XLSX spreadsheet 627 KB Posted
- Solicitation number
- Doc2448869350
- Issued by
- North Carolina
About this file
This is a Bid Worksheet form issued by the North Carolina Department of Public Safety, Division of Emergency Management (NCEM), for acquisition and demolition construction services under the Hazard Mitigation Grant Program (HMGP) Project 4827-0200 in Dare and Jones County. The worksheet is designed for prequalified vendors to submit itemized bids for property acquisition and site demolition work across multiple properties. Three properties are included in this bid opportunity: 23233 Sea Oats Drive in Rodanthe, 106 West Lakeview in Trenton, and 213 South Market Street in Trenton. Vendors must complete a separate Property Worksheet for each property, detailing acquisition costs (intake/DOB calculation, appraisal, title research, document preparation, legal fees, and closing fees) and site demolition costs (asbestos/lead inspection, structure demolition, UST/other clearance, and grade/seed work). The worksheet includes provisions for three miscellaneous line items per work phase per property. Vendors must also provide profit and overhead costs and construction management costs as applicable and submit an overall project timeframe in days from Notice to Proceed through closeout.
Vendors are required to complete the entire Bid Worksheet without modifications to formulas or line items, under penalty of proposal rejection. All light blue cells must be completed by the vendor, with unit prices and quantities required for each line item. The worksheet auto-calculates totals for each work phase and the grand total across all properties. The submission must include a total project completion timeframe that the vendor shall strive to meet to comply with HMGP goals and deadlines. No specific pricing, award date, contract term, set-asides, or bid submission deadline information is contained within this worksheet form itself; those details are referenced as being in the accompanying Scope of Work and Invitation for Bid documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4827-0051 Belhaven, 4827-0118 Jones, 4827-0172 Dare, 4827-0200 Dare and Jones Acq demo.pdf | ||
| 4827-0118+-+Jones+County+-+Acq+Bid+Worksheet.xlsx | XLSX spreadsheet | |
| 4827-0051+Town+of+Belhaven+-+Acquisition+Bid+Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SUMMARY SHEET
| North Carolina Department of Public Safety |
| Emergency Management |
| ACQUISITION REQUEST FOR BID WORKSHEET |
| RFB NUMBER: |
| VENDOR: |
| BID DATE: |
| BID SUMMARY | |
| WORK PHASE | TOTAL |
| ACQUISITION | $0.00 |
| SITE DEMOLITION | $0.00 |
| PROFIT & OVERHEAD | $0.00 |
| CONSTRUCTION MANAGEMENT COSTS | $0.00 |
| GRAND TOTAL: | $0.00 |
TOTAL PROJECT TIME (DAYS):
| NOTES: | **Please read the following information carefully** |
| 1) The Vendor shall fill out this Bid Worksheet in its entirety. | |
| 2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal. | |
| 3) Vendor is responsible for providing information in light blue cells. | |
| 4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Construction Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB. | |
| 5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable. | |
| 6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet. | |
| 7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs). | |
| 8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity. | |
| 9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines. |
REF-SHEET2-DONOTMOVE
*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.
Opt-PROPERTY (1)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 23233 Sea Oats Dr |
| PROJECT #: | 200 | CITY: | Rodanthe |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Acquisition | Intake / DOB Calculation | $0.00 | ||||
| Appraisal | $0.00 | |||||
| Title Research | $0.00 | |||||
| Document Prep | $0.00 | |||||
| Legal Fees | $0.00 | |||||
| Closing Fees | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Opt-PROPERTY (2)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 106W Lakeview |
| PROJECT #: | 200 | CITY: | Trenton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Acquisition | Intake / DOB Calculation | $0.00 | ||||
| Appraisal | $0.00 | |||||
| Title Research | $0.00 | |||||
| Document Prep | $0.00 | |||||
| Legal Fees | $0.00 | |||||
| Closing Fees | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Opt-PROPERTY (3)
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4827 | STREET ADDRESS: | 213 S Market St |
| PROJECT #: | 200 | CITY: | Trenton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Acquisition | Intake / DOB Calculation | $0.00 | ||||
| Appraisal | $0.00 | |||||
| Title Research | $0.00 | |||||
| Document Prep | $0.00 | |||||
| Legal Fees | $0.00 | |||||
| Closing Fees | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Acquisition Total: | $0.00 | |||||
| Site Demolition | Asbestos / Lead Inspection | $0.00 | ||||
| Structure Demolition | $0.00 | |||||
| UST / Other Clearance | $0.00 | |||||
| Grade / Seed | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Site Demolition Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
REF-LASTSHEET-DONOTMOVE