These architectural drawings are for a Fall Protection Installation project at the Fresno VA Medical Center. The drawings cover multiple buildings (Buildings OPC, 01, 02, 22, 03, 24, 28, 31, and 32), providing reflected ceiling plans, roof plans, and typical construction details for installing fall protection systems. The plans include specific instructions for removing and patching various ceiling types (acoustical tiles, gypsum board, plaster) to accommodate guardrail and tie-down anchorage installations.

Key technical specifications include detailed notes about protecting existing infrastructure, verifying roof deck heights, and carefully removing and reinstalling ceiling materials. The drawings reference multiple applicable standards, including the 2021 International Building Code, 2021 NFPA 101 Life Safety Code, OSHA Standards, and VA Design Documents. The project involves precise ceiling modifications across different building sections to implement fall protection measures, with careful attention to maintaining the existing architectural finishes and functional integrity of the spaces.

View the file

Other files

File Type Posted
Part II RFI Responses - Install Fall Protection Fresno.pdf PDF
36C26125R0030 0005.docx DOCX document
36C26125R0030 0004.docx DOCX document
Updated Clauses and Provisions Amendment P0003.pdf PDF
36C26125R0030 0003.docx DOCX document
DBA WD CA20250018 3 21 25.pdf PDF
VHA ICRA - sample template.docx DOCX document
RFI Responses Install Fall Protection Fresno.pdf PDF
36C26125R0030 0003 RFI Responses.docx DOCX document
VA Fresno ACM Survey Asbestos Study 2012.pdf PDF
36C26125R0030 0002.docx DOCX document
36C26125R0030 0001.docx DOCX document
Site Visit Sign-in Sheet 3 20 2025.pdf PDF
6. Request for Information Form Blank.docx DOCX document
1. Drawings - 570 21 109.pdf PDF
4. DBA WD CA20250018 3 7 2025.pdf PDF
36C26125R0030_Solictation.docx DOCX document
7. Pre-Proposal Site Visit Information.pptx PPTX presentation
5. Price Breakdown Worksheet Blank.docx DOCX document
2. Specifications -570 21 109.pdf PDF
3. 100CD Basis of Design - Install Fall Protection.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPLICABLE STANDARDS:

VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).

2021 International Building Code (IBC) (Only when specifically referenced in VA Design Documents, see notes below)

2021 NFPA 101 Life Safety Code

2022 NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations

2018 NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900

Occupational, Safety and Health Administration (OSHA) Standards

2019 VA Seismic Design Requirements, H-18-8

2020 National Electrical Code (NEC) (NFPA 70)

2018 International Plumbing Code (IPC)

2019 Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.

2023 ASME Boiler and Pressure Vessel Code

ASME Code for Pressure Piping

2015 Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)

Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)

Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)

Energy policy Act of 2005 (EPAct)

DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High- Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.

Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)

Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.

The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01 00 00 of the VA Master Construction Specification.

Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2016.

Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2016.

UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN

THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF PROJECT SUBMISSION (U.N.O.)

AB

A

ANCHOR BOLT

AD AREA DRAIN

ADDL ADDITIONAL

ADH

ADDITIONAL

ADHESIVE

ADJ

AFF

ADJACENT

AFG

ABOVE FINISH FLOOR

AFS

ABOVE FINISH GRADE

ABOVE FINISH SLAB

ALUM

ALT

ALUMINUM

ALTERNATE

APPROX

ARCH

APPROXIMATE(LY)

ARCHITECT(URAL)

ASPH ASPHALT

AVG AVERAGE

B

BD BOARD

BTWN

BLDG

BETWEEN

BUILDING

BM

BOT

BENCHMARK

BOTTOM

BITUM BITUMINOUS

BOS BOTTOM OF STEEL

C

CEM CEMENT, CEMENTITIOUS

CJ CONTROL JOINT

CL

CLG

CLR

CMU

COL

CONC

CONN

CONSTR

CONT

CONTR

CORR

CU

CW

CENTER LINE

CEILING

CLEAR

CONCRETE MASONRY UNIT

COLUMN

CONCRETE

CONNECTION

CONSTRUCTION

CONTINUOUS

CONTRACTOR

CORRUGATED

CUBIC

COLD WATER

D

D

DEPTH

DBL DOUBLE

DEG DEGREE

DEMO DEMOLISH

DET DETAIL

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIM PT DIMENSION POINT

DIST DISTANCE

DN DOWN

DR DRAIN

DS DOWNSPOUT

DWG DRAWING

DWGS DRAWINGS

(E)

E

EXISTING

EA EACH

EDR EQUIPMENT DRAWING

EIFS EXTERIOR INSULATION FINISH SYSTEM

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRICAL

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EOS EDGE OF SLAB

EP ELECTRICAL PANEL

EPB ELECTRICAL PANEL BOARD

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

EST ESTIMATE(D)

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXP EXPANSION

EXP JT EXPANSION JOINT

EXT EXTERIOR

FXTR FIXTURE

G

G

GAS

H

H

HIGH

GA GAUGE, GAGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GFRC GLASS FIBER REINFORCED CONCRETE

GFRG GLASS FIBER REINFORCED GYPSUM

GL GLASS

GLU LAM GLUE LAMINATED

GLZ GLAZING

GR GRADE OR GRADING

ID

I

INSIDE DIAMETER

J

L

L

LENGTH, LONG

M

M

METERS

(N)

N

NEW

P

Q

R

R

RISER

S SOUTH

T

W

W

WEST

XFMR

X

TRANSFORMER

YD

Y

YARD

HDW HARDWARE

HGT HEIGHT

HNDRL HANDRAIL

HORIZ HORIZONTAL

HPT HIGH POINT

HVAC HEATING-VENTILATION-AIR CONDITIONING

IN INCH

INCL INCLUDE, INCLUDING

INFO INFORMATION

INSUL INSULATION

INTR INTERIOR

JST JOIST

JT JOINT

LB POUND

LF LINEAR FOOT

LG LENGTH

LIN LINEAR

LPT LOW POINT

LT LIGHT

LTG LIGHTING

LVR LOUVER

HW HOT WATER

S

MACH MACHINE

MATL MATERIAL

MAX MAXIMUM

MB MACHINE BOLT

MECH MECHANICAL

MED MEDIUM

MEMB MEMBRANE

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MM MILLIMETERS

MOD MODULE, MODULAR

MTD MOUNTED

MTG MOUNTING

MVBL MOVABLE

NA NOT APPLICABLE

NE NORTHEAST

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NRC NOICE REDUCTION COEFFICIENT

NTS NOT TO SCALE

NW NORTHWEST

PLBG PLUMBING

PLF POUNDS PER LINEAR FOOT

PLYWD PLYWOOD

PNL PANEL

PNL BD PANEL BOARD

PNT PAINT

PR PAIR

PRCST PRECAST

PREP PREPARATION

PREFAB PREFABRICATION

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT

PTN PARTITION

PVG PAVING

PVMT PAVEMENT

PWR POWER

QTR QUARTER

QTY QUANTITY

RAD RADIUS

RD ROOF DRAIN

RECT RECTANGULAR

REF REFERENCE

REINF REINFORCE (D) (ING) (MENT)

REQD REQUIRED

REQT REQUIREMENT

RET RETURN

REV REVISION

RHMS ROUND HEAD MACHINE SCREW

RHWS ROUND HEAD WOOD SCREW

RM ROOM

RND ROUND

SCHED SCHEDULE

SCRN SCREEN

SE SOUTHEAST

SECT SECTION

SEG SEGMENT

SEP SEPARATION OR SEPARATE

SEP JT SEPARATION JOINT

SHT SHEET, SHEETING

SIM SIMILAR

SMS SHEET METAL SCREW

SP SPACE, SPACED, SPACING

SPEC SPECIFICATION

SPKLR SPRINKLER

SQ SQUARE

SST STAINLESS STEEL

ST STREET

STAG STAGGERED

STC SOUND TRANSMISSION COEFFICIENT

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

STS SELF-TAPPING STEEL

SUSP SUSPENDED

SVCE SERVICE

SW SOUTHWEST

SYMM SYMMETRICAL

SYST SYSTEM

T&B TOP AND BOTTOM

TC TOP OF CONCRETE, TOP OF CURB

TEL TELEPHONE

TEMP TEMPORARY

THERM THERMAL

THK THICK, THICKNESS

THRES THRESHOLD

THRU THROUGH

TMPD GL TEMPERED GLASS

TO TOP OF

TOR TOP OF RAILING

TOS TOP OF STEEL

TOT TOTAL

TOW TOP OF WALL

TP TOP OF PAVEMENT

TTB TELEPHONE TERMINAL BOARD

U

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTABLE POWER SUPPLY

UTIL UTILITY

W/ WITH

W/O WITHOUT

WD WOOD

WDW WINDOW

WGL WIRE GLASS

WM WIRE MESH

WO WHERE OCCURS

WPT WORKING POINT

WR WATER RESISTANT

WSCT WAINSCOT

WSP WET STANDPIPE

WT WEIGHT

WTHPRF WEATHERPROOF

WTRPRF WATERPROOF

WWF WELDED WIRE FABRIC

WWM WELDED WIRE MESH

BUR BUILT UP ROOFING SYSTEM

F

FA FIRE ALARM

FAS FIRE ALARM STATION

FB FLAT BAR

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDN FOUNDATION

FF FINISH FACE

FHMS FLAT HEAD MACHINE SCREW

FHWS FLAT HEAD WOOD SCREW

FLAM FLAMMABLE

FLASH FLASHING

FLEX FLEXIBLE

FO FACE OF

FSTNR FASTENER

FT FOOT, FEET

OC

O

ON CENTER

PA PUBLIC ADDRESS

OA OVERALL

OD OUTSIDE DIAMETER

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

OVHD OVERHEAD

PART PARTIAL

PCF POUNDS PER CUBIC FOOT

PCI POUNDS PER CUBIC INCH

PERF PERFORATED

PERIM PERIMETER

PERM PERMANENT

PERP PERPENDICULAR

PI POINT OF INTERSECTION

PL PLATE

P

V

VB VALVE BOX

VERT VERTICAL

VIT VITREOUS

VP VENT PIPE

VOL VOLUME

ABBREVIATIONS

SYMBOLS

ANGLE

@ AT

C CENTER LINEL

Ø DIAMETER

= EQUAL

> GREATER THAN

< LESS THAN

± PLUS OR MINUS (TOLERANCE)

# POUND(S)

' FOOT OR FEET

" INCH OR INCHES

FOF FACE OF FINISH

HSS HOLLOW STRUCTURAL STEEL

SYMBOLS LEGEND

N

SHEET

NORTH IDENTIFIER

ELEVATION

IDENTIFIER

KEY NOTE TAG

CALL-OUT IDENTIFIER

? PHOTOGRAPH

LOCATIONS

SHEET #

REF # ON SHEET

TPO T.P.O ROOFING

GENERAL NOTES:

1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED BY

THE "INDEX OF DRAWINGS".

2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE

DRAWINGS OF ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE – REFER

TO THE "SHEET INDEX".

3. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE

INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND

ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.

THIS PROJECT AND ALL PARTS OF THE WORK ASSOCIATED WITH THE PROJECT -

INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC - SHALL COMPLY WITH ALL

APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND LAWS OF ALL

FEDERAL, STATE, DISTRICT, TERRITORIAL, AND LOCAL GOVERNMENT AUTHORITIES HAVING

JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,

WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT.

NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE NOR

PERMIT WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION,

ORDINANCE, OR LAW.

4. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT

ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS.

5. SCHEDULE & COORDINATE CONSTRUCTION WORK HOURS TO ACCOMMODATE THE

OPERATION OF THE FACILITY.

6. THE ARCHITECTURAL DRAWINGS ARE A PART OF A LARGER SET OF DRAWINGS WHICH,

WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE

SET OF DRAWINGS, WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE "SHEET

INDEX". PARTIAL SETS OF DRAWINGS ARE INCOMPLETE.

THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND

ELEVATIONS ILLUSTRATE THE DESIGN INTENT. THE ARCHITECTURAL DRAWINGS

ESTABLISH AND COORDINATE THE FINISHED APPEARANCE AND LOCATION OF MANY, BUT

NOT ALL, EXPOSED ELEMENTS OF THE WORK. THE STRUCTURAL, MECHANICAL,

ELECTRICAL, PLUMBING, OTHER DRAWINGS, AND JOB SPECIFICATIONS ARE

SUPPLEMENTARY TO THE ARCHITECTURAL WORKING DRAWINGS.

THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY

THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURER

INSTALLATION REQUIREMENTS. SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH

OTHER, BIDS SHALL BE BASED ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND

QUANTITY OF WORK INDICATED. ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL

BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER FOR

CLARIFICATION.

7. THE SPECIFICATIONS ARE INTENDED TO COMMUNICATE THE DETAILED PROPERTIES AND

QUALITY OF THE INDIVIDUAL MATERIALS, ASSEMBLIES, AND SYSTEMS THAT COMPRISE THE

WORK; THE FUNCTIONAL AND PERFORMANCE REQUIREMENTS FOR THE INDIVIDUAL PARTS

OF THE WORK; AND THE FABRICATION AND INSTALLATION REQUIREMENTS FOR INDIVIDUAL

PARTS OF THE WORK - THE SPECIFICATIONS TAKE PRECEDENCE OVER THE DRAWINGS

WITH RESPECT TO INFORMATION OF THIS NATURE.

8. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":

A. ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT

OR ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE

MANUFACTURES AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR

ASSEMBLY ILLUSTRATED BY THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR

ASSEMBLY.

B. THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN

LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY THE

CONTRACTING OFFICER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE (AT NO

ADDITIONAL EXPENSE TO THE GOVERNMENT) FOR ALL COORDINATION AND

REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME

FUNCTIONAL AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE "BASIS OF

DESIGN" SHOWN IN THE CONTRACT DOCUMENTS.

C. THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS

VARY FROM THAT SHOWN BY THE DRAWINGS. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR THE COORDINATION OF THE WORK OF THE TRADES,

SUBCONTRACTORS, AND MATERIAL SUPPLIERS

GENERAL NOTES CONTINUED:

9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF

ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH ALL REQUIREMENTS OF THE

CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT

ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE

REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK

OF THAT PARTY.

CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES

NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,

DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED

IN THE CONTRACT DOCUMENTS.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, OR PATCHING

THAT MAY BE REQUIRED TO COMPLETE WORK OR TO MAKE ITS SEVERAL PARTS FIT

TOGETHER.

10. THE CONTRACTOR SHALL, IN ADVANCE OF THE WORK, PREPARE COORDINATION

DRAWINGS SHOWING THE LOCATION OF OPENINGS THROUGH SLABS, THE PIPE SLEEVES

AND HANGER INSERTS, AS WELL AS THE LOCATION AND ELEVATION OF UTILITY LINES,

INCLUDING, BUT NOT LIMITED TO, CONVEYOR SYSTEMS, PNEUMATIC TUBES, DUCTS, AND

CONDUITS AND PIPES TWO INCHES AND LARGER IN DIAMETER WITH THEIR SUPPORTS.

THESE DRAWINGS, INCLUDING PLANS, ELEVATIONS, AND SECTIONS AS APPROPRIATE,

SHALL CLEARLY SHOW THE MANNER IN WHICH THE UTILITIES FIT INTO THE AVAILABLE

SPACE AND RELATE TO EACH OTHER AND TO EXISTING BUILDING ELEMENTS. DRAWINGS

SHALL BE OF APPROPRIATE SCALE TO SATISFY THE PREVIOUSLY STATED PURPOSES, BUT

NOT SMALLER THAN 3/8” SCALE. DRAWINGS MAY BE COMPOSITE (WITH DISTINCTIVE

COLORS FOR THE VARIOUS TRADES) OR MAY BE SEPARATE BUT FULLY COORDINATED

DRAWINGS OF THE SAME SCALE. SEPARATE DRAWINGS SHALL BE ALIGNED TO DEPICT

IDENTICAL BUILDING AREAS OR SECTIONS AND SHALL BE CAPABLE OF BEING OVERLAID IN

ANY COMBINATION. THE SUBMITTED DRAWINGS FOR A GIVEN AREA OF THE PROJECT

SHALL SHOW THE WORK OF ALL TRADES THAT WILL BE INVOLVED IN THAT PARTICULAR

AREA. COMPLETE COMPOSITE DRAWINGS IN ELECTRONIC FORMAT SHALL BE RECEIVED BY

THE GOVERNMENT NOT LESS THAN 20 FEDERAL WORKING DAYS PRIOR TO THE

SCHEDULED START OF THE WORK IN THE AREA ILLUSTRATED BY THE DRAWINGS, FOR THE

PURPOSE OF SHOWING THE CONTRACTOR’S PLANNED METHODS OF INSTALLATION. THE

OBJECTIVES OF SUCH DRAWINGS ARE TO PROMOTE CAREFULLY PLANNED WORK

SEQUENCE AND PROPER TRADE COORDINATION, IN ORDER TO ASSURE THE EXPEDITIOUS

SOLUTIONS OF PROBLEMS AND THE INSTALLATION OF LINES AND EQUIPMENT AS

CONTEMPLATED BY THE CONTRACT DOCUMENTS WHILE AVOIDING OR MINIMIZING

ADDITIONAL COSTS TO THE CONTRACTOR AND TO THE GOVERNMENT. IN THE EVENT THE

CONTRACTOR, IN COORDINATING THE VARIOUS INSTALLATIONS AND IN PLANNING THE

METHOD OF INSTALLATION, FINDS A CONFLICT IN LOCATION OR ELEVATION OF ANY OF THE

UTILITIES WITH THEMSELVES, WITH STRUCTURAL ITEMS OR WITH OTHER CONSTRUCTION

ITEMS, THE GENERAL CONTRACTOR SHALL BRING THIS CONFLICT TO THE ATTENTION OF

THE CONTRACTING OFFICER IMMEDIATELY.

IN DOING SO, THE CONTRACTOR SHALL EXPLAIN THE PROPOSED METHOD OF SOLVING THE

PROBLEM OR SHALL REQUEST INSTRUCTIONS AS TO HOW TO PROCEED IF ADJUSTMENTS

BEYOND THOSE OF USUAL TRADES’ COORDINATION ARE NECESSARY. INSTALLATION OF

UTILITIES WORK WILL NOT PROCEED IN ANY AREA PRIOR TO THE SUBMISSION AND

COMPLETION OF THE GOVERNMENT REVIEW OF THE COORDINATION DRAWINGS FOR THAT

AREA, NOR IN ANY AREA IN WHICH CONFLICTS ARE DISCLOSED BY THE COORDINATION

DRAWINGS, UNTIL THE CONFLICTS HAVE BEEN CORRECTED TO THE SATISFACTION OF THE

CONTRACTING OFFICER. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO

SUBMIT THE REQUIRED DRAWINGS IN A TIMELY MANNER CONSISTENT WITH THE

REQUIREMENTS TO COMPLETE THE WORK COVERED BY THIS CONTRACT WITHIN THE

PRESCRIBED CONTRACT TIME.

11. THE ARCHITECT / ENGINEERS SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT

BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON

PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE

WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL

CONTRACTOR.

12. ALL WORK NOTED "N.I.C." OR "NOT IN CONTRACT" IS TO BE ACCOMPLISHED BY A

CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND IS NOT TO BE PART OF THE

CONSTRUCTION AGREEMENT. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE TO

COORDINATE WITH ALL "OTHER" CONTRACTORS PER REQUIREMENTS ESTABLISHED BY

GOVERNMENT, WHICH ARE UNDER SEPARATE CONTRACT WITH THE GOVERNMENT.

13. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE

REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF

THE GOVERNMENT SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. THE

CONTRACTOR SHALL PROMPTLY CORRECT ALL WORK REJECTED BY THE GOVERNMENT AS

DEFECTIVE OR AS FAILING TO CONFORM TO THE CONTRACT DOCUMENTS WHETHER

OBSERVED BEFORE OR AFTER SUBSTANTIAL COMPLETION AND WHETHER OR NOT

FABRICATED, INSTALLED OR COMPLETED. THE CONTRACTOR SHALL BEAR ALL COSTS OF

CORRECTING SUCH REJECTED WORK.

Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

INSTALL FALL PROTECTION

AA/RF

GI001

SHEET INDEX, APPLICABLE

STANDARDS & GENERAL NOTES

570-21-109

SMc

VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703

04/24/2025

ASI 001

N/A

22042

APPLICABLE STANDARDS SHEET INDEX

PROJECT GENERAL NOTES

BLDG 0PC

GI100 BUILDING OPC ROOF REFERENCE PLAN

AD200 BUILDING OPC ROOF DEMOLITION PLAN

AE200 BUILDING OPC ROOF RENOVATION PLAN

AE300 BUILDING OPC WALKWAY REFLECTED CEILING PLAN

AE500 BUILDING OPC EXTERIOR ELEVATIONS & WALL SECTIONS

S200 BUILDING OPC ROOF RENOVATION STRUCTURAL PLAN & DETAILS

BLDG 01

GI101 BUILDING 01 ROOF REFERENCE PLAN

GI101A BUILDING 01 LOBBY ROOF REFERENCE PLAN

GI101B BUILDING 01 UPPER ROOF - WEST REFERENCE PLAN

GI101C BUILDING 01 UPPER ROOF - EAST REFERENCE PLAN

GI101D BUILDING 01 PHARMACY ROOF REFERENCE PLAN

AD201A BUILDING 01 LOBBY ROOF DEMOLITION PLAN

AD201B BUILDING 01 UPPER ROOF - WEST DEMOLITION PLAN

AD201C BUILDING 01 UPPER ROOF - EAST DEMOLITION PLAN

AD201D BUILDING 01 PHARMACY ROOF DEMOLITION PLAN

AE201A BUILDING 01 LOBBY ROOF RENOVATION PLAN

AE201B BUILDING 01 UPPER ROOF - WEST RENOVATION PLAN

AE201C BUILDING 01 UPPER ROOF - EAST RENOVATION PLAN

AE201D BUILDING 01 PHARMACY ROOF RENOVATION PLAN

AE301A BUILDING 01 LOBBY ROOF REFLECTED CEILING PLAN

AE501A BUILDING 01 EXTERIOR ELEVATIONS

AE501B BUILDING 01 EXTERIOR ELEVATIONS

AE501C BUILDING 01 EXTERIOR ELEVATIONS & WALL SECTIONS

AE501D BUILDING 01 EXTERIOR ELEVATIONS & WALL SECTIONS

S201 BUILDING 01 UPPER ROOF RENOVATION STRUCTURAL PLAN

S201A BUILDING 01 LOBBY ROOF RENOVATION STRUCTURAL PLAN

S201B BUILDING 01 UPPER WEST ROOF RENOVATION STRUCTURAL PLAN

S201C BUILDING 01 UPPER EAST ROOF RENOVATION STRUCTURAL PLAN

S201D BUILDING 01 PHARMACY ROOF RENOV. STRUCTURAL PLAN & DETAILS

BLDG 02 & 22

GI102 BUILDINGS 02 & 22 ROOF REFERENCE PLAN

GI102A BUILDINGS 02 & 22 ROOF REFERENCE PHOTOS

AD202 BUILDING 02 & 22 ROOF DEMOLITION PLAN

AE202 BUILDING 02 & 22 ROOF RENOVATION PLAN

AE502 BUILDING 02 & 22 EXTERIOR ELEVATIONS

AE602 BUILDING 02 & 22 WALL SECTIONS

S202A BUILDING 02 ROOF RENOVATION STRUCTURAL PLAN & DETAILS

S202B BUILDING 22 ROOF RENOVATION STRUCTURAL PLAN & DETAILS

BLDG 03

GI103 BUILDING 03 ROOF REFERENCE PLAN

AD203 BUILDING 03 ROOF DEMOLITION PLAN

AE203 BUILDING 03 ROOF RENOVATION PLAN

AE303 BUILDING 03 REFLECTED CEILING PLAN

AE503 BUILDING 03 EXTERIOR ELEVATIONS

S203 BUILDING 03 ROOF RENOVATION STRUCTURAL PLAN & DETAILS

BLDG 24

GI124A BUILDING 24 ROOF REFERENCE PLAN

GI124B BUILDING 24 ROOF REFERENCE PHOTOS

AD224A BUILDING 24 ROOF- NORTH DEMOLITION PLAN

AD224B BUILDING 24 ROOF - SOUTH DEMOLITION PLAN

AE224A BUILDING 24 ROOF - NORTH RENOVATION PLAN

AE224B BUILDING 24 ROOF - SOUTH RENOVATION PLAN

AE324A BUILDING 24 - NORTH REFLECTED CEILING PLAN

AE324B BUILDING 24 - SOUTH REFLECTED CEILING PLAN

AE524A BUILDING 24 EXTERIOR ELEVATIONS

AE524B BUILDING 24 EXTERIOR ELEVATIONS

AE624A BUILDING 24 WALL SECTIONS

S224 BUILDING 24 ROOF OVERALL RENOVATION STRUCTURAL PLAN

S224A BUILDING 24 SOUTH ROOF RENOVATION STRUCTURAL PLANS & DETAILS

S224B BUILDING 24 NORTH & PENTHOUSE ROOF RENOVATION STRUCTURAL PLAN &

DETAILS

BLDG 28

GI128 BUILDING 28 ROOF REFERENCE PLAN

AD228 BUILDING 28 ROOF DEMOLITION PLAN

AE228 BUILDING 28 ROOF RENOVATION PLAN

AE328 BUILDING 28 REFLECTED CEILING PLAN

S228 BUILDING 28 ROOF RENOVATION STRUCTURAL PLAN & DETAILS

BLDG 31

GI131 BUILDING 31 ROOF REFERENCE PLAN

GI131A BUILDING 31 ROOF - NORTH REFERENCE PLAN

GI131B BUILDING 31 ROOF - CENTER REFERENCE PLAN

GI131C BUILDING 31 ROOF - EAST REFERENCE PLAN

GI131D BUILDING 31 ROOF - SOUTH REFERENCE PLAN

AD231A BUILDING 31 ROOF - NORTH DEMOLITION PLAN

AD231B BUILDING 31 ROOF - CENTER DEMOLITION PLAN

AD231C BUILDING 31 ROOF - EAST DEMOLITION PLAN

AD231D BUILDING 31 ROOF - SOUTH DEMOLITION PLAN

AE231A BUILDING 31 ROOF - NORTH RENOVATION PLAN

AE231B BUILDING 31 ROOF - CENTER RENOVATION PLAN

AE231C BUILDING 31 ROOF - EAST RENOVATION PLAN

AE231D BUILDING 31 ROOF - SOUTH RENOVATION PLAN

AE331A BUILDING 31 - NORTH REFLECTED CEILING PLAN

AE331B BUILDING 31 - CENTER REFLECTED CEILING PLAN

AE531A BUILDING 31 EXTERIOR ELEVATIONS

AE531B BUILDING 31 EXTERIOR ELEVATIONS & WALL SECTIONS

S231 BUILDING 31 ROOF OVERALL RENOVATION STRUCTURAL PLAN

S231A BUILDING 31 NORTH & PENTHOUSE ROOF RENOVATION STRUCTURAL PLAN

S231B BUILDING 31 CENTRAL ROOF RENOVATION STRUCTURAL PLAN

S231C BUILDING 31 EAST ROOF RENOVATIONSTRUCTURAL PLAN

S231D BUILDING 31 SOUTH ROOF RENOVATION STRUCTURAL PLAN

BLDG 32

GI132 BUILDING 32 REFEERENCE PLAN

AD232 BUILDING 32 ROOF DEMOLITION PLAN

AE232 BUILDING 32 ROOF RENOVATION PLAN

AE532A BUILDING 32 EXTERIOR ELEVATIONS

AE532B BUILDING 32 EXTERIOR ELEVATIONS

S232A BUILDING 32 ROOF RENOVATION STRUCTURAL PLANS & DETAILS

S232B BUILDING 32 ROOF RENOVATION ADD'L STRUCTURAL PLANS & DETAILS

DETAILS

AE1000 TYPICAL DETAILS

AE1001 TYPICAL DETAILS

AE1002 TYPICAL DETAILS

GENERAL

GI000 COVER SHEET

GI001 SHEET INDEX, APPLICABLE STANDARDS & GENERAL NOTES

GI002 OVERALL REFERENCE SITE PLAN

S-000 STRUCTURAL SHEET INDEX, APPLICABLE STANDARDS, & GENERAL NOTES

Rev. Date Description

1 04/24/2025 ASI 001

04/24/2025

Exp. 12.31.2025

OPEN AIR

3A01A

S

S

S

S

N

+8'-0"

+8'-0"

BUILDING OPC

LOWER ROOF

(NO CEILING WORK)

BUILDING 01

NO CEILING WORK

BUILDING 01

NO CEILING WORK

212212

NOTE: ROOF DECK HEIGHT

APPROXIMATELY 37'-4" FROM A.F.F.

CONTRACTOR TO VERIFY

Corridor 3-1

212212

1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,

MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE

THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING

CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED

THROUGHOUT THE DURATION CONSTRUCTION.

2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND

SURROUNDING SURFACES SHALL BE PROTECTED DURING

CONSTRUCTION.

3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER

CONSTRUCTION IS COMPLETED.

4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING.

GENERAL NOTES:

EXISTING CEILING LEGEND:

GYPSUM BOARD SOFFIT or

SUSPENDED CEILING

SUSPENDED ACOUSTICAL TILE

CEILING SYSTEM

RECESSED DOWN LIGHT

ILLUMINATED EXIT SIGNAGE w/ 90min

BACK UP (REFER TO ELECTRICAL

PLANS)

1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED

LIGHT FXTURE (REFER TO ELECTRICAL)

FIRE SPRINKLER HEAD

RETURN REGISTER

(REFER TO MECHANICAL DWGS.)

SUPPLY REGISTER

(REFER TO MECHANICAL DWGS.)

EXHAUST REGISTER

(REFER TO MECHANICAL DWGS.)

SKYLIGHT

DOWNLIGHT STRIP

CEILING MOUNTED FA STROBE LIGHT

CEILING MOUNTED SMOKE DETECTOR

CEILING MOUNTED SPEAKER

ACCESS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

INSTALL FALL PROTECTION

JI

AE300

BUILDING OPC WALKWAY REFLECTED

CEILING PLAN

570-21-109

SMc

VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703

04/24/2025

ASI 001

N/A

22042

KEY PLAN

1/4" = 1'-0"

OPC Walkway Level 3 - Reflected Ceiling Plan

N

Rev. Date Description

1 04/24/2025 ASI 001

Key Notes

154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.

212 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

ACOUSTICAL CEILING TILES AS NECESSARY TO EXPOSE

AREA OF WORK. PROTECT AND SAVE FOR

RE-INSTALLATION. RE-INSTALL CEILING TILES IN THE SAME

PLACE AFTER WORK IS COMPLETED.

04/23/2025

Exp. 12.31.2025

S

BUILDING 01

LEVEL 2

(NO CEILING WORK)

BUILDING OPC

LEVEL 2

(NO CEILING WORK)

213213

+8'-0" +8'-0"

+8'-0"+8'-0" +8'-0" +8'-0" +8'-0"

+8'-0"

+8'-0"

STORAGE

2A02A.2

STORAGE

2A02D.1

155155

NOTE: ROOF DECK HEIGHT

APPROXIMATELY 25'-6" FROM A.F.F.

CONTRACTOR TO VERIFY

Chapel Corridor Corridor

2A02

Chapel

Nursing Informaties

Office 2A02D

Storage 2A03

Equipment Room 2A07C

MRI Scanner 2A07D

Closet 2A07E

1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,

MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE

THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING

CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED

THROUGHOUT THE DURATION CONSTRUCTION.

2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND

SURROUNDING SURFACES SHALL BE PROTECTED DURING

CONSTRUCTION.

3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER

CONSTRUCTION IS COMPLETED.

4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING.

GENERAL NOTES:

N

EXISTING CEILING LEGEND:

GYPSUM BOARD SOFFIT or

SUSPENDED CEILING

SUSPENDED ACOUSTICAL TILE

CEILING SYSTEM

RECESSED DOWN LIGHT

ILLUMINATED EXIT SIGNAGE w/ 90min

BACK UP (REFER TO ELECTRICAL

PLANS)

1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED

LIGHT FXTURE (REFER TO ELECTRICAL)

FIRE SPRINKLER HEAD

RETURN REGISTER

(REFER TO MECHANICAL DWGS.)

SUPPLY REGISTER

(REFER TO MECHANICAL DWGS.)

EXHAUST REGISTER

(REFER TO MECHANICAL DWGS.)

SKYLIGHT

DOWNLIGHT STRIP

CEILING MOUNTED FA STROBE LIGHT

CEILING MOUNTED SMOKE DETECTOR

CEILING MOUNTED SPEAKER

ACCESS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

INSTALL FALL PROTECTION

JI

AE301A

BUILDING 01 - LEVEL 2 REFLECTED

CEILING PLAN

570-21-109

SMc

VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703

04/24/2025

ASI 001

N/A

22042

3/16" = 1'-0"

Building 01 - Level 2 Reflective Ceiling Plan

N

KEY PLAN

Rev. Date Description

1 04/24/2025 ASI 001

Key Notes

154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.

155 (E) MEDICAL GAS PIPING IN CEILING. PROTECT IN PLACE.

213 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

GYPSUM BOARD CEILING AS NECESSARY TO EXPOSE

AREA OF WORK. PATCH, REPAIR & PAINT GYPSUM BOARD

TO MATCH EXISTING CONDITIONS AFTER WORK IS

COMPLETED. REFER TO DETAILS SHEET FOR CEILING

REPAIR DETAIL.

04/23/2025

Exp. 12.31.2025

N

SD

H

H

COMPRESSED

AIR PIPE

HVAC

DUCTWORK

HP UNIT

HEATER

HP UNIT

HEATER

NO CEILING, OPEN TO ROOF STRUCTURE ABOVENOTE: NO CEILING TYPE INFORMATION

Plan Storage/ Conference

17-3

Facilities Maintenance

18-3

Office 18B-3

Toilet 18C-3

Office 18A-3

Storage 19-3

Carpenter Shop 20-3

1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,

MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE

THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING

CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED

THROUGHOUT THE DURATION CONSTRUCTION.

2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND

SURROUNDING SURFACES SHALL BE PROTECTED DURING

CONSTRUCTION.

3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER

CONSTRUCTION IS COMPLETED.

4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING.

GENERAL NOTES:

EXISTING CEILING LEGEND:

GYPSUM BOARD SOFFIT or

SUSPENDED CEILING

SUSPENDED ACOUSTICAL TILE

CEILING SYSTEM

RECESSED DOWN LIGHT

ILLUMINATED EXIT SIGNAGE w/ 90min

BACK UP (REFER TO ELECTRICAL

PLANS)

1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED

LIGHT FXTURE (REFER TO ELECTRICAL)

FIRE SPRINKLER HEAD

RETURN REGISTER

(REFER TO MECHANICAL DWGS.)

SUPPLY REGISTER

(REFER TO MECHANICAL DWGS.)

EXHAUST REGISTER

(REFER TO MECHANICAL DWGS.)

SKYLIGHT

DOWNLIGHT STRIP

CEILING MOUNTED FA STROBE LIGHT

CEILING MOUNTED SMOKE DETECTOR

CEILING MOUNTED SPEAKER

ACCESS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

INSTALL FALL PROTECTION

MA Arch

AE303

BUILDING 03 REFLECTED CEILING

REFERENCE PLAN

570-21-109

SMc

VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703

04/24/2025

ASI 001

N/A

22042

KEY PLAN

N

3/16" = 1'-0"

Building 3 Reflected Ceiling Plan (Renovation)

Rev. Date Description

1 04/24/2025 ASI 001

Key Notes

04/23/2025

Exp. 12.31.2025

+8'-6"

+8'-6"

+8'-6"

+8'-6"

+8'-6"

+8'-6"

212 212

1AE324B1AE324B

NOTE: ROOF DECK HEIGHT

APPROXIMATELY 41'-6" FROM A.F.F.

CONTRACTOR TO VERIFY

Pulm Doctor Office 3A31

Chief of Sleep Office

3A30

Medical Svc Chief 3A17A

Medical Svc Admin 3A17

Chief of Pul Sta

3A16

Sim Lab 3A013

BUILDING 24

PENTHOUSE

(NO CEILING WORK)

1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,

MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE

THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING

CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED

THROUGHOUT THE DURATION CONSTRUCTION.

2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND

SURROUNDING SURFACES SHALL BE PROTECTED DURING

CONSTRUCTION.

3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER

CONSTRUCTION IS COMPLETED.

4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING.

GENERAL NOTES:

N

EXISTING CEILING LEGEND:

GYPSUM BOARD SOFFIT or

SUSPENDED CEILING

SUSPENDED ACOUSTICAL TILE

CEILING SYSTEM

RECESSED DOWN LIGHT

ILLUMINATED EXIT SIGNAGE w/ 90min

BACK UP (REFER TO ELECTRICAL

PLANS)

1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED

LIGHT FXTURE (REFER TO ELECTRICAL)

FIRE SPRINKLER HEAD

RETURN REGISTER

(REFER TO MECHANICAL DWGS.)

SUPPLY REGISTER

(REFER TO MECHANICAL DWGS.)

EXHAUST REGISTER

(REFER TO MECHANICAL DWGS.)

SKYLIGHT

DOWNLIGHT STRIP

CEILING MOUNTED FA STROBE LIGHT

CEILING MOUNTED SMOKE DETECTOR

CEILING MOUNTED SPEAKER

ACCESS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

INSTALL FALL PROTECTION

JI

AE324A

BUILDING 24 - NORTH REFLECTED

CEILING PLAN

570-21-109

SMc

VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703

04/24/2025

ASI 001

N/A

22042

3/16" = 1'-0"

Building 24 - North Reflected Ceiling Plan

3/16" = 1'-0"

Building 24 - Mechanical Penthouse Reflected Ceiling Plan

KEY PLAN

N

N

Rev. Date Description

1 04/24/2025 ASI 001

Key Notes

154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.

212 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

ACOUSTICAL CEILING TILES AS NECESSARY TO EXPOSE

AREA OF WORK. PROTECT AND SAVE FOR

RE-INSTALLATION. RE-INSTALL CEILING TILES IN THE SAME

PLACE AFTER WORK IS COMPLETED.

04/23/2025

Exp. 12.31.2025

OPEN TO

BELOW

+12'-0"

+12'-6"

+11'-3"

+10'-0"

+9'-8"+9'-8"

213213

+9'-8"

213213

PROJECTION

1B-2154

NOTE: ROOF DECK HEIGHT

APPROXIMATELY 23'-0" FROM A.F.F.

CONTRACTOR TO VERIFY

Auditorium 1B-1

+8'-6"

+9'-0"

+8'-6"

212212

Non-Rated Corridor

C3-02

Men 3A-02

Equipment Room 3A-01

Elevator P-7

Non-Rated Corridor

C3-02 Waiting 3A-40

+8'-0"214214

214214

1AE324A1AE324A

NOTE: ROOF DECK HEIGHT

APPROXIMATELY 41'-6" FROM A.F.F.

CONTRACTOR TO VERIFY

NOTE: ROOF DECK HEIGHT

APPROXIMATELY 12'-0" FROM A.F.F.

CONTRACTOR TO VERIFY

Mall

1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,

MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE

THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING

CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED

THROUGHOUT THE DURATION CONSTRUCTION.

2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND

SURROUNDING SURFACES SHALL BE PROTECTED DURING

CONSTRUCTION.

3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER

CONSTRUCTION IS COMPLETED.

4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING.

GENERAL NOTES:

N

EXISTING CEILING LEGEND:

GYPSUM BOARD SOFFIT or

SUSPENDED CEILING

SUSPENDED ACOUSTICAL TILE

CEILING SYSTEM

RECESSED DOWN LIGHT

ILLUMINATED EXIT SIGNAGE w/ 90min

BACK UP (REFER TO ELECTRICAL

PLANS)

1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED

LIGHT FXTURE (REFER TO ELECTRICAL)

FIRE SPRINKLER HEAD

RETURN REGISTER

(REFER TO MECHANICAL DWGS.)

SUPPLY REGISTER

(REFER TO MECHANICAL DWGS.)

EXHAUST REGISTER

(REFER TO MECHANICAL DWGS.)

SKYLIGHT

DOWNLIGHT STRIP

CEILING MOUNTED FA STROBE LIGHT

CEILING MOUNTED SMOKE DETECTOR

CEILING MOUNTED SPEAKER

ACCESS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

INSTALL FALL PROTECTION

JI

AE324B

BUILDING 24 - SOUTH REFLECTED

CEILING PLAN

570-21-109

SMc

VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703

04/24/2025

ASI 001

N/A

22042

3/16" = 1'-0"

Building 24 - South Reflected Ceiling Plan

N

KEY PLAN

Rev. Date Description

1 04/24/2025 ASI 001

Key Notes

154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.

212 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

ACOUSTICAL CEILING TILES AS NECESSARY TO EXPOSE

AREA OF WORK. PROTECT AND SAVE FOR

RE-INSTALLATION. RE-INSTALL CEILING TILES IN THE SAME

PLACE AFTER WORK IS COMPLETED.

213 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

GYPSUM BOARD CEILING AS NECESSARY TO EXPOSE

AREA OF WORK. PATCH, REPAIR & PAINT GYPSUM BOARD

TO MATCH EXISTING CONDITIONS AFTER WORK IS

COMPLETED. REFER TO DETAILS SHEET FOR CEILING

REPAIR DETAIL.

214 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

CEMENT PLASTER CEILING AS NECESSARY TO EXPOSE

AREA OF WORK. PATCH, REPAIR & PAINT CEMENT

PLASTER CEILING TO MATCH EXISTING CONDITIONS AFTER

WORK IS COMPLETED. REFER TO DETAILS SHEET FOR

CEILING REPAIR DETAIL.

215 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

DECORATIVE CEILING PANELS AS NECESSARY TO EXPOSE

AREA OF WORK. PROTECT AND SAVE FOR

RE-INSTALLATION. RE-INSTALL CEILING PANELS IN THE

SAME PLACE AFTER WORK IS COMPLETED.

04/23/2025

Exp. 12.31.2025

108" x 20"

20" x 8" x x x

213 213 212

NO CEILING, OPEN TO ABOVE

+9'-0"

+9'-0" +9'-0"

+9'-0"

NOTE: T.O. ROOF RIDGE

APPROXIMATELY 20'-0" FROM A.F.F.

CONTRACTOR TO VERIFY

Resident Bed Rm

1E13

Resident Bath Rm 1E13A

Corridor 1E-1

Utility Rm 1E15

Mech 1E19

Resident Bed Rm

1E14

Resident Bath Rm 1E14A

1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,

MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE

THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING

CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED

THROUGHOUT THE DURATION CONSTRUCTION.

2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND

SURROUNDING SURFACES SHALL BE PROTECTED DURING

CONSTRUCTION.

3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER

CONSTRUCTION IS COMPLETED.

4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING.

GENERAL NOTES:

EXISTING CEILING LEGEND:

GYPSUM BOARD SOFFIT or

SUSPENDED CEILING

SUSPENDED ACOUSTICAL TILE

CEILING SYSTEM

RECESSED DOWN LIGHT

ILLUMINATED EXIT SIGNAGE w/ 90min

BACK UP (REFER TO ELECTRICAL

PLANS)

1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED

LIGHT FXTURE (REFER TO ELECTRICAL)

FIRE SPRINKLER HEAD

RETURN REGISTER

(REFER TO MECHANICAL DWGS.)

SUPPLY REGISTER

(REFER TO MECHANICAL DWGS.)

EXHAUST REGISTER

(REFER TO MECHANICAL DWGS.)

SKYLIGHT

DOWNLIGHT STRIP

CEILING MOUNTED FA STROBE LIGHT

CEILING MOUNTED SMOKE DETECTOR

CEILING MOUNTED SPEAKER

ACCESS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

INSTALL FALL PROTECTION

JI

AE328

BUILDING 28 REFLECTED CEILING

PLAN

570-21-109

SMc

VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703

04/24/2025

ASI 001

N/A

22042

KEY PLAN

N

3/16" = 1'-0"

Building 28 Reflected Ceiling Plan

Rev. Date Description

1 04/24/2025 ASI 001

Key Notes

154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.

212 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

ACOUSTICAL CEILING TILES AS NECESSARY TO EXPOSE

AREA OF WORK. PROTECT AND SAVE FOR

RE-INSTALLATION. RE-INSTALL CEILING TILES IN THE SAME

PLACE AFTER WORK IS COMPLETED.

213 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

GYPSUM BOARD CEILING AS NECESSARY TO EXPOSE

AREA OF WORK. PATCH, REPAIR & PAINT GYPSUM BOARD

TO MATCH EXISTING CONDITIONS AFTER WORK IS

COMPLETED. REFER TO DETAILS SHEET FOR CEILING

REPAIR DETAIL.

04/23/2025

Exp. 12.31.2025

+12'-0"

+12'-0"+10'-0"

1/AE331B 1/AE331B

NOTE: ROOF DECK HEIGHT

APPROXIMATELY 19'-2" FROM A.F.F.

CONTRACTOR TO VERIFY

Recreation Room

BUILDING 31

PENTHOUSE

(NO CEILING WORK)

1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,

MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE

THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING

CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED

THROUGHOUT THE DURATION CONSTRUCTION.

2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND

SURROUNDING SURFACES SHALL BE PROTECTED DURING

CONSTRUCTION.

3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER

CONSTRUCTION IS COMPLETED.

4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING.

GENERAL NOTES:

EXISTING CEILING LEGEND:

GYPSUM BOARD SOFFIT or

SUSPENDED CEILING

SUSPENDED ACOUSTICAL TILE

CEILING SYSTEM

RECESSED DOWN LIGHT

ILLUMINATED EXIT SIGNAGE w/ 90min

BACK UP (REFER TO ELECTRICAL

PLANS)

1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED

LIGHT FXTURE (REFER TO ELECTRICAL)

FIRE SPRINKLER HEAD

RETURN REGISTER

(REFER TO MECHANICAL DWGS.)

SUPPLY REGISTER

(REFER TO MECHANICAL DWGS.)

EXHAUST REGISTER

(REFER TO MECHANICAL DWGS.)

SKYLIGHT

DOWNLIGHT STRIP

CEILING MOUNTED FA STROBE LIGHT

CEILING MOUNTED SMOKE DETECTOR

CEILING MOUNTED SPEAKER

ACCESS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

INSTALL FALL PROTECTION

JI

AE331A

BUILDING 31 - NORTH REFLECTED

CEILING PLAN

570-21-109

SMc

VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703

04/24/2025

ASI 001

N/A

22042

KEY PLAN

N

3/16" = 1'-0"

Building 31 Reflected Ceiling Plan 3/16" = 1'-0"

Building 31 - Penthouse Reflected Ceiling Plan

N

Rev. Date Description

1 04/24/2025 ASI 001

Key Notes

216 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

PLASTER CEILING w/ G.I. PLASTER RAIN-DRIP SCREED AS

NECESSARY TO EXPOSE AREA OF WORK. PATCH, REPAIR

& PAINT PLASTER CEILING TO MATCH EXISTING

CONDITIONS AFTER WORK IS COMPLETED. REFER TO

DETAILS SHEET FOR CEILING REPAIR DETAIL.

04/23/2025

Exp. 12.31.2025

+8'-0"

+8'-0"

+8'-0"

1 / AE331A 1 / AE331A

NOTE: ROOF DECK HEIGHT

APPROXIMATELY 14'-0" FROM A.F.F.

CONTRACTOR TO VERIFY

Lounge

Storage 134A

2-Bed Rm

Clean Linen

1. CONTRACTOR SHALL VERIFY ALL CEILING DEVICE LOCATIONS,

MATERIALS, GRID LAYOUT, AND POTENTIAL OBSTRUCTIONS ABOVE

THE CEILING PRIOR TO THE COMMENCEMENT OF WORK. EXISTING

CEILING DEVICES AND DUCTWORK SHALL BE PROTECTED

THROUGHOUT THE DURATION CONSTRUCTION.

2. CEILINGS & SOFITTS, DUCTWORK, UTILITIES, FIXTURES, DEVICES AND

SURROUNDING SURFACES SHALL BE PROTECTED DURING

CONSTRUCTION.

3. RE-INSTALL ANY ITEM REMOVED IN THE SAME LOCATION AFTER

CONSTRUCTION IS COMPLETED.

4. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING.

GENERAL NOTES:

N

EXISTING CEILING LEGEND:

GYPSUM BOARD SOFFIT or

SUSPENDED CEILING

SUSPENDED ACOUSTICAL TILE

CEILING SYSTEM

RECESSED DOWN LIGHT

ILLUMINATED EXIT SIGNAGE w/ 90min

BACK UP (REFER TO ELECTRICAL

PLANS)

1x4, 2x2, 2x4 CLEAN ROOM ROOM TYPE LED

LIGHT FXTURE (REFER TO ELECTRICAL)

FIRE SPRINKLER HEAD

RETURN REGISTER

(REFER TO MECHANICAL DWGS.)

SUPPLY REGISTER

(REFER TO MECHANICAL DWGS.)

EXHAUST REGISTER

(REFER TO MECHANICAL DWGS.)

SKYLIGHT

DOWNLIGHT STRIP

CEILING MOUNTED FA STROBE LIGHT

CEILING MOUNTED SMOKE DETECTOR

CEILING MOUNTED SPEAKER

ACCESS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

INSTALL FALL PROTECTION

JI

AE331B

BUILDING 31 - CENTER REFLECTED

CEILING PLAN

570-21-109

SMc

VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703

04/24/2025

ASI 001

N/A

22042

3/16" = 1'-0"

Building 31 Reflected Ceiling Plan - Center

KEY PLAN

N

Rev. Date Description

1 04/24/2025 ASI 001

Key Notes

154 (E) DUCTWORK TO REMAIN. PROTECT IN PLACE.

212 TO ACCOMMODATE GUARDRAIL OR TIE-DOWN

ANCHORAGE AT THE ROOF DECK, REMOVE EXISTING

ACOUSTICAL CEILING TILES AS NECESSARY TO EXPOSE

AREA OF WORK. PROTECT AND SAVE FOR

RE-INSTALLATION. RE-INSTALL CEILING TILES IN THE SAME

PLACE AFTER WORK IS COMPLETED.

04/23/2025

Exp. 12.31.2025

TERMINATION CAULK

STAINLESS STEEL CLAMPING

RING

APPROVED SUBSTRATE

WATER STOP

TPO NON-REINFORCED

FLASHING

INSULATION PER SCHEDULE

TPO MEMBRANE

SIDE VIEW OF FIELD WRAPPED PIPE

AXONOMETRIC VIEW

M

IN

2" MIN.

2"

TERMINATION CAULK

STAINLESS STEEL CLAMP

APPROVED SUBSTRATE

TPO NON-REINFORCED

FLASHING

INSULATION PER SCHEDULE

TPO MEMBRANE

SIDE VIEW OF FIELD WRAPPED PIPE

AXONOMETRIC VIEW

WATER STOP

SOILD WELDS

F F

L

A B

O V

E

METAL HOOD

WATER STOP

APPROVED SUBSTRATE

TPO NON-REINFORCED

FLASHING

INSULATION PER SCHEDULE

TPO MEMBRANE

SIDE VIEW OF FIELD WRAPPED PIPE

AXONOMETRIC VIEW

M

IN

2" MIN.

2"

(E) GYP. BOARD CEILING

GRID MAIN BEAM

CUT GYPSUM BOARD

PATCH TO FIT SNUG

INTO OPENING

(TEXTURE & PAINT TO

MATCH ADJACENT)

TAPE & FINISH

(N) CROSS TEE @

UNSUPPORTED EDGES

SEE RCP

FOR HEIGHT

(E) PLASTER SOFFIT

ASSEMBLY

(N) PLASTER SOFFIT

(LATH w/ # 8 SCREW WITH

7/16" DIA. PAN WAFER

HEAD, @ 7" O.C.); PAINT

TO MATCH ADJACENT

AREAS

(E) SUSP. SOFFIT FRAMING

(E) FURRING CHANNELS

REQUIRED

PATCH AS

Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

INSTALL FALL PROTECTION

JI

AE1002

TYPICAL DETAILS 570-21-109

SMc

VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703

04/24/2025

ASI 001

N/A

22042

3" = 1'-0"

FIELD FABRICATED PIPE WRAP

3" = 1'-0"

ROOFTOP EQUIPMENT SUPPORT

3" = 1'-0"

HOT PIPE FLASHING

3" = 1'-0"

SUSPENDED GYP. CEILING PATCH

Rev. Date Description

1 04/24/2025 ASI 001

3" = 1'-0"

SUSPENDED CEMENT PLASTER CEILING PATCH

04/23/2025

Exp. 12.31.2025

GI001 - SHEET INDEX, APPLICABLE STANDARDS & GENERAL NOTES
AE300 - BUILDING OPC WALKWAY REFLECTED CEILING PLAN
AE301A - BUILDING 01 -LEVEL 2 REFLECTED CEILING PLAN
AE303 - BUILDING 03 REFLECTED CEILING REFERENCE PLAN
AE324A - BUILDING 24 -NORTH REFLECTED CEILING PLAN
AE324B - BUILDING 24 -SOUTH REFLECTED CEILING PLAN
AE328 - BUILDING 28 REFLECTED CEILING PLAN
AE331A - BUILDING 31 -NORTH REFLECTED CEILING PLAN
AE331B - BUILDING 31 -CENTER REFLECTED CEILING PLAN
AE1002 - TYPICAL DETAILS