47QSSC-25-R-3040N_T10_SF30_Amendment 1_ 10-28-2025.pdf
PDF 647 KB Posted
- Attached to
- GSA-Approved Security Container Program
- Solicitation number
- 47QSSC-25-R-3040N
- Issued by
-
GSA Federal Acquisition Service
About this file
This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for solicitation number 47QSSC-25-R-3040N issued by GSA, FAS, Facilities and Hardware SCM Contracting Division. The amendment (0001) extends the date for receipt of drawings and revises submission requirements for Original Equipment Manufacturers (OEMs). Key changes include: (1) OEMs must submit drawings for every offered Contract Line Item Number (CLIN) by 5pm CST on December 1, 2025, with drawings dated after October 24, 2025, and (2) a note that offerors with outstanding drawing requirements after December 1, 2025 may not be considered for award.
The amendment modifies several sections of the Request for Proposal, including Section L (Instructions to Offerors) and Section M (Evaluation Factors for Award), specifically updating language about physical mailing of drawings and removing drawing submission requirements from certain evaluation factors. The solicitation closing date remains November 7, 2025, at 5:00 pm CST. Offerors are required to acknowledge the amendment in block 15 of SF 33 and transmit the acknowledgment to the government email address, with a warning that failure to acknowledge and sign all amendments may result in the proposal being found not technically acceptable.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amanda B. Foley, Contracting Officer
The attachment details revisions to the solicitation made under amendment 0001.
GSA, FAS, Facilities and Hardware SCM Contracting Division 2300 Main Street, Kansas City, MO 64108
47QSSC-25-R-3040N
10/28/2025
10/24/2025 x x
The purpose of this amendment 0001 to solicitation number 47QSSC-25-R-3040N is to (1) extend the date for receipt of drawings, and (2) revise the solicitation accordingly regarding the submission of the drawings.
All revisions will be shown in red, italic font below with the obsolete solicitation language being strikethrough in the revised Request for Proposal (RFP) document. All other provisions, clauses, and terms and conditions contained within the solicitation remain unchanged unless indicated herein:
1. The section titled, “Drawings ” has the following revisions in red, italic font as shown below.
On page 11, a sentence was revised to the following, “Original Equipment Manufacturers (OEMs) must submit drawings for every offered Contract Line Item Number (CLIN) by 5pm CST on December 1, 2025. All drawings must be dated as having been reviewed after October 24, 2025.”
On Page 12, the following note was added: “NOTE: Offerors with outstanding drawing requirements after December 1, 2025 may not be considered for award.”
2.The following sections have been revised in red, italic font as shown below.
● The section titled, “Section L - Instructions to Offerors,”
○ Page 90, under paragraph 1b, a sentence was revised to the following, “Drawings must be physically mailed to the address listed in Section C by the date and time specified in that section.”
○ Page 91, under paragraph 5, a sentence was revised to the following, “Drawings must be physically mailed to the address listed in Section C by the date and time specified in that section.”
● The section titled, “Section M - Evaluation Factors for Award,
○ Page 99, under the paragraph for EVALUATION REQUIREMENTS, a sentence was revised to the following, “Drawings must be physically mailed to the address listed in Section C by the date and time specified in that section.”
○ Pages 99-101, the submission requirement for drawings by the solicitation close date has been removed from both Factor 1: Submission of Required Documents, Factor 2: Completion of Required Documents, and Factor 5: Brand Name National Stock Numbers.
The solicitation closing date remains November 7, 2025 at 5:00 pm CST.
Offerors must acknowledge their receipt of this amendment number 0001 to this solicitation in block 15 on SF 33, Solicitation, Offer and Award (See page 1 of the RFP). The offeror's acknowledgment of their receipt of this amendment must be transmitted to the Government email address shown in Block 10C of SF 33.
Failure to acknowledge and sign all amendments may result in your proposal being found not technically acceptable.
File details come from the government source that posted it. Updated .