5. Blank Cost Estimate Breakdown.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Demolish Surplus Military Family Housing Units
Solicitation number
FA557525B0017
Issued by

About this file

This document is a blank Construction Cost Estimate Breakdown spreadsheet for a demolition project at Moron Air Base in Spain. The project involves demolishing surplus Military Family Housing (MFH) units in multiple locations, specifically units 635-637, 639-641, 684-686, and 692-694. The cost estimate template breaks down potential work into categories including architectural works, demolition, earth movements, landscaping, concrete works, and communications-related tasks. The solicitation (FA557525B0017) indicates the project magnitude is between $250,000 and $500,000, with a projected performance period of 190 days. Key procurement details include a pre-proposal conference/site visit on 6 August 2025, question submission deadline of 12 August 2025, and bid submission deadline of 1 September 2025 at 10:00 hours local time. The procurement is restricted to local sources in Spain, with contractors required to meet Spanish legislative requirements for government works, and the government reserves the right to cancel the solicitation with no obligation to offerors.

View the file

Other files

File Type Posted
2. Concept Drawings.pdf PDF
7. EFGS, May 2014.pdf PDF
8. Statement of Work (Eng).pdf PDF
Solicitation - FA557525B0017.pdf PDF
1a. Especificaciones Tecnicas.pdf PDF
1b. Technical Specifications.pdf PDF
6. INRMP.pdf PDF
4. Schedule of Material Submittals.xlsx XLSX spreadsheet
9. Statement of Work (Spa).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GOV - Page from 1 - Penultimate

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
DEMO SURPLUS MFH UNITS,MULTI. UNITS (635-637), (639-641), (684-686) and (692-694)€ 0.00$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 24-1003MORÓN AIR BASE, SPAIN
LINE
NO.ITEMUNIT OF
MEAS.MATERIAL COSTLABOR COSTOTHER DIRECT COSTS
COSTLINE TOTAL
QUANTI.UNITTOTALMH/MDAV.RATTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ARCHITECTURAL WORKS

TRABAJOS DE ARQUITECTURA

Demolition Work Trabajos de Demolición

1Utilities disconnection
Desconexión de sistemasJOB
2Remove electrical installation, lighting and accessories.
Eliminar instalaciones eléctricas, iluminación y acces.JOB
3Remove mechanical installation, sanitary fixture & acces.
Eliminar instalacion fontanería, sanitarios y accesorios.JOB
4Remove A/C installation, ducts, grille and accessories.
Eliminar instalacion A/C, conductos, rejillas y acces.JOB
5Remove glass from windows.
Eliminar vidrios de las ventanasJOB
6Remove doors, windows, screems and accessories.
Eliminar puertas, ventanas, rejillas y accesorios.JOB
7Disassemble fence partitions, awnings and misc. elements.
Desmontar cercas, toldos y elementos varios.JOB
8Demolish tile, flooring, carpet and finishes.
Demoler azulejos, solerias, moquetas y acabadosm²
9Remove roof layers and accessories.
Eliminar capas de cubierta y accesorios.m²
10Demolish concrete roof slabs.
Demoler forjados de hormigon armadom²
11Demolish brick walls and enclosures.
Demoler paredes de ladrillo y cerramientos.m²
12Demolish concrete slabs and embebed elements.
Demoler losas de hormigón y elem. Embebidosm²
13Remove sub-bases of concrete slabs to the natural soil
Retirar las subbases de las losas de hormigón hasta el suelo naturalm³
14Demolish tie beams, footings and underground elements.
Demoler vigas zunchos, zapatas y element. Enterradosm³
15Demolish access sidewalks and subbase
Demoler acerados de accesos y subbasesm³
16Demolish asphalt pavement and subgrade.
Demoler pavimnento asfáltico y subbasem³
17Separate, load and transport the waste to authorized dump.
Separar, cargar y transportar residuos a vertedero autorizadoJOB
Total Demoliton Work.

Total Trabajos de Demolición

Earth Movements and Lanscaping Movimientos de Tierras y paisajismo

18Fill and compact void with borrowed earth.
Relleno y compactación de excavación con préstamom³
19Prepare surface and restore the vegetable cover.
Preparar superficie y restaurar la cubierta vegetalm³
20tree and shrub plantations
Plantaciones de arboles y arbustosJOB
Total Earth Movement and Landscaping.

Total Movimientos de Tierras y paisajismo

Concrete Works.

Trabajos de Hormigón

21Concrete sidewalk, subbase and culvert.
Acera de hormigon, subbase y bordillom²
22Relocating or executing elements of the drainage network.
Recolocar o ejecutar elementos de la red de drenajeJOB
Total Concrete Works.

Total Trabajos de Hormigón

Work related to communications Trabajos relacionados con comunicaciones

23Trench openings.
Apertura de zanjasm³
24Execution of the necessary pre-installation for the communications network, ducts, etc.,
Ejecución de la preinstalación necesaria para la red de comunicaciones, canalizaciones, etc,Lm
25Execution of A1 manholes with resistance cover D400, with printing of the name “communications”.
Ejecución de arquetas A1 con tapa de resistencia D400, con impresión del nombre «comunicaciones».Ud
Work related to communications

Trabajos relacionados con comunicaciones

SUMMARIZE ARCHITECTURAL WORK.

RESUMEN DE TRABAJOS DE ARQUITECTURA

Demolitions Work.

Trabajos de Demolicion.

Earth Movements and Landscaping.

Movimientos de tierras y paisajismo Civil Works.

Trabajos Civiles Work related to communications Trabajos relacionados con comunicaciones

TOTAL ARCHITECTURAL.

TOTAL TRABAJOS DE ARQUITECTURA

SUMMARY.

RESUMEN.

TOTAL ARCHITECTURAL.

TOTAL TRABAJOS DE ARQUITECTURA

GRAND TOTAL.

GRAN TOTAL

TOTAL MATERIAL COST
TOTAL LABOR COST
TOTAL OTHER DIRECT COSTS
TOTAL MATERIAL EXECUTION COST
OVERHEAD
SUBTOTAL
PROFIT
TOTAL COST ESTIMATE
EXCHANGE RATE $1.00 =0.9249 €
TOTAL COST ESTIMATE

DATE: FIRM NAME:

TITLE:BY:
(Signature)
These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Regular"Page &P of &N

GOV - Last Page

INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN

Column 1 - Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs. Items will be furnished by the Government.

Column 2 - Units of Measure. Description of the unit in which each item is to be estimated (examples: square meters - m2, cubic meters - m3, linear meters - m, unit - u, kilograms - kg, ton - t). Units of measure will be furnished by the Government.

Column 3 - Quantity. Quantity required for the item in terms of unit of measure shown on Column 2. Quantity will be furnished by the Government only for unit price contract. Otherwise, the contractor is responsible for determining the quantity.

Column 4 and 5 - Material Costs. Enter the unit cost of the material corresponding to the item to be supplied in Column 4 and the total material cost for that item in Column 5. Cost must be in euros.

Column 6 and 7 - Labor Costs. Enter the unit cost of the labor corresponding to the item to be performed in Column 6 and the total labor cost for that item in Column 7. Costs must be in euros.

Column 8 - Total Line Cost. Enter the sum of the total material cost and the total labor cost of the item to be performed. Cost must be in euros.

NOTE: In addition to other totals derived on various pages, the grand total of Column 5, 7 and 10, plus overhead and profit will be shown on the last page. Overhead and profit must be applied over the total material execution.

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror may be required to submit a certificate of current cost or pricing data.

2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer, or his authorized representative, upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

&"Times New Roman,Regular"Page 3 of 3