADVANCE OF THE WORK, PREPARE COORDINATION
DRAWINGS SHOWING THE LOCATION OF OPENINGS THROUGH SLABS, THE PIPE SLEEVES
AND HANGER INSERTS, AS WELL AS THE LOCATION AND ELEVATION OF UTILITY LINES,
INCLUDING, BUT NOT LIMITED TO, CONVEYOR SYSTEMS, PNEUMATIC TUBES, DUCTS, AND
CONDUITS AND PIPES TWO INCHES AND LARGER IN DIAMETER WITH THEIR SUPPORTS.
THESE DRAWINGS, INCLUDING PLANS, ELEVATIONS, AND SECTIONS AS APPROPRIATE,
SHALL CLEARLY SHOW THE MANNER IN WHICH THE UTILITIES FIT INTO THE AVAILABLE
SPACE AND RELATE TO EACH OTHER AND TO EXISTING BUILDING ELEMENTS. DRAWINGS
SHALL BE OF APPROPRIATE SCALE TO SATISFY THE PREVIOUSLY STATED PURPOSES, BUT
NOT SMALLER THAN 3/8” SCALE. DRAWINGS MAY BE COMPOSITE (WITH DISTINCTIVE
COLORS FOR THE VARIOUS TRADES) OR MAY BE SEPARATE BUT FULLY COORDINATED
DRAWINGS OF THE SAME SCALE. SEPARATE DRAWINGS SHALL BE ALIGNED TO DEPICT
IDENTICAL BUILDING AREAS OR SECTIONS AND SHALL BE CAPABLE OF BEING OVERLAID IN
ANY COMBINATION. THE SUBMITTED DRAWINGS FOR A GIVEN AREA OF THE PROJECT
SHALL SHOW THE WORK OF ALL TRADES THAT WILL BE INVOLVED IN THAT PARTICULAR
AREA. COMPLETE COMPOSITE DRAWINGS IN ELECTRONIC FORMAT SHALL BE RECEIVED BY
THE GOVERNMENT NOT LESS THAN 20 FEDERAL WORKING DAYS PRIOR TO THE
SCHEDULED START OF THE WORK IN THE AREA ILLUSTRATED BY THE DRAWINGS, FOR THE
PURPOSE OF SHOWING THE CONTRACTOR’S PLANNED METHODS OF INSTALLATION. THE
OBJECTIVES OF SUCH DRAWINGS ARE TO PROMOTE CAREFULLY PLANNED WORK
SEQUENCE AND PROPER TRADE COORDINATION, IN ORDER TO ASSURE THE EXPEDITIOUS
SOLUTIONS OF PROBLEMS AND THE INSTALLATION OF LINES AND EQUIPMENT AS
CONTEMPLATED BY THE CONTRACT DOCUMENTS WHILE AVOIDING OR MINIMIZING
ADDITIONAL COSTS TO THE CONTRACTOR AND TO THE GOVERNMENT. IN THE EVENT THE
CONTRACTOR, IN COORDINATING THE VARIOUS INSTALLATIONS AND IN PLANNING THE
METHOD OF INSTALLATION, FINDS A CONFLICT IN LOCATION OR ELEVATION OF ANY OF THE
UTILITIES WITH THEMSELVES, WITH STRUCTURAL ITEMS OR WITH OTHER CONSTRUCTION
ITEMS, THE GENERAL CONTRACTOR SHALL BRING THIS CONFLICT TO THE ATTENTION OF
THE CONTRACTING OFFICER IMMEDIATELY.
IN DOING SO, THE CONTRACTOR SHALL EXPLAIN THE PROPOSED METHOD OF SOLVING THE
PROBLEM OR SHALL REQUEST INSTRUCTIONS AS TO HOW TO PROCEED IF ADJUSTMENTS
BEYOND THOSE OF USUAL TRADES’ COORDINATION ARE NECESSARY. INSTALLATION OF
UTILITIES WORK WILL NOT PROCEED IN ANY AREA PRIOR TO THE SUBMISSION AND
COMPLETION OF THE GOVERNMENT REVIEW OF THE COORDINATION DRAWINGS FOR THAT
AREA, NOR IN ANY AREA IN WHICH CONFLICTS ARE DISCLOSED BY THE COORDINATION
DRAWINGS, UNTIL THE CONFLICTS HAVE BEEN CORRECTED TO THE SATISFACTION OF THE
CONTRACTING OFFICER. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO
SUBMIT THE REQUIRED DRAWINGS IN A TIMELY MANNER CONSISTENT WITH THE
REQUIREMENTS TO COMPLETE THE WORK COVERED BY THIS CONTRACT WITHIN THE
PRESCRIBED CONTRACT TIME.
11. THE ARCHITECT / ENGINEERS SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT
BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON
PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL
CONTRACTOR.
12. ALL WORK NOTED "N.I.C." OR "NOT IN CONTRACT" IS TO BE ACCOMPLISHED BY A
CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND IS NOT TO BE PART OF THE
CONSTRUCTION AGREEMENT. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE TO
COORDINATE WITH ALL "OTHER" CONTRACTORS PER REQUIREMENTS ESTABLISHED BY
GOVERNMENT, WHICH ARE UNDER SEPARATE CONTRACT WITH THE GOVERNMENT.
13. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE
REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF
THE GOVERNMENT SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. THE
CONTRACTOR SHALL PROMPTLY CORRECT ALL WORK REJECTED BY THE GOVERNMENT AS
DEFECTIVE OR AS FAILING TO CONFORM TO THE CONTRACT DOCUMENTS WHETHER
OBSERVED BEFORE OR AFTER SUBSTANTIAL COMPLETION AND WHETHER OR NOT
FABRICATED, INSTALLED OR COMPLETED. THE CONTRACTOR SHALL BEAR ALL COSTS OF
CORRECTING SUCH REJECTED WORK.
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
AA/RF
GI001
SHEET INDEX, APPLICABLE
STANDARDS & GENERAL NOTES
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
04/24/2025
ASI 001
N/A
22042
APPLICABLE STANDARDS SHEET INDEX
PROJECT GENERAL NOTES
BLDG 0PC
GI100 BUILDING OPC ROOF REFERENCE PLAN
AD200 BUILDING OPC ROOF DEMOLITION PLAN
AE200 BUILDING OPC ROOF RENOVATION PLAN
AE300 BUILDING OPC WALKWAY REFLECTED CEILING PLAN
AE500 BUILDING OPC EXTERIOR ELEVATIONS & WALL SECTIONS
S200 BUILDING OPC ROOF RENOVATION STRUCTURAL PLAN & DETAILS
BLDG 01
GI101 BUILDING 01 ROOF REFERENCE PLAN
GI101A BUILDING 01 LOBBY ROOF REFERENCE PLAN
GI101B BUILDING 01 UPPER ROOF - WEST REFERENCE PLAN
GI101C BUILDING 01 UPPER ROOF - EAST REFERENCE PLAN
GI101D BUILDING 01 PHARMACY ROOF REFERENCE PLAN
AD201A BUILDING 01 LOBBY ROOF DEMOLITION PLAN
AD201B BUILDING 01 UPPER ROOF - WEST DEMOLITION PLAN
AD201C BUILDING 01 UPPER ROOF - EAST DEMOLITION PLAN
AD201D BUILDING 01 PHARMACY ROOF DEMOLITION PLAN
AE201A BUILDING 01 LOBBY ROOF RENOVATION PLAN
AE201B BUILDING 01 UPPER ROOF - WEST RENOVATION PLAN
AE201C BUILDING 01 UPPER ROOF - EAST RENOVATION PLAN
AE201D BUILDING 01 PHARMACY ROOF RENOVATION PLAN
AE301A BUILDING 01 LOBBY ROOF REFLECTED CEILING PLAN
AE501A BUILDING 01 EXTERIOR ELEVATIONS
AE501B BUILDING 01 EXTERIOR ELEVATIONS
AE501C BUILDING 01 EXTERIOR ELEVATIONS & WALL SECTIONS
AE501D BUILDING 01 EXTERIOR ELEVATIONS & WALL SECTIONS
S201 BUILDING 01 UPPER ROOF RENOVATION STRUCTURAL PLAN
S201A BUILDING 01 LOBBY ROOF RENOVATION STRUCTURAL PLAN
S201B BUILDING 01 UPPER WEST ROOF RENOVATION STRUCTURAL PLAN
S201C BUILDING 01 UPPER EAST ROOF RENOVATION STRUCTURAL PLAN
S201D BUILDING 01 PHARMACY ROOF RENOV. STRUCTURAL PLAN & DETAILS
BLDG 02 & 22
GI102 BUILDINGS 02 & 22 ROOF REFERENCE PLAN
GI102A BUILDINGS 02 & 22 ROOF REFERENCE PHOTOS
AD202 BUILDING 02 & 22 ROOF DEMOLITION PLAN
AE202 BUILDING 02 & 22 ROOF RENOVATION PLAN
AE502 BUILDING 02 & 22 EXTERIOR ELEVATIONS
AE602 BUILDING 02 & 22 WALL SECTIONS
S202A BUILDING 02 ROOF RENOVATION STRUCTURAL PLAN & DETAILS
S202B BUILDING 22 ROOF RENOVATION STRUCTURAL PLAN & DETAILS
BLDG 03
GI103 BUILDING 03 ROOF REFERENCE PLAN
AD203 BUILDING 03 ROOF DEMOLITION PLAN
AE203 BUILDING 03 ROOF RENOVATION PLAN
AE303 BUILDING 03 REFLECTED CEILING PLAN
AE503 BUILDING 03 EXTERIOR ELEVATIONS
S203 BUILDING 03 ROOF RENOVATION STRUCTURAL PLAN & DETAILS
BLDG 24
GI124A BUILDING 24 ROOF REFERENCE PLAN
GI124B BUILDING 24 ROOF REFERENCE PHOTOS
AD224A BUILDING 24 ROOF- NORTH DEMOLITION PLAN
AD224B BUILDING 24 ROOF - SOUTH DEMOLITION PLAN
AE224A BUILDING 24 ROOF - NORTH RENOVATION PLAN
AE224B BUILDING 24 ROOF - SOUTH RENOVATION PLAN
AE324A BUILDING 24 - NORTH REFLECTED CEILING PLAN
AE324B BUILDING 24 - SOUTH REFLECTED CEILING PLAN
AE524A BUILDING 24 EXTERIOR ELEVATIONS
AE524B BUILDING 24 EXTERIOR ELEVATIONS
AE624A BUILDING 24 WALL SECTIONS
S224 BUILDING 24 ROOF OVERALL RENOVATION STRUCTURAL PLAN
S224A BUILDING 24 SOUTH ROOF RENOVATION STRUCTURAL PLANS & DETAILS
S224B BUILDING 24 NORTH & PENTHOUSE ROOF RENOVATION STRUCTURAL PLAN &
DETAILS
BLDG 28
GI128 BUILDING 28 ROOF REFERENCE PLAN
AD228 BUILDING 28 ROOF DEMOLITION PLAN
AE228 BUILDING 28 ROOF RENOVATION PLAN
AE328 BUILDING 28 REFLECTED CEILING PLAN
S228 BUILDING 28 ROOF RENOVATION STRUCTURAL PLAN & DETAILS
BLDG 31
GI131 BUILDING 31 ROOF REFERENCE PLAN
GI131A BUILDING 31 ROOF - NORTH REFERENCE PLAN
GI131B BUILDING 31 ROOF - CENTER REFERENCE PLAN
GI131C BUILDING 31 ROOF - EAST REFERENCE PLAN
GI131D BUILDING 31 ROOF - SOUTH REFERENCE PLAN
AD231A BUILDING 31 ROOF - NORTH DEMOLITION PLAN
AD231B BUILDING 31 ROOF - CENTER DEMOLITION PLAN
AD231C BUILDING 31 ROOF - EAST DEMOLITION PLAN
AD231D BUILDING 31 ROOF - SOUTH DEMOLITION PLAN
AE231A BUILDING 31 ROOF - NORTH RENOVATION PLAN
AE231B BUILDING 31 ROOF - CENTER RENOVATION PLAN
AE231C BUILDING 31 ROOF - EAST RENOVATION PLAN
AE231D BUILDING 31 ROOF - SOUTH RENOVATION PLAN
AE331A BUILDING 31 - NORTH REFLECTED CEILING PLAN
AE331B BUILDING 31 - CENTER REFLECTED CEILING PLAN
AE531A BUILDING 31 EXTERIOR ELEVATIONS
AE531B BUILDING 31 EXTERIOR ELEVATIONS & WALL SECTIONS
S231 BUILDING 31 ROOF OVERALL RENOVATION STRUCTURAL PLAN
S231A BUILDING 31 NORTH & PENTHOUSE ROOF RENOVATION STRUCTURAL PLAN
S231B BUILDING 31 CENTRAL ROOF RENOVATION STRUCTURAL PLAN
S231C BUILDING 31 EAST ROOF RENOVATIONSTRUCTURAL PLAN
S231D BUILDING 31 SOUTH ROOF RENOVATION STRUCTURAL PLAN
BLDG 32
GI132 BUILDING 32 REFEERENCE PLAN
AD232 BUILDING 32 ROOF DEMOLITION PLAN
AE232 BUILDING 32 ROOF RENOVATION PLAN
AE532A BUILDING 32 EXTERIOR ELEVATIONS
AE532B BUILDING 32 EXTERIOR ELEVATIONS
S232A BUILDING 32 ROOF RENOVATION STRUCTURAL PLANS & DETAILS
S232B BUILDING 32 ROOF RENOVATION ADD'L STRUCTURAL PLANS & DETAILS
DETAILS
AE1000 TYPICAL DETAILS
AE1001 TYPICAL DETAILS
AE1002 TYPICAL DETAILS
GENERAL
GI000 COVER SHEET
GI001 SHEET INDEX, APPLICABLE STANDARDS & GENERAL NOTES
GI002 OVERALL REFERENCE SITE PLAN
S-000 STRUCTURAL SHEET INDEX, APPLICABLE STANDARDS, & GENERAL NOTES
Rev. Date Description
1 04/24/2025 ASI 001
04/24/2025
Exp. 12.31.2025
OPEN AIR
3A01A
S
S
S
S
N
+8'-0"
+8'-0"
BUILDING OPC
LOWER ROOF
(NO CEILING WORK)
BUILDING 01
NO CEILING WORK
BUILDING 01
NO CEILING WORK
212212
NOTE: ROOF DECK HEIGHT
APPROXIMATELY 37'-4" FROM A.F.F.
CONTRACTOR TO VERIFY
Corridor 3-1
212212
1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,
MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE
THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING
CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED
THROUGHOUT THE DURATION CONSTRUCTION.
2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND
SURROUNDING SURFACES SHALL BE PROTECTED DURING
CONSTRUCTION.
3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER
CONSTRUCTION IS COMPLETED.
4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING.
GENERAL NOTES:
EXISTING CEILING LEGEND:
GYPSUM BOARD SOFFIT or
SUSPENDED CEILING
SUSPENDED ACOUSTICAL TILE
CEILING SYSTEM
RECESSED DOWN LIGHT
ILLUMINATED EXIT SIGNAGE w/ 90min
BACK UP (REFER TO ELECTRICAL
PLANS)
1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED
LIGHT FXTURE (REFER TO ELECTRICAL)
FIRE SPRINKLER HEAD
RETURN REGISTER
(REFER TO MECHANICAL DWGS.)
SUPPLY REGISTER
(REFER TO MECHANICAL DWGS.)
EXHAUST REGISTER
(REFER TO MECHANICAL DWGS.)
SKYLIGHT
DOWNLIGHT STRIP
CEILING MOUNTED FA STROBE LIGHT
CEILING MOUNTED SMOKE DETECTOR
CEILING MOUNTED SPEAKER
ACCESS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
JI
AE300
BUILDING OPC WALKWAY REFLECTED
CEILING PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
04/24/2025
ASI 001
N/A
22042
KEY PLAN
1/4" = 1'-0"
OPC Walkway Level 3 - Reflected Ceiling Plan
N
Rev. Date Description
1 04/24/2025 ASI 001
Key Notes
154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.
212 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
ACOUSTICAL CEILING TILES AS NECESSARY TO EXPOSE
AREA OF WORK. PROTECT AND SAVE FOR
RE-INSTALLATION. RE-INSTALL CEILING TILES IN THE SAME
PLACE AFTER WORK IS COMPLETED.
04/23/2025
Exp. 12.31.2025
S
BUILDING 01
LEVEL 2
(NO CEILING WORK)
BUILDING OPC
LEVEL 2
(NO CEILING WORK)
213213
+8'-0" +8'-0"
+8'-0"+8'-0" +8'-0" +8'-0" +8'-0"
+8'-0"
+8'-0"
STORAGE
2A02A.2
STORAGE
2A02D.1
155155
NOTE: ROOF DECK HEIGHT
APPROXIMATELY 25'-6" FROM A.F.F.
CONTRACTOR TO VERIFY
Chapel Corridor Corridor
2A02
Chapel
Nursing Informaties
Office 2A02D
Storage 2A03
Equipment Room 2A07C
MRI Scanner 2A07D
Closet 2A07E
1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,
MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE
THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING
CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED
THROUGHOUT THE DURATION CONSTRUCTION.
2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND
SURROUNDING SURFACES SHALL BE PROTECTED DURING
CONSTRUCTION.
3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER
CONSTRUCTION IS COMPLETED.
4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING.
GENERAL NOTES:
N
EXISTING CEILING LEGEND:
GYPSUM BOARD SOFFIT or
SUSPENDED CEILING
SUSPENDED ACOUSTICAL TILE
CEILING SYSTEM
RECESSED DOWN LIGHT
ILLUMINATED EXIT SIGNAGE w/ 90min
BACK UP (REFER TO ELECTRICAL
PLANS)
1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED
LIGHT FXTURE (REFER TO ELECTRICAL)
FIRE SPRINKLER HEAD
RETURN REGISTER
(REFER TO MECHANICAL DWGS.)
SUPPLY REGISTER
(REFER TO MECHANICAL DWGS.)
EXHAUST REGISTER
(REFER TO MECHANICAL DWGS.)
SKYLIGHT
DOWNLIGHT STRIP
CEILING MOUNTED FA STROBE LIGHT
CEILING MOUNTED SMOKE DETECTOR
CEILING MOUNTED SPEAKER
ACCESS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
JI
AE301A
BUILDING 01 - LEVEL 2 REFLECTED
CEILING PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
04/24/2025
ASI 001
N/A
22042
3/16" = 1'-0"
Building 01 - Level 2 Reflective Ceiling Plan
N
KEY PLAN
Rev. Date Description
1 04/24/2025 ASI 001
Key Notes
154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.
155 (E) MEDICAL GAS PIPING IN CEILING. PROTECT IN PLACE.
213 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
GYPSUM BOARD CEILING AS NECESSARY TO EXPOSE
AREA OF WORK. PATCH, REPAIR & PAINT GYPSUM BOARD
TO MATCH EXISTING CONDITIONS AFTER WORK IS
COMPLETED. REFER TO DETAILS SHEET FOR CEILING
REPAIR DETAIL.
04/23/2025
Exp. 12.31.2025
N
SD
H
H
COMPRESSED
AIR PIPE
HVAC
DUCTWORK
HP UNIT
HEATER
HP UNIT
HEATER
NO CEILING, OPEN TO ROOF STRUCTURE ABOVENOTE: NO CEILING TYPE INFORMATION
Plan Storage/ Conference
17-3
Facilities Maintenance
18-3
Office 18B-3
Toilet 18C-3
Office 18A-3
Storage 19-3
Carpenter Shop 20-3
1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,
MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE
THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING
CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED
THROUGHOUT THE DURATION CONSTRUCTION.
2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND
SURROUNDING SURFACES SHALL BE PROTECTED DURING
CONSTRUCTION.
3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER
CONSTRUCTION IS COMPLETED.
4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING.
GENERAL NOTES:
EXISTING CEILING LEGEND:
GYPSUM BOARD SOFFIT or
SUSPENDED CEILING
SUSPENDED ACOUSTICAL TILE
CEILING SYSTEM
RECESSED DOWN LIGHT
ILLUMINATED EXIT SIGNAGE w/ 90min
BACK UP (REFER TO ELECTRICAL
PLANS)
1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED
LIGHT FXTURE (REFER TO ELECTRICAL)
FIRE SPRINKLER HEAD
RETURN REGISTER
(REFER TO MECHANICAL DWGS.)
SUPPLY REGISTER
(REFER TO MECHANICAL DWGS.)
EXHAUST REGISTER
(REFER TO MECHANICAL DWGS.)
SKYLIGHT
DOWNLIGHT STRIP
CEILING MOUNTED FA STROBE LIGHT
CEILING MOUNTED SMOKE DETECTOR
CEILING MOUNTED SPEAKER
ACCESS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
MA Arch
AE303
BUILDING 03 REFLECTED CEILING
REFERENCE PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
04/24/2025
ASI 001
N/A
22042
KEY PLAN
N
3/16" = 1'-0"
Building 3 Reflected Ceiling Plan (Renovation)
Rev. Date Description
1 04/24/2025 ASI 001
Key Notes
04/23/2025
Exp. 12.31.2025
+8'-6"
+8'-6"
+8'-6"
+8'-6"
+8'-6"
+8'-6"
212 212
1AE324B1AE324B
NOTE: ROOF DECK HEIGHT
APPROXIMATELY 41'-6" FROM A.F.F.
CONTRACTOR TO VERIFY
Pulm Doctor Office 3A31
Chief of Sleep Office
3A30
Medical Svc Chief 3A17A
Medical Svc Admin 3A17
Chief of Pul Sta
3A16
Sim Lab 3A013
BUILDING 24
PENTHOUSE
(NO CEILING WORK)
1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,
MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE
THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING
CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED
THROUGHOUT THE DURATION CONSTRUCTION.
2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND
SURROUNDING SURFACES SHALL BE PROTECTED DURING
CONSTRUCTION.
3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER
CONSTRUCTION IS COMPLETED.
4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING.
GENERAL NOTES:
N
EXISTING CEILING LEGEND:
GYPSUM BOARD SOFFIT or
SUSPENDED CEILING
SUSPENDED ACOUSTICAL TILE
CEILING SYSTEM
RECESSED DOWN LIGHT
ILLUMINATED EXIT SIGNAGE w/ 90min
BACK UP (REFER TO ELECTRICAL
PLANS)
1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED
LIGHT FXTURE (REFER TO ELECTRICAL)
FIRE SPRINKLER HEAD
RETURN REGISTER
(REFER TO MECHANICAL DWGS.)
SUPPLY REGISTER
(REFER TO MECHANICAL DWGS.)
EXHAUST REGISTER
(REFER TO MECHANICAL DWGS.)
SKYLIGHT
DOWNLIGHT STRIP
CEILING MOUNTED FA STROBE LIGHT
CEILING MOUNTED SMOKE DETECTOR
CEILING MOUNTED SPEAKER
ACCESS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
JI
AE324A
BUILDING 24 - NORTH REFLECTED
CEILING PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
04/24/2025
ASI 001
N/A
22042
3/16" = 1'-0"
Building 24 - North Reflected Ceiling Plan
3/16" = 1'-0"
Building 24 - Mechanical Penthouse Reflected Ceiling Plan
KEY PLAN
N
N
Rev. Date Description
1 04/24/2025 ASI 001
Key Notes
154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.
212 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
ACOUSTICAL CEILING TILES AS NECESSARY TO EXPOSE
AREA OF WORK. PROTECT AND SAVE FOR
RE-INSTALLATION. RE-INSTALL CEILING TILES IN THE SAME
PLACE AFTER WORK IS COMPLETED.
04/23/2025
Exp. 12.31.2025
OPEN TO
BELOW
+12'-0"
+12'-6"
+11'-3"
+10'-0"
+9'-8"+9'-8"
213213
+9'-8"
213213
PROJECTION
1B-2154
NOTE: ROOF DECK HEIGHT
APPROXIMATELY 23'-0" FROM A.F.F.
CONTRACTOR TO VERIFY
Auditorium 1B-1
+8'-6"
+9'-0"
+8'-6"
212212
Non-Rated Corridor
C3-02
Men 3A-02
Equipment Room 3A-01
Elevator P-7
Non-Rated Corridor
C3-02 Waiting 3A-40
+8'-0"214214
214214
1AE324A1AE324A
NOTE: ROOF DECK HEIGHT
APPROXIMATELY 41'-6" FROM A.F.F.
CONTRACTOR TO VERIFY
NOTE: ROOF DECK HEIGHT
APPROXIMATELY 12'-0" FROM A.F.F.
CONTRACTOR TO VERIFY
Mall
1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,
MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE
THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING
CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED
THROUGHOUT THE DURATION CONSTRUCTION.
2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND
SURROUNDING SURFACES SHALL BE PROTECTED DURING
CONSTRUCTION.
3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER
CONSTRUCTION IS COMPLETED.
4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING.
GENERAL NOTES:
N
EXISTING CEILING LEGEND:
GYPSUM BOARD SOFFIT or
SUSPENDED CEILING
SUSPENDED ACOUSTICAL TILE
CEILING SYSTEM
RECESSED DOWN LIGHT
ILLUMINATED EXIT SIGNAGE w/ 90min
BACK UP (REFER TO ELECTRICAL
PLANS)
1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED
LIGHT FXTURE (REFER TO ELECTRICAL)
FIRE SPRINKLER HEAD
RETURN REGISTER
(REFER TO MECHANICAL DWGS.)
SUPPLY REGISTER
(REFER TO MECHANICAL DWGS.)
EXHAUST REGISTER
(REFER TO MECHANICAL DWGS.)
SKYLIGHT
DOWNLIGHT STRIP
CEILING MOUNTED FA STROBE LIGHT
CEILING MOUNTED SMOKE DETECTOR
CEILING MOUNTED SPEAKER
ACCESS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
JI
AE324B
BUILDING 24 - SOUTH REFLECTED
CEILING PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
04/24/2025
ASI 001
N/A
22042
3/16" = 1'-0"
Building 24 - South Reflected Ceiling Plan
N
KEY PLAN
Rev. Date Description
1 04/24/2025 ASI 001
Key Notes
154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.
212 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
ACOUSTICAL CEILING TILES AS NECESSARY TO EXPOSE
AREA OF WORK. PROTECT AND SAVE FOR
RE-INSTALLATION. RE-INSTALL CEILING TILES IN THE SAME
PLACE AFTER WORK IS COMPLETED.
213 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
GYPSUM BOARD CEILING AS NECESSARY TO EXPOSE
AREA OF WORK. PATCH, REPAIR & PAINT GYPSUM BOARD
TO MATCH EXISTING CONDITIONS AFTER WORK IS
COMPLETED. REFER TO DETAILS SHEET FOR CEILING
REPAIR DETAIL.
214 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
CEMENT PLASTER CEILING AS NECESSARY TO EXPOSE
AREA OF WORK. PATCH, REPAIR & PAINT CEMENT
PLASTER CEILING TO MATCH EXISTING CONDITIONS AFTER
WORK IS COMPLETED. REFER TO DETAILS SHEET FOR
CEILING REPAIR DETAIL.
215 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
DECORATIVE CEILING PANELS AS NECESSARY TO EXPOSE
AREA OF WORK. PROTECT AND SAVE FOR
RE-INSTALLATION. RE-INSTALL CEILING PANELS IN THE
SAME PLACE AFTER WORK IS COMPLETED.
04/23/2025
Exp. 12.31.2025
108" x 20"
20" x 8" x x x
213 213 212
NO CEILING, OPEN TO ABOVE
+9'-0"
+9'-0" +9'-0"
+9'-0"
NOTE: T.O. ROOF RIDGE
APPROXIMATELY 20'-0" FROM A.F.F.
CONTRACTOR TO VERIFY
Resident Bed Rm
1E13
Resident Bath Rm 1E13A
Corridor 1E-1
Utility Rm 1E15
Mech 1E19
Resident Bed Rm
1E14
Resident Bath Rm 1E14A
1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,
MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE
THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING
CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED
THROUGHOUT THE DURATION CONSTRUCTION.
2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND
SURROUNDING SURFACES SHALL BE PROTECTED DURING
CONSTRUCTION.
3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER
CONSTRUCTION IS COMPLETED.
4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING.
GENERAL NOTES:
EXISTING CEILING LEGEND:
GYPSUM BOARD SOFFIT or
SUSPENDED CEILING
SUSPENDED ACOUSTICAL TILE
CEILING SYSTEM
RECESSED DOWN LIGHT
ILLUMINATED EXIT SIGNAGE w/ 90min
BACK UP (REFER TO ELECTRICAL
PLANS)
1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED
LIGHT FXTURE (REFER TO ELECTRICAL)
FIRE SPRINKLER HEAD
RETURN REGISTER
(REFER TO MECHANICAL DWGS.)
SUPPLY REGISTER
(REFER TO MECHANICAL DWGS.)
EXHAUST REGISTER
(REFER TO MECHANICAL DWGS.)
SKYLIGHT
DOWNLIGHT STRIP
CEILING MOUNTED FA STROBE LIGHT
CEILING MOUNTED SMOKE DETECTOR
CEILING MOUNTED SPEAKER
ACCESS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
JI
AE328
BUILDING 28 REFLECTED CEILING
PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
04/24/2025
ASI 001
N/A
22042
KEY PLAN
N
3/16" = 1'-0"
Building 28 Reflected Ceiling Plan
Rev. Date Description
1 04/24/2025 ASI 001
Key Notes
154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.
212 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
ACOUSTICAL CEILING TILES AS NECESSARY TO EXPOSE
AREA OF WORK. PROTECT AND SAVE FOR
RE-INSTALLATION. RE-INSTALL CEILING TILES IN THE SAME
PLACE AFTER WORK IS COMPLETED.
213 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
GYPSUM BOARD CEILING AS NECESSARY TO EXPOSE
AREA OF WORK. PATCH, REPAIR & PAINT GYPSUM BOARD
TO MATCH EXISTING CONDITIONS AFTER WORK IS
COMPLETED. REFER TO DETAILS SHEET FOR CEILING
REPAIR DETAIL.
04/23/2025
Exp. 12.31.2025
+12'-0"
+12'-0"+10'-0"
1/AE331B 1/AE331B
NOTE: ROOF DECK HEIGHT
APPROXIMATELY 19'-2" FROM A.F.F.
CONTRACTOR TO VERIFY
Recreation Room
BUILDING 31
PENTHOUSE
(NO CEILING WORK)
1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,
MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE
THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING
CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED
THROUGHOUT THE DURATION CONSTRUCTION.
2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND
SURROUNDING SURFACES SHALL BE PROTECTED DURING
CONSTRUCTION.
3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER
CONSTRUCTION IS COMPLETED.
4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING.
GENERAL NOTES:
EXISTING CEILING LEGEND:
GYPSUM BOARD SOFFIT or
SUSPENDED CEILING
SUSPENDED ACOUSTICAL TILE
CEILING SYSTEM
RECESSED DOWN LIGHT
ILLUMINATED EXIT SIGNAGE w/ 90min
BACK UP (REFER TO ELECTRICAL
PLANS)
1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED
LIGHT FXTURE (REFER TO ELECTRICAL)
FIRE SPRINKLER HEAD
RETURN REGISTER
(REFER TO MECHANICAL DWGS.)
SUPPLY REGISTER
(REFER TO MECHANICAL DWGS.)
EXHAUST REGISTER
(REFER TO MECHANICAL DWGS.)
SKYLIGHT
DOWNLIGHT STRIP
CEILING MOUNTED FA STROBE LIGHT
CEILING MOUNTED SMOKE DETECTOR
CEILING MOUNTED SPEAKER
ACCESS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
JI
AE331A
BUILDING 31 - NORTH REFLECTED
CEILING PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
04/24/2025
ASI 001
N/A
22042
KEY PLAN
N
3/16" = 1'-0"
Building 31 Reflected Ceiling Plan 3/16" = 1'-0"
Building 31 - Penthouse Reflected Ceiling Plan
N
Rev. Date Description
1 04/24/2025 ASI 001
Key Notes
216 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
PLASTER CEILING w/ G.I. PLASTER RAIN-DRIP SCREED AS
NECESSARY TO EXPOSE AREA OF WORK. PATCH, REPAIR
& PAINT PLASTER CEILING TO MATCH EXISTING
CONDITIONS AFTER WORK IS COMPLETED. REFER TO
DETAILS SHEET FOR CEILING REPAIR DETAIL.
04/23/2025
Exp. 12.31.2025
+8'-0"
+8'-0"
+8'-0"
1 / AE331A 1 / AE331A
NOTE: ROOF DECK HEIGHT
APPROXIMATELY 14'-0" FROM A.F.F.
CONTRACTOR TO VERIFY
Lounge
Storage 134A
2-Bed Rm
Clean Linen
1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,
MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE
THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING
CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED
THROUGHOUT THE DURATION CONSTRUCTION.
2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND
SURROUNDING SURFACES SHALL BE PROTECTED DURING
CONSTRUCTION.
3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER
CONSTRUCTION IS COMPLETED.
4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED TO MATCH EXISTING.
GENERAL NOTES:
N
EXISTING CEILING LEGEND:
GYPSUM BOARD SOFFIT or
SUSPENDED CEILING
SUSPENDED ACOUSTICAL TILE
CEILING SYSTEM
RECESSED DOWN LIGHT
ILLUMINATED EXIT SIGNAGE w/ 90min
BACK UP (REFER TO ELECTRICAL
PLANS)
1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED
LIGHT FXTURE (REFER TO ELECTRICAL)
FIRE SPRINKLER HEAD
RETURN REGISTER
(REFER TO MECHANICAL DWGS.)
SUPPLY REGISTER
(REFER TO MECHANICAL DWGS.)
EXHAUST REGISTER
(REFER TO MECHANICAL DWGS.)
SKYLIGHT
DOWNLIGHT STRIP
CEILING MOUNTED FA STROBE LIGHT
CEILING MOUNTED SMOKE DETECTOR
CEILING MOUNTED SPEAKER
ACCESS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
JI
AE331B
BUILDING 31 - CENTER REFLECTED
CEILING PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
04/24/2025
ASI 001
N/A
22042
3/16" = 1'-0"
Building 31 Reflected Ceiling Plan - Center
KEY PLAN
N
Rev. Date Description
1 04/24/2025 ASI 001
Key Notes
154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.
212 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN
ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING
ACOUSTICAL CEILING TILES AS NECESSARY TO EXPOSE
AREA OF WORK. PROTECT AND SAVE FOR
RE-INSTALLATION. RE-INSTALL CEILING TILES IN THE SAME
PLACE AFTER WORK IS COMPLETED.
04/23/2025
Exp. 12.31.2025
TERMINATION CAULK
STAINLESS STEEL CLAMPING
RING
APPROVED SUBSTRATE
WATER STOP
TPO NON-REINFORCED
FLASHING
INSULATION PER SCHEDULE
TPO MEMBRANE
SIDE VIEW OF FIELD WRAPPED PIPE
AXONOMETRIC VIEW
M
IN
2" MIN.
2"
TERMINATION CAULK
STAINLESS STEEL CLAMP
APPROVED SUBSTRATE
TPO NON-REINFORCED
FLASHING
INSULATION PER SCHEDULE
TPO MEMBRANE
SIDE VIEW OF FIELD WRAPPED PIPE
AXONOMETRIC VIEW
WATER STOP
SOILD WELDS
F F
L
A B
O V
E
METAL HOOD
WATER STOP
APPROVED SUBSTRATE
TPO NON-REINFORCED
FLASHING
INSULATION PER SCHEDULE
TPO MEMBRANE
SIDE VIEW OF FIELD WRAPPED PIPE
AXONOMETRIC VIEW
M
IN
2" MIN.
2"
(E) GYP. BOARD CEILING
GRID MAIN BEAM
CUT GYPSUM BOARD
PATCH TO FIT SNUG
INTO OPENING
(TEXTURE & PAINT TO
MATCH ADJACENT)
TAPE & FINISH
(N) CROSS TEE @
UNSUPPORTED EDGES
SEE RCP
FOR HEIGHT
(E) PLASTER SOFFIT
ASSEMBLY
(N) PLASTER SOFFIT
(LATH w/ # 8 SCREW WITH
7/16" DIA. PAN WAFER
HEAD, @ 7" O.C.); PAINT
TO MATCH ADJACENT
AREAS
(E) SUSP. SOFFIT FRAMING
(E) FURRING CHANNELS
REQUIRED
PATCH AS
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
JI
AE1002
TYPICAL DETAILS 570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
04/24/2025
ASI 001
N/A
22042
3" = 1'-0"
FIELD FABRICATED PIPE WRAP
3" = 1'-0"
ROOFTOP EQUIPMENT SUPPORT
3" = 1'-0"
HOT PIPE FLASHING
3" = 1'-0"
SUSPENDED GYP. CEILING PATCH
Rev. Date Description
1 04/24/2025 ASI 001
3" = 1'-0"
SUSPENDED CEMENT PLASTER CEILING PATCH
04/23/2025
Exp. 12.31.2025
| GI001 - SHEET INDEX, APPLICABLE STANDARDS & GENERAL NOTES |
| AE300 - BUILDING OPC WALKWAY REFLECTED CEILING PLAN |
| AE301A - BUILDING 01 -LEVEL 2 REFLECTED CEILING PLAN |
| AE303 - BUILDING 03 REFLECTED CEILING REFERENCE PLAN |
| AE324A - BUILDING 24 -NORTH REFLECTED CEILING PLAN |
| AE324B - BUILDING 24 -SOUTH REFLECTED CEILING PLAN |
| AE328 - BUILDING 28 REFLECTED CEILING PLAN |
| AE331A - BUILDING 31 -NORTH REFLECTED CEILING PLAN |
| AE331B - BUILDING 31 -CENTER REFLECTED CEILING PLAN |
| AE1002 - TYPICAL DETAILS |
File details come from the government source that posted it. Updated .