47QFAA21Q0055 - BLM Water - Site and Disposal Area Layout - Attachment E.pdf

PDF 199 KB Posted

Attached to
Northwest Oregon Water Testing and Wastewater Treatment / Bureau of Land Management
Solicitation number
47QFAA21Q0055
Issued by

About this file

This solicitation seeks proposals for operation and maintenance of a wastewater treatment system and potable water testing services. Under Task 1, the contractor will operate and maintain a Level 1 domestic sewage collection and treatment system serving a recreation site, residence, and administration building. Services must comply with permits, plans, and standards. Task 2 requires regularly collecting and testing potable drinking water samples from 14 water systems. Testing shall adhere to state requirements. Proposals are due by September 7, 2021. The Bureau of Land Management and General Services Administration are involved. Questions must be submitted by August 20. The contractor will be selected based on best value.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Standard Operating Procedures

Shotgun Wastewater Treatment Plant

This document describes procedures for wastewater systems operations Conduct weekly system inspections to identify repair or maintenance requirements.

All operations, maintenance, repairs and reporting will be in compliance with the current Shotgun Wastewater Permit and Recycled Water Use Plan.

Record daily operations data in the Shotgun Wastewater log.

Project requests may come from, hereafter referred to as project proponent;

o District Engineering Team o District Recreation Staff o Field Office Staff o Emergency Situations o Other

• Requests for service should include;

o Project Location o Description of project

• Once a project is identified and a request for service is received the assigned engineer or technician will work with the project proponent to develop a general statement of work and perform initial site investigations to determine existing conditions of the project

• District engineer will determine, based on workloads, timelines, and staff knowledge and experience, if design services will be performed in-house or by other means (i.e. Forest Service, A&E, etc.)

Contracting

• Contracts with an Independent Government Estimate of less than $25,000 will be procured through district procurement.

• Contracts with an Independent Government Estimate of greater than or equal to $25,000 will be procured through State Office procurement with prior State Office Engineering review.

References

• Recycled Water Use Plan S:\Engineering\Water Wastewater Reports\Shotgun WWTP

• Shotgun Wastewater Permit S:\Engineering\Water Wastewater Reports\Shotgun WWTP file://ilmoreu3ds1/eu/loc/Shared/Engineering/Water%20Wastewater%20Reports/Shotgun%20WWTP

-------:::::-.. ;:;;~_;;;,,;.;;;,:;:,~=-~-=-~--:---- i\ :, "i-1-ll 11'

II ',,

; 't"::.f~ f ·,,i:;; ·(!

G_

1,:1GA1...vsn.------

CHLORINE CONTACT

---~:~~~~;;~=~~~====~~~---------------------------------------------------------l'""'A"'WlNG'"''°='C"-·7

~ ~~·-~~~:::= I

DETAILS

c.o f\)

SHOTGUN PARK EFFLUENT DISPOSAL AREA

I I I I I I I I I I I I I I I I I I I I \ I

VALVE DRAIN VALVE .ck .. -~ ..

I I I I :q I

I I I I I

-:r 9 I I

I I I I I

SPRINKL R f ,\ HEADs, , r f SPRINKLE I I I I I I I I I I I I

I I I

I-:

z:

u.J :

I

__j I

LL_ :

LL_ :

u.J :

I I I I I I I I I I I I

I? V, t 9 '.,</( / . : q I .._ _, V,C-. 1 I --- --~ ,. I I 121' - - - - -c±:r ----~ -------- ------------

\ \Sc . ~ \ \ -1'v&s,.._ ~,.()<¢' ~ ¢ <,:1- , I I I I I I I I I

I

I I

S RiNkL R HEAD i I 1q

INKLER HEA

I I I I I

I I I I I I

I I

: q I I

-K

DRAIN VALV

OJ

0)

5' c\-\ \N

INSTALLED:

I I

I I

DRAIN

OJ

CO N

..p.. 0 co

"1

OJ

K-LINE 01410 POLY LOW DENSITY PIPE, 50mm 900 - ELEVATION

21 NELSON R2000WF ROTATOR SPRINKLER HEADS

(Adjusted to 45 psi max pressure, 40' apart)

TWO RAIN BIRD PESB-R SERIES SCRUBBER VALVES

(in center valve boxes, to alternate & regulate flow on sprinkler lines)

FOUR 1.5" GHEEN DRAIN VALVES (located at end of lines)

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

EUGENE DISTRICT OFFICE

03/11

File details come from the government source that posted it. Updated .