Section 2 – Document 2.0 Unit Price Schedule
County requires Contractor to submit the following installed unit costs, which include Contractor overhead and profit. Should the need arise to add or delete items during construction, the unit cost must be valid for either adding or deleting. This unit price schedule must be attached in the Online Solicitation System (OSS).
Item No.
Unit
Description of Item
Unit Bid Price Dollars Cents
| 1. |
| Linear Foot |
| Construction Fencing |
| 2. |
| Square Foot |
| Clear and Grub |
| 4. |
| Cubic Yard |
| Imported General Fill |
| 5. |
| Cubic Yard |
| Excavated Cut Used as Fill On-Site |
| 6. |
| Linear Foot |
| Saw Cut of Asphalt |
| 7. |
| Linear Foot |
| Saw Cut of Concrete Sidewalk |
| 8. |
| Linear Foot |
| Saw Cut of Concrete Curb and Gutter |
| 9. |
| Square Foot |
| Removal and Haul Off of Asphalt Pavement Along Parking Lot |
| 10. |
| Square Foot |
| Removal and Haul Off of Concrete Sidewalk |
| 11. |
| Linear Foot |
| Removal and Haul Off of Concrete to Mow Curb |
Site Improvements
| 12. |
| Square Foot |
| 6” thick concrete sidewalk and base material, including all materials & labor incidental |
| 13. |
| Linear Foot |
| Stairs with a handrail with base material, including all materials and labor incidental |
| 14. |
| Square Foot |
| 3” Asphalt complete with base material, including all materials and labor incidental |
| 15. |
| Linear Foot |
| 24” Spill Concrete Curb and Gutter and base material complete, including all materials & labor incidental |
| 16. |
| Linear Foot |
| 12” Concrete Mow Curb complete with base material, including all materials & labor incidental |
| 17. |
| Linear Foot |
| 12” Curb wall around plant bed |
| 18. |
| Square Foot |
| ADA concrete ramp with handrail with base materials, including all materials and labor incidental |
Irrigation System
| 19. |
| Each |
| 6” Pop-Up with Spray Nozzle (per detail) including all materials and labor incidental |
| 20. |
| Linear Foot |
| Two Wire Path with Conduit (per detail and specs) including all materials and labor incidental |
| 21. |
| Each |
| Cable Fuse Device in 10” Round Valve Box (per specs) including all materials and labor incidental |
| 22. |
| Linear Foot |
| 1” PVC Schedule 40 Irrigation Pipe and Fittings (per detail and specs) including all materials and labor incidental |
| 23. |
| Linear Foot |
| 1-1/2” PVC Schedule 40 Irrigation Pipe and Fittings (per detail and specs) including all materials and labor incidental |
| 24. |
| Linear Foot |
| 2” HDPE PE4710 DR11 Pipe and Fittings (per detail and schedule) including all materials and labor incidental |
| 25. |
| Linear Foot |
| 3” HDPE PE4710 DR11 Pipe and Fittings (per detail and schedule) including all materials and labor incidental |
| 26. |
| Linear Foot |
| 4” HDPE PE4710 DR11 Pipe and Fittings (per detail and schedule) including all materials and labor incidental |
| 27. |
| Linear Foot |
| 6” HDPE PE4710 DR11 Pipe and Fittings (per detail and schedule) including all materials and labor incidental |
| 28. |
| Linear Foot |
| Tracer Tape (per specs) including all materials and labor incidental |
Planting and Landscape
| 29. |
| Each |
| Tree – 2” Caliper Deciduous and Staking – provide, plant, and establish |
| 30. |
| Each |
| Groundcover – 4” pot – provide, plant, and establish |
| 31. |
| Square Foot |
| New Sod for Turf Patch & Repair along all Irrigation Trenches and Disturbed Areas – provide, plant, and establish |
| 32. |
| Square Foot |
| Fine Grading and Soil Prep |
| 33. |
| Cubic Yard |
| Provide and Placement of Utelite Structural Soil, all materials and labor incidental |
| 34. |
| Cubic Yard |
| Planting Soil Mix per specs, provide and installed |
35.
Other Items (at contractor’s discretion)
Project _____________________________________
Name of Company Bidding __________________________________________________