This is a Modified Constructed Underground Storage Facility Permit (No. 71-220048.0003) issued by the Arizona Department of Water Resources to the Town of Prescott Valley for the Upper Agua Fria Recharge Facility. The permit authorizes the operation of a constructed underground storage facility consisting of two sites: an In-Channel Site within the natural channel of the Agua Fria River with a maximum storage capacity of 1,200 acre-feet per annum, and a North Plains Site with Phase 1 capacity of 2,400 acre-feet per annum and Phase 2 capacity of 3,000 acre-feet per annum. The maximum combined storage at any time shall not exceed 68,150 acre-feet for both sites. The source water to be stored is effluent, with the permit effective from March 22, 2019, through May 21, 2032.
The permit requires extensive monitoring and reporting protocols including monthly water level measurements at specified monitor wells, daily water quantity monitoring, quarterly infiltration rate measurements, and annual supplemental data reports due by March 31 following each reporting period. The facility must operate in conjunction with applicable Water Storage Permits and Aquifer Protection Permit P-102503 issued by the Arizona Department of Environmental Quality. Alert levels and operational prohibition limits are established for water levels, with specific response requirements including notification to ADWR within 48 hours of alert conditions and potential cessation of recharge activities if prohibition limits are exceeded. The permit includes detailed contingency provisions for Phase 2 construction and allows for basin substitution among designated contingency basins, provided minimum acreage requirements are met.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USF Permit No. 71-220048.0003
ARIZONA DEPARTMENT OF WATER RESOURCES
CONSTRUCTED
UNDERGROUND STORAGE FACILITY PERMIT
MODIFIED
PERMIT NO. 71-220048.0003
STATE OF ARIZONA )
) ss.
COUNTY OF MARICOPA )
This is to certify that Application No. 71- 220048.0003 meets the requirements of Arizona Revised Statutes Title 45, Chapter 3.1, Article 2, for a Constructed Underground Storage Facility Permit.
This permit modifies and replaces Underground Storage Facility Permit No. 71-220048.0002. The Director hereby grants authority to the Town of Prescott Valley to operate a constructed underground storage facility, subject to the following limitations and conditions:
Permit Limitations
Permittee: Town of Prescott Valley 7501 E. Skoog Boulevard
Prescott Valley, AZ 86314
Name of Facility: Upper Agua Fria Recharge Facility
Active Management Area: Prescott
ADWR Groundwater Sub-basin: Upper Agua Fria
Cadastral Location of Facility: In-Channel Site: within the natural channel of the
Agua Fria River in portions of sections 16, 21, 22 and 27 of T14N, R1E, GSRB&M and
North Plains Site: most of the SE¼ and portions of the S½ of the NE¼ of Section 8 and also the east part of the SE¼ and NE¼ of the SW¼ of Section 8, T14N, R1E, GSRB&M
Maximum Storage at Facility: In-Channel Site: 1,200 acre-feet per annum and
North Plains Site:
Phase 1: 2,400 acre-feet per annum
Phase 2: 3,000 acre-feet per annum not to exceed 41,950 acre-feet maximum in storage at any time at the North Plains Site.
The maximum amount of water in storage at any time shall not exceed a total of 68,150 acre-feet for both sites combined.
Source Water to be Stored: Effluent
Effective Date: March 22, 2019
Expiration Date: May 21, 2032
Permit Conditions
1. Hydrologic Report:
The facility shall be constructed and operated as specified in the following documents, correspondence and reports (collectively "the hydrologic report"), which are incorporated in and made a part of this permit:
a. Hydrologic Report in Support of Applications for Constructed Underground
Storage Facility Permit and Amended Aquifer Protection Permit, Expanded Upper Agua Fria Recharge Project, Town of Prescott Valley, Arizona, Volume 1: Text, Tables, and Illustrations, prepared by Montgomery and Associates dated April 14,
b. Hydrologic Report in Support of Applications for Constructed Underground Storage Facility Permit and Amended Aquifer Protection Permit, Expanded Upper Agua Fria Recharge Project, Town of Prescott Valley, Arizona, Volume 2:
Appendices, prepared by Montgomery and Associates dated April 14, 2011
c. Response to July 25, 2011 Incomplete and Incorrect Determination for
Underground Storage Facility (USF) Application No. 71-220048.0000 and Water Storage (WS) Application No. 73-220048.0000 for the Town of Prescott Valley’s Upper Agua Fria Recharge Project dated October 7, 2011
d. Email from Jeff Meyer (Errol Montgomery and Associates) to Tracey Carpenter
(ADWR) dated Friday, February 3, 2012 regarding “Permit conditions for Phase 2 basins” with attachment “tbl_S1_NP_Basin_Info_nav29_Rev.pdf”
e. Email from Jeff Meyer (Errol Montgomery and Associates) to Tracey Carpenter
(ADWR) dated Wednesday February 6, 2013 regarding Prescott Valley USF submittal with attachments “Updated Tables.pdf”, “Well Schematics.pdf”, “Lithlogs.pdf” and “PV NORTH PLAINS WELL REPORTS.pdf”
f. Letter from John Munderloh (Town of Prescott Valley) to David McKay (ADWR) dated April 20, 2018 regarding “Director’s Modification to USF No. 71- 220048.0001, Town of Prescott Valley, Upper Agua Fria Underground Storage Facility – Addition of Constructed Basins”
g. Email with attachments from John Munderloh (Town of Prescott Valley) to Tracey
Carpenter (ADWR) regarding “Recharge Inspection 71-220048.0002” dated March 7, 2019
2. Annual Reporting Schedule:
The permittee shall submit all monitoring data and analyses in the form of annual supplemental data reports. The permittee shall submit an annual report, on an ADWR-approved form, and a supplemental data report no later than March 31 following the end of each completed annual reporting period. Annual reports are required regardless of the operational status of the facility. If no deliveries are made to the facility during the reporting period, the permittee shall indicate that fact on the annual report and in the supplemental data report. The permittee shall send one (1) copy of all annual supplemental data reports to the Recharge, Assured and Adequate Water Supply Programs, Water Planning and Permitting Division, Arizona Department of Water Resources, 1110 W. Washington St., Suite 310, Phoenix, Arizona 85007.
3. Annual Supplemental Reporting Requirements:
The annual supplemental data reports shall include all information and monitoring data required by this permit and as described in the hydrologic report. The data reports shall include the following:
a. Facility Map:
The data reports shall include a facility map showing the location of all facility monitoring points and relevant facility features including the length of the In- Channel site and the recharge basins at the North Plains site, monitor well locations and flow measurement devices. The map shall include township, range, and section boundaries, if applicable.
b. Water Level Monitoring Data:
The data reports shall contain static water levels measured at all water level monitor points during the reporting period as specified in permit condition 4.a. and Tables 1, 2 and 3. The water level data shall be displayed in tables and hydrographs containing the following: facility well identifier, ADWR well registration number, cadastral location, measurement date, the depth to water in feet below land surface, and the groundwater elevation in feet above mean sea level. The reports shall note any condition, such as pumping from nearby wells, surface water flows, or any other hydrologic or environmental condition that may be reasonably known and have affected the water level at the time of measurement.
c. Water Quantity Monitoring Data:
The data reports shall contain all water quantity data for the recharge facility as specified in permit condition 4.b. and Table 4. The data shall be presented in monthly summary tables indicating the month, daily volume of water discharged from the Advanced Treatment Facility (ATF), the volume of water diverted for direct reuse, the volume of water diverted for utility uses, the volume of water delivered to the In-Channel site and the volume of water delivered to the North Plains site. The total volume of water delivered to and recharged at each of the recharge sites as well as for the entire facility shall be presented by the month, quarter and year in gallons and acre-feet.
d. Operational Monitoring Data:
i. The data reports shall contain infiltration rates as specified in permit conditions 4.d.i and 4.d.viii. for each site. The reports shall describe the method used to calculate the infiltration rates, present the data in table(s) and the infiltration rate in feet per day. If more than one measurement is made during the reporting period, all data shall be presented.
ii. The data reports shall contain the wet/dry status data and calculated evaporation losses as specified in permit condition 4.d.ii and 4.d.ix..
iii. The data reports shall contain the vegetation monitoring data and calculated transpiration losses as specified in permit condition 4.d.v..
e. Alert Level and Operation Prohibition Limit Exceedances and Other Reportable
Events:
i. The data reports shall summarize activities and information described in permit condition 5.a. for any exceedance of an alert level or operation prohibition limit for water levels at any monitor point listed in Table 1 or 2.
ii. The data reports shall summarize the failure(s) of any water quantity measuring device that causes the measurement device to be out of compliance with permit condition 5.b.i. and corrective action(s) taken to resolve the failure(s).
iii. The data reports shall summarize any exceedance of the maximum storage allowed pursuant to the permit limitation of 41,950 acre-feet maximum in storage at any time at the North Plains Site or 68,150 acre-feet maximum in storage at any time for both sites combined. The reports shall include the date the maximum storage limitation was exceeded, the number of days that the facility remained above the maximum storage limitation, a description of how the condition was remedied, an assessment of any potential impacts to land or other water users caused by the overage, an assessment considering the continuing feasibility of the project, and a current water level measurement from all water level monitor points.
iv. If Aquifer Protection Permit (APP) number P-102503 is suspended, revoked or terminated during the reporting period, the quarterly and annual supplemental data reports shall summarize events that resulted in the suspension, revocation or termination. The summary shall include all water quality data collected during the reporting period and shall be presented in a table indicating the sample date, sample point identification, analyte(s), the APP limit(s) exceeded, and the sample results.
v. The reports shall contain a summary of the activities and information described in permit condition 5.d.i. for any observation of inflow of storm flows into the In-Channel site based on visual inspection as described in permit condition 4.d.iii. and Table 4.
vi. The reports shall contain a summary of the activities and information described in permit condition 5.d.ii. for any observation of effluent flow downstream of the In-Channel site, based on visual inspection as described in permit condition 4.d.iv. and Table 4.
vii. The reports shall contain a summary of the berm inspections performed at the In-Channel site as described in permit condition 4.d.vi. and any repairs to berms required during the reporting period, as described in permit condition 5.d.iii. The summary of any repairs to berms shall include the date of the discovery of the damage to the berms, the date of the repair(s), the location of the repaired berms along the Agua Fria River channel, and a statement whether the damage resulted in effluent flow downstream of the In-Channel site.
viii. The reports shall contain a summary of the daylighting monitoring performed at the North Plains site as described in permit condition 4.d.x.
and Table 4 and a summary of the activities and information described in permit conditions 5.a.iii., 5.a.iv. and 5.d.iv..
4. Monitoring Requirements:
a. Water Level Monitoring Requirements:
i. The permittee shall measure the depth to water to the nearest one-tenth (0.1) foot at all water level monitor points listed in Tables 1, 2 and 3.
ii. The frequency of the water level monitoring at the monitoring points listed in Table 1 shall be once each month.
iii. The frequency of the water level monitoring at the monitoring points listed in Table 2 shall be once every two weeks until the facility has operated for a period of twelve (12) consecutive months with less than two (2) instances alert level exceedances at any of the Table 2 monitoring points. After this twelve-month period, the monitoring frequency shall be automatically reduced to monthly for all of the Table 2 monitoring points without the need for a permit modification.
iv. The frequency of the water level monitoring at the monitoring points listed in Table 3 shall be once every two weeks.
v. In wells equipped with a pump, water levels shall be allowed to recover for at least twenty-four (24) hours after the pump has been turned off before making depth to water measurements, except that if a 24-hour recovery period is not feasible, a shorter recovery time may be used and shall be noted in the data reports.
b. Water Quantity Monitoring Requirements:
i. The permittee shall calculate the total volume of water delivered to the In-
Channel site each day, using the approved water measuring devices listed in Table 4. The amount of water delivered to the In-Channel site shall be calculated as the effluent discharged from the ATF, as measured by the ATF Flume, minus the effluent measured by the Reuse Meter and minus the effluent measured by the Utility Meter.
ii. The permittee shall measure the total volume of water delivered to the North
Plains site each day with the approved water measuring device listed in Table 4.
iii. The permittee shall calculate, annually, the cumulative volume of water stored at the North Plains site and for the both sites combined. Cumulative stored volume shall mean the cumulative volume of water delivered to the facility since commencing recharge at the facility under this permit less the cumulative volume of losses due to evaporation, transpiration, recovery within the area of impact of the stored water, diversions, or any other losses since commencing recharge under this permit.
c. Water Quality Monitoring Requirements:
The source water and groundwater quality shall be monitored at the recharge facility as specified in Aquifer Protection Permit (APP) number P-102503, issued by the Arizona Department of Environmental Quality (ADEQ).
d. Operational Monitoring Requirements:
For the In-Channel Site:
i. The permittee shall measure the annual average infiltration rate, in feet per day, for the length of the wetted channel listed in Table 6 if the site was used for recharge during the reporting period.
ii. When effluent is being delivered to the In-Channel site, the permittee shall monitor the wet/dry status of the site daily. Based on this data, evaporation from the wetted surface of the In-Channel site shall be calculated on a monthly basis using the maximum evaporation rating curve and the applicable adjustment factor specified in Evaporation from Open Water Surfaces in Arizona, by Keith R. Cooley (1970).
iii. When effluent is being delivered to the In-Channel site, the permittee shall monitor for any storm flows entering the In-Channel site from the Agua Fria River above the northern boundary of the site and from Grapevine Gulch at the locations listed in Table 4. Storm flows are defined as periods of time when runoff, from rainfall or snowmelt, is present in the Agua Fria River channel immediately upstream or within the In-Channel site. During and after storm events, the storm flow monitor points listed in Table 4 shall be observed a minimum of once daily for the presence of storm flow in the river. Observations shall continue until storm flow is not present in the channel. If the storm event does not generate runoff in the Agua Fria River channel, observations shall continue for a minimum of one (1) day after cessation of rainfall. Documentation for each observation shall consist of the date, time, and a notation of the presence or absence of storm flow.
iv. When effluent is being delivered to the In-Channel site, the permittee shall monitor the extent of effluent flow in the Agua Fria River channel within the In-Channel site by visual inspection at the locations listed in Table 4.
Visual inspections shall be performed every two (2) weeks at the southern boundary of the In-Channel site. Documentation for each observation shall consist of the date, time, a notation of whether the extent of flow is upstream or downstream of the southern boundary of the In-Channel site, an estimate of the time period during which effluent flows exited the facility, if that has occurred, and a narrative on how the duration of flow passing the southern boundary of the In-Channel site was determined and documented.
v. The permittee shall perform annual monitoring of the vegetation within the In-Channel site at the locations listed in Table 4. Documentation for each observation shall include photographs from each of the monitor points (both upstream and downstream views) which must be clearly labeled and their locations identified on a map and included in the annual data reports. The photographs shall be taken during the growing season (typically from May to October). The annual reports shall also include a narrative describing the changes that may have occurred during the reporting periods and subsequent transpiration changes. Based on this data, the permittee shall calculate transpiration losses within the In-Channel site on a monthly basis using the Blainey-Criddle Method and a reference crop coefficient appropriate for the type of vegetation identified during the monitoring.
vi. The permittee shall inspect the integrity of the berms constructed within the In-Channel site on a monthly basis and after storm events. Documentation for each observation shall consist of the date, time, type of inspection (monthly inspection or after a storm event), the estimated discharge (if after a storm event), and a description of the physical integrity of the berms.
vii. The permittee shall compile the median daily mean discharge by month at the USGS stream gage 09512450, Agua Fria River near Humboldt.
For the North Plains Site:
viii. The permittee shall measure, at least quarterly, the infiltration rate, in feet per day, for the recharge basins listed in Table 5 that were used during the reporting period.
ix. The permittee shall monitor the number of wet/dry days for each recharge basin listed in Table 5 that was used during the reporting period. Based on this data, evaporation from the wetted surface of the basin(s) shall be estimated on a monthly basis using the maximum rating curve for evaporation and the applicable adjustment factor specified in Evaporation from Open Water Surfaces in Arizona, by Keith R. Cooley (1970).
x. The permittee shall monitor the site for any daylighting of recharged effluent at the locations and frequencies referenced in Table 4.
Documentation for each inspection shall consist of the date, location and indication of the presence or absence of daylighting. If daylighting is detected, photographs will be taken to document the daylighting and the amount of flow will be documented using relative descriptors as described in the daylighting monitoring plan in the document referenced in permit condition 1.c..
5. Alert Levels, Operational Prohibition Limits and Response Requirements:
a. Water Level Alert Levels and Operational Prohibition Limits:
i. If the water level at any monitor point listed in Table 1 or 2 rises to, or above, the alert level specified for that monitor point in the table, a water level alert status shall exist at the site associated with that monitor point and the permittee shall implement the following:
(1) Take actions that are sufficient to prevent water levels from reaching the operational prohibition limit for water levels at all monitor points.
(2) Notify ADWR in writing within forty-eight (48) hours of becoming aware of the alert status.
(3) Increase the frequency of water level measurements to daily at all monitor points associated with the site that is in alert level status as listed in Table 1 or 2.
(4) Submit bi-weekly reports of daily water level measurement results to ADWR. The water level data shall be displayed in tables and hydrographs containing the following: facility well identifier, ADWR well registration number, cadastral location, measurement date, the depth to water in feet below land surface, and the groundwater elevation in feet above mean sea level. The reports shall note any condition, such as pumping from nearby wells, surface water flows, or any other hydrologic or environmental condition that may be reasonably known and have affected the water level at the time of measurement.
(5) Resume routine water level monitoring when the alert status ends. The alert status ends when water levels remain below the alert level for fourteen (14) consecutive days.
(6) Submit a final report to ADWR describing the incident within fourteen
(14) days after the alert status ends. The report shall include a listing of all water level measurements made during the alert status for water levels, a description of actions taken to lower water levels to below the alert levels, and an assessment of any potential impacts to land and other water users.
ii. If the water level at any monitor point listed in Table 1 or 2 rises to, or above, the operation prohibition limit specified for that monitor point in the table, a water level prohibition status shall exist at the site associated with that monitor point and the permittee shall implement the following:
(1) Immediately cease all recharge activities at the site in prohibition status pursuant to this permit.
(2) Take actions that are sufficient to prevent water levels from causing unreasonable harm to land and other water users.
(3) Notify ADWR in writing within forty-eight (48) hours of becoming aware of the prohibition status.
(4) Increase the frequency of water level measurement(s) to daily at all monitor point(s) associated with the site that is in prohibition status as listed in Table 1 or 2. If daily water level measurements are already required under an alert status, continue the daily water level measurements.
(5) Submit weekly reports of daily water level measurement results to ADWR. The water level data shall be displayed in tables and hydrographs containing the following: facility well identifier, ADWR well registration number, cadastral location, measurement date, the depth to water in feet below land surface, and the groundwater elevation in feet above mean sea level. The reports shall note any condition, such as pumping from nearby wells, surface water flows, or any other hydrologic or environmental condition that may be reasonably known and have affected the water level at the time of measurement.
(6) The prohibition status ends when water levels decline below the operational prohibition limit for seven (7) consecutive days. Alert level status and associated monitoring frequency and reporting requirements as specified in permit condition 5.a.i. shall resume at this time and recharge activities at the site pursuant to this permit may recommence.
iii. If the water level at any monitor point listed in Table 3 rises to, or above, the alert level specified for that monitor point in the table, the permittee shall implement the following:
(1) Increase the frequency of water level measurements to weekly at the monitor point(s) in alert level exceedance status.
(2) Increase the frequency of daylighting monitoring to weekly at the monitoring points referenced in Table 4.
(3) Follow the monitoring response requirements described in the daylighting monitoring plan in the document referenced in permit
iv. If the water level at any monitor point listed in Table 3 rises to, or above, the action limit specified for that monitor point in the table, the permittee shall implement the following:
(1) Take actions to prevent/reduce daylighting of recharge water.
(2) Increase the frequency of water level measurements to daily at the monitor point(s) in action level exceedance status.
(3) Increase the frequency of daylighting monitoring to daily at the monitoring points referenced in Table 4.
(4) Follow the monitoring response requirements described in the
b. Water Quantity Operational Response Requirements:
i. The water quantity measurement devices and methods listed in Table 4 shall continue to quantify flow accurately pursuant to A.A.C. R12-15-905.
If any water quantity measurement device fails to perform its designated function for more than seventy-two (72) hours, the permittee shall notify ADWR in writing within seven (7) calendar days of the failure (A.A.C.
R12-15-906). The notice shall state the reason for the failure and include the estimated date the device will be returned to service.
ii. The permittee shall notify ADWR in writing within seven (7) days after the measuring device is returned to service. The notice shall identify the device that failed and include the date of the malfunction, the amount of time the device failed to properly operate, an estimate of the amount of flow during the period the device was out of service, and a description of the method(s) used to calculate the amount of flow while the device was out of service.
iii. The maximum volume of water in storage at any time shall not exceed
41,950 acre-feet at the North Plains site or a total of 68,150 acre-feet for both sites combined for the duration of the permit. If the maximum volume of water in storage reaches 41,950 acre-feet at the North Plains site, or a total of 68,150 acre-feet for both sites combined, water storage at the facility pursuant to this permit shall immediately cease. Water storage pursuant to this permit may recommence when one of the following occurs:
(1) The volume of water in storage is reduced to less than 41,950 acre-feet at the North Plains site or a total of 68,150 acre-feet for both sites combined by recovery pursuant to A.R.S. § 45-834.01 within the area of impact of the permitted facility. For the purposes of recovery, the area of impact shall be deemed to be a safe harbor area within one (1) mile of the facility, unless the permittee establishes to ADWR’s satisfaction a different area of impact calculated considering the cumulative storage at the facility and the cumulative recovery within the area of impact.
(2) This permit is modified by ADWR to increase the maximum volume of water in storage at any time.
c. Water Quality Operational Response Requirements:
The Permittee shall notify ADWR in writing of any suspension, revocation, or termination of APP No. P-102503 within ten (10) days of the suspension, revocation, or termination. The notification shall include a written description of the reason for the suspension, revocation, or termination and a copy of any written action by ADEQ suspending or revoking the APP. The Permittee shall not store water pursuant to this permit during any period in which the APP is suspended by final administrative decision of ADEQ. If the APP is revoked by a final administrative decision of ADEQ or otherwise terminates, the permittee shall cease water storage pursuant to this permit and ADWR shall terminate this permit.
d. Other Operational Response Requirements:
i. If storm flow is detected entering the In-Channel site as described in permit condition 4.d.iii., the permittee shall commence daily flow monitoring until storm flow is not present within the site. During the period of time when storm flow is present within the In-Channel site, the site shall be considered non-operational and no water storage credits shall accrue.
ii. If effluent flow is visually detected beyond the terminus of the In-Channel site as described in permit condition 4.d.iv, the permittee shall increase the frequency of the flow monitoring to weekly observations until effluent flow is no longer observed past the terminus of the In-Channel site. During the period of time when effluent is detected beyond the terminus of the In- Channel site, the site shall be considered non-operational and no water storage credits shall accrue.
The permittee shall report to ADWR within thirty (30) days of the initial observation describing the occurrence of flow beyond the terminus of the In-Channel site. The notification shall include, at a minimum, the date, the extent of the flow in feet beyond the site boundary (also presented on a map), the duration of the flow, and details of any unreasonable harm that may have occurred due to effluent flow.
iii. If the permittee observes damage to berm(s) within the In-Channel site that result in effluent flow downstream of the In-Channel site terminus as described in permit condition 4.d.vi., the site shall be considered non-operational and no water storage credits shall accrue. The non-operational status of the In-Channel site shall remain in effect until the permittee repairs the berm(s) and effluent flow past the end of the In-Channel site terminus ceases.
iv. If the permittee observes daylighting of recharged effluent at or near the North Plains site as described in permit condition 4.d.x., the permittee shall implement the following:
(1) Increase the frequency of water level measurements to weekly at the nearest piezometer listed in Table 3.
(2) Increase the frequency of daylighting monitoring to weekly at the monitoring points referenced in Table 4.
(3) Follow the monitoring response requirements described in the
6. Operational Provisions:
a. Monitoring Plan Changes:
Any changes to the design, operation, and/or monitoring of the facility, other than those included as contingencies and described in permit condition 7 are prohibited except through a modification of this permit.
b. Well Construction, Location, and Wellhead Elevation Data:
The permittee shall submit the as-built well construction data, location information and the wellhead elevation for monitor well MW-NP-4, listed in Table 2, when the monitor well is installed.
c. Pressure Transducers:
The pressure transducer measuring devices listed in Tables 1, 2 and 3 shall be calibrated at least quarterly using an electrical sounder or any other method approved by ADWR.
7. Contingencies
a. Upon construction of Phase 2, the permittee may substitute any of the basins listed in the “Contingency Basins” section for any of the basins listed in the “Phase 2” section of Table 5. However, the permittee is required to construct at least 8.76 (wetted) acres of basins for Phase 2, unless they can demonstrate, using operational data from Phase 1, that a smaller basin acreage is hydrological feasible.
b. When the permittee constructs North Plains site basins 1B and/or 2B, the permittee shall install MW-NP-4 as listed in Table 2 prior to commencing recharge in either of these basins.
c. If additional monitoring is necessary, the permittee may monitor and report water level measurements from MW-NP-1. The permittee shall consult with ADWR to determine the monitoring and reporting frequencies which will be incorporated into Table 2 at that time.
d. The permittee shall notify ADWR of the construction of additional berms anywhere within the facility boundary prior to construction. Additional berms shall be constructed in accordance with the berm design in the hydrologic report. Berms shall be spaced a minimum of 235 feet. The maximum average berm spacing shall be 340 feet. The maximum berm spacing shall be 800 feet (with the exception of the 1,000-foot spacing at Old Fain Road). Any berm design or spacing different than that described in the hydrologic report may require a permit modification.
e. If high groundwater levels are indicated in a particular reach of the In-Channel site, the Town shall meet with ADWR to determine a future course of action which may include increasing berm spacing distance beyond the 340-foot average and 800-foot maximum spacing.
8. General Provisions:
a. In accordance with A.R.S. § 45-814.01(G), the Director may modify the conditions of this permit.
b. The facility shall continue to meet the requirements of A.R.S. § 45-811.01 during operation of the facility. If the facility does not continue to meet the requirements of A.R.S. § 45-811.01, the Director may revoke the permit.
c. No waters other than those waters specified under the permit limitations are authorized for recharge at this facility.
d. The issuance of this permit does not waive compliance with any federal, state, county or local government statutes, rules or permits.
e. The facility shall be operated only in conjunction with the applicable Water Storage
Permit(s) and subject to the conditions set forth within that/those permit(s).
f. Recharge pursuant to Phase 2 of this permit as described in Table 7 may not commence until ADWR conducts a pre-recharge inspection and notifies the permittee that recharge may commence. The permittee shall contact ADWR at least thirty (30) days prior to commencing recharge pursuant to Phase 2 to schedule a pre-recharge inspection.
g. The Director may terminate this permit if, after recharge activities are commenced, the permittee suspends those activities for a period of five (5) or more consecutive years.
h. All ADWR agency notifications and reports, other than annual reports, shall be addressed to the Recharge, Assured and Adequate Water Supply Programs, Water Planning and Permitting Division, Arizona Department of Water Resources, 1110 W. Washington St., Suite 310, Phoenix, Arizona 85007.
Table 1 In-Channel Site
Water Level Monitoring Monitor Wells
Monitor Point ID
ADWR
Registration
Number Cadastral Location
Well Elevation (feet msl)
Well Depth
(feet bls)
Screened Interval (feet bls)
Measuring Device1
Monitoring Frequency
Reporting Frequency
Alert Water Level
(feet bls)
Operation Prohibition
Limit (feet bls)
Associated Phase
MW-1 55-543437 A(14-01) 21DBA 4,719.5 69 20-69 Sounder/ Transducer Monthly Annually 22 20 1 & 2
MW-2 55-543438 A(14-01) 21BDB 4,739.5 122 32-122 Sounder/ Transducer Monthly Annually 27 25 1 & 2
MW-3 55-543439 A(14-01) 21BBA 4,755.5 147 37-147 Sounder/ Transducer Monthly Annually 27 25 1 & 2
MW-4 55-597701 A(14-01) 27CDB2 4,638.4 44 14-44 Sounder/ Transducer Monthly Annually 17 15 1 & 2
1 The permittee may provide water level data measured by either an electric sounder or pressure transducer equipment as needed as long as the permittee complies with permit conditions 4.a. and 6.d. for all water level measurements.
Table 2
North Plains Site Water Level Monitoring
Monitor Wells
Monitor Point ID
ADWR
Registration
Number
Cadastral Location
Well Elevation (feet msl)
Well Depth
(feet bls)
Screened Interval (feet bls)
Measuring Device1
Monitoring Frequency Reporting Frequency
Alert Water Level
(feet bls)
Operation Prohibition
Limit (feet bls)
Associated Phase Minimum of 1st
12 months of operation2
Remainder of permit
MW-NP-2 55-915032 A(14-01) 08DCD 4,783.50 180 69-179 Sounder/ Transducer
Once every two weeks Monthly Annually 20 15 1 & 2
MW-NP-3 55-915033 A(14-01) 08ACD 4,814.80 180 68-178 Sounder/ Transducer
Once every two weeks Monthly Annually 20 15 1 & 2
MW-NP-43 55-* A(14-01) 08ABD * Proposed 180*
Proposed 60-180*
Sounder/ Transducer
Once every two weeks Monthly Annually 20 15 *
Contingency Well4
MW-NP-1 55-908401 A(14-01) 08CAD 4,803.34 185.8 65.8-
185.8
Sounder/ Transducer TBD TBD TBD TBD TBD NA
* The permittee shall submit the Well Registration Numbers, location, and well construction data to ADWR before commencing recharge activities for the associated phase.
The information will be inserted into this table at that time.
1 The permittee may provide water level data measured by either an electric sounder or pressure transducer equipment as needed as long as the permittee complies with permit conditions 4.a. and 6.d. for all water level measurements.
2 Upon commencing recharge under this permit, the monitoring frequency shall be once every two weeks until the facility has operated for a period of twelve (12) consecutive months with less than two (2) instances alert level exceedances at any of the Table 2 monitoring points. After this twelve-month period, the monitoring frequency shall be automatically reduced to monthly for all of the Table 2 monitoring points without the need for a permit modification.
3 When the permittee constructs North Plains site basins 1B and/or 2B, the permittee shall install MW-NP-4.
4 If additional monitoring is necessary, the permittee may monitor and report water level measurements from MW-NP-1. The permittee shall consult with ADWR to determine the monitoring and reporting frequencies, which will be incorporated into this table at that time.
Table 3
North Plains Site Water Level Monitoring
Piezometers
Monitor Point ID
ADWR
Registration
Number
Cadastral Location
Well Elevation (feet msl)
Well Depth
(feet bls)
Screened Interval (feet bls)
Measuring Device1
Monitoring Frequency
Reporting Frequency
Alert Water Level
(feet bls)
Action Limit
(feet bls)
Associated Phase
PZ-NP-1S 55-915034 A(14-01) 08CAD 4,795.88 20 10-20 Sounder/ Transducer
Once every two weeks Annually 8.9 6.9 1 & 2
PZ-NP-1D 55-915034 A(14-01) 08CAD 4,795.88 45 30-45 Sounder/ Transducer
Once every two weeks Annually 10.9 7.9 1 & 2
PZ-NP-2S 55-915035 A(14-01) 08DCC 4,786.42 19 9-19 Sounder/ Transducer
Once every two weeks Annually 13.6 11.6 1 & 2
PZ-NP-2D 55-915035 A(14-01) 08DCC 4,786.42 45 30-45 Sounder/ Transducer
Once every two weeks Annually 15.6 12.6 1 & 2
PZ-NP-3S 55-915036 A(14-01) 08DBD 4,802.55 20 10-20 Sounder/ Transducer
Once every two weeks Annually 11.0 9.0 1 & 2
PZ-NP-3D 55-915036 A(14-01) 08DBD 4,802.55 45 30-45 Sounder/ Transducer
Once every two weeks Annually 13.0 10.0 1 & 2
1 The permittee may provide water level data measured by either an electric sounder or pressure transducer equipment as needed as long as the permittee complies with permit conditions 4.a. and 6.d. for all water level measurements.
Table 4
Facility Monitoring
Monitor Point ID
Measuring Device Parameter Cadastral Location
Monitoring Frequency
Reporting Frequency
Advanced Treatment Facility
(ATF) Flume
Parshall Flume & Ultrasonic Water
Level Device
Total Effluent Outflow from ATF into Effluent Reservoir A(14-01) 16CCC Daily1 Annually
Reuse Meter Inline Flowmeter Effluent Diverted from Effluent Reservoir into Reuse Pipeline A(14-01) 16CCC Daily1 Annually
Utility Meter Inline Flowmeter Effluent Diverted from Effluent Reservoir back to ATF A(14-01) 16CCC Daily1 Annually
North Plains Flowmeter Inline Flowmeter Effluent Delivered to North Plains Site A(14-01) 08DCD Daily1 Annually
Visual Inspection Storm Flow into the In-Channel Site
A(14-01) 16CCB (ATF Utility/Shop Building) and A(14-01) 22CCA (Grapevine Gulch Channel near confluence with Agua Fria River)
Daily during and after storm events until flow ceases2
Annually
Terminus of the In-Channel Site Visual Inspection Effluent Flow Past the Terminus of the
In-Channel Site A(14-01) 27BDC Every two (2) weeks2 Annually
USGS Stream Gage
Surface Water Flow out of the Prescott AMA A(13-01) 23CCC Daily1 Annually
Visual Inspection Berm Integrity within the In-Channel Site Length of In-Channel Site Monthly and After
Storm Events2 Annually
Visual Inspection & Camera
Vegetation Changes within the In-Channel Site
PP-1 A(14-01) 21BDB
PP-2 A(14-01) 21DAB
PP-3 A(14-01) 22CDB
PP-4 A(14-01) 27BDC
Annually Annually
Visual Inspection Daylighting of Effluent See Figure 7-Rev3 Every two (2) weeks Annually
1 The data shall be summarized by month and reported to ADWR as specified in this table.
2 The permittee shall monitor the In-Channel site for storm flow entering the site, effluent leaving the site and the berm integrity within the site only when effluent is being delivered to the In-Channel site.
3 Response to July 25, 2011 Incomplete and Incorrect Determination for Underground Storage Facility (USF) Application No. 71-220048.0000 and Water Storage (WS) Application
No. 73-220048.0000 for the Town of Prescott Valley’s Upper Agua Fria Recharge Project, dated October 7, 2011
Table 5 North Plains Site
Recharge Basin Description
Basin Identifier Cadastral Location Maximum Wetted Area (acres) Associated Monitor Wells
Phase 1 Basins
1A A(14-01) 08ACD 2.16 MW-NP-2 and MW-NP-3
2A A(14-01) 08DBB 5.39 MW-NP-2 and MW-NP-3
3A A(14-01) 08DBC 6.64 MW-NP-2 and MW-NP-3
4A A(14-01) 08DCB 4.25 MW-NP-2 and MW-NP-3
5A A(14-01) 08DCD 3.48 MW-NP-2 and MW-NP-3
11B A(14-01) 08DCD 1.72 MW-NP-2 and MW-NP-3
12B A(14-01) 08DDC 1.93 MW-NP-2 and MW-NP-3
Phase 1 Total Basin Acreage 25.57
Phase 2 Basins1
3B A(14-01) 08DAB Proposed
1.62 MW-NP-2 and MW-NP-3
6B A(14-01) 08DBD Proposed
1.35 MW-NP-2 and MW-NP-3
9B A(14-01) 08DDB Proposed
3.95 MW-NP-2 and MW-NP-3
8B A(14-01) 08DDB Proposed
1.84 MW-NP-2 and MW-NP-3
Phase 2 Total Basin Acreage Proposed 8.761
Contingency Basins
1B A(14-01) 08ACA Proposed
2.00 MW-NP-2, MW-NP-3 and MW-NP-4
2B A(14-01) 08ADC Proposed
2.31 MW-NP-2, MW-NP-3 and MW-NP-4
4B A(14-01) 08DBA Proposed
1.15 MW-NP-2 and MW-NP-3
5B A(14-01) 08DAB Proposed
1.30 MW-NP-2 and MW-NP-3
7B A(14-01) 08DAC Proposed
1.54 MW-NP-2 and MW-NP-3
10B A(14-01) 08DDB Proposed
1.64 MW-NP-2 and MW-NP-3
13B A(14-01) 08DDC Proposed
1.85 MW-NP-2 and MW-NP-3
1 Upon construction of Phase 2, the permittee may substitute any of the basins listed in the Contingency Basins section for any of the basins listed in the Phase 2 section. However, the permittee is required to construct at least 8.76 (wetted) acres of basins for Phase 2, unless they can demonstrate, using operational data from Phase 1, that less basin acreage is necessary for hydrologic feasibility.
Table 6
In-Channel Site Description
Site Component Cadastral Location Maximum Site Length (miles)
Maximum Wetted Area (acres)
Upper Agua Fria In- Channel Site and Berms A(14-01) 16, 21, 22, 27 2.2 3.2
Table 7 Phased Recharge Schedule
Construction Phase Associated Facility Sites Annual Permitted Recharge
Volume
(acre-feet per year)
Phase 1 In-Channel Constructed Site 1,200
North Plains Site 2,400
Phase 2 In-Channel Constructed Site 1,200
North Plains Site 3,000
| 07_Final Permit_Dir Mod 71-220048.0003_as-builts.pdf |
| 09_Final Permit_Dir Mod 71-220048.0003_as-builts_new_address.pdf |
| Table 4 |