Enclosure No.1 Instructions to Offerors_4-B176-Q-00095-00.doc

DOC document 250 KB Posted

Attached to
Heavy Duty 4-Wheel Dynamometer
Solicitation number
4-B176-Q-00095-00
Issued by

About this file

This document provides instructions to offerors for solicitation number 4-B176-Q-00095-00 from the Department of Energy Office of Science. Over an 18-month period, Argonne National Laboratory will build, commission, and demonstrate a fully integrated medium- and heavy-duty vehicle chassis dynamometer. A dynamometer manufacturer will execute this project in four distinct tasks including dynamometer design, construction, shipment, and optional installation and commissioning. Offerors are requested to provide firm fixed price proposals by November 16th, 2023 for review under a best value methodology, with technical and pricing factors considered approximately equal. Proposals should include separate technical and pricing volumes, acceptance of technical requirements, and other supporting documentation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP-4-B176-Q-00095-00

11/13/2023

INSTRUCTIONS TO OFFERORS

1.

Definitions: As used in this Document

Offeror
The party that makes an OFFER and looks for acceptance from the offeree. In this document, the “Offeror” is the generic term for prospective contractors that submit Bids or Proposals.

Argonne or

“the Laboratory” Argonne National Laboratory is operated by the UChicago Argonne, LLC under Prime Contract with the U. S. Department of Energy. As contractor, UChicago Argonne, LLC is responsible for the management of Argonne and endeavors to ensure that Argonne effectively carries out the mission assigned to it by the sponsoring government agency. UChicago Argonne, LLC is a nonprofit, limited liability corporation.

Discussions
Negotiations that occur after establishment of the competitive range that may, at the Laboratory Procurement Official’s discretion, result in the offeror being allowed to revise its quotation.
In writing
Any word or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
Modification
A change made to a quotation before the solicitation closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

2.

Explanation to Prospective Offerors (a) Over an 18-month period, Argonne National Laboratory will build, commission, and demonstrate a fully integrated medium- and heavy-duty vehicle chassis dynamometer. A dynamometer manufacturer will execute this project in four distinct, yet closely related tasks including dynamometer design (task 1), dynamometer construction (task 2), dynamometer shipment (task 3), and an optional task of dynamometer installation and commissioning (task 4).

*******THIS R.F.P. USES BEST VALUE METHODOLOGY******

(b) Any prospective Offeror desiring an explanation or interpretation of the solicitation, technical documents etc., must request Question and Answers in writing prior to 12:00 CST on November 16, 2023 with replies sent to all prospective Offerors before the submission of the offers. Oral explanations or instructions given before the award of the contract will not be binding. Any information given to a prospective offeror concerning a solicitation will be furnished promptly to all other prospective Offerors as an amendment of the solicitation, if that information is necessary in submitting offers or if the lack of it would be prejudicial to any other prospective Offerors.

3.

Proposal Requirements (CONTENT):

(1) All Proposals shall be responsive to the terms and conditions contained in this solicitation.

(2) Any exceptions taken shall be detailed and refer to specific paragraphs of the technical requirements. The Laboratory reserves the right to accept minor deviations from the specifications attached.

(3) Proposals should be submitted in two (2) parts; Part I - Technical Management Information, and Part II - Price and Business Management Information.

Each of the parts shall be separate and complete in itself so that evaluation of one may be accomplished independently of and concurrently with the evaluation of the other. A cover page is not required for submittal of the two management proposals. The Technical Information shall not contain any reference to price. It must include sufficient information to address the specification requirements and technical evaluation criteria identified in (Best Value Eval Criteria) which is made part and included as an attachment for this solicitation.

(4) A completed and fully executed copy of the Pre-Award Information and Booklet of Representations and Certifications (ANL-70B) which accompanies this solicitation, must be included to be considered responsive and eligible for consideration of award.

4.

Price

(a) Firm Fixed Price, “FOB Destination” proposals are requested. “FOB destination” refers to the location where title will be transferred to Argonne. The contractor maintains all responsibility up to that destination point, and FOB does not refer to freight charges. No upcharge on freight will be accepted.

(b) Proposals shall be firm for a minimum period of sixty (60) days after the “due date” defined on page 1 of the Request for Quotation.

5.

Delivery Requirements

Offerors are requested to quote their earliest and most realistic delivery date with the knowledge that said delivery may be a prime factor in making an award.

6.

Proposal Evaluation/Source Selection

(a) It is the preference of the Laboratory to purchase from a single source. The Laboratory reserves the right to have multiple awards if, after considering the additional administrative costs, it is in the Laboratory’s best interest to do so.

(b) Any resultant award will be made to the responsible offeror whose proposal contains the combination of those criteria offering the best overall value to Argonne. This will be determined by comparing the difference in cost to Argonne. Price and price related factors will not be scored or adjectively rated.

(c) In making a final selection, Argonne is more concerned with obtaining superior technical, or management features, than with making an award at the lowest cost to Argonne. However, Argonne will not make an award at a significantly higher overall cost to Argonne to achieve slightly superior technical or management features. TECHNICAL EVALUATION FACTORS AND COST OR PRICING ARE APPROXIMATELY EQUAL IN IMPORTANCE.

(d) Offerors should remember that when making trade-off decisions during proposal evaluations, Argonne will give preference to a contractor that demonstrates a high degree of expertise through past performance records, experience, and overall project quality; rather than, relatively small price savings.

7.

Award

Argonne may award a contract on the basis of initial offers received, without discussion. Therefore, each initial quotation should contain the bidder’s best terms from a cost or price and technical standpoint.

Argonne may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in this solicitation, offers may be submitted for quantities less than those specified. Argonne reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the offer.

(c) Neither financial data submitted with an offer, nor representation concerning facilities or financing, will form a part of the resulting contract. However, if the resulting contract contains a clause providing for price reduction for defective cost or pricing data, the contract price will be subject to reduction if cost or pricing data furnished is incomplete, inaccurate, or not current.

8.

Submission of Offers

Proposals are due by 12:00 PM. (CST) on the “due date” defined on page one (1) of the “Request for Quotation,” dated November 13, 2023.

********Offers and modification thereof shall be submitted by the following method:

(1) Electronic submittal. Electronic Mail will be (1) addressed to mmurtaugh@anl.gov and (2) the subject line must identify the Argonne solicitation number and the name of the offeror.

The following documents must be fully executed by a person authorized to legally bind the Offeror:

· TECHNICAL PROPOSAL

· PRICE PROPOSAL

· ANL-70 Request for Quotation

· ANL-70B Representations and Certifications

· Price justification stated in ANL-70 RFQ

· Certificate of Insurance

· Written acceptance of the technical requirements listed in the Statement of Work, “Medium/Heavy-Duty 4-Wheel Drive Chassis Dynamometer" dated October 26, 2023

· Written acceptance and proof of the technical requirements listed in the Quality Assurance Procurement Requirements ANL-407

· Signed OCI Disclosure

This procurement is subject to the provisions of the Buy American Act, and domestic manufacturers using more that 60% domestic materials are preferred.

9.

Late Submissions

Proposals received after the date and time specified may be rejected by Argonne without further review.

10.

Restriction on Disclosure and Use of Data Offerors or quoters who include in their proposals or quotations data that they do not want disclosed to the public for any purpose or used by Argonne except for evaluation purposes, shall—

(a) Mark the title page with the following legend:

"This proposal or quotation includes data that shall not be disclosed outside Argonne and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal or quotation. If, however, a contract is awarded to this offeror or quoter as a result of—or in connection with—the submission of this data, Argonne shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit Argonne's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets (insert numbers or other identification of sheets)"; and

(b) Mark each sheet of data it wishes to restrict the following legend:

"Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal or quotation."

11.

Acknowledgment of Amendments to Solicitations Offerors shall acknowledge receipt of any amendment to this solicitation (a) by signing and returning the amendment; (b) by identifying the amendment number and date in the space provided for this purpose on the form for submitting an offer; or (c) by electronic mail. Argonne must receive the acknowledgment by the time and at the place specified for receipt of offers.

File details come from the government source that posted it. Updated .