This document is a Pricing Bid Template for DC Fast Charging Stations issued by Boulder County, Colorado, as part of a Request for Proposal (RFP) for community electric vehicle charging infrastructure. The RFP seeks vendors to design, construct, install, maintain, and operate four DC Fast Charging ports within Boulder County, with specific requirements including CCS Type 1 connectors, networked capabilities, and compliance with National Electric Vehicle Infrastructure (NEVI) standards. The project will involve comprehensive services from pre-construction site assessment through installation and ongoing operations, with final charging station locations to be determined after vendor selection.

The project is federally funded through the U.S. Department of Transportation's Charging and Fueling Infrastructure (CFI) discretionary grant program, authorized under the Bipartisan Infrastructure Law. The pricing template requires detailed cost breakdowns across five key categories: pre-construction planning, equipment purchase, installation, operational costs, and other potential expenses like battery storage. Vendors must provide unit costs and total costs for a four-port charging system, including equipment, labor, networking fees, maintenance, electricity costs, and warranty expenses. The goal is to create community charging stations with high user satisfaction and over 97% station uptime, with vendors responsible for ensuring safety, reliability, accessibility, and convenience while meeting all federal funding compliance requirements.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 - Pricing Bid Template for DC Fast Chargers Please provide a detailed list of costs associated with designing, installing, and operating four DC Fast Charging ports in Boulder County. This includes all necessary phases: pre-construction, installation, and ongoing operations.

System Overview

· Ports: Four DC Fast charging ports (power level must meet NEVI standards and requirements)

· Connectors: CCS Type 1, permanently attached

· Networked: Yes

· Location: Final sites to be determined within Boulder County. These are community charging stations, not Alternative Fuel Corridor (AFC) stations.

Cost Breakdown - Four Networked DC Fast Charging Ports Please use this template to describe the items, unit cost, and total cost to implement the project described in the RFP Scope of Services.

Site host locations will be finalized after vendor(s) are selected for award. Therefore, the applicant’s budget must describe costs on a per unit basis, and then calculate the total overall cost of four DCFC charging ports.

Boulder County is providing applicants with this template to ensure the selection committee can review consistent budget information in all applications. The applicant must include the cost for each item (both equipment and labor) listed in the tables below. However, applicants are encouraged to modify the template to add any costs that are missing and necessary to be responsive to the requested services in the RFP. Please include the costs for items of equipment, hardware, accessories, parts, construction materials, and software as well as hourly labor rates.

I. Pre-Construction (Planning & Design)

Item
Description
Quantity
Unit Cost
Total Cost (1 dual-port station)
Total Cost (4 ports)
Site Assessment
Physical inspection, parking lot survey, grid proximity, load capacity check
Site Drawings
Drawings of parking lot and charger locations; including ADA accessibility requirements
Preliminary Engineering
Provide description
Permitting
Local jurisdiction permits
Utility Coordination
Utility applications and engineering reviews; stamped electrical drawing
Site easement, if applicable
Provide description, if Category 4 applicant will offer 3rd party ownership
Other Pre-Construction items, if relevant
Provide description
Hourly rate for respective team members
Include hourly rate of each worker, estimated hours needed, and duration of time

II. Equipment Purchase

Item
Description
Quantity
Unit Cost
Total Cost (1 dual-port station)
Total Cost (4 ports)
EVSE Units (4 ports networked)
Charging station hardware; Networked DCFC EVSE with CCS Type 1 connectors
Other necessary critical power components
Provide description
Mounting (pedestals / walls)
Installation accessories for mounting chargers
Cabling / Connectors
Heavy-duty cable, connectors, protective sleeves; indicate whether cables are replaceable
Network Activation Fee (include ongoing network management fee under Operational costs below)
One-time fee to activate network features per station
Communication Hardware
Provide description
Other equipment items, if relevant
Provide description

III. Installation (Construction & Electrical)

Item
Description
Quantity
Unit Cost
Total Cost (1 dual-port station)
Total Cost (4 ports)
Construction / Trenching
Underground conduit work in parking lot (trenching, boring, concrete, asphalt) and repairs; open trenches must be safely covered during off hours
Concrete and bases for chargers, or similar
Provide description
Safety features for chargers, such as bollards
Provide description
Other construction items, if relevant
Provide description; ensure project meets ADA accessibility requirements
Conduit & Wiring
From electrical panel to charging stations
Panel Upgrades
New circuit breakers, meter upgrades, or added capacity
Transformer Upgrade (if needed)
External or pad-mounted transformer work
Other electrical components, if relevant
Provide description; a method for disconnecting chargers may be necessary depending on the site.
Installation Labor (licensed electrician, construction employees, etc.)
Include hourly rate of each worker, estimated hours needed, and duration of time
Signage & Pavement Markings
EV-only and/or Accessible-EV-Use-Last signs, paint, wayfinding decals
Landscaping
Site restoration, replanting
Station Commissioning
Final testing, utility sign-off, activation
Other installation items, if relevant
Provide description

IV. Operational Costs (Provide annual cost data)

Item
Description
Quantity
Unit Cost
Total Cost Per Year (1 dual-port station)
Total Cost Per Year (4 ports)
Networking Fees / Software (all categories)
Connectivity, user access, remote diagnostics, data sharing

Clarify in application if cost is invoiced all at once or annually

5-year Warranty (all categories)
Equipment and labor warranties

Clarify in application if cost is invoiced all at once or annually

Maintenance & Repairs / Support (Category 3)
Example: Routine inspections, cleaning, cable replacements; Applicants to Category 3 must customize this price bid template to match their maintenance and repairs service that meets the safety, reliability, and customer service objectives of this RFP and these specific categories.
Maintenance & Repairs / Support (Category 4)
Example: Routine inspections, cleaning, cable replacements; Applicants to Category 4 must customize this price bid template to match their maintenance and repairs service that meets the safety, reliability, and customer service objectives of this RFP and these specific categories.
Electricity Costs
Power usage based on kWh delivered
Data & Reporting Services
Reporting platform
Other operational items, if relevant
Provide description
Hourly rate for respective team members
Include hourly rate of each worker, estimated hours needed, and duration of time.

V. Other Costs

Item
Description
Quantity
Unit Cost
Total Cost (1 dual-port station)
Total Cost (4 ports)
Battery Storage (for demand management) (cost would need justification for approval)
Mitigate peak loads or store solar (covered outside project)

Summary Estimate (4 networked ports)

Item
Cost (total of 4 ports)

1.Planning

2.Equipment

3.Installation

Total Capital Cost (#1 + #2 + #3 above)

Operating Cost (Annual)