amendment to c006.pdf
PDF 15 KB Posted
- Solicitation number
- 4PGA-VFL01233-3
About this file
Page 2 Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| domestic water pump information.pdf | ||
| SF 30.pdf | ||
| Volume 3 Revised.pdf | ||
| Revised Bid Form.pdf | ||
| Response to Bidder RFI.pdf | ||
| RFI Response .pdf | ||
| GenerateSF30.pdf | ||
| GenerateSF30.pdf | ||
| Attendance Sheet SMG MEP Pre-bid_2009.11.03.pdf | ||
| CxA GCH MEP DB SOW_2009.07.07.pdf | ||
| Signed PBS Order 3490.1.pdf | ||
| SMG MEP Project Addendum No. 1 -DETERMINATION.doc | DOC document | |
| ORCA 20Quick 20Reference 20Guide.pdf | ||
| RFP MEP OCTOBER 2009.doc | DOC document | |
| GenerateSF1442.pdf | ||
| RFP MEP OCTOBER 2009.doc | DOC document | |
| ORCA 20Handbook.pdf | ||
| ORCA 20Quick 20Reference 20Guide.pdf | ||
| GenerateSF1442.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.: GS-04P-10-EX-C-0006 (Design-Build Services for General MEP Upgrade, Repair and Alteration Work at the Sam M. Gibbons Courthouse in Tampa, Florida)is amended as follows:
PLEASE NOTE:
PROPOSAL DUE DATE IS CHANGED FROM NOVEMBER 23, 2009 TO NOVEMBER 24, 2009,
2:30 P.M.
DUE DATE FOR SUBMITTING QUESTIONS IS CHANGED TO NOVEMBER 13, 2006 COB.
1. Volume 3 - The quantity amount is changed from five (5) to seven (7) for all proposal (technical) documents and copies of (Price) SF 1442, solicitation, offer and award.
2. Volume 3 – Proposal and Award – provision for electronic submittal is deleted. NO ELECTRONIC
SUBMITTAL WILL BE ACCEPTED.
3. Reference RFP Page 12 section titled "Reference Materials Item a. Asbestos 6 Month Periodic Surveillance Report Latest Edition.” This item and all references to it shall be DELETED.
4. Reference RFP Page 12 sections titled - Reference Materials Item b. "Existing MEP Record CD AutoCAD Drawings for reference only". Documents provided by Contracting Officer via Federal Express Mail upon verification of Bidders submitted information. All Bidders shall comply with PBS 3490.1 requirements in reference to distribution of all Sensitive But Unclassified (SBU) Information. Reference PBS 3490.1 attached.
5. Reference RFP Page 12 section titled - Reference Materials Item c. "Designed dwgs for projects on Sam Gibbons Courthouse - October 20, 2006". Documents provided by Contracting Officer via Federal Express Mail. All Bidders shall comply with PBS 3490.1 requirements in reference to distribution of all Sensitive But Unclassified (SBU) Information. Reference PBS 3490.1 attached.
6. Reference RFP Page 13 - Project Delivery Team Roles and Responsibilities ...The specific activities, tasks, and deliverables required of the CxA are further delineated in the CxA scope Attached below. All Bidders shall comply with PBS 3490.1 requirements in reference to distribution of all Sensitive But Unclassified (SBU) Information. Reference PBS 3490.1 attached.
7. Reference RFP Page 45 - "5. Parking Garage Stairway Tower Air Circulation and Water Accumulation Avoidance: 5.1 (Reference design drawings by Seay, Seay and Litchfield for information only).
Documents provided by Contracting Officer via Federal Express Mail. All Bidders shall comply with PBS
3490.1 requirements in reference to distribution of all Sensitive But Unclassified (SBU) Information.
Reference PBS 3490.1 attached.
8. All members of the successful Bidder's team shall comply with the Security Clearance Process indicated in the attached document titled "Clearance Request Process for Long-Term Contract Employees" (dated June 1, 2009).