5-Ashley American Legion Final 9-17-2026.pdf
PDF 14 MB Posted
- Attached to
- Ashley American Legion
- Solicitation number
- American Legion Post 673, Luzerne County
- Issued by
- Luzerne County, Pennsylvania
About this file
This file comprises architectural and engineering design drawings for a construction project at Ashley American Legion Post 673, located at 121 North Main Street, Ashley, Pennsylvania. The project involves the construction of a new 3,276 square-foot building to replace the existing structure at the same location. The design documents, prepared by POZ Engineering & Environmental Consulting, P.C. and Kesselman Architectural Design, LLC, include comprehensive plans for architectural, mechanical, electrical, and plumbing (MEP) systems, as well as structural and foundation details. The building design incorporates multiple functional areas including a bar area, dining area, kitchen, restrooms, storage spaces, and basement mechanical rooms. Key architectural features include first-floor and basement plans, building elevations, detailed sections, deck construction specifications with 38 posts and 101 framing members, and a complete door and window schedule totaling 16 doors and 22 windows. The MEP systems include HVAC with AHU-1 (12.5-ton Carrier unit), multiple exhaust fans, hot water heating via a Weil-McLain boiler, comprehensive plumbing for kitchen and restroom fixtures, and electrical systems with lighting and power distribution throughout the facility.
The design specifications establish detailed technical requirements for construction, including roof assembly specifications (R-49 insulation, 25-year asphalt shingles), flooring assemblies (composite and ceramic tile), mold-resistant partitions in wet areas, and foundation details with reinforced concrete footings (24" x 12" minimum). Mechanical equipment includes cooling (Carrier 12.5-ton condensing unit), heating capacity of 200 MBH input from the gas boiler, and ventilation with outdoor air requirements of 2,160 CFM from a Greenheck MAU unit. The electrical design provides 100-amp, 24-circuit panelboard service with GFCI protection in kitchen and bathroom areas, LED lighting fixtures, and grounding for safety. All work must comply with the 2021 International Building Code (IBC), 2021 International Residential Code (IRC), National Electrical Code (NEC) 2023, and local Pennsylvania codes. The project is privately funded and requires contractor bonding and formal contract award documents, with the existing building remaining operational during the transition to the new facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6-Ashley Legion Supplemental Electric Plans.pdf | ||
| 1-Ashley Legion FinalRev12.pdf | ||
| 8-AMENDMENT2.pdf | ||
| 3-AMENDMENT1.pdf | ||
| 2-Ashley American Legion Bid Doc.pdf | ||
| 7-Pre Bid Sign in Sheet 9-18-26.pdf | ||
| 4-AMENDMENT1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
9/
/2
:5 4:
A
M
COVER
POZ Engineering P.O. Box 663, Pittston, PA 18640
570-654-0113
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
Ashley American Legion Post 673 121 N. Main St. Ashley, Luzerne County, PA
IndexIndex
SHEET INDEXSHEET INDEX
0.0 - Cover
ARCHITECTURALARCHITECTURAL
A-1.1 - First Floor Plan A-2.1 - Elevations A-2.2 - Elevations A-3.1 - Section A-A A-4.1 - Deck Details A-4.2 - Deck Schedules A-5.1 - Door and Windows Schedule
MEP
MEP-1.1 – First Floor Plan HVAC MEP-1.2 – First Floor Plan Plumbing MEP-1.3 – Basement Plan HVAC & Plumbing MEP-2.1 – Sections A MEP-2.2 – Sections B MEP-2.3 – Sections C MEP-3.1 – Schedules MEP-4.1 - Electrical Outlet Plan MEP-4.2 - First Floor Lighting and Power MEP-4.3- Basement Lighting and Power MEP-4.4 - Electrical Schedules *
FOUNDATION
S-1.1 - Foundation Plan S-1.2 - Foundation Detail S-2.1 - Truss Details
* Addendum #1
No. Description Date
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
L
COVER REVISED 9/15/2026
A-2.1 LOUVERS & FOOTER 9/17/2026
MEP4.4 SCHEDULES 9/17/2026
S-1.2 FOOTERS 9/17/2026
09/17/2026
DN
GFI GFI GFI GFI
EF-2 EF-3
TRANSFER GRILLES 540 CFS
700 CFM
DINING AREA
KITCHEN
MEN'S LADIES
T-STAT
CD-2
CO2
T-STAT
CD-1
90' - 4 1/4"
/1 6"
63' - 0 7/8"
3/
/4
5' - 1"
PLAN LEGEND
F-1 COMPOSITE FLOORING
F-2 CERAMIC TILE FLOORING
ROOF ABOVE
P-1 TYPICAL INTERIOR PARTITION
P-2 MOLD RESISTANT PARTITION
(RESTROOMS & KITCHEN)
GENERAL FLOORING NOTES:
CONTRACTOR SHALL FOLLOW ALL FLOOR
FINISH MANUFACTURER INSTALLATION REQUIREMENTS.
ALL SUBFLOORING SHALL BE CLEAN, DRY, AND
SECURELY FASTENED PRIOR TO UNDERLAYMENT
AND FLOORING INSTALLATION.
PROVIDE EXPANSION GAPS AT PERIMETER OF FLOORING
PER MANUFACTURER REQUIREMENTS.
ALL CHANGES IN FLOOR MATERIAL SHALL OCCUR AT
CENTERLINE OF DOOR UNLESS OTHERWISE NOTED.
REFER TO STRUCTURAL DRAWINGS FOR
FRAMING INFORMATION.
F-1
F-1
F-1
F-2F-2
BAR AREA
Dance Floor
Pool Table
Shuffle Board
Storage
St or ag e
FreezerCoolerIce
S.S Table S.S Table www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
As indicated
8/
/2
:4 4:
A
M
A-1.1
1ST FLOOR PLAN
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
No. Description Date
1/4" = 1'-0"1 1ST FLOOR
1 1/2" = 1'-0"2 F-2 CERAMIC TILE FLOOR
1 1/2" = 1'-0"3 F-1 COMPOSITE FLOORING
CERAMIC TILE
2X12 FLOOR JOISTS
1/2'' GYPSUM BOARD
1/2'' CDX PLYWOOD SUBFLOOR
1/4" CEMENT BACKER BOARD OR
APPROVED UNCOUPLING MEMBRANE
CERAMIC TILE
2X12 FLOOR JOISTS
1/2'' GYPSUM BOARD
1/2'' CDX PLYWOOD SUBFLOOR
MANUFACTURER-APPROVED RESILIENT
FLOORING UNDERLAYMENT
FLOOR ASSEMBLY SCHEDULE
F-1 – COMPOSITE FLOORING
COMPOSITE FLOORING
MANUFACTURER-APPROVED RESILIENT
FLOORING UNDERLAYMENT, IF REQUIRED
1/2" PLYWOOD SUBFLOOR
FLOOR FRAMING PER PLAN
LOCATION:
ALL NON-TILED AREAS UNLESS OTHERWISE NOTED.
NOTES:
INSTALL FLOORING AND UNDERLAYMENT IN ACCORDANCE
WITH MANUFACTURER REQUIREMENTS.
F-2 – CERAMIC TILE FLOORING
CERAMIC TILE SET IN THIN-SET MORTAR
1/4" CEMENT BACKER BOARD OR APPROVED UNCOUPLING MEMBRANE
WATERPROOFING MEMBRANE AT WET AREAS, WHERE REQUIRED
1/2" PLYWOOD SUBFLOOR
FLOOR FRAMING PER PLAN
LOCATION:
BATHROOMS AND OTHER TILED AREAS AS INDICATED ON PLAN.
NOTES:
INSTALL TILE ASSEMBLY IN ACCORDANCE WITH TILE AND
UNDERLAYMENT MANUFACTURER REQUIREMENTS.
North
GENERAL DRYWALL NOTES
ALL DRYWALL TO BE 5/8" GYPSUM WALLBOARD UNLESS OTHERWISE
NOTED. SEE WALL SCHEDULE ABOVE.
ALL INTERIOR WALLS TO BE FINISHED AS SCHEDULED, UNLESS
OTHERWISE NOTED
PROVIDE MOISTURE-RESISTANT GYPSUM BOARD IN ALL BATHROOMS
AND KITCHEN AREAS AS INDICATED (P-2).
COORDINATE WALL AND DOOR LOCATIONS WITH MEP AND
STRUCTURAL DRAWINGS.
INTERIOR WALL SCHEDULE
P-1 – TYPICAL INTERIOR PARTITION
1/2" GYPSUM WALLBOARD EACH SIDE
2x4 WOOD STUDS @ 16" O.C. (U.N.O.)
FINISH AS SCHEDULED
P-2 – MOLD-RESISTANT PARTITION (BATHROOMS & KITCHEN)
1/2" MOLD-RESISTANT GYPSUM WALLBOARD ON ROOM SIDE
2x4 WOOD STUDS @ 16" O.C. (U.N.O.)
FINISH AS SCHEDULED
PROVIDE MOISTURE-RESISTANT GYPSUM BOARD IN BATHROOMS
AND KITCHEN AREAS.
SEAL ALL PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF
AS REQUIRED TO PREVENT WATER INTRUSION.
PROVIDE PROPER FLASHING AT WINDOWS, DOORS, ROOF EDGES,
AND OTHER EXTERIOR OPENINGS.
MAINTAIN POSITIVE DRAINAGE AWAY FROM THE
BUILDING FOUNDATION.
PROVIDE VAPOR / MOISTURE BARRIERS WHERE REQUIRED BY THE
WALL, FLOOR, AND ROOF ASSEMBLIES.
ALL WET MATERIALS SHALL BE ALLOWED TO DRY PRIOR
TO ENCLOSURE.
REPLACE WATER-DAMAGED OR MOLD-CONTAMINATED MATERIALS
PRIOR TO FINISH INSTALLATION.
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
L
Architectural Design by:
Kesselman Architectural Design, LLC Lynn Kesselman, RA
08/28/2026
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
Top of rail 611' - 6"
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
Top of rail 611' - 6"
GRADE TO CLEAR LOUVER
24" MINIMUM
24" X 24" X 18" THK
CONCRETE FOOTER
#5 BARS @ 6" EACH WAY
www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1/4" = 1'-0"
9/
/2
:5 5:
A
M
A-2.1
ELEVATIONS
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
1/4" = 1'-0"1 NORTH ELEVATION
1/4" = 1'-0"2 SOUTH ELEVATION1
No. Description Date
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
L
A.2.1 REVISED 9/17/2026
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
Top of rail 611' - 6"
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
Top of rail 611' - 6" www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1/4" = 1'-0"
8/
/2
:4 4:
A
M
A-2.2
ELEVATIONS
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
1/4" = 1'-0"1 EAST ELEVATION
1/4" = 1'-0"2 WEST ELEVATION3
No. Description Date
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
L
1/2'' GYPSUM BOARD CEILING
R-49 INSULATION
TYPICAL ROOF ASSEMBLY
ASPHALT SHINGLES, 25-YEAR MIN.
ROOFING UNDERLAYMENT
1/2" EXTERIOR-GRADE PLYWOOD SHEATHING
PREFABRICATED WOOD TRUSSES
R-49 INSULATION
1/2" GYPSUM BOARD CEILING
TOP OF ROOF
CEILING LEVEL
FIRST FLOOR
REAR GRADE
TOP OF SLAB
9'
3/
8'
0" 3'
0"
TYPICAL EXTERIOR WALL ASSEMBLY
EXTERIOR FINISH
WEATHER-RESISTIVE BARRIER
15/32" OR 5/8" STRUCTURAL EXTERIOR-GRADE OSB SHEATHING
2x6 WOOD STUDS @ 16" O.C. (IF CONFIRMED)
R-20 INSULATION
1/2" GYPSUM WALLBOARD
FASTEN OSB WITH 8d NAILS
@ 6" O.C. AT PANEL EDGES,
12" O.C. IN FIELD, AND 4"
O.C. AT BUILDING CORNERS.
TYPICAL FLOOR ASSEMBLY
FINISH FLOORING
(REST ROOM CERAMIC TILE)
(OTHERS COMPOSITE FLOORING)
APPROVED UNDERLAYMENT
1/2" PLYWOOD SUBFLOOR
WOOD FLOOR JOISTS
TYPICAL FOUNDATION WALL ASSEMBLY
CAST-IN-PLACE CONCRETE FOUNDATION WALL
EXTERIOR WATERPROOFING MEMBRANE
REINFORCED CONCRETE FOOTING BELOW
TYPICAL BASEMENT SLAB ASSEMBLY
6'' CONCRETE SLAB
VAPOR BARRIER
COMPACTED GRANULAR BASE
COMPACTED SUBGRADE
TYPICAL FOUNDATION FOOTING
REINFORCED CONCRETE CONTINUOUS FOOTING
SIZE AS SHOWN 24''X12''
CENTERED BELOW FOUNDATION WALL
SEE S-2.1 FOR FOUNDATION DETAILS
1'
0"
2' - 0"
3.5” SCHEDULE 80 STEEL POST
¼” STEEL PLATE TOP AND BOTTOM OF POST
W 12X58 STEEL BEAM
“DRAWINGS DEPICT THE GRAPHIC NATURE OF THE WORK TO BE PERFORMED.
IT IS THE GENERAL CONTRACTOR’S RESPONSIBILITY TO VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING CONSTRUCTION.
ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF
THE ARCHITECT PRIOR TO PROCEEDING WITH CONSTRUCTION.”
NOTE:
1/4'' STEEL PLATE WELDED TO POST
WIDE FLANGE STEEL BEAM
1/4" STEEL PLATE, BOLTED TO BEAM
3.5" SCH. 80 STEEL POST
1/4" STEEL BASE PLATE, WELDED TO POST
BEAM AND PLATE DRILLED FOR 3/4" A325 OR F3148 BOLT
OR APPROVED BEAM CLAMP
/4
8'
/2
C-1
C-2 www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1/2" = 1'-0"
8/
/2
:4 5:
A
M
A-3.1
SECTION A-A
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
No. Description Date
1/2" = 1'-0"1 SECTION A-A
TYPICAL CEILING CONSTRUCTION
ACOUSTICAL CEILING TILE THROUGHOUT OCCUPIED AREAS
SUSPENDED GRID SYSTEM
COORDINATE WITH LIGHTING, HVAC DIFFUSERS, SPRINKLERS,
AND OTHER CEILING DEVICES
OPEN TO STRUCTURE AT BASEMENT MECHANICAL / OPEN AREAS
PROVIDE ACCESS PANELS WHERE REQUIRED FOR EQUIPMENT
ABOVE CEILING
GENERAL CEILING NOTES
All ceilings shall be installed in accordance with manufacturer ’s requirements and applicable ANSI/ASTM standards.
Coordinate ceiling grid with light fixtures, HVAC diffusers, sprinklers, speakers, and other ceiling-mounted devices.
Center ceiling grid in room where practical. Maintain symmetry about centerlines.
Provide and locate access panels as required for access to valves, controls, and equipment above ceiling.
Maintain minimum clearances at light fixtures and sprinklers as required by code.
All mechanical, electrical, and plumbing work above ceiling shall be coordinated prior to ceiling installation.
CEILING SCHEDULE
C-1 – ACOUSTICAL CEILING TILE
2' x 4' acoustical ceiling tile White fine texture Suspended ACT grid system Ceiling height: 10'-0" A.F.F.
C-2 – OPEN TO STRUCTURE
No suspended ceiling Structure, ductwork, piping, and conduit exposed Ceiling height: 10'-0" A.F.F.
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
1st Floor 608' - 0"
Ground Elev 600' - 0"
Top of rail 611' - 6"
A-4.1
63' - 0"
8' - 0"
6' - 0"
Basement 597' - 0"
1st Floor 608' - 0"
Ground Elev 600' - 0"
Top of rail 611' - 6"
A-4.1
A-4.1
11' - 3 9/16"
0' - 5 1/2"
0' - 4 1/2"
0'
1/
4"
0' - 3 1/2"
0' - 5 1/2"
1'
6"
1' - 0"
1st Floor 608' - 0"
Ground Elev 600' - 0"
Top of rail 611' - 6"
50' - 11 15/16"
10' - 0"
5' - 0" www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
As indicated
8/
/2
:4 5:
A
M
A-4.1
Deck Details
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
1/4" = 1'-0"1 Deck Section
1" = 1'-0"2 Deck details 3" = 1'-0"3 Deck details - Callout 1
3" = 1'-0"4 Deck details - Callout 2
Concrete Footing
6x6 Post
Simpson BC46
4x4 Post
2x10 Double Beam
6x6 Post
Simpson CC76
2x6 Cross Rail
1/4" = 1'-0"5 Deck section 2
Wood Decking
No. Description Date
GENERAL NOTES
ALL WORK SHALL CONFORM TO THE 2021 IBC, 2021 IRC AND ALL APPLICABLE LOCAL CODES.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND CONDITIONS IN THE FIELD
PRIOR TO CONSTRUCTION.
DETAILS ON THIS SHEET ARE TYPICAL. REFER TO PLAN FOR LOCATIONS AND DIMENSIONS.
ALL STRUCTURAL MEMBERS SHALL BE PROPERLY FASTENED IN ACCORDANCE WITH
MANUFACTURER'S REQUIREMENTS AND CODE.
DECK NOTES
DECK DESIGN LIVE LOAD: 40 PSF
GUARDRAIL HEIGHT SHALL BE 36" MIN. ABOVE DECK SURFACE.
MAXIMUM SPACING BETWEEN GUARDRAIL PICKETS SHALL BE 4" O.C.
ALL WOOD IN CONTACT WITH CONCRETE OR GROUND SHALL BE PRESSURE TREATED.
ALL HARDWARE AND FASTENERS EXPOSED TO THE WEATHER SHALL BE HOT-DIP
GALVANIZED OR STAINLESS.
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
8/
/2
:4 5:
A
M
A-4.2
Deck Schedules
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
No. Description Date
DECK Post Schedule Mark Count Type Family and Type Structural Material Comments
P1 24 4x4 Dimension Lumber-Column: 4x4 Softwood, Lumber DECK P2 14 6x6 Timber-Column: 6x6 Softwood, Lumber DECK
Grand total: 38
DECK Framing Schedule
Mark COUNT MEMBER SIZE DESCRIPTION FAMILY AND TYPE COMMENTS
F1 12 2x6 PRESSURE-TREATED WOOD POST Dimension Lumber: 2x6 DECK
F2 68 2x8 PRESSURE-TREATED WOOD POST Dimension Lumber: 2x8 DECK
F3 21 2x10 PRESSURE-TREATED WOOD POST Dimension Lumber: 2x10 DECK
Grand total: 101
DECKING BOARD SCHEDULE
SIZE DESCRIPTION TOTAL INSTALLED LENGTH
2x6 PRESSURE-TREATED WOOD
DECKING
1943' - 3 1/2"
DECK FOOTING SCHEDULE
Mark Count Type Description Comments
MARK DESCRIPTION
MEMBER MARK LEGEND
P1
P2
F1
F2
F3
D1
FT1
6X6 DECK POST
4X4 GUARD POST
2X6 DECK FRAMING MEMBER
2X8 DECK FRAMING MEMBER
2X10 DECK FRAMING MEMBER
2X6 DECK BOARD
CONCRETE DECK POST FOOTING
GENERAL DECK NOTES
1. ALL EXTERIOR DECK POSTS, BEAMS, JOISTS, LEDGERS, BLOCKING, RIM MEMBERS, AND WOOD DECKING SHALL
BE PRESSURE-PRESERVATIVE-TREATED LUMBER UNLESS NOTED OTHERWISE.
2. LUMBER SPECIES, GRADE, AND ALLOWABLE SPANS SHALL CONFORM TO THE STRUCTURAL DESIGN AND
APPROVED PROJECT SPECIFICATIONS.
3. PROVIDE LUMBER TREATMENT APPROPRIATE FOR THE EXPOSURE CONDITION. WOOD IN CONTACT WITH
CONCRETE, MASONRY, OR SOIL SHALL BE RATED FOR THE APPLICABLE USE.
4. ALL FASTENERS, ANCHORS, HANGERS, POST BASES, AND CONNECTORS SHALL BE EXTERIOR-RATED AND
COMPATIBLE WITH THE SPECIFIED PRESERVATIVE-TREATED LUMBER.
5. USE HOT-DIP GALVANIZED OR STAINLESS-STEEL FASTENERS AND HARDWARE WHERE REQUIRED FOR
COMPATIBILITY WITH PRESERVATIVE-TREATED WOOD.
6. FIELD-TREAT ALL CUT ENDS, NOTCHES, AND BORED HOLES IN TREATED LUMBER IN ACCORDANCE WITH THE
LUMBER TREATMENT MANUFACTURER’S REQUIREMENTS.
7. INSTALL ALL MANUFACTURED CONNECTORS WITH THE MANUFACTURER’S SPECIFIED FASTENERS. DO NOT
SUBSTITUTE FASTENER TYPES OR QUANTITIES.
8. PROVIDE CONTINUOUS CORROSION-RESISTANT FLASHING AT ALL DECK LEDGER-TO-BUILDING CONNECTIONS.
MAINTAIN POSITIVE DRAINAGE AWAY FROM THE EXISTING BUILDING.
9. VERIFY ALL EXISTING DIMENSIONS, ELEVATIONS, AND FIELD CONDITIONS PRIOR TO FABRICATION OR
CONSTRUCTION. REPORT DISCREPANCIES BEFORE PROCEEDING.
10. DO NOT CUT, NOTCH, DRILL, OR MODIFY STRUCTURAL MEMBERS EXCEPT AS SPECIFICALLY SHOWN OR
APPROVED BY THE DESIGN PROFESSIONAL.
11. DIMENSIONS SHOWN SHALL GOVERN. DO NOT SCALE DRAWINGS.
12. REFER TO SHEET A-4.1 FOR DECK CONNECTIONS, GUARD DETAILS, FOOTING DETAILS, AND TYPICAL ASSEMBLIES.
13. F1 FOOTINGS SUPPORT P1 6×6 DECK POSTS. REFER TO A-4.1 FOR TYPICAL FOOTING AND POST-BASE DETAILS.
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
8/
/2
:4 5:
A
M
A-5.1
Door and Windows Schedule
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
No. Description Date
Window Quantities Assembly
Code Assembly
Description Count Window Description Type Manufacturer Model URL Window
Type Comments
B2020100 Windows 8 Window-Double_Hung_Transom-And ersen-E_Series
20" x 20" Andersen Corporation
E-Series Double Hung Transom www.eaglewindo w.com
29 Aluminum-clad wood double hung picture window
B2020100 Windows 8 Window-Double_Hung_Transom-And ersen-E_Series
30" x 20" Andersen Corporation
E-Series Double Hung Transom www.eaglewindo w.com
30 Aluminum-clad wood double hung transom window
B2020100 Windows 6 Window-Double_Hung-Andersen-E_S eries
30" x 60" Andersen Corporation
E-Series Double Hung www.eaglewindo w.com
31 Aluminum-clad wood double hung window
Grand total: 22
Door Quantities Assembly
Code Count Door Description Type Width Height Thickness Type Mark Comments
2 Hollow_Metal_Door_9236 36" x 84" 3' - 0" 7' - 0" 0' - 1 3/4" 37 DOORS 1 Door-Overhead-Rolling 72'' 6' - 0" 6' - 6" 0' - 3" 44 DOORS 2 Doble-Panel_2 1830 x 1981 mm 5' - 0" 6' - 6" 0' - 2" 38 DOORS
B2030200 9 Door-Passage-Single-Flush Door-Passage-Single-Flush 2' - 6" 7' - 0" 0' - 1 3/4" 26 DOORS B2030200 2 Door-Passage-Single-Flush-Dbl_Acting Door-Passage-Single-Flush-Dbl_Acting 3' - 0" 7' - 0" 0' - 1 3/4" 27 DOORS
Grand total: 16
GENERAL NOTES
1. FIELD VERIFY ALL EXISTING OPENINGS BEFORE FABRICATION
2. COORDINATE HARDWARE SETS WITH PROJECT SPECS
3. VERIFY TEMPERED / SAFETY GLAZING WHERE REQUIRED BY CODE
4. CONFIRM MANUFACTURER SIZES AND ROUGH OPENINGS PRIOR TO ORDERING
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
4" HIGH HOUSEKEEPING PAD
1/2" DRAIN VALVE
PIPING SCHEMATIC
WITH HOSE BIBB END
WATER BOILER
NO SCALE
NO
NC
1/2" BYPASS
PT
2"
H W R
1/2"
CW
TO PUMP
2"
OPEN
M
2" PT
CAST BRONZE AUTO
AIR VENT
1/2"
A
LOCK HANDLE
PRESSURE/TEMPERATURE
PLUG. (TYP.)
EXPANSION
TANK
3 WAY VALVE
HWS
AIR SEPARATOR
OTHER CONNECTIONS & CONTROLS.
2.
RELIEF VALVE
ASME RATED PRESSURE
BOILER MANUFACTURER.
1.
NOTES:
TO FLOOR
1" BOILER DRAIN, PIPE
1/2" MANUAL VENT
AQUASTAT
4" HOUSEKEEPING
LOW-WATER CUTOFF
FLOOR
PIPE DISCHARGE TO
M
UNION
PAD
SHUT-OFF VALVE
(TYP.)
THERMOMETER
VENT PIPING
SEE SPECIFICATIONS FOR
COORDINATE CONNECTIONS WITH
WHERE ACCEPTABLE BY MANUFACTURER.
3. USE CONCENTRIC VENT TERMINATION KIT
HWR HWS
CONTROL VALVE
MOTORIZED 3 WAY
DETAIL.
4. SEE MANUFACTURER'S DRAWINGS FOR GAS CONNECTION
3/4" NATURAL GAS LINE
FINAL CONNECTION
1" COLD WATER LINE
BY M.C.
PIPE FOR COUNTER FLOW CONFIGURATION.
WITH MEMORY STOP INDICATOR
AT ALL HIGH POINTS IN PIPING
PROVIDE MANUAL AIR VENTS
NOTE:
SYSTEM.
HWS
DRAIN LINE
1/2" BALL VALVE
HWR
TYPICAL
TYPICAL
PRESSURE GAUGE
MANUAL AIR VENT
TEMPERATURE GAUGE
FLOW
AIR
M
BALANCE/SHUT-OFF VALVE
CONTROL VALVE
UNION
BLOW DOWN
Y-STRAINER W/
BALL VALVE
HWS
HWR SIZES
SEE PLANS
FOR RUN OUT
M M
MANUAL AIR
VENT (TYP.)
INSTALL SOLID 4" HIGH
EXISTING DRYWALL AND
INSULATION SYSTEM TO REMAIN
FIELD VERIFY
FIELD APPLIED DUCT INSULATION
SEALANT, ALL AROUND
INSTALL SOLID C.M.U. AT ALL SIDE OF LOUVER,
WEAVE SOLID C.M.U. INTO EXISTING C.M.U.
NOTE:
AT JAMBS AND SILL
FILL CAVITY W/ GROUT
CONT. SEALANT
INTAKE/EXHAUST LOUVER
W/ BIRD SCREEN
|" SHIM AND
ALL AROUND
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
C.M.U.
X
X
X
X
X
X
X
M
MOTOR OPERATED INTAKE DAMPER.
(24v CONTROL POWER REQUIRED)
COORDINATE WITH ATC VENDOR.
UNION OR FLANGE
REDUCER
SCREWED END
Y-STRAINER W/
(IF REQ'D)
W/GAUGECOCK
CHECK VALVE
PRESSURE GAUGE
P-1
BALL VALVE
VALVE
BALANCING
2"2"
TO PUMP P-1
2"
2"
EXTERIOR WALL LOUVER DETAIL
N.T.S.
INLINE PUMP DETAIL
N.T.S.
HYDRONIC COIL DETAIL (AHU-1)
N.T.S.
HOT WATER GAS BOILER DETAIL
N.T.S.
NOTE: THIS DETAIL IS VERY GENERIC AND MAY NOT
COMPLY WITH THE BASIS OF DESIGN EQUIPMENT
MANUFACTURER'S IOM. USE MANUFACTURER'S
RECOMMENDED INSTALLATION DETAIL IF AVAILABLE OR
EDIT AS REQUIRED.
B-1
DI
AI
DIRTY ALARM
(.75" WC)
TSDPS
ALARM
DI
FS
AI
TT
H
C
STATUS/FAILURE
O A
H
ALARM
DI
HC
CT
M
SUPPLY FAN
DO
START/STOP
FILTER
OUTSIDE
TS
AI
SPACE TEMPERATURE
SENSOR (WITH TOC)
INTEGRAL HOT WATER
HEATING COIL WITH
SUPPLY AIR
TEMPERATURE
FOR BAR AREA AND DINING AREA
AI
SPACE CARBON DIOXIDE
SENSOR (FOR BAR AREA)
CO2
AIR
OUTSIDE
AIR DAMPER
AO
M
RETURN
AIR
ECONOMIZER
LINKAGE
FACE & BYPASS DAMPER
AO
M
AO
HWS
SCHEMATIC - REFER TO CARRIER COMPANY FOR EQUIPMENT CONTROLS
AHU-1 CONTROLS
NOTES:
LOCKING LUGS INTEGRAL W/VANE.
MAXIMUM UNSUPPORTED VANE LENGTH 48"
FRAMES-BOLTED OR RIVETED TO ELBOW.
VANES & FRAMES-SAME GAUGE AS ELBOW.
1.
2.
3.
4.
2"
3"
VANED ELBOW TURNING VANE
LOCKING LUG
4\"
2|"
FRAME
2"
DRAIN PLUG
M
IN
1" PVC 90°
STANDARD
ELBOWS
3/4" RED MALE
ADAPTER (IF REQ'D)
CEILINGMIN.
1" RETURN BEND, PVC
DRAIN PAN
1" MPT GALV NIPPLE
3"
TO DRAIN
AIR FLOW
DOUBLE SIDE
TRANSITIONS
SINGLE SIDE
W2xD2
& BRANCH MAINS
MAINS
BxD1
MAINS, SUBMAINS
AxD1
W1xD1
W2xD2 W2xD2+W3xD3
W3xD3 W2xD2+W3xD3
DUCT
TURNING VANES
DOUBLE-THICKNESS
VANED ELBOWS
B=
A=
RADIUS
AIR
FLOW
NOTE
W
R
SUPPLY
R=W
FLOW
AIR
SUPPLY
BOOT TAP
AIR FLOW
W3xD3
L=W/4, MIN 4"NOTE:
W
FLOW
AIR
DUCT
RETURN OR EXHAUST
AIR
L=W/4, MIN 4"
BOOT TAP
NOTE:
VOLUME DAMPER
FLOW
W
VOLUME DAMPER
DUCT
15°
30°
6" MIN.
45°
45°
6" MIN.
RETURN OR
EXHAUST DUCT
RECTANGULAR
MAIN OR BRANCH DUCT
DUCT MAX. 5'-0"
INSULATED
FLEXIBLE
ROUND NECK
ON DIFFUSER
CEILING
VOLUME DAMPER (INSULATED)
BUTTERFLY
CEILING DIFFUSER
OR SQUARE-
TO-ROUND
ADAPTER
MAX. SIDE
(8 FT. MAX. HANGER SPACING)
NOTES:
TYPE "B", "C", & "D"
1. FOR SEVERAL DUCTS ON ONE HANGER, TYPE "B", "C",
OR "D" MAY BE USED. SIZE OF HANGER WILL BE
SELECTED ON SUM OF DUCT WIDTHS EQUAL TO MAX.
WIDTH OF DUCT SCHEDULE.
1" STRAP
DOVER 96"
UP TO 18"
19" TO 60"
61" TO 96"
DIMENSION
DUCT HANGER
A
B
C
TYPE
1-1/2" x 1-1/2" x 1/8"
1-1/2" x 1-1/2" x 3/16"
1/2" 2" x 2" x 1/4"
ROD
5/16"
3/8"
DIA.
ANGLE
SIZE
4'-0"
MAX
8'-0"
8'-0"
8'-0"
SPACING
(8 FT. MAX. HANGER SPACING. ALSO
PROVIDE 3 HANGERS AT EACH TAKE-OFF
TYPE "A"
1" x 16 GA.
GALV. IRON
STRAP OR
ALUMINUM
SHEET METAL SCREW,
RIVET OR BOLT TO
BOTH SIDES OF DUCT.
SECURE TO STRUCTURE
ABOVE AS RECOMMENDED
BY SMACNA
FOR BRACING ANGLES
NUT & WASHER AT
SEE NOTES
END OF ROD.
HANGER ROD (TYP)
SECURE TO STRUCTURE
ABOVE AS RECOMMENDED
BY SMACNA
FLOOR
ANGLE IRON PERIMETER
PACK VOID WITH FIBROUS
FILL. SEAL WITH CAULK AIRTIGHT
SUPPORT ATTACH TO DUCT
AND FLOOR
45°
MAIN DUCT
45°
EQUAL TO REQ'D
BRANCH DUCT
DIMENSIONS
1/4 BRANCH
DUCT WIDTH,
BUT MIN. 4"
EQUAL TO
REQ'D BRANCH
DUCT DIA.
ADJUSTABLE
ELBOW RINGS
1" MIN. ON
TOP AND
BOTTOM
SEAL ALL
AROUND
SUPPLY AIRFLOW
SEAL ALL
AROUND
1" MIN. ON
TOP AND
BOTTOM
MAIN DUCT
SUPPLY AIRFLOW
SUPPLY MAIN
SET SCREW
SLIP SLEEVE
1/4" DIA PUSH/PULL ROD
T
THROAT VARIES
CLOSED HEM EDGE
12" MIN BUT NOT
LESS THAN 2"T"
OF LIGHTS.
OPENING ABOVE LEVEL
LOCATE BOTTOM OF
SEE PLANS FOR SIZE
AIRFLOW
BEVELED EDGE FRAME.
GRILLE WITH
WALL
MOUNTING ANGLE
SCREW IN BEVELED
EDGE FRAME.
DUCTWORK CONNECTION DETAILS
N.T.S.
DUCTWORK HANGAR DETAILS
N.T.S.
TYPICAL BRANCH TAKE-OFF FITTING DETAILS
N.T.S.
DIFFUSER DUCTWORK CONNECTION DETAIL
N.T.S.
DUCT DIVISION DETAIL
N.T.S.
DUCTWORK THRU FLOOR DETAIL
N.T.S.
TRANSFER GRILLE DETAIL
N.T.S.
CONDENSATE PIPING CONNECTION DETAIL
N.T.S.
DOUBLE THICKNESS TURNING VANES FOR SQ ELBOW
N.T.S.
x 16"14" x x 16"14" x 20"14" x 8"14"x 8"14" x x x 8"12" x 8"12" x 8"12" x 8"12" x 8"12"x 8"12" x 16"20" x 16"20" x 16"20" x x x 14"20" x 14"20" x 12"18" x 12"12" x x 12"20" x 16"14" x 16"12" ø8" ø8" ø8" ø8" ø8" ø8" ø8" ø8" ø8" ø8" ø10" ø10" ø10" ø10" ø10" ø10" ø10" ø10"
200 CFM
200 CFM
200 CFM
200 CFM
200 CFM
200 CFM
200 CFM
200 CFM
200 CFM
200 CFM
300 CFM
300 CFM
300 CFM
300 CFM 1
300 CFM
300 CFM
300 CFM
300 CFM
x 16"14" x 20"20" x
EF-2 EF-3
x
" TRANSFER GRILLES 540 CFS
800 CFM
CFM
CFM
CFM
600 CFM700 CFM
BAR AREA
DINING AREA
KITCHEN
MEN'S LADIES
T-STAT
CD-2
CO2
T-STAT
CD-1
www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
As indicated
8/
/2
:4 5:
A
M
MEP-1.1
FIRST FLOOR PLAN HVAC
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker
DMP
Issue Date Project Number
1/4" = 1'-0"1 1st Floor
NOTE:
DUCTWORK TO BE INSTALLED
IN ATTIC. DUCTWORK SHOWN
ON THIS PLAN FOR CLARITY.
No. Description Date
6" = 1'-0"2 Details 1
6" = 1'-0"3 Details 2
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
MODEL #B-LINE
FIG. 3100 STANDARD
CLEVIS HANGER OR
APPROVED EQUAL PER
SPECIFICATIONS
CROSS
BRACE
ALL THREADED
ROD
PIPE
RING
PIPE
NUT AND WASHER
ADJUST & POSITION
WITHIN SLOT
TYPICAL WALL PENETRATION
DETAIL
TYPICAL GAS METER
DETAIL
DETAIL AT VENT PIPE THRU
ROOF
GAS PIPE CONNECTION
DETAIL
FLOOR CLEANOUT
DETAIL
PIPE HANGER
DETAIL
NOTES:1. AN OPEN VENT TERMINAL FROM A DRAINAGE SYSTEM SHALL
NOT BE LOCATED DIRECTLY BENEATH ANY DOOR, OPERABLE WINDOW,
OR OTHER INTAKE OPENING OF THE BUILDING OR OF AN
ADJACENT BUILDING, AND ANY SUCH VENT TERMINAL SHALL NOT BE
WITHIN 10 FEET HORIZONTALLY OF SUCH AN OPENING UNLESS
IT IS AT LEAST 2 FEET ABOVE THE TOP OF SUCH
OPENING2. FOLLOW ROOF MANUFACTURER'S FLASHING INSTRUCTIONS
WHERE REQUIRED MANUFACTURER'S
WARRANTY
NOTE: P.C. SHALL LOCATE GAS COCK (SHUT-OFF VALVE) WITHIN 48"
OF GAS EQUIPMENT CONNECTION - COORDINATE LOCATION
OFEQUIPMENT WITH ALL OTHER TRADES AND
H.C..
M
IN
IM
U M
V E R
IF
Y w A U
TH
O R
IT
Y
H A V
IN
G
JU
R
IS
D
IC
TI
O N
BY P.C.BY H.C.
PAINT PIPE WITH
BLACK FINISH
VENT PIPE SIZE TO
BE A MIN. OF 3"∅.
(SEE DRAWINGS
FOR EXACT SIZE)
MAKE SEAL WATERTIGHT
BY AN APPROVED
FLASHING (BLACK FINISH)
FLASHING
COLLAR
WOOD
FRAMING
REDUCE IF REQUIRED
(ANY INCREASE IN THE
SIZE OF THE VENT SHALL
BE MADE INSIDE THE
STRUCTURE A MIN. OF 1
FOOT BELOW THE ROOF
REQUIRED SIZE
(SEE DRAWINGS
FOR EXACT SIZE)
6" DIRT
LEG
FROM GAS
SUPPLY
CORRUGATED
STAINLESS STEEL
FLEXIBLE GAS HOSE
TO CONNECT TO
EQUIPMENT
GROUND JOINT
UNION
MANUAL SHUT-OFF VALVE
WITH AN 1/8" N.P.T
PLUGGED TAPPING
ACCESSIBLE FOR TEST
GAUGE CONNECTION
EXTEND GAS VENT(S) TO
OUTSIDE OF BUILDING.
COORDINATE ALL VENT
LOCATION AS REQUIRED
BY CODE WITH ALL OTHER
BUILDING ENVELOPE OPENINGS
GAS PRESSURE REGULATOR IF
NECESSARY, 4.5" TO 10.5" WC
OUTLET, SET OUTLET PRESSURE
PER EQUIPMENT MANUFACTURER'S
RECOMMENDATIONS (MAXITROL
OR APPROVED EQUAL)
GRADE
P.C. TO VERIFY
WITH SITE CONTRACTOR
RESPONSIBILITY OF
WORK ON SITE
GAS METER
PROVIDED TO
OWNER BY THE
LOCAL UTILITY
COMPANY (TYP.)
GAS SHUT-OFF
VALVE (TYP.)
UNION
(TYP.)
GAS PRESSURE REGULATOR
(PROVIDED BY LOCAL
UTILITY COMPANY)
ESCUTCHEON PLATE ON
BOTH SIDES WHERE
PIPING IS EXPOSED
METAL
STUD
INSULATION
(WHERE REQ'D)
CONTINUOUS FLANGE
FULL FORMED
SHEET METAL SLEEVE
(MIN. 22 GA.)
ZERO
CLEARANCE
SHEET METAL ANGLE
RING (MIN. 22 GA.),
SECURE TO SLEEVE
FIBERGLASS ROPE (1000°F)
MIN. OF 3 WRAPS REQUIRED
FRICTION FIT BETWEEN
PIPE AND SLEEVE
ROUND FLANGED
CLEANOUT HOUSING
1/8 BEND SOIL
PIPE
Y BRANCH
SOIL PIPE
N.T.S.
N.T.S.
N.T.S.
N.T.S.
N.T.S.
N.T.S.
2"ø 1"ø2"ø UP
1/
2" ø
1"ø
1"ø
1"ø
3/4"ø
1/2"ø
TYP FOR 4
1 1/2"ø
DN
2" Ø DN3/
4" ø
TY
P
FO
R
3/4"ø DN
1/2"ø
TO ICE MACHINE
1/2"ø 1/2"ø
DN
DN
1/2"ø
1/2"ø
DN
DN
1/2"ø
TYP FOR 4
FD-1
FD-2
FD-3 FD-4 FD-5
3"ø
3"ø UP & DN
S-1
3 BAY SINK GREASE TRAP
S-1
3 BAY SINK
BAR AREA
MEN'S
LADIES
KITCHEN
DINING AREA
WC-1WC-1
WC-1UR-1
LAV-1LAV-1
LAV-1
LAV-1
MOP SINK
MS-1
1/2"ø
1/2"ø www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
As indicated
8/
/2
:4 5:
A
M
MEP-1.2
FIRST FLOOR PLAN
PLUMBING
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker
DMP
Issue Date Project Number
1/4" = 1'-0"1 1st Floor Plumbing
No. Description Date
1/2" = 1'-0"2 Details 3
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
UP
x 36"20" x 16"20" x 16"20" x 16"20" x x 20"36" x 20"36" x
"x x 24"22" x 20"16" x 20"16" x 16"20"x x 24"22"
2" ø
3/ 4" ø 2 1/2"ø
0 CFM
L-1
2" ø
1 1/4"ø
2 1/2"ø
1/ 2" ø
1/
2" ø
2"ø
1/ 2" ø1/ 2" ø
2"ø1 1/4"ø 1 1/2"ø UP
2"ø
2"ø
1/2"ø
2"ø
1/2"ø
UP
UP
1/2"ø
UP
3/4"ø
UP
1/2"ø
1/2"ø
UP
3/4"ø
OUT
IN
3/4"ø
HC-1
1/2"ø
UH-1
CU-1
6"ø
4"ø6"ø 4"ø4" ø
4"ø
4"ø 4"ø
4"ø
4"ø
2" ø
6"ø
3" ø
4" ø
3" ø
BASEMENT
2"ø1 1/
2" ø
WH-1
B-1
P-11 1/2"ø
1/
2" ø
COOLER COOLER
ROOM ROOM ROOM
T-STAT
UH-1
CD-1
CD-2
CD-4
CD-5
CD-3
x x
UP
6"ø OUT
2" ø
W
AT
ER
IN
G
AS
IN
3 WAY VALVE
ELECTRICAL
PANEL
UNDERGROUND
SERVICE
GAS VENT
GAS
VENT
1/ 2" ø
1/ 2" ø 2" ø
1/2" UP
AHU-1
0 CFM
L-2
RAMP 6' WIDE
x 9' LONG
DN www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1/4" = 1'-0"
8/
/2
:4 5:
A
M
MEP-1.3
BASEMENT PLAN HVAC
AND PLUMBING
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker
DMP
Issue Date Project Number
1/4" = 1'-0"1 Ground Elev No. Description Date
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0" ø10"ø10"ø10" x 12"20"x 16"20"x 16"20" ø10" ø8"x 10"18"ø8"ø8" x 36"20" x 24"22" x 16"20"
1 1/2"ø
1/
2" ø
1 1/2"ø x 16"20"
UH-11/2"ø x
B-1
MEP-2.3
200 CFM
200 CFM
200 CFM
300 CFM
300 CFM
300 CFM
300 CFM
3/ 4" ø
1/
4" ø
2"ø x 18"12"
MEP-2.3
MEP-2.3
MEP-2.2
MEP-2.2
L-2
MEP-2.3
Top of rail 611' - 6"
A-4.1 ø8" ø8" x 16"14" x 20"14" ø8" x 16"14" x 16"14"
3"ø 3"ø
6"ø6"ø6"ø4"ø x 16"20" x x 20"16" x 14"20" x 20"36" x 36"20" x 80"24"
4"ø
2"ø
1/ 2" ø 1/
2" ø
1" ø
2"ø2"ø2"ø
2" ø 2"ø
3/4"ø
6" ø
6"ø
4" ø
2" ø
2"ø
1 1/2"ø
1 1/2"ø
1/2"ø
1/2"ø
4" ø
4" ø4" ø
4" ø
EF-2 EF-3
HOOD
C.O.
C.O.
FD-1 FD-2 FD-3 FD-4 FD-5
AHU-1
EF-1
MAU-1
MEP-2.3
200 CFM
200 CFM
200 CFM
CD-3
MEP-2.3
MEP-2.2
MEP-2.2
ELECTRICAL
PANEL
MEP-2.3
A-4.1
A-4.1
A-1.1
RAMP
www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1/4" = 1'-0"
8/
/2
:4 5:
A
M
MEP-2.1
SECTIONS A
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
1/4" = 1'-0"1 Section 1
1/4" = 1'-0"2 Section 2
NOTE:
DUCTWORK TO BE INSTALLED
IN ATTIC. DUCTWORK SHOWN
IN LIVING SPACE FOR CLARITY.
No. Description Date
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
MEP-2.1
MEP-2.1
CU-1
x 16"14" x ø8" x 16"20" x 16"20" x 16"20"
4" ø
3/4"ø
1 1/4"ø
FD-3
MEP-2.2
Top of rail 611' - 6"
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
MEP-2.1
MEP-2.1
FD-4
x x x 16"20" x 16"20"
4" ø
6"ø
2"ø x 16"12"
MEP-2.2
EF-3
6"Ø
Top of rail 611' - 6"
2" ø
A-1.1 ø10" ø8"
200 CFM
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
MEP-2.3
MEP-2.3
MEP-2.3
MEP-2.2
MEP-2.2
x 14"20" x 14"20" x 12"18" x 12"12"
300 CFM
300 CFM1
300 CFM
300 CFM
ø10" x 16"12"x 16"14"x 16"14" x 16"14" ø8" ø8"ø8"ø8"
3/4"ø
1 1/4"ø
1"ø
1 1/2"ø
1/
2" ø
2 1/2"ø2 1/2"ø
2" ø
2 1/2"ø
200 CFM
200 CFM
200 CFM
200 CFM
2"ø
T STAT
CD-1
1 1/4"ø
P-1
3 WAY VALVE
B-1
WH-1
GAS
VENT
Top of rail 611' - 6"
A-4.1 www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1/4" = 1'-0"
8/
/2
:4 5:
A
M
MEP-2.2
SECTIONS B
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
NOTE:
DUCTWORK TO BE INSTALLED
IN ATTIC. DUCTWORK SHOWN
IN LIVING SPACE FOR CLARITY.
1/4" = 1'-0"1 Section 9 1/4" = 1'-0"2 Section 10
1/4" = 1'-0"3 Section 11
No. Description Date
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
MEP-2.1
MEP-2.1
x 10"18" ø8" x 16"14"
200 CFM x 10"18" x 20"14" x 16"14" x 36"20" x 24"22" x 80"24" x x 74"17" x x 60"12"
4"ø4" ø
CD-5
CD-3
AHU-1
1 1/4"ø 3/4"ø
2 1/2"ø CD-4
ECONOMIZER
FD-2
MEP-2.2
x 60"44"
L-1
Top of rail 611' - 6"
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
MEP-2.1
MEP-2.1
3" ø
1" ø
1" ø
2" ø
2"ø
2"ø
3" ø
3"ø
6" ø
6" ø
2 1/2"ø
2 1/2"ø
2"ø x 12"20" ø10" 1
300 CFM
ø10" x 12"18" x
MAU-1
EF-1
HOOD
VE
N
T
MEP-2.2
ELECTRICAL
PANEL
UNDERGROUND
SERVICE
Top of rail 611' - 6"
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
3" ø
2"ø 3"ø
1/
2" ø
1/
2" ø
3"ø
4"ø
3"ø
6" ø
1 1/2"ø
3/ 4" ø
1 1 /2
"ø
1/
2" ø
2"ø
2" ø
3" ø1 1/2"ø 3/4"ø2" ø
VE
N
T
VENT VENT
VE
N
T
VE
N
T
VE
N
T
Top of rail 611' - 6"
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Ground Elev 600' - 0"
3 BAY BAR SINK
2"ø
1/
2" ø
2" ø
4"ø
1/ 2" ø
1/2"ø
2" ø
2" ø
2" ø
2" ø
1/2"ø
VE
N
T
FD-1
Top of rail 611' - 6" x 36"20"
L-2
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Ground Elev 600' - 0"
MEP-2.1
W H
-1
B-1
P-1
3 WAY VALVE
SEE DETAIL FOR
BOILER PIPING
3/4"ø
1 1/2"ø
1 1/2"ø
2"ø
MEP-2.2
Top of rail 611' - 6"
S-1.2
3/4"ø 3/4"ø 1 1/2"ø
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Top of Roof 628' - 8 1/2"
Ground Elev 600' - 0"
12" X 18" TRANSFER GRILLE
GREASE TRAP
3 BAY KITCHEN SINK
6"ø
3"ø
3" ø
3"ø
2"ø 2"ø
1/2"ø
1/ 2" ø
3/4"ø
VENT
Top of rail
611' - 6"
Basement 597' - 0"
1st Floor 608' - 0"
B.O. Footing 593' - 0"
Roof 618' - 4 1/2"
Ground Elev 600' - 0"
MEP-2.1
MEP-2.3
HOOD
S-1
MAU-1
EF-1
6" ø
2"ø
3"ø
1/
2" ø
2"ø
3/4"ø
Top of rail 611' - 6"
RAMP
x 16"20" www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1/4" = 1'-0"
8/
/2
:4 5:
A
M
MEP-2.3
SECTIONS C
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
1/4" = 1'-0"1 Section 3 1/4" = 1'-0"2 Section 4
NOTE:
DUCTWORK TO BE INSTALLED
IN ATTIC. DUCTWORK SHOWN
IN LIVING SPACE FOR CLARITY.
1/4" = 1'-0"3 Section 5 1/4" = 1'-0"4 Section 6
1/4" = 1'-0"5 Section 7 1/4" = 1'-0"6 Section 8
1/4" = 1'-0"7 Section 12
No. Description Date
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
MINIMUM OUTDOOR AIR SCHEDULE
DINING AREA AHU-1 920 0.18 70 68 7.5 680 2400
BAR AREA AHU-2 0.18 100 40 7.5 585 2000
KITCHEN RTU-1 480 0.12 20 2 7.5 75 2700
OA REQ'D
PER AREA
(CFM)
AREA (SQ.
FT.)SERVED BYROOM NAME
OCCUPANCY
(PEOPLE/
1000 SQ.FT.)
OCCUPANCY
(NUMBER OF
PEOPLE)
OA REQ'D
PER PRSN
(CFM)
UNCORRECTED
OA (CFM)
SUPPLY
AIR (CFM)
ACTUAL
OA
SUPPLIED
(CFM)
REMARKS
2160 MAU - 2160 CFM
540 CFM TRANSFER
CO2 SENSOR
MINIMUM OUTDOOR AIR SCHEDULE
DINING AREA AHU-1 920 0.18 70 68 7.5 680 2400
BAR AREA AHU-2 0.18 100 40 7.5 585 2000
KITCHEN RTU-1 480 0.12 20 2 7.5 75 2700
OA REQ'D
PER AREA
(CFM)
AREA (SQ.
FT.)SERVED BYROOM NAME
OCCUPANCY
(PEOPLE/
1000 SQ.FT.)
OCCUPANCY
(NUMBER OF
PEOPLE)
OA REQ'D
PER PRSN
(CFM)
UNCORRECTED
OA (CFM)
SUPPLY
AIR (CFM)
ACTUAL
OA
SUPPLIED
(CFM)
REMARKS
2160 MAU - 2160 CFM
540 CFM TRANSFER
CO2 SENSOR
AHU-1
CARRIER 40RLA-14
12.5 TONS
5747 CFM MAX. AIRFLOW
4400 CFM DESIGN AIRFLOW
TOTAL EXTERNAL STATIC: 0.91 IN WG
154.5 MBH SENSIBLE
ENT AIR DB: 85.0 F
ENT AIR WB: 67.0 F
ENT ENTHALPY: 31.41 BTU/LB
LVG AIR DB: 60.1 F
LVG AIR WB: 58.6 F
HOT WATER COIL:
MAX. HTG CAPACITY: 362.8 MBH
DESIGN HEATING: 150 MBH
EAT: 60.0 F
LAT: 118.4 F
FLOW RATE: 36.3 GPM MAX.
18 GPM DESIGN
EWT: 180 F
LWT: 160 F
CU-1
CARRIER 38AXZ014
12.5 TONS
DUAL STAGE
ENT AIR DB: 95 F
BOILER
WEIL-MCLAIN CGa-7
CAST IRON
INPUT: 200 MBH
DOE HEATING CAPACITY: 170 MBH
CIRCULATING PUMP TO HW COIL
TACO 2400-30 VARIABLE SPEED
18 GPM @ 10' FT HEAD
MAU-1
GREENHECK DGX-P112-H12-MF
NATURAL GAS
SUPPLY AIR 2160 CFM @ 0.25 ESP
TOTAL SP: 1.02 IN WG
INPUT: 215.5 MBH
OUTPUT: 198.3 MBH
EF-1
GREENHECK CUBE-160-7
2700 CFM @ 0.84 ESP
BELT DRIVEN
PROVIDE GREENHECK GPIP
PITCHED ROOF CURB
www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
As indicated
8/
/2
:4 5:
A
M
MEP-3.1
SCHEDULES
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
Air Terminal Schedule
Mark Design
CFM
Assembly Name
Duct Neck Size
Manufactur er Model Size NC LEVEL
Selected Model
Selected Module
Size Throw Ft
1 300 CFM Titus HVAC TMS 24x24 1 300 CFM Titus HVAC TMS 24x24 1 300 CFM Titus HVAC TMS 24x24 1 300 CFM Titus HVAC TMS 24x24 1 300 CFM Titus HVAC TMS 24x24 1 300 CFM Titus HVAC TMS 24x24 1 300 CFM Titus HVAC TMS 24x24 2 200 CFM Titus HVAC TMS 24x24 2 200 CFM Titus HVAC TMS 24x24 2 200 CFM Titus HVAC TMS 24x24 2 200 CFM Titus HVAC TMS 24x24 2 200 CFM Titus HVAC TMS 24x24 2 200 CFM Titus HVAC TMS 24x24 2 200 CFM Titus HVAC TMS 24x24 2 200 CFM Titus HVAC TMS 24x24 2 200 CFM Titus HVAC TMS 24x24 2 200 CFM Titus HVAC TMS 24x24
L-1 Greenheck Fan Corp.
3 Titus HVAC 0 3 Titus HVAC 0 4 Titus HVAC 0 5 Titus HVAC 0 5 Titus HVAC 0
Titus HVAC 0 1 300 CFM Titus HVAC TMS 24x24
Titus HVAC 0 Titus HVAC 0
L-2 Greenheck Fan Corp.
Mechanical Equipment Quantities
Mark Unit Description Type Description Manufacturer Model Comments
AHU-1 Split_Unit-Carrier-Gemini_40RLA_H W_6-30_Ton
12.5 Ton Packaged Air-Handling Units Carrier 40RLA_14
CU-1 Split_Unit-Carrier-Gemini_38AXZ_1_ Circuit
12.5 Ton
Unit
Commercial Split Systems Air Conditioning Condensing Units
Carrier 38AXZ_14
P-1 Pump-Circulator-Taco-2400 2400-20S-3 P - 1.5x1.5_11 5V
High Capacity Circulator Taco 2400-20S-3 P
WH-1 Water_Heater_Tankless-Rinnai-CX1 60i-Commercial-Interior
CX160iN Commercial Int 160k Btu 9.0gpm max w/Valve, Natural Gas
Rinnai America Corporation
CX160iN
EF-1 RoofExhaust_LOD350_v00 Default Model - Use Type Catalog (.txt) (see instructions
@Description Greenheck Fan Corp.
CUBE-160-
H-1 Commercial-Kitchen-Vent Greenheck X-Tractor Hood
Extra-Heavy-Duty Canopy Commercial Kitchen Vent (CKV)
Generic Generic
UH-1 Unit_Heater-Gas-Modine-HD Unit-Propeller
HD 30AS01 gas fired hydronic unit heater Modine HD 30AS01
MAU-1 AirHandler_v03 K-MAU DGX-H12 Greenheck DGX-P112-
H12-MF
B-1 Boiler-Weil-McLain-LGB4_12 Not a Type
- Load Type Catalog
LGB Commercial Gas Boiler Weil-McLain CGa-7
EF-2, EF-3 Exhaust_Fan-LED_Light-Delta-Breez Smart-SMT150-200
SMT150LE
D
Delta Breez low noise BreezSmart Ventilation Fan with LED Light & Night-light.
Delta Electronics (Americas) Ltd.
SMT150LE
D
Grand total
Mechanical and Kitchen Equipment Electrical Data
Type Mark Mfg Model Voltage Phase FLA RLA MCA MOCP HP Notes
Indoor AHU
12.5 Tons
AHU-1 Carrier 40RLAA14T3A5-U A0A0
230 3 16.7 21 35 2.9
Outdoor Unit
12.5 Tons
CU-1 Carrier 38AXZM14A0A5-0 A0A0
230 3 2 21.1 51 60
Boiler B-1 Weil-McLai n
CGa-7 115 1 15
Kitchen MAU MAU-1 Greenheck DGX-P112-H12-M F
230 1 9.3 15 3/4
Kitchen Exhaust Fan
EF-1 Greenheck CUBE-160-7 115 1 13.8 35 3/4
Circulating Pump
P-1 Taco 2400-30 115 1 0.167
Tankless Water Heater
WH-1 Rinnai CX160i 115 1 4 10
Kitchen Mixer MIX-1 Eurodib M40A-220ETL 230 3 5 2 Hardwire
Plumbing Fixture Quantities
Mark Assembly
Description Count Unit Description Type Description Manufacturer Model Comments
LAV-1 Sinks 4 Sink-Wall_Mount-Lavatory-KOHLER -Morningside-K-12634
0-White 20 Inch x 27 Inch mounted/concealed arm carrier wheelchair bathroom sink with 11-1/2 Inch centers faucet holes
KOHLER Co. K-12634-0
Domestic Water Distribution
1 Flushometer-Urinal_Touchless-KOH
LER-MACH_WAVE-K-40UH00D20
0.125 GPF
Flushometer, CP-Polished Chrome
HEC 0.125 GPF URINAL FLASH
VALVE
KOHLER Co. K-40UH00
D20-CP
<varies> 2 Sink - Mop 28"x28" Domestic Water Distribution
3 Flushometer-Toilet_Manual-KOHLE R-Primme-K-76321
CP-Polished Chrome
Manual flushometer valve for 1.28 gpf toilet
KOHLER Co. K-76321-C P
FD-1 -FD-5 Floor Drains
5 Floor_Drain-Integral_Trap-Round_S trainer-WATTS-FD-170-P_Series
FD-170-P-A5-1 Floor Drain with No Hub (MJ) Side Outlet with 3 Inlet Connection
WATTS FD-170-P
<varies> Interceptors 5 Interceptor_Grease-Zurn-GT2702 GT2702-25-3
NPT
Polyethylene Grease Interceptor Zurn Water, LLC
GT2702 GT2702-25
3 Inch Female
NPT
UR-1 Urinals 1 Urinal-Wall_Mount-KOHLER-Dexter -K-5016
Not A Type-See Type Catalog
Siphon-jet wall-mount 0.5 or 1.0 gpf urinal with rear spud
KOHLER Co. K-5016-ER-
Sinks 2 Sink_Triple _Compartment_Floor_Mount-Elkay-
RNSF83544_LR4
RNSF8354LR4
(Rigidbilt® Stainless Steel Floor Mount Triple Compartment Scullery Sink w/ Drainboard)
Rigidbilt® Stainless Steel 97 1/2 inch x 29 3/4 inch x 12 3/4 inch Floor Mount Triple Compartment Scullery Sink w/ Drainboard
Elkay (by Zurn Elkay Water Solutions)
RNSF8354
LR4
S-1 Sinks 2 Sink_Triple _Compartment_Floor_Mount-Elkay-
RNSF83544_LR4
RNSF83544
(Rigidbilt® Stainless Steel Floor Mount Triple Compartment Scullery Sink)
Elkay Rigidbilt Stainless Steel 67 1/4 inch x 29 3/4 inch x 12 3/4 inch Floor Mount Triple Compartment Scullery Sink
Elkay (by Zurn Elkay Water Solutions)
RNSF8354
WC-1 Water Closets
3 Toilet-Floor_Mount-KOHLER-Highcli ff_Ultra-K-96058
See Type Catalog
0 KOHLER Co. HighCliff
Grand total
3/32" = 1'-0"1 OA Schedule
Specialty Equipment Quantities
Assembly Code
Coun t Unit Description Type Description
Manufactur er Model URL Comments
3 Toilet-Partition_Hadrian-Inc_Stainless-Steel-RV23 Standard - Floor Mounted
Stainless steel toilet partitions feature industry-best fire resistance, high recycled content and excellent corrosion resistance. Less expensive than composite and phenolic type options, stainless steel achieves an upscale look and outstanding performance at a cost effective price point.
Hadrian Inc Stainless Steel Toilet Partitions http://www.hadrian-inc.com/
Grand total
No. Description Date
1/16" = 1'-0"2 Mechanical Equipment
1/16" = 1'-0"3 Boiler
1/8" = 1'-0"4 MAU 1 EF-1
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
X
X
X
X
LC
PC X
GENERAL NOTES
1. ELECTRICAL CONTRACTOR (EC) IS REQUIRED TO SURVEY THE SITE PRIOR TO BIDDING.
2. ALL EQUIPMENT SHALL BE PURCHASED NEW. .
3. EC SHALL REFER TO PANEL SCHEDULES FOR CABLE SIZES EXCEPT FOR THOSE OTHERWISE SHOWN ON THE ELECTRICAL PLANS.
4. ALL WORK SHALL BE DONE IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE (NEC) 2023 AS WELL AS ALL LOCAL CODES.
5. ALL WIRING SHALL HAVE COPPER CONDUCTORS AND THHN, THWN, OR XHHW INSULATION UNLESS OTHERWISE SHOWN. CABLES INSTALLED IN
WET AREAS OR OUTSIDE SHALL BE WATER RESISTANT.
6. CONTRACTOR TO OBTAIN AND PAY FOR ALL LICENSES, PERMITS, AND INSPECTION FEES.
7. ALL WIRING SHALL BE ENCLOSED IN PVC CONDUIT (FOR UNDERGROUND INSTALLATIONS), RIGID METALLIC CONDUIT (FOR INDOOR INSTALLATIONS, WHERE REQUIRED), NON-METALLIC SHEATHS OR METAL CLADDING IN ACCORDANCE WITH NEC 2023.
8. ALL WORK TO BE PERFORMED BY WORKERS SKILLED IN THEIR TRADE.
9. ALL EQUIPMENT SHALL BE WIRED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
10. CONTRACTOR SHALL KEEP THE PREMISES FREE OF WASTE WHICH IS CAUSED BY HIS EMPLOYEES OR WORK. CONTRACTOR SHALL LEAVE THE
AREA IN WHICH HE IS WORKING SAFE AT ALL TIMES.
11. ALL SEALS SHALL BE MADE, ALL EQUIPMENT SHALL BE CLEAN, AND ALL EQUIPMENT TESTED FOR FULL FUNCTIONALITY PRIOR TO TURNING
EQUIPMENT OVER TO OWNER.
12. UPON COMPLETION OF WORK, CONTRACTOR TO NOTIFY ENGINEER FOR INSPECTION.
13. DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY SHOW THE EXACT LOCATION OF EQUIPMENT. ELECTRICAL CONTRACTOR TO COORDINATE THE EXACT LOCATION OF EQUIPMENT WITH GENERAL CONTRACTOR AND/OR THE BUILDING OWNER.
15. COORDINATION WITH THE UTILITY IS THE RESPONSIBILITY OF THE EC. ALL UTILITY REQUIREMENTS SHALL BE THE RESPONSIBILITY OF THE EC.
16. UNLESS OTHERWISE SHOWN, ALL RECEPTACLES SHALL BE MOUNTED 18" AFF AND ALL LIGHT SWITCHES SHALL BE MOUNTED 42" AFF.
17. ALL LIGHTING FIXTURES SHALL INCLUDE ALL HARDWARE NECESSARY TO INSTALL THE FIXTURES.
18. THE EC SHALL SUBMIT CATALOG CUTS OF ALL ELECTRICAL EQUIPMENT TO THE ENGINEER FOR APPROVAL PRIOR TO INSTALLATION.
19. THE EC SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY POWER FOR THE INSTALLATION.
PNL
EF
J
HTR
A
A1
B
C
X
DUPLEX 120V, 20A RECEPTACLE, CKT X
X GFI DUPLEX 120V, 20A RECEPTACLE, CKT X
GFI
240/120V, 100A, 24 CIRCUIT PANELBOARD
SX 2-WAY LIGHT SWITCH, 120V, 20A CKT X
SX Y-WAY LIGHT SWITCH, 120V, 20A CKT XY
BATHROOM EXHAUST FAN, 120V
UNSWITCHED CEILING LIGHT, 100W, 120V, CKT X
SWITCHED CEILING LIGHT, 100W, 120V
EXTERIOR LIGHT, 120V, WITHOUT PHOTOCELL
EXTERIOR LIGHT, 120V, WITH PHOTOCELL, CKT X
JUNCTION BOX, CKT X
ELECTRIC BASEBOARD HEATER WITH CONTROLS, 1500W, CKT X
SYMBOLS
EMERGENCY LIGHTING WITH BATTERY BACKUP, CKT X
EXIT SIGN, CKT X
X
PC
X
X
X
X
2'X4' LED FLUSH MOUNTED LIGHT FIXTURE, 100W MAX, 120V
2'X2' LED FLUSH MOUNTED LIGHT FIXTURE, 100W MAX, 120V
4" RECESSED LIGHT FIXTURE, 120V
WALL MOUNTED EXTERIOR LIGHT FIXTURE WITH PHOTOCELL,
MOUNTED 8' ABOVE GRADE, 120V
POLE MOUNTED LIGHT FIXTURE: RUGGED GRADE 100W NEXTGEN
IV SERIESWITH RUGGED GRADE TORIN SERIES POLE, MOUNTED
14' (4.25M) ABOVE GRADE.
LIGHTING CONTACTOR WITH MANUAL OVERRIDE, 120V
PHOTOCELL, 120V
X
PC 43LC
NOTES:
1. PARKING LOT LIGHTS SHALL BE WIRED
TO LIGHTING CONTACTOR. CABLES
SHALL BE DIRECT BURIAL, UF-TYPE,
2/C#10,#10G.
2. LIGHTING CONTACOTR SHALL BE
CONTAINED IN A NEMA 3R
ENCLOSURE.
700 CFM
DINING AREA
KITCHEN
MEN'S LADIES
90' - 4 1/4"
/1 6"
63' - 0 7/8"
3/
/4
5' - 1"
BAR AREA
WP WP
www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
As indicated
8/
/2
:4 5:
A
M
MEP-4.1
ELECTRICAL OUTLET PLAN
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
No. Description Date
1/4" = 1'-0"1 ELECTRIC OUTLETS
ELECTRICAL NOTES – RECEPTACLE LAYOUT
GENERAL / OPEN AREAS: PROVIDE RECEPTACLES AT MAXIMUM 20'-0" O.C. ALONG WALLS.
BAR AND KITCHEN AREAS: PROVIDE RECEPTACLES NOT LESS THAN 24" APART. ALL KITCHEN
RECEPTACLES TO BE GFCI PROTECTED.
OFFICE: PROVIDE RECEPTACLES AT APPROXIMATELY 12'-0" O.C. ALONG WALLS. FIRST
RECEPTACLE TO BE APPROXIMATELY 6'-0" FROM DOOR, IF OFFICE EXISTS.
EXTERIOR: PROVIDE AT LEAST (1) GFCI RECEPTACLE AT FRONT OF BUILDING AND (1) GFCI
RECEPTACLE AT REAR OF BUILDING.
ALL RECEPTACLES SHALL BE MOUNTED AT 18" A.F.F. U.N.O., UNLESS OTHERWISE REQUIRED
BY CODE, EQUIPMENT, OR OWNER REQUIREMENTS.
COORDINATE RECEPTACLE LOCATIONS WITH CABINETRY, COUNTERTOPS, APPLIANCES,
FURNITURE, DOORS, AND OTHER EQUIPMENT.
VERIFY ALL FINAL ELECTRICAL REQUIREMENTS AND DEVICE LOCATIONS WITH APPLICABLE
CODES AND ELECTRICAL CONTRACTOR PRIOR TO INSTALLATION.
1" = 200'-0"2 ELECT SYMBOLS
ELECTRICAL LEGEND
DUPLEX RECEPTACLE
WEATHERPROOF GFCI RECEPTACLE
CAT-6 DATA OUTLET
CONCELED CAT-6 CABLE
GFI
1" = 400'-0"3 SITE LIGHTING
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
44 47
A A A A A
A A A A
A A A A A A
A A A A A A A A A A A
A A
A
A
A A A A AA
A A A
B
A A A1 A1 A1 A1
A1 A1 A1 A1 A1
A1 A1 A1
A1
A1A1
C C
C
C C
C
EFEF
44 44 44 44
444444
44 44
45c
45b
45b 45b
45b
45b
45c
50a
50a 50a
50a 50a
50a 50a
50a50a
50a
4747474747
47 47 47 47 47
4747474747
50b
50b
50a
50a
45b
45c
45c45a
45a45a
45a 45c
45b
45b
3 3
44 45b
45c
45 45
44 50
45c
45a
45a
SHUFFLE BOARD
GA
M E
AR
EA
51 BAR SEATING AREA
GAME AREA
BAINE
FREEZER
PIZZA
OVEN
FRY
COOLER
MARIE
TRASH
STORAGE
68 SEATING AREA
BAND/DANCE AREA
POOL TABLE
ST
OR
AG
E MIXER
S.S. TABLE S.S. TABLE
SPEED WELL
3-BAY SINK
W/ICE
SPEED WELL
W/ICE
REFRIGERATOR
ICE
TAPS/GLASSWARETAPS/GLASSWARE
TA
PS
/G
LA
SS
W
AR
E
C
OO
LE
R
C
OO
LE
R
SP
EE
D W
EL
L
W /I C E
RE
FR
IG
ER
AT
OR
REFRIGERATOR
B
EL
OW
S
HE
LV
IN
G
B
EL
OW
S
HE
LV
IN
G
C
OO
LE
R
COOLER
NOTES:1. EQUIPMENT LOCATION TO BE
DETERMINED.
2 3 3
4 4
5 5
6 6 6 6
6 7 7 7
788888
9 9
11 12 13
141516
26 27
DS
J
34/36/38 29/31/33
DS 30 J
37 39
J J
M
[1] [1]
[1]
[1]
SHUFFLE BOARD
GA
M E
AR
EA
32 BAR SEATING AREA
GAME AREA
BAINE
FREEZER
PIZZA
OVEN
FRY
COOLER
MARIE
TRASH
STORAGE
68 SEATING AREA
BAND/DANCE AREA
POOL TABLE
ST
OR
AG
E MIXER
S.S. TABLE S.S. TABLE
SPEED WELL
3-BAY SINK
W/ICE
SPEED WELL
W/ICE
REFRIGERATOR
ICE
TAPS/GLASSWARETAPS/GLASSWARE
TA
PS
/G
LA
SS
W
AR
E
C
OO
LE
R
C
OO
LE
R
SP
EE
D W
EL
L
W /I C E
RE
FR
IG
ER
AT
OR
REFRIGERATOR
B
EL
OW
S
HE
LV
IN
G
B
EL
OW
S
HE
LV
IN
G
C
OO
LE
R
COOLER
www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1" = 50'-0"
8/
/2
:4 5:
A
M
MEP-4.2
FIRST FLOOR LIGHTING
AND POWER
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
1" = 50'-0"1 1ST FLOOR LIGHTING
1" = 50'-0"2 1ST FLOOR POWER
No. Description Date
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
A A A A1 A1
A1A1
C
48a
48a
48a
48a
46a
48a
48a
48a
48a
48a
48a
48a
48a
48a
46a
49 49 46a
46a
46a
46a
46a
46a
46a
46a
46a
46a 46a
46a
49 49
46a4949 4949
48c48b
48a 46a
27b
48c48b
46a
46a
A A A A
A A A A A A
A A A A A A A A A A
A A A A A A
A A A
A A
A1A1A1 A1A1
UP
18 18
18 19 19 19 19
28/30/32
DS J
J
J
J
PANEL
[1]
[1]
[1]
[1]
[1]
DS
J
212121
21212121
GFIGFI
[1]
NOTES:
1. EQUIPMENT LOCATION TO BE
DETERMINED.
UP
UNDERGROUND
SERVICE
ELECTRICAL
PANEL
ELECTRICAL
PANEL
UNDERGROUND
SERVICE
www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1" = 40'-0"
8/
/2
:4 5:
A
M
MEP-4.3
BASEMENT LIGHTING AND
POWER
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
1" = 40'-0"1 BSMT LIGHTING
1" = 40'-0"2 BSMT POWER
No. Description Date
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1/16" = 1'-0"
9/
/2
:5 5:
A
M
MEP-4.4
ELECTRICAL SCHEDULES
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
No. Description Date
1/16" = 1'-0"1 ELEC SCHED
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
L
MEP-4.4 ADDENDUM 9/17/2026
UP
WH-1
B-1
AHU-1
CU-1
P-1
LFT-1
43 SF
Room
44 SF
Room
7' - 0"
7'
0"
S-1.2
S-1.2
S-1.2
S-1.2
Reinforced Concrete Wall See
0' 2' 4' 8' 16'
139 SF
Room
139 SF
Room
139 SF
Room
A-3.1
BASEMENT
www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
1/4" = 1'-0"
8/
/2
:4 5:
A
M
S-1.1
Foundation Plan
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
No. Description Date
1/4" = 1'-0"1 Foundation
Reinforced Concrete Wall See Detail 1 S-1.3
Reinforced Concrete Footing See S-1.2
Reinforced Concrete Slab See Detail 1&2 S-1.3
FOUNDATION KEYNOTES
REINFORCED CONCRETE WALL
SEE DETAIL 1 S-1.3
REINFORCED CONCRETE SLAB
SEE DETAIL 1&2 S-1.3
REINFORCED CONCRETE FOOTING
SEE SHEET S-1.2
NOTE:
FOUNDATION WALL, FOOTINGS
AND SLAB SHOWN AS REINFORCED
CONCRETE - SEE DETAILS AND SECTIONS
NOTE:
ALL CONCRETE SHALL HAVE A MINIMUM 28-DAY
COMPRESSIVE STRENGTH OF 3,000 PSI, UNLESS
NOTED OTHERWISE.
ALL CONCRETE STRUCTURAL ELEMENTS SHALL BE
DESIGNED FOR A MINIMUM FACTOR OF SAFETY OF
2.0 AGAINST FAILURE UNDER THE APPLICABLE DESIGN
LOADS. FINAL CONCRETE STRENGTH, MEMBER SIZES,
AND REINFORCEMENT SHALL BE VERIFIED BY THE
STRUCTURAL ENGINEER.
EXAMPLE SHEET ONLY - FINAL STRUCTURAL DESIGN
AND REINFORCEMENT BY ENGINEER
Foundation Schedule
Mark Description Family and Type Count Comments S1 6'' REINFORCED SLAB Foundation Slab: 6" Foundation Slab 1 Foundation
<varies> 24'' x 12'' REINFORCED FOOTING Wall Foundation: Bearing Footing - 24" x 12" 9 Foundation
Mark Description Family and Type Count Comments <varies> REINFORCED CONCRETE WALL Basic Wall: Foundation - 8" Concrete 10 Foundation
MARK DESCRIPTION
MEMBER MARK LEGEND
S1
F1
W1
REINFORCED CONCRETE SLAB
REINFORCED CONCRETE FOOTING
REINFORCED CONCRETE WALL
North
PROFESSIONAL
L
Emanuel T Posluszny, P.E.
ENGINEER
No. PE074947
E
N
S
N
Y
P
N
I
A
V
A
E
REGISTERED
M
M
O
C
N
O
W
T
H
O
F
A
0'
6"
1'
0"
TOP OF FOOTING
1'
0"
TOP FOOTING
BOTTOM OF FOOTING
MIN. 42" BELOW FINISHED GRADE
0'
6"
0' - 5 1/16"
/8
/8
1'
0"
TOP OF WALL
FINISHED FLOOR
TOP OF SLAB
B/O FOOTING
12'' Concrete Wall
36'' x 12'' Concrete Footing
6'' Foundation Slab
3'
0"
2' - 0"
2x12 Lumber
W 12x58 Steel Beam
2'
6"
4'
0"S-1.2
S-1.2
Wood Flooring2x10 Lumber
W 12x58 Steel Beam
Provide Min. 7.5" w x 8" lg x 5/8" thk bearing plate (Typ both ends) www.poz-e.com
Scale
Date
Drawn By
Checked By
Project Number
POZ Engineering & Environmental Consulting, P.C.
P.O. Box 663 Pittston, PA 18640 570-654-0113
As indicated
9/
/2
:5 6:
A
M
S-1.2
Foundation Detail
Ashley American Legion Post
121 N. Main St. Ashley, PA
Checker Author
Issue Date Project Number
No. Description Date
1" = 1'-0"1 s-3 - Callout 1 1" = 1'-0"2 s-4 - Callout 1
(3) 3/4'' #6 Diameter Rebar Evenly Spaced @ MID-Depth of Footing
Reinforced Concrete Wall W/ Vertical & Horizontal Rebar
6'' Reinforced Concrete Slab
NOTE:
ALL REBAR SPACING AND
CONCRETE LENGTHS ARE PER
STRUCTURAL ENGINEER
3/8" = 1'-0"3 S 1.1 3/8" = 1'-0"4 S-2
3/8" = 1'-0"5 s-3 3/8" = 1'-0"6 s-4
TYPICAL EXTERIOR WALL ASSEMBLY
EXTERIOR FINISH
WEATHER-RESISTIVE BARRIER
15/32" OR 5/8" STRUCTURAL EXTERIOR-GRADE OSB SHEATHING
2x6 WOOD STUDS @ 16" O.C. (IF CONFIRMED)
R-20 INSULATION
1/2" GYPSUM WALLBOARD
NOTE:
VERIFY ALL DIMENSIONS, ELEVATIONS, MATERIALS AND
REINFORCEMENT WITH STRUCTURAL DETAILS
STRUCTURAL I EXTERIOR-GRADE OSB SHEATHING FASTENED
WITH 8d NAILS @ 6" O.C. AT PANEL EDGES AND 12" O.C. IN THE FIELD. PROVIDE 8d NAILS @ 4" O.C. ALONG PANEL
EDGES AT BUILDING CORNERS.
8' - 11 1/2"
W-WIDE FLANGE W12X58
91'
NOTE:
DRAWINGS ARE NOT TO SCALE.
ALL DIMENSIONS ARE BASED
ON FIELD MEASUREMENTS AND
SHALL BE VERIFIED IN THE FIELD
PRIOR TO CONSTRUCTION.
5” SCHEDULE 80 STEEL POST
5''
NOTE:
ALL CONCRETE SHALL HAVE A MINIMUM 28-DAY
COMPRESSIVE STRENGTH OF 3,000 PSI, UNLESS
NOTED OTHERWISE.
ALL…
This is the start of the file's text. The full file is on GovTribe.