25_006 AMI WMRP City of Commerce GA RFP_v2.pdf

PDF 1006 KB Posted

Attached to
AMI WATER METER REPLACEMENT 25-006
Solicitation number
PE-77111-NONST-2025-000000022
Issued by
Jasper County, Georgia

About this file

This is a Request for Proposal (RFP) issued by the City of Commerce, Georgia for an AMI Water Meter Replacement Project. The project involves replacing approximately 1,500 3/4-inch and 24 1-inch water meters with electronic registers and installing Sensus AMI transmitters for integration with the existing Sensus AMI Network. Individual sealed proposals are due by February 24, 2025 at 2:00 p.m. local time. The contract duration is 90 days upon issuance of Notice to Proceed, with a one-year initial term renewable for four additional one-year periods, for a total potential term of five years. The scope includes installation and activation of AMI transmitters, reprogramming meters to 1 gallon registration, and installation/replacement of meter boxes, lids, washers, backflow devices and other appurtenances.

The proposal evaluation criteria includes Overall Experience (25 points), Approach to Project (25 points), Pricing (25 points), Key Personnel (15 points), and Responsiveness to RFP (10 points). The City will furnish all water meters, boxes, lids, backflows, and transmitters, while the contractor is responsible for providing labor, tools, equipment and miscellaneous plastic pipe fittings. Bidders must include a current Utility Contractors License issued by the State of Georgia. The contractor must maintain $1,000,000 general liability insurance coverage and workers compensation insurance. A performance bond and payment bond will be required from the successful bidder. The contract includes liquidated damages of $250 per calendar day for delays.

View the file

Other files

File Type Posted
5_AMI WMRP Jan 2025 RFP BUDGET.xlsx XLSX spreadsheet
RFP 25_006 ADDENDUM _1 _ AMI WATER METER REPL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMI Water Meter Replacement Project

(AMI WMRP)

City of Commerce, Georgia

TABLE OF CONTENTS

Invitation to RFP

Offeror Pricing Response

Statement of Qualifications

Execution of Proposal

Addendum Acknowledgement

Insurance Requirements

Contractor Affidavit

Vendor Master

W9

RFP Required Documents Checklist

Contract Agreement

Performance Bond

Payment Bond

Summary of Work

Project Materials and Standard

Payment Section

City of Commerce

DEFINITIONS as used herein, the term “Owner/City” shall be defined as the City of Commerce, Georgia.

As used herein, the term “Offeror(s)/Bidder(s)/Contractor(s)/Vendor(s)” shall be defined as the company or individual bidding on the aforementioned project.

SEPARATE SEALED PROPOSAL City of Commerce, Georgia is seeking qualified and experienced Offerors to perform the work for the AMI Water Meter Replacement Project. City of Commerce is requesting individual sealed proposals be submitted to the Owner, until 2:00 p.m., local time, on February 24, 2025.

COPIES OF the Contract Documents may be obtained after January 15, 2025, on the City of Commerce’s website at https://commercega.gov/business/bid-opportunities.

PROJECT BACKGROUND The City of Commerce is desiring to replace its aged water meters. The Utility embarked on replacing water meters in 2023 and has completed installation of approximately 500 of the 4,500 existing water meters to date. The City of Commerce is now seeking to implement a water meter replacement project Phase 1.

THE PROJECT The project will consist of the replacing existing ⅝” x ¾” and 1” Water Meters with electronic registers and installation and activation of Sensus AMI transmitters for sending the water meters readings to the existing Sensus AMI Network. The offeror should include as part of this proposal furnishing the appropriate water meter and transmitter activation equipment required to install and activate the AMI transmitters and reprogram any Sensus water meters to 1 gallon. Equipment shall utilize windows, android and/or IOS devices equipped with LTE GPS and appropriate Sensus Command Link 2 device. The offeror shall include the installation and/or replacement of all water meter assembly materials i.e., meter boxes, lids, washers, backflow device and other appurtenances to satisfy the desired installation standard. All boxes, lids, backflows, water meters and transmitters to be furnished by Owner. See additional document “Commerce GA AMI WMRP Routes (WATER)” for a list of the water routes included in the scope of work.

AWARD METHOD The Proposal shall be evaluated as described in PROPOSAL AWARD AND CONTRACTOR SELECTION using the following criteria:

• Overall Experience 25

• Approach to project 25

• Pricing 25

• Key Personnel 15

• Responsiveness to RFP 10

If a contract is awarded, it will be awarded to the most responsive and responsible offeror whose offer conforms to the RFP and will be the most advantageous to the Owner as set forth in the evaluation criteria.

The City requires all bidders to include in their bid a copy of their current Utility Contractors License issued by the State of Georgia Division of Utility Contractors.

THE WORK will be awarded in one Contract and will include the replacement and/or reprogramming of Water Meters: approximately 1,500 - ¾” and 24 - 1” water meters and 1,524 transmitters.

https://commercega.gov/business/bid-opportunities

COURIER DELIVERY & POSTAL SERVICE DELIVERY

27 Sycamore Street Commerce, Georgia 30529

CLARIFICATIONS: Any explanation desired by an Offeror regarding the meaning or interpretation of this Request for Proposal (RFP) shall be requested in writing and with sufficient time allowed, but not less than ten (10) working days prior to the date and time specified for the receipt of offers, for a reply to reach Offerors before the submission of their offers. All inquiries shall be directed to Debby Peete. Any information given to a prospective offeror concerning this RFP shall be furnished to all known prospective Offerors as an amendment to this RFP, if such information is necessary to Offerors in submitting offers on this RFP, or if the lack of such information would be prejudicial to uninformed offerors. Oral explanations or instructions given prior to award are not binding.

Debby Peete, Finance Specialist: bids@commercega.gov

LAST DATE FOR QUESTIONS: Monday, February 3, 2025 @ 4:30pm EST

ACKNOWLEDGEMENT OF AMENDMENTS: Receipt of any amendment to this RFP shall be acknowledged on the Response Form and submitted with the proposal.

THE OWNER reserves the right to reject any or all proposals, to waive informalities and to readvertise.

OVERALL EXPERIENCE

Overall experience on related projects & demonstrated results will be based on contents as provided within the 'STATEMENT OF OFFEROR’S QUALIFICATIONS' (attached herein). The Statement of Offeror’s Qualifications shall be completed and submitted with additional information that will serve to establish the credentials of the Offeror and the level of experience in water meter and service line replacement.

Procedures, examples of and references of other similar projects, experience of Project Manager, Installation Field Manager and staff assigned to the project will all be evaluated. Experience that only involves changing out the water meter along with activation under AMI System will be evaluated and other components of the water meter assembly and service line will not qualify the Offeror for this project.

APPROACH TO PROJECT

The Owner will evaluate the written response to the proposed approach to the project as provided by the Offeror. Specifically, as it pertains to normal work hours, number of water meter replacements to be changed per day, number of crews, number of workers per crew. Explain the process for Data Collection.

Contractor should furnish the approach to the work as proposed herein. The approach to the project should include the services to be provided by the Offeror based on the contractor’s capacity and ability to perform all aspects of project administration, construction installation and data management, customer service and responsiveness and all other aspects of AMI water meter replacement as detailed and explained in the Contract Documents. Contractor should provide examples of data management and water meter change out software. Capacity to perform work within the schedule and budget will be evaluated.

PRICING

The selection criterion is pricing. The proposal shall include a unit price that make up a lump sum that represents the best cost for the work and services to be provided. All mobilization, set-up, etc. costs shall be included in the unit costs. All work is to be performed in accordance with City of Commerce, Georgia, local, state, and federal standards.

mailto:bids@commercega.gov

KEY PERSONAL

Key personnel and their qualifications and any licenses will be evaluated as part of the criteria. Offeror should provide resume(s), description and/or details of key personnel that will be used during this project.

RESPONSIVENESS TO RFP

Responsiveness will include the degree to which the proposal includes sufficient information and details to evaluate the responsiveness to RFP and the clarity of the proposal which clearly and concisely follows the Request for Proposal. Answers should be complete, must include and correspond to the questions.

PROJECT SPECIFICATIONS

Transmitter:

The transmitter is installed into the water meter lid 1 ¾” diameter hole and connects to the water meter electronic sensor. The transmitter is equipped with a plug and play clip style connection; no manual wiring is required. The transmitter is activated using the handheld device and command link. Each transmitter is activated after the water meter and transmitter have been properly installed.

Water Meters:

The ⅝” x ¾” and 1” water meters are all made by the same manufacturer. The meters are made using brass body positive displacement manufacturing with an Electronic Register. The meter reading is displayed in a 9-digit LCD display with a flow indicator. The Owner will be using water meters registering down to 1 gallon. The direction of flow arrows is indicated on the exterior of the meter face and body.

When activated and a reading is obtained electronically the reading is 100% what is read visually from the meter display.

Electronic Data Files:

This project will require all field installations of water meters and transmitters to be transferred to two formats to the Owner both in an electronic format to be used for importing into Utility Billing BS&A environment and secondly for daily project management of completed work. Approved formats are comma delimited file and excel. Daily reports will be required listing installation of water meters, transmitters and additional project items excel format.

END OF SECTION

OFFEROR PRICING RESPONSE FORM

# Labor for installing SmartPoints and new AMI Meters Qty Unit Price EACH Total

1 3/4" Water Meter Replacement and 520M Installation 1500 Each $ - $ -

2 1" Meter Replacement and 520M Installation 24 Each $ - $ -

3 3/4" & 1" Reprogram exist. Meter to 1 gallon and 520M installation 400 Each $ - $ -

4 Return Skip Data 20 Each $ - $ -

5 Hard Surface Removal 25 Each $ - $ -

6 Replace Water Meter Box Residential 75 Each $ - $ -

7 Replace Water Meter Lid 75 Each $ - $ -

8 Lead and Copper Survey Inventory 1500 Each $ - $ -

9 Install Back Flow device 1500 Each $ - $ -

Price in Words:

Contractor Company Name:

Contractor Contact Person:

City of Commerce AMI Water Meter Replacement

TOTAL: $ -

All information to be provided by the Contractor shall be answered and the data given shall be clear and comprehensive. This statement shall be notarized. If necessary, responses may be answered on separate attached sheets.

Submission of a response authorizes the Owner to make inquiries concerning the respondent and its officers to any persons or firms deemed appropriate by the Owner. Any proprietary information that the Contractor does not want disclosed to the public shall be so identified on each page in which it is found. The Owner, solely for the purpose of qualifying and contract negotiations, will use data or information so identified.

1. Bidder Information:

a. Name of Bidder

b. Permanent main office address: (no PO box)

c. When organized:

d. If a Corporation, where incorporated:

e. How many years have you been engaged in the contracting business under your present firm or trade name?

2. List the current Contracts on hand that are Water Meter Replacement contracts/projects.

(Schedule of these, showing amount of each contract and the appropriate anticipated dates of completion.):

3. Have you ever failed to complete any work awarded to you? If yes, where, and why?

4. Have you ever defaulted on a contract? If yes, where, and why?

5. To meet the requirements for this contract your Company shall have successfully completed a minimum of 5 projects in the last 5 years where the primary scope of work was the replacement of ¾” to 1” water meters under an AMI Network. Please provide a detailed response for each of the 5 projects as it meets the following:

a. 2 of the 5 projects must have included at least a minimum of 1,500 – ¾” water meters per project activated under an AMI System.

b. The 3 remaining projects must have included a minimum of 500 – ¾” water meters per project.

c. At least 2 of the projects must have included the water meter ¾” and 1” replacement under a Sensus AMI Network with a 520m FlexNet Transmitter.

d. In each project the Contractor must have been primarily responsible for inventorying the project meters, transmitters, and removed meters on a weekly basis.

e. In each project the paperwork, data collection, daily electronic meter data change out ID’s, geo coding transaction files, installer field notes and ancillary replacement materials must have been complied in a Daily Work electronic format and furnished to the Owner daily. This Daily Work electronic file must have been comprehensive in including all the day’s work as needed to use in computation of monthly Pay Request. In addition, a second file must have been provided on a weekly basis, to the Owner, in the required CIS Billing software format to be used for automated mass meter change out processing.

f. In all the 5 projects the data errors encountered must have not exceeded 5% of the total electronic data provided back to the Utility.

g. List the field and office personal and their duties that were utilized to perform each of the 5 projects on a weekly basis.

h. List the electronic devices used for field programing of water meters, data collection and geo coding.

i. List how customer complaints and leaks were managed by your company during the projects above.

6. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the City of Commerce in verification of the recitals comprising this Statement of Bidder's Qualifications.

Dated this day of , 2025.

BIDDER:

By:

Title:

State of

County of being duly sworn deposes and says that he or she is of and that the answers to the foregoing questions and all statements therein contained are true and correct.

Subscribed and sworn to before me this day of , 2025.

Notary Public:

My Commission Expires:

(Date)

EXECUTION OF PROPOSAL

DATE:

The potential Contractor certifies the following by placing an "X" in all blank spaces:

That this proposal was signed by an authorized representative of the firm.

That the potential Contractor has determined the cost and availability of all materials and supplies associated with performing the services outlined herein.

That all labor costs associated with this project have been determined, including all direct and indirect costs.

That the potential Contractor agrees to the conditions as set forth in this Request for Proposal with no exceptions.

Therefore, in compliance with the foregoing Request for Proposal, and subject to all terms and conditions thereof, the undersigned offers and agrees, if this proposal is accepted within sixty (60) days from the date of the opening, to furnish the services/products for the prices quoted within the time frame required. The undersigned offers and agrees to furnish any or all the items upon which prices are quoted at the price set opposite each item, in the quantities described, delivered to the point(s) specified, in accordance with the terms and conditions set forth herein. The laws of the State of Georgia shall prevail concerning all purchases and services under this contract.

I certify that I have read and understand the terms and conditions herein except as stated below. I further state that I am and/or my company is capable, able to, and will provide the requested products and/or service described herein. I am the owner or agent of the company stated below and am authorized and empowered to contract. By my signature on this RFP, I/we guarantee and certify that all items included in my bid meet or exceed specifications.

I certify that this quotation is made without prior understanding, agreement, or connection with any corporation, firm or person submitting a quotation for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the quotation and certify that I am authorized to sign this quotation for the Contractor.

Business Contact Representative

Operational Contact Representative

Contractor’s Name Federal ID #

Address

Phone Fax

Email

Authorized Signature Date

Typed Name & Title

Subscribed and sworn to before me this day of , 20 .

Notary Public

ADDENDA ACKNOWLEDGEMENT

The vendor has examined and carefully studied the Request for Proposals and the following

Addenda, receipt of all of which is hereby acknowledged:

Addendum No.

Addendum No

Authorized Representative/Title Authorized Representative (Date) (Print or Type) (Signature)

Offerors must acknowledge any issued addenda. Proposals which fail to acknowledge the Offeror’s receipt of any addendum would result in the rejection of the offer if the addendum contained information which substantively changes the Owner’s requirements.

INSURANCE

1.01 INSURANCE

A. Selected vendor will be required to provide proof of liability and workman’s compensation insurance before work can begin on this City’s project.

Workman’s Compensation Insurance should be as required by the State of Georgia. General Liability should cover $1,000,000 per incident. The vendor, if awarded a contract, shall maintain insurance coverage reflecting the minimum amounts and conditions specified by the City. In the event the vendor is a government entity or a self-insured organization, different insurance requirements may apply.

B. The vendor shall procure and maintain for the life of the

Contract/Agreement Worker’s Compensation Insurance covering all employees with limits meeting all applicable state and federal laws. This coverage shall include Employer’s Liability with limits meeting all applicable state and federal laws. This coverage shall extend to any subcontractor that does not have their own Worker’s Compensation and Employer’s Liability Insurance. A thirty (30) day notice of cancellation is required and must be provided to the City of Commerce via Certified Mail.

Contractor Affidavit under O.C.G.A. § 13-10-91(b)(l)

The undersigned contractor ("Contractor") executes this Affidavit to comply with O.C.G.A § 13-10-91 related to any contract to which Contractor is a party that is subject to O.C.G.A. § 13-10-91 and hereby verifies its compliance with O.C.G.A. § 13-10-91, attesting as follows:

a) The Contractor has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program;

b) The Contractor will continue to use the federal work authorization program throughout the contract period, including any renewal or extension thereof;

c) The Contractor will notify the public employer in the event the Contractor ceases to utilize the federal work authorization program during the contract period, including renewals or extensions thereof;

d) The Contractor understands that ceasing to utilize the federal work authorization program constitutes a material breach of Contract;

e) The Contractor will contract for the performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the Contractor with the information required by O.C.G.A. § 13-10-91(a), (b), and (c);

f) The Contractor acknowledges and agrees that this Affidavit shall be incorporated into any contract(s) subject to the provisions of O.C.G.A. § 13-10- 91 for the project listed below to which Contractor is a party after the date hereof without further action or consent by Contractor; and

g) Contractor acknowledges its responsibility to submit copies of any affidavits, drivers' licenses, and identification cards required pursuant to O.C.G.A. § 13-10-91 to the public employer within five business days of receipt.

_ E-Verify Number Date of Authorization

_ Name of Contractor Name of Project

_ Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on , , 20 in (city), (state).

Signature of Authorized Officer or Agent

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE DAY OF , 20 .

NOTARY PUBLIC

My Commission Expires:

City of Commerce, 27 Sycamore St., Commerce, GA 30529

AMI WMRP Contractor Affidavit 13

PO Box 348 Commerce, Georgia 30529 www.commercega.gov

COMPANY CONTACT

VENDOR REGISTRATION FORM

COMPANY NAME

MAILING ADDRESS

I

TELEPHONE

FAX

EMAIL

WEBSITE

POINT OF CONTACT

NAME&TITLE

CONTACT EMAIL

CONTACT PHONE 1

CONTACT PHONE 2

COMPANY OVERVIEW

GENERAL

DETAILS OF

SERVICES / GOODS

DATE COMPANY

ESTABLISHED

GROSS ANNUAL

SALES

GEOGRAPHIC

SERVICE AREA

LEGAL STRUCTURE

BUSINESS TYPE

YEARS PREVIOUSLY

REGISTERED

INSURED?

BONDED?

LICENSED?

LICENSE NUMBER

ADDITIONAL INFO

BANKING INFORMATION

BANK NAME

BANK ADDRESS

BENEFICIARY NAME

ACCOUNT NUMBER

CERTIFICATION

I hereby affirm that all information supplied is true and accurate to the best of my knowledge and belief, and I understand that this information will be considered material in the evaluation of quotations, bids, and proposals. Notice must be given of any change in status impacting the information provided within ten (1OJ days of said change.

PRINTED / TYPED

NAME

TITLE

SIGNATURE

DATE

AMI WMRP Vendor Master 14 http://www.commercega.gov/

Certification

Form W-9 (Rev. October 2018) Department of the Treasury Internal Revenue Service

Request for Taxpayer Identification Number and Certification

► Go to www.irs.gov/FormW9 for instructions and the latest information.

Give Form to the requester. Do not send to the IRS.

1 Name (as shown on your income tax return). Name is required on this line; do not leave this line blank.

2 Business name/disregarded entity name, if different from above

C') aJ gi 0..

3 Check appropriate box for federal tax classification of the person whose name is entered on line 1. Check only one of the following seven boxes.

4 Exemptions (codes apply only to certain entities, not individuals; see instructions on page 3):

C

• f/) Q) C:

D Individual/sole proprietor or single-member LLC

D C Corporation D S Corporation D Partnership D Trust/estate Exempt payee code (if any)

Q. 0 ..>.,. ·t-i :s 2 a£:

:E Q)

D Limited liability company. Enter the tax classification (C=C corporation, S=S corporation, P=Partnership)►

Note: Check the appropriate box in the line above for the tax classification of the single-member owner. Do not check LLC if the LLC is classified as a single-member LLC that is disregarded from the owner unless the owner of the LLC is another LLC that is not disregarded from the owner for U.S. federal tax purposes. Otherwise, a single-member LLC that is disregarded from the owner should check the appropriate box for the tax classification of its owner.

D Other (see instructions) ►

Exemption from FATCA reporting code (if any)

(Applies to accounts maintained outside the U.S.)

Q.

1/) Q) Q)

5 Address (number, street, and apt. or suite no.) See instructions.

6 City, state, and ZIP code

7 List account number(s) here (optional)

Requester's name and address (optional)

Taxpayer Identification Number (TIN) Enter your TIN in the appropriate box. The TIN provided must match the name given on line 1 to avoid backup withholding. For individuals, this is generally your social security number (SSN). However, for a resident alien, sole proprietor, or disregarded entity, see the instructions for Part I, later. For other entities, it is your employer identification number (EIN). If you do not have a number, see How to get a TIN, later.

Note: If the account is in more than one name, see the instructions for line 1. Also see What Name and

Social security number Employer identification number

Under penalties of perjury, I certify that:

1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me); and

2. I am not subject to backup withholding because: (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal Revenue

Service (IRS) that I am subject to backup withholding because of a failure to report all interest or dividends, or (c) the IRS has notified me that I am no longer subject to backup withholding; and

3. I am a U.S. citizen or other U.S. person (defined below); and

4. The FATCA code(s) entered on this form (if any) indicating that I am exempt from FATCA reporting is correct.

Certification instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return. For real estate transactions, item 2 does not apply. For mortgage interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement (IRA), and generally, payments other than interest and dividends, you are not required to sign the certification, but you must provide your correct TIN. See the instructions for Part II, later.

General Instructions Section references are to the Internal Revenue Code unless otherwise noted.

Future developments. For the latest information about developments related to Form W-9 and its instructions, such as legislation enacted after they were published, go to www.irs.gov/FormW9.

Purpose of Form An individual or entity (Form W-9 requester) who is required to file an information return with the IRS must obtain your correct taxpayer identification number (TIN) which may be your social security number (SSN), individual taxpayer identification number (ITIN), adoption taxpayer identification number (ATIN), or employer identification number (EIN), to report on an information return the amount paid to you, or other amount reportable on an information return. Examples of information returns include, but are not limited to, the following.

• Form 1099-INT (interest earned or paid)

Sign Here

Signature of U.S. person► http://www.irs.gov/FormW9 http://www.irs.gov/FormW9

• Form 1099-DIV (dividends, including those from stocks or mutual funds)

• Form 1099-MISC (various types of income, prizes, awards, or gross proceeds)

• Form 1099-B (stock or mutual fund sales and certain other transactions by brokers)

• Form 1099-S (proceeds from real estate transactions)

• Form 1099-K (merchant card and third-party network transactions)

• Form 1098 (home mortgage interest), 1098-E (student loan interest), 1098-T (tuition)

• Form 1099-C (canceled debt)

• Form 1099-A (acquisition or abandonment of secured property)

Use Form W-9 only if you are a U.S. person (including a resident alien), to provide your correct TIN.

If you do not return Form W-9 to the requester with a TIN, you might be subject to backup withholding. See What is backup withholding, later.

AMI WMRP W9

Cat. No. 10231X Form W-9 (Rev. 10-2018)

1.01 CONTRACTOR RFP DOCUMENTS CHECK LIST

A. OFFEROR PRICING RESPONSE FORM

B. STATEMENT OF QUALIFICATIONS

C. INSURANCE CERTIFICATE

D. ADDENDUM ACKNOWLEDGEMENT (if any)

E. EXECUTION OF PROPOSAL

F. CONTRACTOR AFFIDAVIT

This Contract Agreement made and entered into the , 2025 between the CITY OF COMMERCE, GEORGIA, a municipal corporation located in the County of Jackson of the State of Georgia, (hereinafter referred to as Owner) and (hereinafter referred to as Contractor).

WITNESSETH:

That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the Owner as follows:

That the Contractor will furnish all products (except those listed in RFP 25-006 as provided by the Owner), tools, construction equipment, skill, and labor of every description necessary to carry out and to complete in a good, firm, substantial workmanlike manner the construction of the project known as:

AMI WATER METER REPLACEMENT PROJECT

City of Commerce, Georgia and will complete work in strict conformity with the Summary of Work and City of Commerce standards, together with the contents of the Request for Proposal documents.

The successful Contractor shall enter a written contract binding all the terms, conditions, and provisions of the proposal. The contract will be drawn for a period of one (1) year, renewable in four (4) one-year increments thereafter, for a total of five (5) years subject to the mutual agreement of both parties. The contract period in Fiscal Year 2025 being the first year of these terms, therefore four (4) renewable years remain.

The Owner reserves the option to discontinue this contract if service is not satisfactory or continue for a period beyond that stated in this Contract provided the level of service is satisfactory and related cost remain reasonably constant and competitive.

That the Contractor shall commence the Work to be performed under this Contract Agreement on a date to be specified in a written Notice to Proceed and shall fully complete all work hereunder within Ninety (90) consecutive calendar days, which includes the inclement weather days. Time is of the essence and is an essential element of this Contract, and the Contractor shall pay to the Owner, not as a penalty, but as liquidated damages, the sum of Two Hundred and Fifty Dollars ($250.00) for each calendar day that there is default of completing the Work within the time limit named herein. If the Contractor abandons the Contract before commencement of the Work or defaults in completion of all the Work after commencement thereof, the Contractor shall be liable for such liquidated damages. These fixed liquidated damages are not established as a penalty but are calculated and agreed upon in advance by the Owner and the Contractor due to the uncertainty and impossibility of making a determination as to the actual and consequential damages incurred by the Owner and the general public of the City of Commerce, Jackson County, Georgia as a result of the failure on the part of the Contractor to complete the Work on time. Such liquidated damages referred to herein are intended to be and are cumulative and shall be in addition to every other remedy now or hereafter enforceable at law, in equity, by statute, or under the Contract.

The Owner hereby agrees to pay to the Contractor for the faithful performance of this Contract Agreement, subject to additions and deductions as provided in the Specifications and Proposal, in lawful money of the United States of America, the sum:

which sum shall also pay for loss or damage arising out of the nature of the Work aforesaid, or from the action of the elements, or from unforeseen obstructions or difficulties encountered in the prosecution of the Work, and for all expenses incurred by, or in consequence of the Work, its suspension or discontinuance and for well and faithfully completing the Work and the whole thereof, as herein provided, and for replacing defective work or products for periods of time after completion as specified under various warranty and guarantee sections of this Contract Documents.

The Owner shall make monthly partial payments to the Contractor in accordance with the provisions of the Contract Documents. Final payment on account of this Contract Agreement shall be made within thirty (30) days after the completion by the Contractor of all work covered by this Contract Agreement and the acceptance of such work by the Owner, in accordance with the provisions of the Contract Documents.

It is further mutually agreed between the parties hereto that if, at any time after the execution of this Contract Agreement and the surety bonds hereto attached for its faithful performance, the Owner shall deem the surety or sureties upon such bond to be unsatisfactory, or if, for any reason, such bond ceases to be adequate to cover the performance of the Work, the Contractor shall, at no additional expense to Owner, within five days after the receipt of notice from the Owner to do so, furnish an additional bond or bonds in such form and amount, and with such surety or sureties as shall be satisfactory to the Owner. In such event, no further payment to the Contractor shall be deemed to be due under this Contract Agreement until such new or additional security for the faithful performance of the Work shall be furnished in manner and form satisfactory to the Owner.

IN WITNESS WHEREOF, the parties hereto have executed this Contract Agreement under their respective seals on the day and date first above written in three counterparts each of which shall, without proof or accounting for the other counterparts, be deemed an original Contract.

CONTINUED ON NEXT PAGE

OWNER: CITY OF COMMERCE, GEORGIA

By: .

Name: Clark Hill III, Mayor

WITNESS: CITY OF COMMERCE CLERK

Name: Sandra Haggard

CONTRACTOR:

Name: .

Title: .

Notary Public: .

My Commission Expires: .

Notary Seal:

KNOW ALL MEN BY THESE PRESENTS THAT

(as CONTRACTOR, hereinafter referred to as the “Principal”), and (as SURETY

COMPANY), hereinafter referred to as the “CONTRACTOR’S SURETY”), are held and firmly bound unto the City of Commerce (as OWNER, hereinafter referred to as “City of

Commerce”), for the use and benefit of any “Claimant” as hereinafter defined in the sum of

Dollars ($ ) lawful money of the United States of America, for the payment of which the Principal and the Contractor’s Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the Principal has entered, or is about to enter, into a certain written agreement with City of Commerce, dated , which is incorporated herein by reference in its entirety (hereinafter referred to as the “CONTRACT”), for the construction of a project known as Water Meter Replacement (hereinafter referred to as

“the PROJECT”).

NOW THEREFORE, the conditions of this obligation are as follows:

1. That if the Principal shall fully and completely perform each and all of the terms, provisions and requirements of the Contract, including and during the period of any warranties or guarantees required thereunder, and all modifications, amendments, changes, deletions, additions, and alterations thereto that may hereafter be made; and if the Principal and the Contractor’s

Surety shall indemnify and hold harmless City of Commerce from any and all losses, liability and damages, claims, judgments, liens, costs and fees of every description, including but not limited to, any damages for delay, which

City of Commerce may incur, sustain or suffer by reason of the failure or default on the part of the Principal in the performance of any and all of the terms, provisions and requirements of the Contract, including all modifications, amendments, changes, deletions, additions, and alterations thereto and any warranties or guarantees required thereunder, then this obligation shall be void; otherwise, to remain in full force and effect.

2. In the event of a failure of performance of the Contract by the Principal, which shall include, but not be limited to, any breach of default of the Contract:

a. The Contractor’s Surety shall commence performance of its obligations and undertakings under this Bond no later than thirty (30) days after written notice from City of Commerce to the Contractor’s Surety;

b. The means, method, or procedure by which the Contractor’s Surety undertakes to perform its obligations under this Bond shall be subject to the advance written approval of the City of Commerce.

The Contractor’s Surety hereby waives notice of all modifications, omissions, additions, changes and advance payments or deferred payments in or about the Contract and agrees that the obligations undertaken by this Bond shall not be impaired in any manner by reason of any such modifications, omissions, additions, changes, and advance payments or deferred payments. The Parties further expressly agree that any action on this Bond may be brought within the time allowed by Georgia law for suit on contracts under seal.

IN WITNESS WHEREOF, the principal and Contractor’s Surety have hereunto affixed their corporate seals and caused this obligation to be signed by their duly authorized officers or attorneys-in-fact, this day of 20 .

(Name of Principal) (Name of Contractor’s Surety)

By: By: .

Name Printed: Name Printed: .

Title: Title: .

Attest: Attest: .

Name: Name: .

Date: Date: .

[Corporate Seal] [Corporate Seal]

(ATTACH SURETY’S POWER OF ATTORNEY)

KNOW ALL MEN BY THESE PRESENTS THAT

(as CONTRACTOR, hereinafter referred to as the “Principal”), and (as

SURETY COMPANY, hereinafter referred to as the “CONTRACTOR’S SURETY”), are held and firmly bound unto the City of Commerce (as OWNER, hereinafter referred to as “City of

Commerce”), for the use and benefit of any “Claimant” as hereinafter defined in the sum of

Dollars ($ ), lawful money of the United States of America, for the payment of which the Principal and the

Contractor’s Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the Principal has entered, or is about to enter, into a certain written agreement with City of Commerce, dated , which is incorporated herein by reference in its entirety (hereinafter referred to as the “CONTRACT”), for the construction of a project known as Water Meter Replacement Project, (hereinafter referred to as “the

PROJECT”).

NOW THEREFORE, the condition of this obligation is such, that if the Principal shall promptly make payment to any Claimant, as hereinafter defined, for all labor, services and materials used or reasonably required for use in the performance of the Contract, then this obligation shall be void; otherwise, to remain in full force and effect.

A “Claimant” shall be defined herein as any subcontractor, person, party, partnership, corporation or other entity furnishing labor, services or materials used or reasonably required for use in the performance of the Contract, without regard to whether such labor, services or materials were sold, leased or rented, and without regard to whether such Claimant is or is not in privity of the Contract with the Principal or any subcontractor performing work on the Project.

In the event of any claim made by the Claimant against City of Commerce, or the filing of a Lien against the property of City of Commerce affected by the Contract, the

Contractor’s Surety shall either settle or resolve the Claim and shall remove any such Lien by bond or otherwise as provided in the Contract.

The Parties further expressly agree that any action on this Bond may be brought within the time allowed by Georgia law for suit on contracts under seal.

IN WITNESS WHEREOF, the Principal and Contractor’s Surety have hereunto affixed their corporate seals and caused this obligation to be signed by their duly authorized officers or on, this day of 20 .

(Name of Principal) (Name of Contractor’s Surety)

By: By: .

Name Printed: Name Printed: .

Title: Title: .

Attest: Attest: .

Name: Name: .

Date: Date: .

[Corporate Seal] [Corporate Seal]

(ATTACH SURETY’S POWER OF ATTORNEY)

PART 1 GENERAL INFORMATION

1.01 SCOPE

A. The work to be performed under this Contract shall consist of furnishing all labor, tools, equipment, and miscellaneous plastic pipe fittings (for Customer side tie-ins) to perform all Work required to construct complete in place and ready to operate.

B. The project consists of the following major elements: Performing all labor necessary for the replacement and/or upgrading of approximately 1,524 water meters, and appurtenances for sizes ¾” to 1”: including all necessary and required erosion and sedimentation control. The Owner will furnish all water meters, washers, boxes, lids, backflows, and transmitters.

C. Contractor provides all locates, equipment, and miscellaneous material such as gravel, sod, seed, fertilizer, mulch, hay, etc. to complete the work in accordance with the plans and contract documents.

D. STANDARDS. Contractor shall install meter assembly per City of Commerce and

Manufacturer standard specifications. Work will be inspected by representative of the Owner and any below standard work inspected will not be accepted and shall be removed and replaced at Contractor‘s expense. Standards to include but not limited to: Meter box replacement, Meter box lid replacement, removal of all debris from meter box, fittings, and piping.

E. DATA MANAGEMENT OF WORKFLOW: Contractor shall utilize electronic data management system to transfer water meter, and transmitter changes and installs to the Owner. Contractor will be assigned meter books consisting of the services as noted in the project. The General Contractor shall furnish all activation equipment The equipment set shall consist of: Windows, Android, and/or IOS devices, Command LinkII, 3096 TouchReader and FieldLogic Communicator. The Contractor will be given a comma delimited project file containing all service location data. Standard workflow work order procedures shall be defined by the Owner and the Contractor MUST follow the workflow procedure. Each location will have an assigned workflow procedure, any changed to the work order or workflow MUST be approved by Owner.

a. Contractor MUST collect and return change-out data daily for the previous day's activities to the Owner in two electronic formats: #1- Custom-format Export file (to be specified by Owner) for direct import into CIS Billing; and, #2- Work Order Report in either *.csv or *.xlsx format, as preferred with field installation notes as pertains to water service location i.e. helping location notes, helpful installation notes, if found existing meter leaking, if service was found to be at other location that original Owner file indicated.

b. Daily electronic Work Order Report MUST include additional installed items along with meter change out data. For example, file must note if box was replaced, meter box replaced, new backflow or other Contractor or Owner furnished materials were installed. This file shall be comprehensive and accumulate totals used in producing monthly pay request.

F. TYPES OF WORK TO BE PERFORMED: All work to be performed to City standards.

1. WATER METER REPLACEMENT: Contractor shall replace existing water meters ¾” to 1” with new meter and install 520M AMI Transmitter.

2. REPROGRAM METER: Contractor shall reprogram existing water meters from 100 gallon to 1 gallon registration and install 520M AMI Transmitter.

3. RETURN SKIP DATA: Where Contractor is unable to perform meter replacement the Contractor shall return water meter serial number, register ID, reading, meter size, meter manufacturer, photo of meter set and reason for unable to perform meter replacement.

4. HARD SURFACE REMOVAL: Where an existing water meter is in concrete/asphalt and to perform the meter replacement the removal of the concrete/asphalt is required the Contractor shall cut and remove of the hard surface material.

5. METER BOX REPLACEMENT: Contractor shall replace existing damaged meter box completely which includes existing or new lid if damaged beyond use.

6. METER BOX LID ONLY REPLACEMENT: Contractor shall replace any broken or damaged meter box lids. Lids to be provided by Owner.

7. LEAD AND COPPER SURVEY INVENTORY: Contractor shall record inlet and outlet pipe material at water meter service.

8. INSTALL BACKFLOW: Contractor shall install backflow device where no backflow devices are found and/or where existing backflow device found during water meter replacement is damaged or unusable to complete the work.

F. ADMINISTRATIVE ELEMENTS. The Contractor shall assign a responsible representative and an alternate representative, as approved by the Owner, to coordinate with City project management staff. Any changes in responsible representative must be approved, in advance, by the City. The City will have the right to reject proposed changes in personnel and may consider changes in responsible personnel a breach of contract.

G. HARD SURFACE REMOVAL. Concrete/Asphalt Removal – The Contractor shall cut and remove any hard surface as required to successfully perform the water meter replacement. The Contractor will transport and dispose of hard surface debris to a designated location by the Owner. The Contractor shall upon replacement of water meter, backfill excavated area and install a minimum of 2 inches of gravel within the top of the cut section. Gravel provided by the Owner. The Owner will be responsible for replacing the hard surface and until such time will maintain the cut section.

H. LAWNS AND LANDSCAPE. Contractor must return yards to original grade and condition “as good as or better than before conditions” and in accordance with City specifications. This will require the use of sod where sod exists. Contractor shall make every effort to limit the amount of disturbance in lawn areas and make necessary provision to return lawn area in as good or better condition than before disturbance. Landscape beds shall be returned to as good or better condition.

Contractor is required to replant flowers, plants, and/or shrubs removed to perform work. Contractor is required to contact property Owner prior to disturbance to allow property Owner to remove said landscape, if so desired, prior to any work being performed.

I. PAPERWORK. The Contractor shall complete the meter service forms, when required, in addition to using the mobile work order system. ALL meter installations shall be documented with mobile work order system. Any meter installation completed not utilizing the mobile work order system will be deemed a breach of contract.

J. PUBLIC NOTIFICATION

1. Contractor will attempt to notify residential Customer prior to water interruption.

2. The Owner will provide door hangers. The Contractor will leave a door hanger at each resident / business where work is performed.

3. Contractor will be required to coordinate water interruption with Commercial

Customers.

4. The Contractor must have trucks identifying that they are working for the Owner and the Contractors name and contact phone number. Workers must wear a uniform and documentation identifying they are working for the City and the project number / identification number etc. with picture.

K. INVENTORYING OWNER FURNISHED MATERIALS. The Contractor will be responsible for maintaining a running count on inventory as furnished by the Owner which will include water meters, meter boxes, backflows, and transmitters to be installed by the Contractor on this project. The Contractor shall provide weekly inventory totals of Owner furnished, stored materials as well as inventory count on all sizes of pulled meters.

L. FLUSHING of SERVICE LINES. When water meter is replacement that may require the service line to be flushed, the Contractor shall flush service lines as needed to remove any foreign debris prior to connecting to water meter and customer service line.

M. REPAIRS AND LEAKS. The Contractor shall respond to leaks and repairs resulting from water meter replacement work in a timely fashion. Leaks and repairs that require immediate attention shall be addressed by the Contractor the same working day. The Contractor shall maintain a log of repairs / leaks performed and submit to Owner on a weekly basis. Log should note repairs made, meter reading at time of repair and any other pertinent information.

N. CUSTOMER COMPLAINTS AND CLAIMS. The Contractor shall be available to receive customer complaints and claims regarding damages to water customer’s property occurring during water meter replacements and work to resolve said complaint and/or claim to the best of their ability. To prevent complaints and claims the Contractor shall take appropriate measures necessary to document all site features, landscaping, etc. prior to performing work. If such features are to be removed, damaged, and/or modified because of the replacement work, Contractor shall contact property Owner prior to performing any work.

O. SUBCONTRACTING. The Contractor may utilize the services of specialty

Subcontractors on those parts of the Work that, under normal contracting practices, are performed by specialty Subcontractor. It is understood that at least 75% of the work to be performed shall be performed by the successful Contractor. Any subcontractor used must adhere to the same terms and conditions as the successful Contractor. The Offeror is representing to the City that the Offeror has all appropriate licenses, certifications, and registrations to perform the work hereunder.

P. WARRANTY. Contractor shall fully warrant all work and Contractor supplied materials provided by the Contractor against poor and inferior quality or workmanship for a period of not less than 12 months from the Owner’s final acceptance of work.

Contractor shall repair and/or replace any inoperable materials or equipment in a timely manner during warranty period.

Q. EXISTING METERS and INOPERABLE DEVICES. All meters / material removed during the project is property of the City. All material shall be returned to City on a weekly basis. Removed meters are to be placed in empty Sensus meter packaging and returned to the Client.

R. EXISTING METER BOXES AND LIDS. The Contractor may reuse existing meter boxes and lids granted these materials meet the City standard for the appropriate size meter installation and are in good working condition having no cracks, breaks, or damages. The Contractor will be required to drill appropriate size circular holes in existing cast iron and plastic lids to receive radio read transmitter. Owner will inspect all reused boxes and lids prior to installation to make final determination of reusability.

S. LEAD COPPER SURVEY. The Contractor shall determine and record pipe material as part of the water meter replacement project. The pipe material on the Owner side of the inlet side of the water service shall be determined and recorded. The pipe material on the Customer side of the outlet water service shall be determined and recorded. Pipe materials such as poly, copper, galvanized, lead, etc… will be encountered. The collected inlet and outlet material shall be entered into the daily water meter changeout data. The Contractor shall clean off the inlet and outlet pipe at each inlet and outlet side within the meter box and scratch the pipe to determine the existing pipe material. “Other” shall not be an approved pipe material. The Contractor will perform this survey on water replacement locations as well as locations that were originally assigned as water meter replacements but changed to skips or no work performed.

T. BACK FLOW DEVICE. As part of the water meter replacement work the Contractor shall install a back flow device where there is no back flow device encountered on 5/8”, ¾” and 1” water services. The Owner will furnish the back flow device.

1.02 PROJECT SCHEDULE AND DURATION

The project duration shall be established as 90 days (Ninety Days) upon the issuance of the Notice to Proceed. Upon issuance of the Notice to Proceed the Contractor will perform 50 water meter replacements and provide meter change out data to Owner for review and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .