This is a bid schedule attachment for an Invitation for Bid (IFB) issued by the Utah Department of Transportation (UDOT) Procurement Services Division for the Vernal MS4 Project Detention Pond construction. The project involves the reconstruction of a detention pond with liners and concrete, and must be completed by June 25th, 2026. A mandatory site visit is required on Tuesday, March 24th, 2026 at 11:00 am at the UDOT maintenance facility located at 2773 N Vernal Ave, Vernal, Utah. Contractors must attend the site visit to be eligible to submit a bid. The contract will be awarded to the lowest responsive and responsible bidder, with UDOT reserving the right to evaluate bidder responsibility based on past MS4 project performance, including timely completion and absence of excessive delays or warranty issues. The Solicitation Number is UDOT260192CN.

The bid schedule identifies 20 line items encompassing mobilization, site preparation, excavation, drainage systems, liner installation, concrete work, and site restoration. Key quantities include 58,558 square feet of HDPE liner, 29,279 square feet of geonet, 1,686 cubic yards of site excavation, 30 cubic yards of structural concrete, 426 square yards of asphalt patching and hydroseeding, and 3,619 pounds of reinforcing steel. Bidders must submit unit costs for each item with a total bid amount. The awarded contractor must provide a performance and payment bond upon award. UDOT reserves discretionary authority to reject bids from firms with current uncompleted MS4 projects in a liquidated damage state or those with a history of excessive delays on previous MS4 projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM UDOT SPECIFICATION DESCRIPTION QTY UNIT UNIT COST COST

1 01501 MOBLIZATION 1 LUMP

2 01571 SILT FENCE 462 FT

3 01721 SURVEY 1 LUMP

4 02076* GEOCUSHION 58,558 SQ FT

5 02076* GEONET 29,279 SQ FT

6 02076* HDPE LINER 58,558 SQ FT

7 02221 LINER DEMO 1 LUMP

8 02221 REMOVE DRAINAGE BOX 1 EACH

9 02316 SITE EXCAVATION (PLAN QTY) 1,686 CU YD

10 02610 LEAK DETECTION PORT 3 EACH

11 02610

4" UNDERDRAIN PERFORATED PVC WITH FILTER

SOCK

288 FT

12 02610 4" UNDERDRAIN PERFORATED PVC 144 FT

13 02610 4" UNDERDRAIN PVC 42 FT

14 CONCRETE FILLED STEEL BOLLARD 3 EACH

15 02721 UNTREATED BASE COURSE 1,075 CU YD

16 02737 ASPHALT PATCH 41 CU YD

17 02911 HECP TYPE 2 426 SQ YD

18 02922 BROADCAST SEED 426 SQ YD

19 03055M CONCRETE W/MACROSYNTHETIC FIBER 480 CU YD

20 03211 REINFORCING STEEL (PLAN QTY) 3,619 LBS

21 03310 STRUCTURAL CONCRETE (PLAN QTY) 30 CU YD

MS4 PE DESIGN - VERNAL EVAP POND BID SCHEDULE

TOTAL BID AMOUNT