Attachment 5 - ADA Map with Door Dimensions.pdf
PDF 236 KB Posted
- Solicitation number
- 47PL0225Q0004
About this file
This document is a floor plan/layout drawing showing ADA accessibility requirements for door modifications at the Pacific Wildland Fire Sciences Laboratory Suite 201 in Seattle, which comprises approximately 10,272 square feet of office space.
The drawing details specific door dimensions (98 1/4" x 35 5/8" x 1 3/4" and 84" x 35 3/4" x 1 3/4") and highlights doors requiring handicap access modifications in red. The layout includes numerous offices, cubicles, conference rooms, and common areas. Key security features are noted, including a push-button lock and key access point approximately 6 feet above the floor at the reception desk entrance, and a numeric keypad-secured women's restroom at the end of the hall. The floor plan appears to be specifically focused on identifying doors that need ADA-compliant modifications to support the solicitation's requirement for installing automatic door openers on four sets of doors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/16/24, 1:54 PM OTH_07212023105918_662.ppt chrome-extension://gbkeegbaiigmenfmjfclcdgdpimamgkj/views/app.html 1/1
# 48
739.8 SF
Large Conference Room
# 46
237.9 SF
Kitchen
# 70
54.0 SF
Restroom
# 49
283.4 SF
Small Conference
Room
# 50
192.0 SF
Copier area
# 47
169.2.0 SF
Lobby
# 25
55.8 SF
cubicle
# 24
54.5 SF
cubicle
Server
Room # 45
192.8 SF
Computer room
# 32
Shared office
327.4 SF
# 26
73.3 SF
cubicle
# 28
78.0 SF
Cubicle
# 27
81.1 SF
cubicle
# 30
54.8 SF
cubicle
# 29
56.5 SF
cubicle
Office
# 65
64.7 SF
cubicle
# 67
64.7 SF
cubicle
# 66
64.7 SF
cubicle
# 62
60.7 SF
cubicle
# 63
64.0 SF
cubicle
# 64
63.3 SF
cubicle
# 23
50.8 SF
Storage closet
# 22
50.9 SF
cubicle
# 21
53.5 SF
cubicle
# 20
60.0 SF
cubicle
# 16B
71.5 SF
½ of shared office
# 16A
71.5 SF
½ of shared office
# 1
83.3 SF
office
# 2
102.8 SF
office
# 4
108.4 SF
office
# 3
105.5 SF
office
# 11
120.0 SF
office
# 10
121.3 SF
office
# 9
177.5 SF
office
# 7
124.9 SF
office
# 6
113.0 SF
office
# 15 155.3
SF
office
(GSV)
# 14
113.8 SF
office
# 13
118.8 SF
office
# 12
163.8 SF
office
# 19
126.4 SF
office
# 18
124.6 SF
Office
# 17
157.5 SF
office
Printer/ Plotter
# 47A
84.5 SF
Reception desk
# 61
173.8 SF
Plus
92.2 SF
Common
Space
Building Hallway
35th Street building entrance lobby
Pacific Wildland Fire Sciences Laboratory Suite 201
(Not to Scale) Approximately 10,272 Sq. Ft.
# 33
159.8 SF
# 31
109.1 SF
# 44
66.1 SF
Elect. C loset
Building Hallway
C loset
# 8B
145.6 SF
office
# 8A
171.3 SF
office
# 5
148.0 SF
office
Shelves,file cabs
Shelves,file cabs
File cabinets
Door to women’s public restroom at end of hall. The door is locked with a numeric keypad. {area not to scale)
The door to the reception desk is locked with a push button lock & key beside the door, approx. 6’ above the floor.
Bldg entrance, 35th Street side
GUIDE TO DOORS
Doors in red will or may need handicap access.
reder Line reder Line reder Line reder Line
| Door to womens: |
| Text1: 98 1/4" x 35 5/8" x 1 3/4" |
| Text2: 98 3/4" x 35 5/8" x 1 3/4" |
| Text3: 84" x 35 3/4" x 1 3/4" |
| Text4: 84" x 35 3/4" x 1 3/4" |
File details come from the government source that posted it. Updated .