5_AMI WMRP Jan 2025 RFP BUDGET.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
AMI WATER METER REPLACEMENT 25-006
Solicitation number
PE-77111-NONST-2025-000000022
Issued by
Jasper County, Georgia

About this file

This is a bid form and budget document for the City of Commerce, Georgia Water Meter Replacement Project, detailing labor costs for installing SmartPoints and new AMI meters. The project encompasses the installation of 1,500 3/4" water meters, 24 1" meters, and the reprogramming of 400 existing meters to 1-gallon measurements with 520M installation. Additional work includes processing 20 return skip data instances, drilling holes in 100 meter lids (50 cast iron and 50 plastic), replacing 75 residential water meter boxes and lids, conducting 1,500 lead and copper survey inventories, and installing 1,500 backflow devices.

The total project budget is $239,430.00, with individual line item costs ranging from $15.00 per water meter lid replacement to $65.00 per 3/4" water meter replacement and installation. The most significant cost items are the 3/4" water meter replacements ($97,500.00) and backflow device installations ($97,500.00), which together comprise approximately 81% of the total budget. The document includes spaces for contractor company name and contact person information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water

City of Commerce, Georgia
Water Meter Replacement Project
BID FORM
City of Commerce Water Meter Replacement
#Labor for installing SmartPoints and new AMI MetersQtyPrice Ea.Total
13/4" Water Meter Replacement and 520M Installation1500$ 65.00$ 97,500.00
21" Meter Replacement and 520M Installation24$ 70.00$ 1,680.00
33/4" & 1" Reprogram exist. Meter to 1 gallon and 520M installation400$ 40.00$ 16,000.00
4Return Skip Data20$ 30.00$ 600.00
5Drill 1.75" hole in existing cast iron lid50$ 25.00$ 1,250.00
6Drill 1.75" hole in existing plastic lid50$ 18.00$ 900.00
7Replace Water Meter Box Residential75$ 65.00$ 4,875.00
8Replace Water Meter Lid75$ 15.00$ 1,125.00
9Lead and Copper Survey Inventory1500$ 12.00$ 18,000.00
10Install Back Flow device1500$ 65.00$ 97,500.00

TOTAL: $ 239,430.00

Price in Words:

Contractor Company Name:

Contractor Contact Person:

File details come from the government source that posted it. Updated .