5-Attachment D Plans.pdf
PDF 10 MB Posted
- Attached to
- UDOT Vernal MS4 Project Detention Pond
- Solicitation number
- UDOT260192CN
- Issued by
- Utah County, Utah
About this file
This attachment contains technical plans and design documents for the Utah Department of Transportation (UDOT) Vernal MS4 Project Detention Pond, prepared by CivCo Engineering, Inc. for Region 3 of UDOT in Uintah County. The project involves the reconstruction of an evaporation pond and brine tank concrete pad at the UDOT maintenance facility located at 2773 N Vernal Avenue in Vernal, Utah. The scope of work includes demolition of existing asphalt, liners, and leak detection systems; installation of a new double-liner evaporation pond with concrete floor and embankment; construction of a concrete brine tank pad; implementation of erosion control measures; and installation of underdrain systems with leak detection ports. The plans include detailed site layouts, pond cross-sections, material specifications, and construction details. All work must be completed by June 25, 2026, with a mandatory site visit scheduled for Tuesday, March 24, 2026, at 11:00 AM at the project location.
The design documents specify concrete specifications including Type 2 Portland cement with a minimum compressive strength of 4,000 psi, a water-cementitious ratio of 0.44 to 0.49, and 6% air entrainment. The pond construction requires a double HDPE geomembrane liner system (60 mil primary and secondary), geonet or geocomposite drainage layers, and 4-inch underdrain perforated PVC pipe with filter sock. The brine tank concrete walls will reach a height of 3.35 feet with a 5.60-foot width, while the evaporation pond will feature interior berms and a 6% slope ramp for drainage. All environmental control measures, including silt fencing, must be implemented per the MS4 compliance plan and removed upon project completion. Key utility contacts are provided for coordination, including Rocky Mountain Power, Enbridge Gas, Ashley Valley Water & Sewer, and Strata Networks for fiber optics.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Standard Units (Inch-Pound Units)
ALL UNITS IN FEET UNLESS
OTHERWISE NOTED
APPROVED FOR USE BY UDOT
THIS SEAL APPLIES TO ALL
SHEETS
CONTAINING THIS SIGNATURE
UTAH DEPARTMENT OF TRANSPORTATION
PLANS OF PROPOSED PROJECT
UTAH DEPARTMENT OF TRANSPORTATION
SHEET
NO.
UINTAH COUNTY
FOR
REGION THREE DISTRICT ENGINEER
STATE FUNDED PROJECT
UTAH
STATE OF
MAJOR HIGHWAYS
UTAH DEPARTMENT OF TRANSPORTATION
2500 N
VICINITY MAP
VERNAL SITE
MS4 PE DESIGN - VERNAL EVAP POND
VERIFIED FOR SUBMISSION FOR ADVERTISEMENT
DESIGN ENGINEER
E
W
VE
R
N
AL
A
VE
N U
E
SITE
PIN: 23311
PROJECT SITE
2773 N VERNAL AVE.
UDOT MAINTENANCE SHED
AutoCAD SHX Text N
AutoCAD SHX Text Sigurd
AutoCAD SHX Text
GREAT
AutoCAD SHX Text
SALT
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
UTAH
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
SEVIER
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
POWELL
AutoCAD SHX Text
COLORADO
AutoCAD SHX Text
SAN
AutoCAD SHX Text
JUAN
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
GREEN
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
GREEN
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
FLAMING
AutoCAD SHX Text
GORGE
AutoCAD SHX Text
BEAR
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BRIGHAM
AutoCAD SHX Text
CITY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KANAB
AutoCAD SHX Text Antimony
AutoCAD SHX Text Mt.Carmel Jct.
AutoCAD SHX Text Junction
AutoCAD SHX Text Panguitch
AutoCAD SHX Text Hurricane
AutoCAD SHX Text
BEAVER
AutoCAD SHX Text
AutoCAD SHX Text
PAROWAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Milford
AutoCAD SHX Text Minersville
AutoCAD SHX Text Kanosh
AutoCAD SHX Text Meadow
AutoCAD SHX Text
FILLMORE
AutoCAD SHX Text Hinckley
AutoCAD SHX Text Delta
AutoCAD SHX Text Marysvale
AutoCAD SHX Text Cove
AutoCAD SHX Text Fort
AutoCAD SHX Text Salina
AutoCAD SHX Text Holden
AutoCAD SHX Text Mayfield
AutoCAD SHX Text Gunnison
AutoCAD SHX Text
MANTI
AutoCAD SHX Text Monroe
AutoCAD SHX Text
RICHFIELD
AutoCAD SHX Text
LOA
AutoCAD SHX Text Clear Creek
AutoCAD SHX Text Scofield
AutoCAD SHX Text Helper
AutoCAD SHX Text
PRICE
AutoCAD SHX Text Huntington
AutoCAD SHX Text Castle
AutoCAD SHX Text Dale
AutoCAD SHX Text Ferron
AutoCAD SHX Text Emery
AutoCAD SHX Text East
AutoCAD SHX Text Carbon
AutoCAD SHX Text Sunnyside
AutoCAD SHX Text Boulder
AutoCAD SHX Text Bicknell
AutoCAD SHX Text Torrey
AutoCAD SHX Text Tropic
AutoCAD SHX Text Escalante
AutoCAD SHX Text Wellington
AutoCAD SHX Text Hanksville
AutoCAD SHX Text Wendover
AutoCAD SHX Text Dugway
AutoCAD SHX Text Grantsville
AutoCAD SHX Text
TOOELE
AutoCAD SHX Text
NEPHI
AutoCAD SHX Text
HEBER
AutoCAD SHX Text
PROVO
AutoCAD SHX Text Orem
AutoCAD SHX Text Springville
AutoCAD SHX Text Spanish Fork
AutoCAD SHX Text Payson
AutoCAD SHX Text Santiquin
AutoCAD SHX Text Ephriam
AutoCAD SHX Text Moroni
AutoCAD SHX Text Fountian
AutoCAD SHX Text Green
AutoCAD SHX Text Mt.
AutoCAD SHX Text Pleasent
AutoCAD SHX Text Riverton
AutoCAD SHX Text Lehi
AutoCAD SHX Text Park
AutoCAD SHX Text City
AutoCAD SHX Text Eureka
AutoCAD SHX Text Fairview
AutoCAD SHX Text
AutoCAD SHX Text
COALVILLE
AutoCAD SHX Text Wanship
AutoCAD SHX Text
SALT
AutoCAD SHX Text
LAKE
AutoCAD SHX Text Sandy
AutoCAD SHX Text Echo
AutoCAD SHX Text
MORGAN
AutoCAD SHX Text Henefer
AutoCAD SHX Text Roy
AutoCAD SHX Text Clearfield
AutoCAD SHX Text Bountiful
AutoCAD SHX Text Farmington
AutoCAD SHX Text Kaysville
AutoCAD SHX Text North
AutoCAD SHX Text Ogden
AutoCAD SHX Text
OGDEN
AutoCAD SHX Text U I N T A H
AutoCAD SHX Text S U M M I T
AutoCAD SHX Text D U C H E S N E
AutoCAD SHX Text C A R B O N
AutoCAD SHX Text G R A N D
AutoCAD SHX Text E M E R Y
AutoCAD SHX Text S A N J U A N
AutoCAD SHX Text K A N E
AutoCAD SHX Text G A R F I E L D
AutoCAD SHX Text B O X E L D E R
AutoCAD SHX Text T O O E L E
AutoCAD SHX Text J U A B
AutoCAD SHX Text M I L L A R D
AutoCAD SHX Text B E A V E R
AutoCAD SHX Text I R O N
AutoCAD SHX Text D A G G E T T
AutoCAD SHX Text W A Y N E
AutoCAD SHX Text S E V I E R
AutoCAD SHX Text R I C H
AutoCAD SHX Text C A C H E
AutoCAD SHX Text U T A H
AutoCAD SHX Text W A S A T C H
AutoCAD SHX Text M O R G A N
AutoCAD SHX Text W E B E R
AutoCAD SHX Text D A V I S
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
SALT
AutoCAD SHX Text Kamas
AutoCAD SHX Text
SANPETE
AutoCAD SHX Text Snowville
AutoCAD SHX Text Tremonton
AutoCAD SHX Text W A S H I N G
AutoCAD SHX Text T O N
AutoCAD SHX Text P I U T E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Levan
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MANILA
AutoCAD SHX Text Neola
AutoCAD SHX Text Myton
AutoCAD SHX Text Bonanza
AutoCAD SHX Text Green River
AutoCAD SHX Text
MOAB
AutoCAD SHX Text
MONTICELLO
AutoCAD SHX Text Blanding
AutoCAD SHX Text Bluff
AutoCAD SHX Text Mexican
AutoCAD SHX Text Hat
AutoCAD SHX Text Cisco
AutoCAD SHX Text Thompson Sp.
AutoCAD SHX Text Crescent Jct.
AutoCAD SHX Text
RANDOLPH
AutoCAD SHX Text Woodruff
AutoCAD SHX Text
LOGAN
AutoCAD SHX Text Smithfield
AutoCAD SHX Text Garden
AutoCAD SHX Text City
AutoCAD SHX Text U.D.O.T. 1995
AutoCAD SHX Text I D A H O
AutoCAD SHX Text W Y O M I N G
AutoCAD SHX Text A R I Z O N A
AutoCAD SHX Text N E V A D A
AutoCAD SHX Text C O L O R A D O
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VERNAL
AutoCAD SHX Text Jensen
AutoCAD SHX Text
DUCHESNE
AutoCAD SHX Text Roosevelt
AutoCAD SHX Text Naples
AutoCAD SHX Text City
AutoCAD SHX Text Cedar
AutoCAD SHX Text Enterprise
AutoCAD SHX Text
ST.
AutoCAD SHX Text
GEORGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
X X X Fence, Wire Existing
Fence, Wood Existing
Gate Post
Fiber Optics Existing
Telephone Buried Existing
Water Existing
Gas Existing
Storm Drain Existing
Ditch Irrigation
Fence, Chain Link Existing Cable TV Box
Fire Hydrant
Water Well
Center Line
Bench Mark
Signal Pole Existing
Irrigation Existing
Guy Wire or Anchor
Flow Line Existing
Valve
Electric Buried Existing fo fo fo e e e be be be g g g ir ir ir swr swr swr btel btel btel tel tel tel wtr wtr wtr sd sd sd
Sanitary Sewer Existing
Electric Overhead Existing
Telephone Overhead Existing
Section Corner Found
Section Corner Not Found
Pipe Culvert Existing
Electrical Transformer pc pc pc
GP
B M
LC
Geotech Drill Hole
SUE Test Hole
Delineator
TH #
24:E
PC PC PC
SD SD SD
A
G
PS
MG
MSD
ME
MSS
MT
MW
UP
PAVE CUT PAVE CUT
NOTE:
THE LINE STYLES AND SYMBOLS CONTAINED HEREIN ARE NOT ALL INCLUSIVE. ANY
ADDITIONAL LINE STYLES NOT SHOWN HERE ARE SHOWN ON THEIR RESPECTIVE SHEETS
WITHIN A LEGEND.
SIGN (SINGLE POST)
SIGN (DOUBLE POST)
LIGHT POLE
POWER SOURCE
MAIL BOX
MANHOLE ELECTRIC
X X X
BUILDING
JUNCTION BOX STREET LIGHT
MANHOLE SANITARY SEWER
MANHOLE TELEPHONE
MANHOLE WATER
MANHOLE GAS
MANHOLE STORM DRAIN
RIGHT OF WAY MARKER
MONUMENT
UNDERGROUND SERVICE PED
CURB RETURN RADIUS
ATMS CABINET
PARCEL BALLOON
UTILITY POLE
STORM DRAIN
SANITARY SEWER
WATER
FIBER OPTICS
GAS
ELECTRIC BURIED
FENCE, WIRE
FENCE, WOOD
IRRIGATION
FENCE, CHAIN LINK
FLOW LINE
SURFACE FEATURE LINE STYLES SUBSURFACE/OVERHEAD LINE STYLES
HORIZONTAL CURVE (#)
JUNCTION BOX
METER
SIGN, GAS
TREE
HORIZONTAL/VERTICAL P.I.
HORIZONTAL/VERTICAL CURVE POINT
TELEPHONE BURIED
E E E
BE BE BE
FO FO FO
G G G
IR IR IR
SWR SWR SWR
TEL TEL TEL
BTEL BTEL BTEL
WTR WTR WTR
ELECTRIC OVERHEAD
TELEPHONE OVERHEAD
CUT
FILL
CUT CATCH LINE
FILL CATCH LINE
PAVEMENT CUTTING
LINE STYLES SYMBOLS
PROJECT SPECIFIC SYMBOLS AND LINE STYLES
PIPE CULVERT
R/W R/W R/W r/w r/w r/w Existing Highway R/W
HIGHWAY R/W
SEC SEC SEC
RIGHT OF WAY LINE STYLES
SECTION LINE
QUARTER SECTION LINE1/4 1/4 1/4
SILT FENCE
NEW CONCRETE
EMBANKMENT
ASPHALT PATCH
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
1- B
1-B
AB
BR
EV
IA
TI
O
N S
AN
D
L
EG
EN
D
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 2
/9 /2
D W
G N
AM
E:
3/
/2
W
SEC SEC SEC SEC SEC SEC SEC SEC SEC SEC
S E
C S
E C
S E
C S
E C
S E
C S
E C
S E
C1/4 1/4 1/4 1/4 1/4 1/4 1/4 1/4 1/4 1/4 1/4 1/4
/4
/4
/4
/4
/4
/4
N87° 27' 29"E 1331.33' N87° 34' 36"E 2676.49'
N
"W
.9
N87° 49' 47"E 2690.96'
MSSMSSMSS
MSD
X X
X
X X
X
X
X
EPB
N87° 50' 20"E 2660.32'
N
"W
.3
/2
/2 jb c iv c o x .c tb S
P R
O J E
C T
S \2
\0
U D
O T
\2
M S
P E
D
E S
IG
N
V
E R
N A
L E
V A
P P
O N
D \S
U R
V E
Y
D A
T A
\2
S C
-0
SC-01
S U
R V
E Y
C O
N T
R O
L
V E
R N
A L E
V A
P P
O N
D
M S
P
E D
E S
IG
N
D W
P
S R
V
SHEET No.
S
H T
S E
T
S T
Y L E
T A
B L E
L A
S T
U P
D A
T E
D
R A
W
IN
G C
R E
A T
E D
/2
/2
D W
G N
A M
E
00 500' 1000'
PRIMARY CONTROL
CONTROL
POINT
LONGITUDE NAD 83 LATITUDE NAD 83
STATE PLANE COORDINATES PROJECT COORDINATES CONTROL POINT
DESCRIPTIONNORTHING EASTING NORTHING EASTING ELEVATION
1 N40°29'52.99323" W109°31'50.87930" 7356180.773 2188021.597 358344.211 188665.039 5359.47 3 14" BRASS CAP STAMPED: VERNAL 2018 (UDOT #11)
3 N40°29'32.33863" W109°31'45.17758" 7354100.823 2188508.010 356263.663 189151.592 5347.89 SPINDLE, 14 COR SEC 2 & 11
4 N40°29'32.87292" W109°31'10.55135" 7354213.961 2191181.333 356376.834 191825.684 5324.48 5
8" REBAR AND CAP, SEC. 1, 2, 11 &12
5 N40°29'58.94212" W109°64'10.78513" 7356851.007 2191104.872 359014.638 191749.200 5358.52 5
8" REBAR, 14 COR SEC. 1 & 2
6 N40°29'58.10874" W109°32'20.02858" 7356648.846 2185758.949 358812.419 186401.741 5395.55 3.5" ALUMINUM CAP, 14 COR SEC. 2 & 3
7 N40°29'32.04461" W109°32'02.40046" 7354041.797 2187178.372 356204.620 187821.571 5366.03 BOLT, W 116 COR SEC. 2 & 11
8 N40°29'58.53136" W109°31'45.20876" 7356750.721 2188447.204 358914.322 189090.768 5369.33 2.5" UINTAH CO. ALUMINUM CAP, C 14 COR SEC. 2
SCALE: 1" = 500'
T.4S.
S.L.B.
R.21E.
& M.
V E
R N
A L A
V E
U .S
E
A S
T S
T R
E E
T
2500 NORTH STREET
ALL FIELD WORK FOR THE SURVEY CONTROL WAS PERFORMED USING TRIMBLE GPS EQUIPMENT IN
FEBRUARY 2026. THE SURVEY WAS PREFORMED BY THE RTK METHOD USING THE UTAH REFERENCE
NETWORK (TURN) VRS SERVICES TO OBTAIN THE NAD83 AND NAVD88 POSITION OF ALL PROJECT
CONTROL POINTS.
THE HORIZONTAL AND VERICAL ACCURACY OF ALL CONTROL POINTS CONFORM TO UDOT'S TWO
CENTIMETER LOCAL ACCURACY STANDARDS.
BASIS OF COORDINATES
SURVEY DATE: FEBRUARY 5, 2026
PROJECT COORDINATES: LOCAL COORDINATES SCALED AND TRUNCATED FROM STATE PLANE
STATE PLANE COORDINATES: UTAH COORDINATE SYSTEM 1983 NORTH ZONE (2011) EPOCH
2010.0000
PROJECT DATUM: NAD83 FROM THE UTAH REFERENCE NETWORK (VRS)
VERTICAL DATUM: NAVD88 FROM THE UTAH REFERENCE NETWORK (VRS)
UNITS: US SURVEY FOOT
SCALE FACTOR: 1.0002874656 (DERIVED FROM N 40°29'52.99323",
W 109°31'50.87930", HEIGHT 5305.44')
SCALE ORIGIN: N = 0, E = 0
GEOID: GEOID18
CONVERSIONS
PARAMETERS FOR CONVERSION FROM STATE PLANE COORDINATES TO PROJECT COORDINATES ARE
AS FOLLOWS:
SCALE FACTOR: 1.0002874656
OFFSET NORTHING: 6999951.211 SP X SCALE FACTOR - 6999951.211 = PRJ
OFFSET EASTING: 1999985.539 SP X SCALE FACTOR - 1999985.539 = PRJ
PARAMETERS FOR CONVERSION FROM PROJECT COORDINATES TO STATE PLANE COORDINATES ARE
AS FOLLOWS:
SCALE FACTOR: 1.0002874656
OFFSET NORTHING: 6999951.211 (PRJ + 6999951.211) / SCALE FACTOR = SP
OFFSET EASTING: 1999985.539 (PRJ + 1999985.539) / SCALE FACTOR = SP
= PROJECT CONTROL POINT AS NOTED
= FOUND CORNER OF THE PLSS.
SE 14
SEC. 2
SEC. 2
SEC. 2
SEC. 2SEC. 3
SEC. 1
SEC. 1
SEC. 11 SEC. 12SEC. 2
SEC. 11
SW 14
SEC. 2
UDOT SHED
SITE
/0 /2
03/05/2026
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
SM
-0
SM-01
SU
M
M
AR
Y
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 2
/2 7/
D W
G N
AM
E:
3/
/2
NOTE:
1. CONTRACTOR IS TO DISPOSE OF REMOVED ASPHALT.
2. SEE DM-01 FOR PLACEMENT OF WASTE MATERIAL.
GENERAL NOTES
ROCKY MOUNTAIN POWER
183 S 500 E
VERNAL, UT 84078
(385) 315-6277
KEVIN HILL
POWER
ENBRIDGE GAS
115 E 100 S
ROOSEVELT, UT 84066
(801) 324-3970
NATURAL GAS
ASHLEY VALLEY WATER & SEWER
1753 E 1500 S
VERNAL, UT 84078
(435) 789-9400
DAVE HATCH
WATER/SEWER
UTILITY CONTACTS
UTILITY NOTES
UINTAH COUNTY
PLANNING & ZONING
152 E 100 N
VERNAL, UT 84078
(435) 781-5336
MATT CAZIER
STORM
STRATA NETWORKS
2085 W HWY 40
VERNAL, UT 84078
(435) 622-6383
SHAD SAGERS
FIBER
1. CONTRACTOR TO FOLLOW ALL BLUE STAKES PROTOCOLS.
2. ACCESS TO EXISTING UTILITIES MUST BE MAINTAINED THROUGHOUT THE PROJECT.
3. CONTACT FOR ANY REQUIRED CHANGES OR CONFLICTS WITH EXISTING UTILITY
INFRASTRUCTURE.
1. THE CONTRACTOR SHALL PROVIDE SUITABLE METHODS & EQUIPMENT TO CONTROL DUST
AND AIR POLLUTION CAUSED BY CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL
ALSO PROVIDE SUITABLE MUD AND DIRT CONTAINMENT TO MAINTAIN THE WORK SITE,
ACCESS ROADWAYS, AND ADJACENT PROPERTIES IN A CLEAN CONDITION.
2. ALL WORK MUST BE PERFORMED TO NOT INTERFERE WITH UDOT MAINTENANCE
OPERATIONS.
3. COORDINATE WITH ROD THURGOOD AT (435) 790-4560 FOR PLACEMENT OF WASTE
MATERIAL.
4. ALL WORK MUST BE COMPLETED BY JUNE 25, 2026.
ADAM KESLER
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
G -0
G-01
N O
TE
S
C
O N
TA
C
TS
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 3
/5 /2
D W
G N
AM
E:
3/
/2
MSS
MSS
MSD
X
X
X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
EPB
e e e e g g g
NOTES:
1. COMPLETE THE MS4 COMPLIANCE PLAN AND SUBMIT TO REGION STORM
WATER COORDINATOR FOR APPROVAL PRIOR TO BEGINNING CONSTRUCTION.
NICOLE RICH
PHONE: (801)-604-5160
EMAIL: nrich@utah.gov
2. IMPLEMENT BEST MANAGEMENT PRACTICES AND THE MS4 AND UDOT
STANDARD SPECIFICATION REQUIREMENTS OF 01355, ENVIRONMENTAL
COMPLIANCE.
3. DAILY INSPECT ENVIRONMENTAL CONTROL TO DETERMINE THE
EFFECTIVENESS OF THE ENVIRONMENTAL CONTROLS AND WHAT
MODIFICATIONS ARE NEEDED IF ANY.
4. ALL ENVIRONMENTAL CONTROL MEASURES WILL BE REMOVED UPON
COMPLETION OF THE PROJECT.
SILT FENCE (TYP.)
SILT FENCE (TYP.)
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
EC
-0
EC-01
ER
O
SI
O
N C
O N
TR
O
L
PL
AN
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 2
/2 6/
D W
G N
AM
E:
EROSION CONTROL PLAN
EVAPORATION POND
BRINE
TANK PAD
3/
/2
MSS
MSD
X X
X X
X X
X X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
EPB
e e g g
VE
R
N
AL
A
VE
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
D M
-0
DM-01
D
EM
O
LI
TI
O
N P
LA
N
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 3
/1 0/
D W
G N
AM
E:
REMOVE EXISTING LEAK
DETECTION SYSTEMS
TRUCK WASH RACK
PROTECT IN PLACE
REMOVE CATCH BASIN
REMOVE EXISTING
ASPHALT (4" THICK)
SEE DT-01
00 50' 100'
1" = 50'
REMOVE EXISTING ASPHALT
REMOVE EXISTING LINERS
DISPOSAL AREA FOR WASTE
MATERIAL - SEE SM-01
EARTHWORK SUMMARY
DEMOLITION PLAN
3/
/2
N
MSS
MSD
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
EPB
e e g
Garage And Office
Salt Storage Shed
VE
R
N
AL
A
VE
Chain Link Fence
Chain Link Fence
Field Fence
Plow Truck Stand
Plow Truck Wash Rack
Evaporation Pond
Brine Bldg
Brine Tank Concrete Pad
NEW BRINE TANK
CONCRETE PAD
Concrete Waterway
Edge of Asphalt
FUTURE
TRUCK
WASH
RACK
Storm Inlet
Storm Inlet
Concrete Pad
NEW EVAPORATIVE POND
Concrete Box
Shed
Shed
Shed
Shed
Garage
Edge of Asphalt
HMA APRON
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
SP
-0
SP-01
O
VE
R
AL
L
SI
TE
P
LA
N
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 3
/1 1/
D W
G N
AM
E:
00 60' 120'
1" = 60'
3/
/2
OVERALL SITE PLAN
MSS
MSD
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
EPB
e e e e g g g
OUTSIDE EDGE OF APRON
MATCH EXISTING
OUTSIDE EDGE OF APRON
MATCH EXISTING
OUTSIDE EDGE OF APRON
MATCH EXISTING
166.73'
103.40'
127.76'
45.10' 25.00'
24.00' 49.12'
65.77'
4.00'
-0.5%
-0.
5%
OUTSIDE EDGE OF APRON
MATCH EXISTING
-6 .0
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
SP
-0
SP-02
PO
N
D L
AY
O
U T
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 3
/2 /2
D W
G N
AM
E:
00 30' 60'
1" = 30'
NOTE
1. SEE SP-02 FOR POINT TABLE.
2. GRADE POND TO DRAIN TO EXISTING OUTLET PIPE.
3. TOP OF FLOOR SLAB TO BE 4 INCHES BELOW
BOTTOM OF EXISTING OUTLET PIPE AT END OF PIPE.
ASPHALT TRANSITION
RAMP AREA
BOTTOM AREA
TOE SLOPE
BERM TOP
FUTURE TRUCK
WASH AREA
1 INCH PVC PIPE THRU WALL
CONCRETE FLOOR, SLOPE
TO DRAIN TO 1 INCH PIPE
CUT LINE
CUT LINE
CUT LINE
CUT LINE
Existing Pipe Location
EMBANKMENT
A
A
B
B
CUT LINE
EXISTING OUTLET PIPE PROTECT IN PLACE
TOP OF PIPE ELEV: 5357.21
Existing Truck Wash Area
3/
/2
POND LAYOUT
EVAPORATION POND
BRINE
TANK
PAD
POINT LOCATION
POINT #
ELEVATION
5357.20
5357.18
5357.13
5356.90
5356.54
5356.63
5359.81
5359.55
5359.50
5359.50
5359.50
5359.50
5359.50
5359.83
5359.50
5359.50
5359.50
5359.50
5359.50
5356.44
NORTHING
358318.36
358269.29
358192.56
358196.87
358307.30
358324.08
358368.00
358363.42
358363.04
358266.50
358183.13
358188.05
358310.25
358368.45
358362.88
358265.29
358179.04
358184.22
358310.42
358288.23
EASTING
188690.32
188692.36
188739.75
188843.06
188838.45
188827.25
188797.97
188688.43
188679.25
188683.28
188734.77
188852.62
188847.52
188808.72
188675.25
188679.33
188732.59
188856.79
188851.52
188839.24
DESCRIPTION
TOP OF FLOOR
TOP OF FLOOR
TOP OF FLOOR
TOP OF FLOOR
TOP OF FLOOR
TOP OF FLOOR
TOP OF FLOOR
TOP OF FLOOR
INSIDE TOP OF BERM
INSIDE TOP OF BERM
INSIDE TOP OF BERM
INSIDE TOP OF BERM
INSIDE TOP OF BERM
INSIDE TOP OF BERM
OUTSIDE TOP OF BERM
OUTSIDE TOP OF BERM
OUTSIDE TOP OF BERM
OUTSIDE TOP OF BERM
OUTSIDE TOP OF BERM
TOP OF FLOOR
POINT LOCATION
POINT #
ELEVATION
5362.40
5362.40
5362.40
5362.40
NORTHING
358285.81
358286.54
358311.53
358310.80
EASTING
189003.28
189029.27
189028.57
189002.58
DESCRIPTION
TOP OF WALL OUTER CORNER
TOP OF WALL OUTER CORNER
TOP OF WALL OUTER CORNER
TOP OF WALL OUTER CORNER
POND POINTS BRINE TANK POINTS
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
SP
-0
SP-03
PO
IN
T
LO
C
AT
IO
N
T
AB
LE
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 2
/2 5/
D W
G N
AM
E:
3/
/2
POINT LOCATION TABLE
-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
TOE OF SLOPEPOND BOTTOM
Existing Ground
OUTSIDE TOP OF BERM
INSIDE TOP OF BERM
INSIDE TOP OF BERM
25.00% SLOPE (TYP.)-33.30% SLOPE (TYP.)POND RAMP (6% SLOPE) WATER LINE (ELEV. 5359.00 TYP.)
-100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100
WATER LINE (ELEV. 5359.00 TYP.)
POND BOTTOM (ELEV. VARIES TYP)
Existing Ground
TOE OF SLOPE (TYP.)
OUTSIDE TOP OF BERM (TYP.)
INSIDE TOP OF BERM (TYP.)
INSIDE TOP OF BERM (TYP.)
25.00% SLOPE (TYP.)
-33.30 SLOPE (TYP.)
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
C S-
CS-01
PO
N
D C
R O
SS
S
EC
TI
O N
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 2
/2 6/
D W
G N
AM
E:
SECTION A-A
SECTION B-B
3/
/2
6"
· ASTM A615 #4 REBAR
CAST-IN-PLACE CONCRETE SLAB PER UDOT
SPECIFICATION 03055 WITH THE FOLLOWING:
D-1557 (REF. UDOT SPECIFICATION
SECTION 02721)
AND ADD WATER STOP
REMOVABLE CAP
TEE 12X12X4
12" PVC
REMOVABLE CAP
CAP
TEE 12X12X4
4" UNDERDRAIN
PERFORATED PVC
WITH FILTER SOCK
12" PVC
REMOVABLE CAP
CAP
TEE 12X12X4
LOWER LEAK DETECTION DETAIL BELOW LEAK DETECTION DETAIL
4" UNDERDRAIN PVC
UPPER LEAK DETECTION DETAIL
4" UNDERDRAIN PVC
12" PVC
CAP
4" UNDERDRAIN PVC
STAINLESS STEEL BANDING
W/ BOOT PER MFG.
4" UNDERDRAIN
PERFORATED PVC
WITH FILTER SOCK
4" UNDERDRAIN
PERFORATED PVC
STAINLESS STEEL
BANDING W/
BOOT PER MFG.
EMBANKMENT
CONCRETE
UNTREATED BASE COURSE
0.33' 0.50'
3.00'
3'
HMA
DOUBLE LINER
DOUBLE LINER
CONCRETE
UNTREATED BASE COURSE
TOP OF RAMPTOP OF BERM
1'
1.00'
1.00' 10'
EXISTING UNTREATED
BASE COURSE
0.33'
1.00'
1.33'
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
D T-
DT-01
D
ET
AI
L
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 3
/1 2/
D W
G N
AM
E:
ASPHALT PATCH SECTION
CONCRETE BRINE TANK SLAB
POUR CONCRETE SLAB AND WALL IN A
SINGLE POUR OR ROUGH IN SLAB AND ADD
WATER STOP.
3/
/2
CUSHION GEOTEXTILE
60 MIL HDPE SALT RESISTANCE GEOMEMBRANE (PRIMARY)
GEONET OR GEOCOMPOSITE
60 MIL HDPE GEOMEMBRANE (SECONDARY)
6"
12" PRIMARY HDPE LINER AND
CUSHION GEOTEXTILE GEONET OR
COMPOSIT
UNTREATED BASE COURSE OR
STRUCTURAL FILL
1/2"
4"
12" PRIMARY HDPE LINER AND
CUSHION GEOTEXTILE GEONET OR
COMPOSIT
SECONDARY HDPE LINER
AND CUSHION GEOTEXTILE
GEONET OR GEOCOMPOSITE
UNTREATED BASE COURSE OR
STRUCTURAL FILL
CUSHION GEOTEXTILE
1/2" SECONDARY HDPE LINER
AND CUSHION GEOTEXTILE
GRADE BASE TO PROVIDE A CLEAN 3 4"
MINUS SURFACE WITH NO ANGULAR
SURFACES SHOWING. COMPACT BASE
MATERIAL WITH A STATIC ROLLER.
GEONET OR GEOCOMPOSITE
CAST-IN-PLACE SLAB PER UDOT
SPECIFICATION 03055 WITH THE FOLLOWING:
TYPE 2 PORTLAND CEMENT
fc = 4,000 psi min.
6-bag mix with max w/c ratio - 0.44 6% air entrainment.
7.0 lb/cu yd of 2-1/4 IN
MACROSYNTHETIC FIBER
REINFORCEMENT WITH HIGH RANGE
WATER REDUCERS - SEE DT-03
GRADE BASE TO PROVIDE A CLEAN 3 4"
MINUS SURFACE WITH NO ANGULAR
SURFACES SHOWING. COMPACT BASE
MATERIAL WITH A STATIC ROLLER.
CAST-IN-PLACE SLAB PER UDOT
SPECIFICATION 03055 WITH THE FOLLOWING:
TYPE 2 PORTLAND CEMENT
fc = 4,000 psi min.
6-bag mix with max w/c ratio - 0.44 6% air entrainment.
7.0 lb/cu yd of 2-1/4 IN
MACROSYNTHETIC FIBER
REINFORCEMENT WITH HIGH RANGE
WATER REDUCERS - SEE DT-03
SD SD
SD SD
SD SD 5.60'
5.60'
3.35' CONCRETE FILLED
STEEL BOLLARD (TYP.)
DETECTION PORT (TYP.)
2.00'
2.00'
NOTE:
LABEL EACH OF THE CAPS WITH 4"
LETTERING SO IDENTIFICATION OF
EACH TEST PORT CAN BE MADE.
U = UPPER
L = LOWER
B = BELOW
U
L
B
4.00'
3.00'
0.50'
ROUND TOP OF CONCRETE
- PAINT YELLOW
6" DIA. CONCRETE FILLED
SCHEDULE 40 STEEL PIPE
24" DIA. CONCRETE
- SLOPE TOP TO DRAIN
UNTREATED
BASE COURSE
2.00'
PRIME AND PAINT WITH
(2) FINISH COATS OF
SAFETY YELLOW
0.04'
FINISH GRADE
NO PAINT ON PIPE
BELOW FINISH GRADE
(4) 3" STUD ANCHORS
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
D T-
DT-02
D
ET
AI
L
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 3
/1 2/
D W
G N
AM
E:
EVAPORATION POND LAYERS (RAMP AND BOTTOM OF POND)
EVAPORATION POND LAYERS (SIDE OF POND)
DOUBLE LINER
CONCRETE FILLED
STEEL BOLLARD
TEST PORT CAP LABELS
3/
/2
CONCRETE FILLED STEEL
BOLLARD LOCATION
CRACK CONTROL JOINT
SEE NOTES
CRACK CONTROL JOINT
NOT TO SCALE
VARIES 4-6"
1.5" DEEP
SAWCUTFILL
W / ELASTOMERIC
JOINT MATERIAL
1.5"
REINFORCEMENT,
7.0 lb/cu yd OF 2-1/4 IN
MACROSYNTHETIC FIBER
REINFORCEMENT WITH HIGH
RANGE WATER REDUCERS
CONCRETE, AA(AE)
fc=4000 psi
WATER/CEMENTITIOUS RATIO: 0.44
- 0.49
NOTES
1. CRACK CONTROL MAXIMUM JOINT SPACING = 12 FEET
2. CONCRETE FLOOR RAMP AND SIDE SLOPES SHALL BE PLACED IN ONE CONTINUOUS
POUR
3. IN THE EVENT OF UNFORESEEN CIRCUMSTANCES THAT CONCRETE POUR MUST BE
STOPPED, BULKHEAD OFF POUR AND INSTALL WATERSTOP. HAVE ±200 FT WATERSTOP
AVAILABLE ON SITE WHEN PLACING POND CONCRETE IN CASE IT IS NEEDED.
WATERSTOP DETAIL
NOT TO SCALE
VARIES 4-6"
6" WATERSTOP
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
D T-
DT-03
D
ET
AI
L
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 3
/1 1/
D W
G N
AM
E:
CRACK CONTROL JOINT LAYOUT
3/
/2
MSS
MSD
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X
SD SD SD SD SD SD SD
SD SD SD SD SD SD SD
SD SD SD SD SD SD SD
4" UNDERDRAIN PERFORATED
PVC WITH FILTER SOCK
BOTTOM OF RAMP
BELOW LEAK DETECTION PORT
LOWER LEAK DETECTION PORT
UPPER LEAK DETECTION PORT
SEE DT-02 (TYP.)
4" UNDERDRAIN PVC
4" UNDERDRAIN PERFORATED PVCCAP END OF PIPES
CONCRETE FILLED STEEL BOLLARD
SEE DT-02 (TYP.)
CONCRETE FILLED STEEL BOLLARD
CONCRETE FILLED STEEL BOLLARD
2.00' 2.00'
3/
/2 ci vc o.
ct b
1_
VE
RN
AL
E
VA
P
PO
ND
S:
\1 _P
R O
JE
C
TS
\2
6\
_U
D O
T\
1_
M S4
_P E_
D
ES
IG
N
_V
ER
N
AL
E
VA
P
PO
N D
\S H
EE
T-
FI
LE
S\
1_
D R
-0
DR-01
PO
N
D U
N D
ER
D
R
AI
N P
LA
N
M S4
P E
D
ES
IG
N
VE
R N
AL
E
VA
P
PO
N
D
JWM
D
K
R
EM
AR
KS
D
AT
E
BY
N o.
C H
EC
KE
D B
Y
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
AP
PR
O
VE
D
D
AT
E
N U
M
BE
R
PR
O
JE
C T
SHEET No.
R
EV
IS
IO
N S
PR
O
JE
C
T
Q
CD
R
AW
N
B Y
U
TA
H D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
R
EG
IO
N
C
IV
C O
E N
G
IN
EE
R
IN
G
, I N
C
PI
N
SH
T
SE
T:
ST
YL
E
TA
BL
E:
LA
ST
U
PD
AT
E:
D
R
AW
IN
G
C R
EA
TE
D : 3
/1 2/
D W
G N
AM
E:
00 30' 60'
1" = 30'
VE
R
N
AL
, U
IN
TA
H
C O
U N
TY
3/
/2
POND UNDER DRAIN PLAN
NOTE:
SLOPE UNDERDRAINS AT
0.5% TOWARDS THE EAST.
| 23311_TITLE SHEET |
| Sheets and Views |
| TITLE SHEET |
| 23311_1-B |
| Sheets and Views |
| 1-B |
| 23311_G-01 |
| Sheets and Views |
| G-01 |
| 23311_EC-01 |
| Sheets and Views |
| GR-01 |
| 23311_DM-01 |
| Sheets and Views |
| DM-01 |
| 23311_SP-01 |
| Sheets and Views |
| SP-01 |
| 23311_SP-02 |
| Sheets and Views |
| SP-02 |
| 23311_SP-03 |
| Sheets and Views |
| SP-03 |
| 23311_CS-01 |
| Sheets and Views |
| CS-01 |
| 23311_DT-02 |
| Sheets and Views |
| DT-02 |
| 23311_DT-03 |
| Sheets and Views |
| DT-03 |
| 23311_SM-01 |
| Sheets and Views |
| SM-01 |
| 23311_DR-01 |
| Sheets and Views |
| DR-01 |
| 23311_DT-01.pdf |
| Sheets and Views |
| DT-01 |
| 23311_SM-01.pdf |
| Sheets and Views |
| SM-01 |
File details come from the government source that posted it. Updated .