About this file

Page 2 Amendment 0001

View the file

Other files

File Type Posted
domestic water pump information.pdf PDF
SF 30.pdf PDF
Volume 3 Revised.pdf PDF
Revised Bid Form.pdf PDF
Response to Bidder RFI.pdf PDF
RFI Response .pdf PDF
GenerateSF30.pdf PDF
GenerateSF30.pdf PDF
Attendance Sheet SMG MEP Pre-bid_2009.11.03.pdf PDF
CxA GCH MEP DB SOW_2009.07.07.pdf PDF
Signed PBS Order 3490.1.pdf PDF
SMG MEP Project Addendum No. 1 -DETERMINATION.doc DOC document
ORCA 20Quick 20Reference 20Guide.pdf PDF
RFP MEP OCTOBER 2009.doc DOC document
GenerateSF1442.pdf PDF
RFP MEP OCTOBER 2009.doc DOC document
ORCA 20Handbook.pdf PDF
ORCA 20Quick 20Reference 20Guide.pdf PDF
GenerateSF1442.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.: GS-04P-10-EX-C-0006 (Design-Build Services for General MEP Upgrade, Repair and Alteration Work at the Sam M. Gibbons Courthouse in Tampa, Florida)is amended as follows:

PLEASE NOTE:

PROPOSAL DUE DATE IS CHANGED FROM NOVEMBER 23, 2009 TO NOVEMBER 24, 2009,

2:30 P.M.

DUE DATE FOR SUBMITTING QUESTIONS IS CHANGED TO NOVEMBER 13, 2006 COB.

1. Volume 3 - The quantity amount is changed from five (5) to seven (7) for all proposal (technical) documents and copies of (Price) SF 1442, solicitation, offer and award.

2. Volume 3 – Proposal and Award – provision for electronic submittal is deleted. NO ELECTRONIC

SUBMITTAL WILL BE ACCEPTED.

3. Reference RFP Page 12 section titled "Reference Materials Item a. Asbestos 6 Month Periodic Surveillance Report Latest Edition.” This item and all references to it shall be DELETED.

4. Reference RFP Page 12 sections titled - Reference Materials Item b. "Existing MEP Record CD AutoCAD Drawings for reference only". Documents provided by Contracting Officer via Federal Express Mail upon verification of Bidders submitted information. All Bidders shall comply with PBS 3490.1 requirements in reference to distribution of all Sensitive But Unclassified (SBU) Information. Reference PBS 3490.1 attached.

5. Reference RFP Page 12 section titled - Reference Materials Item c. "Designed dwgs for projects on Sam Gibbons Courthouse - October 20, 2006". Documents provided by Contracting Officer via Federal Express Mail. All Bidders shall comply with PBS 3490.1 requirements in reference to distribution of all Sensitive But Unclassified (SBU) Information. Reference PBS 3490.1 attached.

6. Reference RFP Page 13 - Project Delivery Team Roles and Responsibilities ...The specific activities, tasks, and deliverables required of the CxA are further delineated in the CxA scope Attached below. All Bidders shall comply with PBS 3490.1 requirements in reference to distribution of all Sensitive But Unclassified (SBU) Information. Reference PBS 3490.1 attached.

7. Reference RFP Page 45 - "5. Parking Garage Stairway Tower Air Circulation and Water Accumulation Avoidance: 5.1 (Reference design drawings by Seay, Seay and Litchfield for information only).

Documents provided by Contracting Officer via Federal Express Mail. All Bidders shall comply with PBS

3490.1 requirements in reference to distribution of all Sensitive But Unclassified (SBU) Information.

Reference PBS 3490.1 attached.