5. Blank Cost Estimate Breakdown.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- Demolish Surplus Military Family Housing Units
- Solicitation number
- FA557525B0017
About this file
This document is a blank Construction Cost Estimate Breakdown spreadsheet for a demolition project at Moron Air Base in Spain. The project involves demolishing surplus Military Family Housing (MFH) units in multiple locations, specifically units 635-637, 639-641, 684-686, and 692-694. The cost estimate template breaks down potential work into categories including architectural works, demolition, earth movements, landscaping, concrete works, and communications-related tasks. The solicitation (FA557525B0017) indicates the project magnitude is between $250,000 and $500,000, with a projected performance period of 190 days. Key procurement details include a pre-proposal conference/site visit on 6 August 2025, question submission deadline of 12 August 2025, and bid submission deadline of 1 September 2025 at 10:00 hours local time. The procurement is restricted to local sources in Spain, with contractors required to meet Spanish legislative requirements for government works, and the government reserves the right to cancel the solicitation with no obligation to offerors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2. Concept Drawings.pdf | ||
| 7. EFGS, May 2014.pdf | ||
| 8. Statement of Work (Eng).pdf | ||
| Solicitation - FA557525B0017.pdf | ||
| 1a. Especificaciones Tecnicas.pdf | ||
| 1b. Technical Specifications.pdf | ||
| 6. INRMP.pdf | ||
| 4. Schedule of Material Submittals.xlsx | XLSX spreadsheet | |
| 9. Statement of Work (Spa).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOV - Page from 1 - Penultimate
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||
| CONTRACTOR | ADDRESS | ||||||||||
| MORÓN AIR BASE, SPAIN | |||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | ||||||||||
| DEMO SURPLUS MFH UNITS,MULTI. UNITS (635-637), (639-641), (684-686) and (692-694) | € 0.00 | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| QUUG 24-1003 | MORÓN AIR BASE, SPAIN | ||||||||||
| LINE | |||||||||||
| NO. | ITEM | UNIT OF | |||||||||
| MEAS. | MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | ||||||||
| COST | LINE TOTAL | ||||||||||
| QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | ||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| ARCHITECTURAL WORKS |
TRABAJOS DE ARQUITECTURA
Demolition Work Trabajos de Demolición
| 1 | Utilities disconnection | |
| Desconexión de sistemas | JOB | |
| 2 | Remove electrical installation, lighting and accessories. | |
| Eliminar instalaciones eléctricas, iluminación y acces. | JOB | |
| 3 | Remove mechanical installation, sanitary fixture & acces. | |
| Eliminar instalacion fontanería, sanitarios y accesorios. | JOB | |
| 4 | Remove A/C installation, ducts, grille and accessories. | |
| Eliminar instalacion A/C, conductos, rejillas y acces. | JOB | |
| 5 | Remove glass from windows. | |
| Eliminar vidrios de las ventanas | JOB | |
| 6 | Remove doors, windows, screems and accessories. | |
| Eliminar puertas, ventanas, rejillas y accesorios. | JOB | |
| 7 | Disassemble fence partitions, awnings and misc. elements. | |
| Desmontar cercas, toldos y elementos varios. | JOB | |
| 8 | Demolish tile, flooring, carpet and finishes. | |
| Demoler azulejos, solerias, moquetas y acabados | m² | |
| 9 | Remove roof layers and accessories. | |
| Eliminar capas de cubierta y accesorios. | m² | |
| 10 | Demolish concrete roof slabs. | |
| Demoler forjados de hormigon armado | m² | |
| 11 | Demolish brick walls and enclosures. | |
| Demoler paredes de ladrillo y cerramientos. | m² | |
| 12 | Demolish concrete slabs and embebed elements. | |
| Demoler losas de hormigón y elem. Embebidos | m² | |
| 13 | Remove sub-bases of concrete slabs to the natural soil | |
| Retirar las subbases de las losas de hormigón hasta el suelo natural | m³ | |
| 14 | Demolish tie beams, footings and underground elements. | |
| Demoler vigas zunchos, zapatas y element. Enterrados | m³ | |
| 15 | Demolish access sidewalks and subbase | |
| Demoler acerados de accesos y subbases | m³ | |
| 16 | Demolish asphalt pavement and subgrade. | |
| Demoler pavimnento asfáltico y subbase | m³ | |
| 17 | Separate, load and transport the waste to authorized dump. | |
| Separar, cargar y transportar residuos a vertedero autorizado | JOB | |
| Total Demoliton Work. |
Total Trabajos de Demolición
Earth Movements and Lanscaping Movimientos de Tierras y paisajismo
| 18 | Fill and compact void with borrowed earth. | |
| Relleno y compactación de excavación con préstamo | m³ | |
| 19 | Prepare surface and restore the vegetable cover. | |
| Preparar superficie y restaurar la cubierta vegetal | m³ | |
| 20 | tree and shrub plantations | |
| Plantaciones de arboles y arbustos | JOB | |
| Total Earth Movement and Landscaping. |
Total Movimientos de Tierras y paisajismo
Concrete Works.
Trabajos de Hormigón
| 21 | Concrete sidewalk, subbase and culvert. | |
| Acera de hormigon, subbase y bordillo | m² | |
| 22 | Relocating or executing elements of the drainage network. | |
| Recolocar o ejecutar elementos de la red de drenaje | JOB | |
| Total Concrete Works. |
Total Trabajos de Hormigón
Work related to communications Trabajos relacionados con comunicaciones
| 23 | Trench openings. | |
| Apertura de zanjas | m³ | |
| 24 | Execution of the necessary pre-installation for the communications network, ducts, etc., | |
| Ejecución de la preinstalación necesaria para la red de comunicaciones, canalizaciones, etc, | Lm | |
| 25 | Execution of A1 manholes with resistance cover D400, with printing of the name “communications”. | |
| Ejecución de arquetas A1 con tapa de resistencia D400, con impresión del nombre «comunicaciones». | Ud | |
| Work related to communications |
Trabajos relacionados con comunicaciones
SUMMARIZE ARCHITECTURAL WORK.
RESUMEN DE TRABAJOS DE ARQUITECTURA
Demolitions Work.
Trabajos de Demolicion.
Earth Movements and Landscaping.
Movimientos de tierras y paisajismo Civil Works.
Trabajos Civiles Work related to communications Trabajos relacionados con comunicaciones
TOTAL ARCHITECTURAL.
TOTAL TRABAJOS DE ARQUITECTURA
SUMMARY.
RESUMEN.
TOTAL ARCHITECTURAL.
TOTAL TRABAJOS DE ARQUITECTURA
GRAND TOTAL.
GRAN TOTAL
| TOTAL MATERIAL COST | |
| TOTAL LABOR COST | |
| TOTAL OTHER DIRECT COSTS | |
| TOTAL MATERIAL EXECUTION COST | |
| OVERHEAD | |
| SUBTOTAL | |
| PROFIT | |
| TOTAL COST ESTIMATE | |
| EXCHANGE RATE $1.00 = | 0.9249 € |
| TOTAL COST ESTIMATE |
DATE: FIRM NAME:
| TITLE: | BY: | ||
| (Signature) | |||
| These costs and overhead and profit percentages will be applied in any possible future modifications |
&"Times New Roman,Regular"Page &P of &N
GOV - Last Page
INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Column 1 - Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs. Items will be furnished by the Government.
Column 2 - Units of Measure. Description of the unit in which each item is to be estimated (examples: square meters - m2, cubic meters - m3, linear meters - m, unit - u, kilograms - kg, ton - t). Units of measure will be furnished by the Government.
Column 3 - Quantity. Quantity required for the item in terms of unit of measure shown on Column 2. Quantity will be furnished by the Government only for unit price contract. Otherwise, the contractor is responsible for determining the quantity.
Column 4 and 5 - Material Costs. Enter the unit cost of the material corresponding to the item to be supplied in Column 4 and the total material cost for that item in Column 5. Cost must be in euros.
Column 6 and 7 - Labor Costs. Enter the unit cost of the labor corresponding to the item to be performed in Column 6 and the total labor cost for that item in Column 7. Costs must be in euros.
Column 8 - Total Line Cost. Enter the sum of the total material cost and the total labor cost of the item to be performed. Cost must be in euros.
NOTE: In addition to other totals derived on various pages, the grand total of Column 5, 7 and 10, plus overhead and profit will be shown on the last page. Overhead and profit must be applied over the total material execution.
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror may be required to submit a certificate of current cost or pricing data.
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer, or his authorized representative, upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
&"Times New Roman,Regular"Page 3 of 3