SMG MEP Project Addendum No. 1 -DETERMINATION.doc

DOC document 38 KB Posted

Attached to
ARRA - American Recovery and Reinvestment Act-Design-Build Services for General MEP Upgrade, Repair and Alterations
Solicitation number
4PGA-VFL01233-3
Issued by

About this file

SITE VISIT -PREPROPOSAL SCHEDULED FOR NOVEMBER 3 2009 AT 1 00 P.M.

View the file

Other files

File Type Posted
domestic water pump information.pdf PDF
SF 30.pdf PDF
Volume 3 Revised.pdf PDF
Revised Bid Form.pdf PDF
Response to Bidder RFI.pdf PDF
RFI Response .pdf PDF
GenerateSF30.pdf PDF
GenerateSF30.pdf PDF
Attendance Sheet SMG MEP Pre-bid_2009.11.03.pdf PDF
amendment to c006.pdf PDF
CxA GCH MEP DB SOW_2009.07.07.pdf PDF
Signed PBS Order 3490.1.pdf PDF
ORCA 20Quick 20Reference 20Guide.pdf PDF
RFP MEP OCTOBER 2009.doc DOC document
GenerateSF1442.pdf PDF
RFP MEP OCTOBER 2009.doc DOC document
ORCA 20Handbook.pdf PDF
ORCA 20Quick 20Reference 20Guide.pdf PDF
GenerateSF1442.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DETERMINATION

Solicitation _

THERE WILL BE A SITE VISIT/PRE-PROPOSAL CONFERENCE IN THE 3RD FLOOR CONFERENCE ROOM OF THE SAM M. GIBBONS U.S. COURTHOUSE, LOCATED AT 801 FLORIDA AVE, TAMPA, FL, AT 1:00 P.M. NOVEMBER 3, 2009.

ALL QUESTIONS MUST BE SUBMITTED TO BOBBIE CLARK IN WRITING VIA FAX 404-331-7696 OR ELECTRONIC MAIL TO BOBBIE.CLARK@GSA.GOV. QUESTIONS MUST BE RECEIVED BY NOVEMBER 6, 2009 TO ALLOW THE GOVERNMENT ADEQUATE RESPONSE TIME PRIOR TO PROPOSAL DUE DATE.

only Offerors acting as Prime Contractor submitting Design-Build proposals directly to GSA may contact GSA's Contracting Officer, Bobbie Clark to formally request as-built drawings. As-built drawings and other information included in this solicitation include Sensitive But Unclassified (SBU) building information. SBU documents provided under this solicitation are intended for use by authorized users only. In support of this requirement, GSA requires bidders/offerors to exercise reasonable care when handling documents relating to SBU building information per the solicitation and in compliance with PBS Order PBS 3490.1, dated March 8, 2002. It shall be the responsibility of the Prime Contractor to distribute the information received to its project team, and to ensure compliance with the constraints of PBS 3490.1.

DOCUMENT SECURITY

NOTICE TO PROSPECTIVE BIDDERS/OFFERORS

This solicitation includes Sensitive But Unclassified (SBU) building information. SBU documents provided under this solicitation are intended for use by authorized users only. In support of this requirement, GSA requires bidders/offerors to exercise reasonable care when handling documents relating to SBU building information per the solicitation.

REASONABLE CARE:

1. Limiting dissemination to authorized users. Dissemination of information shall only be made upon determination that the recipient is authorized to receive it. The criterion to determine authorization is need-to-know. Those with a need-to-know are those who are specifically granted access for the conduct of business on behalf of or with GSA. This includes all persons or firms necessary to do work at the request of the Government, such as architects and engineers, consultants, contractors, sub-contractors, suppliers, and others that the contractor deems necessary in order to submit an offer/bid or to complete the work or contract, as well as maintenance and repair contractors and equipment service contractors.

Note: It is the responsibility of the person or firm disseminating the information to assure that the recipient is an authorized user and to keep records of recipients.

Authorized users shall provide identification as set forth below:

Valid identification for nongovernment users. Authorized non-Government users shall provide valid identification to receive SBU building information. The identification shall be presented and verified for each dissemination. Valid identification shall be all items (a) through (c), below, and including item (d), as necessary:

(a) A copy of a valid business license or other documentation granted by the state or local jurisdiction to conduct business. The license at a minimum shall provide the name, address, phone number of the company, state of incorporation, and the name of the individual legally authorized to act for the company. The business must be of the type required to do the work. A general contractor's license may be substituted for the business license in states that issue such licenses. In the rare cases where a business license is not available from the jurisdiction, the information shall be provided and testified to by the submitter; and

(b) Verification of a valid DUNS Number against the company name listed on the business license or certification. Verification may be obtained through http://www.fpdc.gov/, or by calling Dun & Bradstreet at 703-807-5078 to set up an account; and

(c) A Valid IRS Tax ID Number of the company requesting the information; and, as necessary,

(d) A Valid picture state driver's license shall be required of person(s) picking up SBU documents. Phone verification must be made to a previously validated authorized user that the individual(s) picking up the documentation is authorized to do so by the company obtaining the documents. SBU documents will not be released to any individual or firm who has not, either previously or at the time of pickup, supplied the required documentation as outlined in paragraphs (a) through (c), above.

Solicitation _

2. Retaining and destroying documents. The efforts required above shall continue throughout the entire term of the contract and for whatever specific time thereafter as may be necessary. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning or shredding hardcopy, and/or physically destroying CD's, deleting and removing files from the electronic recycling bins and removing material from computer hard drives using a permanent erase utility or similar software.

3. Term of Effectiveness. The efforts required above shall continue throughout the entire term of contract and for what specific time thereafter as may be necessary, as determined by the Government. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention.

4. Written agreement of disposal. For all contracts using SBU building information, the contractor shall provide a written statement that he and his subcontractors have properly disposed of the SBU building documents, with the exception of the contractor's record copy, at the time of Release of Claims to obtain final payment. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning or shredding hardcopy, and/or physically destroying CDs, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software. The recipient acknowledges the requirement to use reasonable care, as outlined above, to safeguard the documents and, if not awarded, the contract (and at the completion of any protest/appeal process) will make every reasonable and prudent effort to destroy or render useless all SBU information received during the solicitation.

I agree that I will abide by this agreement and will only disseminate Sensitive but Unclassified (SBU) building information to other authorized users under the conditions set forth above.

Signature: ______________________________________________

Title: __________________________________________________

Date: _____________________________

___ Copy of valid business license attached

___ Copy of picture driver’s license from applicant requesting SBU information attached

IRS Tax ID Number: _________________________________________

DUNS Number: _________________________________________

Prime Contractors should fully execute the above form and transmit a copy, along with their request for as-built drawings, to Contracting Officer, Bobbie Clark via email at bobbie.clark@gsa.gov.

Provide the contact information below and a CD disk shall be transmitted to the appropriate party via FedEx overnight.

Organization: ______________________________________

Contact: __________________________________________

Phone: ______________________________

Email: ___________________________________________

Address:

Item below intended for GSA use only Solicitation Verified: Yes No

File details come from the government source that posted it. Updated .