47QSWC25Q0192 Amendment 001 Engine Lathe.pdf

PDF 468 KB Posted

Attached to
AFLCMC Engine Lathe
Solicitation number
47QSWC25Q0192
Issued by

About this file

This document is an Amendment (Amendment 001) to a Request for Quotation (RFQ) 47QSWC25Q0192 issued by GSA/FAS Federal Acquisition Service for nine (9) manual, toolroom lathes. The amendment includes a set of detailed questions and answers addressing potential accessories and specifications for the lathes. Key technical requirements include a removable steady rest, a quick-change tool post with at least four turn/face toolholders, minimum two removable toolholders conforming to ISO 13399 standards, and specific chuck and collet requirements. The Q&A clarifies that the government is seeking manual, toolroom lathes and provides guidance on packaging and shipping, with additional details referenced in an attached SPI (Solicitation Provisions and Instructions).

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO.

AMENDMENT 001

3. EFFECTIVE DATE

SEE BLOCK 16C.

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (IF APPLICABLE)

6. Issued By Code 7. ADMINISTERED BY (If other than Item 6) Code

GSA/FAS FEDERAL ACQUISITION

SERVICE, General Supply & Services (GSS), Assisted Contracting Branch B

819 TAYLOR ST

FORT WORTH, TX 76102

8. Name and Address of Contractor (No., street, county, State and ZIP Code (x) 9A. AMENDMENT OF SOLICITATION NO.

RFQ# 47QSWC25Q0192

X 9B. DATED (SEE ITEM 11)

September 30, 2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended. X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of is extended

Offers Offer's must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ___1____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or

(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(3) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO : (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF :

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, X is required to sign this document and return _1__ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The above numbered solicitation is amended as follows:

1. The purpose of this Amendment is to revise the Request for Quotation (RFQ) 47QSWC25Q0192 based on Questions and Answers.

The Questions and Answers attached are to be incorporated into the Request for Quotation. Quoters must sign and return a copy of Amendment 001, which acknowledges receipt and accepts the changes to this procurement.

All other terms and conditions remain unchanged.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

DANIEL HERRERA, CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

________________________________________ BY ______________________________________________

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

RFQ47QSWC25Q0192 Engine, Lathe General Questions and Answers

1. Will this current opportunity seek any accessories (such as the below named) for the nine (9) lathes?

3 Jaw Chuck-6 in.

Collets- 5-C (minimum 7-piece set 1/8in. - 7/8 in. round) by 1/8 in. increments Quick Change Tool Post with Toolholders and Cutter Holders.

Chucks shall feature serrated jaws and shall be of the manual, wrench operated variety. Chucks and collets shall be capable of imparting clamping force necessary to hold the workpiece during turning operations. Adapters and hardware necessary to mount the chucks and/or collets shall be included.

Chucks and collets shall conform to American Society of Mechanical Engineers (ASME) B5.9.

Tooling, attachments, and accessories. All tooling, attachments, accessories, and hardware required to render the machine usable shall be included, including, as a minimum:

Toolholders. A minimum of two removeable toolholders shall be provided.

Toolholders shall be functional with the lathe or toolholder provided. The toolholder shall be capable of holding C-style inserts via top clamping and hole clamping, though not simultaneously. The toolholder shall be in a right-handed, external tool orientation and have a 95-degree angle. The toolholder shall conform to ISO 13399 standards.

Steady rest. A removeable steady rest shall be provided for increased support when turning long or narrow workpieces. The steady rest shall be able to be positioned anywhere along the work bed in the Z direction and mechanically locked into place. The steady rest shall be usable with or without the tailstock in use. The steady rest shall be adjustable to support workpieces up to 3.0 inches (toolroom lathes) or 6.375 inches (engine lathes).

Quick-change tool kit. A removeable quick-change tool post shall be provided that allows for quick and repeatable manual tool changes. The kit shall include all hardware for mounting the tool post onto the system, for at least four turn/face toolholders compatible with the toolholder and a boring bar holder compatible with the boring bar. The tool post shall be capable of rotating/adjusting orientation and locking into place.

2. 2. What style of Lathe is the government seeking?

Manual, Toolroom Lathe.

3. We understand machines will be shipped to different locations, do you need any special packaging? Or a skid, wrapped in plastic, is fine or fully crated?

Referenced in the SPI, The SPI is attached.

4. There were no accessories requested. Just wanted to confirm you do not need any accessories and also any special electrics required such as UL?

See above for clarification on accessories.

File details come from the government source that posted it. Updated .