5-Bid Tabulation Results (BASE).pdf

PDF 27 KB Posted

Attached to
2026-2027 Zone 5 Sidewalk Repair Project
Solicitation number
CIP 21-18
Issued by
Salt Lake County, Utah

About this file

This is a Bid Tabulation Results document from the City of Draper, Utah for the 13800 South Widening Phase 3 Project. The project scope involves providing all labor, materials, tools, and equipment necessary to complete sidewalk repairs throughout the west and north areas of Draper as described in the project plans and specifications. Bid documents and specifications were posted on U3P-Bonfire on or before Thursday, September 3, 2026 at 5:00pm. The Engineering Division received electronic responses on U3P-Bonfire until 2:00pm on Tuesday, September 22, 2026, with only the names of firms submitting responses and their total bid amounts being read. A 5% Bid Bond was required from all respondents. Questions concerning the scope of work, response submittal, or process were to be directed electronically through SCIQUEST before 12:00pm on Thursday, September 17, 2026.

Eleven vendors submitted bids for the project, with Albretsen Construction providing the apparent low bid at $259,787.00. The remaining bids ranged from Geneva Rock at $298,800.00 to Acme Construction, Inc at $647,050.00. The City of Draper reserves the right to reject any and all responses and to waive any irregularities, informalities, or technicalities deemed in the best interest of the City. The City is not responsible for expenses incurred prior to award by the City Council. Eric Lundell, Senior Engineer/Project Manager, was the point of contact for questions regarding the bid results.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1020 E. Pioneer Road • Draper, Utah 84020 • 801-576-6546 • Fax: 801-576-6388 • www.draper.ut.us

BID TABULATION RESULTS

FOR THE 13800 SOUTH WIDEING PHASE 3 PROJECT

The apparent low bid was provided by Albretsen Construction. Below is the bid tabulation results.

VENDOR TOTAL BID

Albretsen Construction $259,787.00 Geneva Rock $298,800.00 RC Enterprise Paving & Const. $326,350.00 Pronghorn Construction, Inc $377,900.00 AARROW Landscape $414,229.00 MC Green and Sons $415,944.62 Dirty Boys Contracting, LLC $448,264.00 Beck Construction & Excavation $515,050.00 Trico Construction, LLC $585,395.98 Stapp Construction, Inc $595,259.00 Acme Construction, Inc $647,050.00

If you any questions regarding the bid result feel free to reach out to me with those questions.

Respectfully, Eric Lundell

Senior Engineer/Project Manager

File details come from the government source that posted it. Updated .