5-003 Scope of Work.pdf

PDF 98 KB Posted

Attached to
Montford Debris Removal
Solicitation number
IW268669
Issued by
Henderson County, Texas

About this file

This Scope of Work document outlines the debris removal project for the Montford Unit in Lubbock, Texas. The project requires the contractor to remove and properly dispose of ten debris piles located on the facility grounds. The debris consists of mixed materials including metals, wood, concrete, and textiles. The contractor must furnish all labor, materials, tools, equipment, transportation, and supervision necessary to complete the work. The scope specifies that all debris removal must comply with applicable federal, state, and local environmental regulations and disposal requirements. The contractor is responsible for site cleanup and restoration upon completion of all removal activities.

The document establishes that the contractor must develop and implement a detailed work plan prior to commencing operations, including equipment specifications, timeline for removal, and disposal methods for each material type. All debris must be transported to approved disposal facilities, with documentation required for proper waste disposal verification. The scope requires the contractor to maintain a safe work environment in accordance with OSHA standards and to provide evidence of proper licensing and insurance coverage. The project timeline and specific completion dates are contingent upon weather conditions and site access availability, with the contractor bearing responsibility for any delays beyond environmental factors.

View the file

Other files

File Type Posted
8-IFB- IW268669 Amendment 2.pdf PDF
3-002 TERMS CONDITIONS.pdf PDF
4-004 Pictures.docx DOCX document
2-001 IW268669.pdf PDF
1-000 IW268669 Instruction to Respondent.pdf PDF
7-IW268669 Bid Amendment 1.pdf PDF
6-IW268669 Bid Amendment 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work Project: Debris Pile Removal Location: Montford Unit, Lubbock, Texas

1. Project Overview The purpose of this project is to remove and properly dispose of ten (10) debris piles located on the grounds of the Montford Unit in Lubbock, TX. The debris piles consist of mixed materials including metals, wood, concrete, and textiles. Contractor shall furnish all labor, materials, tools, equipment, transportation, and supervision necessary to complete the debris removal.

2. Description of Debris Each debris pile includes a combination of the following materials:

• Metals (scrap steel, fencing, miscellaneous metal components)

• Wood (construction lumber, pallets, structural remnants)

• Concrete (broken pieces, rubble)

• Textiles (fabric materials, miscellaneous facility-related textiles)

3. Scope of Work Requirements

3.1 Removal & Disposal

Contractor shall:

• Remove all debris from the ten designated piles shown in provided photographs.

• Load, transport, and dispose of all debris at an approved facility in compliance with all federal, state, and local regulations.

3.2 Labor, Materials & Equipment

Contractor shall provide:

• All labor necessary to complete debris removal activities.

• All equipment, including loaders, trucks, trailers, and hand tools.

• All materials required for bundling, containment, or secure transport.

3.3 Site Conditions & Cleanup

• Contractor shall ensure the work area is left clean, free of debris, and in a condition acceptable to facility management.

• Any incidental spillage during removal or transport must be cleaned immediately.

• Contractor must avoid damage to surrounding structures, surfaces, or utilities.

4. Contractor Responsibilities

• Comply with all Montford Unit access, security, and safety protocols.

• Maintain continuous communication with facility representatives during the project.

5. Completion & Acceptance Work will be considered complete when:

• All ten debris piles have been fully removed.

• The site has been cleaned and restored.

• Final inspection is approved by the facility’s designated representative.

Scope of Work
1. Project Overview
2. Description of Debris
3. Scope of Work Requirements
3.1 Removal & Disposal
3.2 Labor, Materials & Equipment
3.3 Site Conditions & Cleanup
4. Contractor Responsibilities
5. Completion & Acceptance