General Site Map.pdf
PDF 2 MB Posted
- Attached to
- RFI for Remedial Action Contractor Services for Groundwater Extraction and Treatment System York, Nebraska
- Solicitation number
- 4-B157-P-00225-00
- Issued by
-
Department of Energy Office of Science
About this file
This document is a Request for Information (RFI) for Remedial Action Contractor Services to install a Groundwater Extraction and Treatment System (GETS) at a former USDA - Commodity Credit Corporation site in York, Nebraska.
The key details are: The GETS system will extract and treat (using air stripping) groundwater contaminated by carbon tetrachloride and chloroform. The contractor is required to provide all labor, equipment, tools, supplies, and materials to install the GETS system, including drilling 3 extraction wells and 2 injection wells; onsite layout and piping installation; installation of a gravel pad and prefabricated groundwater treatment plant building with air stripper; provision and installation of a SCADA and communications system; site restoration; system startup and commissioning; construction close-out and reporting. The RFI is being issued by the U.S. Department of Energy Office of Science on behalf of Argonne National Laboratory, who is assisting the USDA with implementation of the Remedial Action Plan. Respondents are requested to confirm their interest in the project to the RFI point of contact.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request For Information (RFI).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROAD 5
R O
AD
ROAD 2
R O
AD
R O
AD
R O
AD
SI
TE
L
AY
O U
T
INJ1A
INJ1B
GWEX 3
GWEX 2
GWEX 1
NOTES:
TOTAL ESTIMATED PIPING LENGTH IS ~3.93 MILES.
ELECTRICAL FOR GWEX1, GWEX3, INJ1A AND INJ1B ARE
PREFERRED TO BE SUPPLIED BY LOCALIZED POWER
DROPS. ELECTRICAL FOR GWEX2 IS ANTICIPATED TO BE
SUPPLIED FROM THE TREATMENT PLANT.
EXACT LOCATION OF EXTRACTION AND INJECTION
WELLS TO BE DETERMINED IN THE FIELD.
1"=600'
N
PREFERRED INFLUENT
PIPING ROUTE 4-INCH
HDPE PIPING
PREFERRED EFFLUENT
PIPING ROUTE
2x4-INCH HDPE PIPING
PREFERRED INFLUENT
PIPING ROUTE 3-INCH
HDPE PIPING
STREET SIDE OF
STREET UTILITY
ROAD 1 W SAN SEWER
ROAD 1 E 10" WATER MAIN, OVERHEAD ELECTRIC
ROAD 2 N
10" WATER MAIN, SAN SEWER UNDER ROAD, OVERHEAD
ELECTRIC, COMMUNICATION
ROAD 2 S NONE
ROAD 4 W COMMUNICATION
ROAD 4 E 10" WATER MAIN, SAN SEWER UNDER ROAD, COMMUNICATION
ROAD 5 N
10" WATER MAIN STOPPING @ WEST SIDE OF PROPERTY A,
COMMUNICATION, GAS, OVERHEAD ELECTRIC
ROAD 5 S
SAN SEWER SERVICE LINE FROM PROPERTY A TO ROAD 4,
COMMUNICATION
ROAD 6 W
SAN SEWER SOUTH OF ROAD 5, COMMUNICATION,
OVERHEAD ELECTRIC
ROAD 6 E COMMUNICATION
LEGEND
GW TREATMENT PLANT
PROPOSED GWEX WELL
PROPOSED INJ WELL
FIRE HYDRANT
PREFERRED INFLUENT
PIPING ROUTE
PREFERRED EFFLUENT
PIPING ROUTE
KNOWN UTILITIES
rsedivy Rectangle rsedivy Text Box
PROPERTY A