Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

47PK0222Q0008/0002

Description of Modification Continuation Page

I. The following are in reference to specific Section changes and/or updates in the RFQ Performance Based Scope Of Work (PBSOW).

1. Section J:

a. “Exhibit J6.2 U.S. DOL Wage Rates” is hereby updated to reflect WD 2015-5613 Revision 21 dated 03/15/2022 (See Attachment 1).

2. Section M.2.3, Teaming, Mentor-Protege, Joint Ventures is hereby added:

“For any teaming agreements, Mentor-Protégé agreements, Prime/Subcontract, Joint Ventures, etc., where the non 8(a) entity’s experience and past performance is used to meet the technical criteria, the 8(a) Contractor must submit a letter signed by the parties indicating their commitment to fulfilling the requirement for the full anticipated contract term and must include concurrence with SBA requirements of the 8(a) entity by indicating the percentages and types of work to be performed by each entity.

Contractors may only utilize the performance of another entity for which they’ve included a signed letter, however the 8(a) contractor must submit at least one (1) project and indicating their own experience under the technical criteria. Contractors shall not make any changes, modifications, and/or outside arrangement(s) that change the composition of the parties as submitted in the signed letter without the Contracting Officer’s approval.

II. The following are responses to submitted Pre-Quote Questions (PQQ).

1. Can GSA provide a site map of the area that will need to be covered for Grounds Maintenance?

Government Response: There are currently no site maps available for the current grounds maintenance. The site visit was utilized to cover most of these areas.

2. Can the Government provide a list of current vendors used for window washing, pest control, grounds maintenance, and solid waste management.

Government Response: No.

3. Can you please provide the # of windows needed to be cleaned for window washing.

Government Response: Number of windows not available. Exterior and interior windows washing shall be performed once per year. See C.3.1.11.

4. Can you please provide the sq footage of areas that need to be cleaned within the federal building and courthouse.

Government Response: Please see Exhibit J1: Building Information Sheet.

5. For solid waste management/recycling, what is the frequency of services for trash and recycling (i.e. 2x a week) and size of containers currently being used onsite (i.e. 8 cu yd container / compactor)?

Government Response: Solid waste management/recycling frequencies vary based on the Government’s contract (separate) with the Los Angeles City and County.

6. What is the current annual value of the contract per month ?

Government Response: Please utilize usaspending.gov for any questions regarding current contract pricing.

7. What is the current amount for the base year and all option years per year?

Government Response: See PQQ #6.

8. Has the scope of work , under the new solicitation, remained the same , decreased or increased compared to the current Solicitation contract ?

Government Response: This is a Request For Quote, not a solicitation. The PBSOW has changed under the current RFQ. Quoters should submit a quote package based on the requirements issued in RFQ

47PK0222Q0008.

9. In the last five years has the scope of work changed?

Government Response: Yes. See PQQ #8.

10. Does the previous contractor compete this solicitation contract?

Government Response: We do not share this information.

11. What is the current contract term (1 base year and 4 option years)?

Government Response: Base plus four (4) one year options.

12. Is there a mandatory site visit?

Government Response: No. Please review Section L.3 of the RFQ.

13. Can you give us the current personnel number and Anniversary Dates of Employment Government Response: No.

14. Can you give us the current supply estimated cost, including paper products and chemicals?

Government Response: No. See PQQ #6.

15. Can you give us an estimate of the daily population for each facility?

Government Response: No

16. Who is the incumbent contractor ?

Government Response: Bishop/Exemplar JV

17. What is the current contract number?

Government Response: 47PK0217D0004

18. Do you have the new Collection Bargain agreement for 2022 Government Response: The current CBA is uploaded on the Sam.gov website.

19. We only have 2 projects currently with the over 500k square footage mentioned. Will the GSA consider a teaming agreement (prime has two and sub has one) meeting the 3 required projects? Or is there a work around? Such as we have over 1 million sq. feet will it count for two? Or a combination of other projects?

Government Response: The technical criteria requirements remain unchanged. See Amendment 0002 Section I, subparagraph 2.

20. Is Exhibit J6.1 (CBA Agreement), the correct one for this solicitation? The CBA lists employee wage rates for solely engineers. Solicitation 47PK0222Q0008 is a Custodial & related services at Edward R. Roybal, which I believe do not require any engineers, but rather janitors, and perhaps tree trimmers.

Can you confirm if this is in fact the correct CBA agreement?

Government Response: The incorrect CBA was originally uploaded on the Sam.gov site but was replaced with the correct CBA on 03/24/2022.

21. What is the current incumbent contract number for this solicitation?

Government Response: Please see PQQ #17.

22. Could you please send me a copy of the current contract for the Custodial and Related Services Edward R.

Roybal Federal Building & U.S. Courthouse?

Government Response: Interested parties should reference Section L.7 of the RFQ to submit a Freedom of Information Act (FOIA) request. Quoters should submit a quote package based on the requirements issued in

RFQ 47PK0222Q0008.

23. I would like to confirm if the effort mentioned above is considered a new requirement. If not, is Contract # GS09P12KSD0007 the incumbent contract?

Government Response: Please see PQQ #17.

24. If there is an incumbent, could you please provide the current / previous contract number?

Government Response: Please see PQQ #17.

25. In our experience, many respondents overlook FAR 52.208-9 and provide quotes that include commercially equivalent products, which adversely impacts the Federal Government's mission of supporting manufacturing agencies who employ people who are blind. How would you recommend to ensure products made by people who are blind are supplied?

Government Response: FAR 52.208-9 is included in the RFQ and therefore a requirement of the PBSOW.

Quoters are required to ensure their quote packages meet all of the requirements of the RFQ.

26. We do not have three contracts that are over 500,000 gsf. Any chance you can change the requirement to two of the three projects being for buildings over 500,000 gsf? This will allow us to bid on this contract and perhaps other small businesses as well.

Government Response: The technical criteria requirements remain unchanged.

27. Section M mentions we need 3 projects in the last five years of 500,000 sq. feet, we only have two. Is there a work around this requirement?

Government Response: Please see PQQ #26.

28. CBA APPENDIX A* States "B. New employee start rate for the life of the Contract shall be $11.50" and "C. After one year of employment said new employee shall be brought up to the applicable wage rate for each year."

Request: Please provide a copy of the Seniority List or the percentage of employees Government Response: These records are not available at this time.

29. Please provide the breakage of square foot by building (Edward R. Roybal Federal Building & U.S. Courthouse) Government Response: Please see PQQ #4.

30. Please provide the breakage of the square foot for the types of floor in each buildings (i.e. Carpets, Granite, Marble, Terrazzo, Wood, etc) Government Response: Approximately 768,691 sq ft floor types (carpet, granite, VTC flooring, LVT flooring, concrete flooring, raised flooring

31. Please provide the quantity of Drinking Fountains, Fixtures (Toilets, Sinks, Urinals), Passenger Elevators/Escalators, Floor Mats/Runner, Stairs.

Government Response: Approximately 58 drinking fountains; Approximately 273 toilets/urinals, Approximately 210 sinks, 24 elevators, 2 floor mats, 4 different stairwells.

32. Please provide the quantity of Trash and Recycle receptacles & Ash Receptacles Government Response: Not available. No ash receptacles in and around the facility.

33. Please provide the quantity/square foot of Windows & Windows Blind Government Response: size of windows 69”x 68”, 17 1/4”x68”, 32 ½” x 62”

34. In CLEANABLE SQUARE FOOT DATA (CSF), please clarify the Restroom, Kitchen & Classroom square foot are inclusive of Child Care Restroom, Kitchen & Classroom. If not, please provide the Child Care square ft breakage for Restroom, Kitchen & Classroom Government Response: All square footage is approximate. Restroom square footage is approximately 25,929.84SF, Cafeteria square footage is approximately 7,252.29 SF, and Child Care square footage is approximately 5,788.34 SF.

35. In CLEANABLE SQUARE FOOT DATA (CSF), other areas are not included in Net Cleaning area- Question:

Please confirm if other area is also needs to be cleaned. If so, please provide the square foot for those areas.

Government Response: The pricing of the quoter shall be based on the Rentable Square Footage (RSF).

Cleaning is still required outside the CSF. The CSF is provided to allow the potential quoter further detail as to what the RSF breakdown contains.

36. Please provide the Frequency for the task as the Frequency listed in C.9.4 Cleaning Requirements are only for Child Care Government Response: The frequency of cleaning requirements in the child care is listed in the PBSOW Section C.9.4.

37. Please confirm if there is a requirement for Snow removal as mentioned in section C.15.7 Snow and Ice Removal for Areas Requiring Heavy Equipment.

Government Response: There is no requirement for Snow and Ice Removal. Requirements are hereby removed.

38. M.2.1.1 Experience: 1. Performing custodial services within secured facilities in a single building consisting of commercial office, executive, and public meeting spaces of 500,000 gross square feet performed within the past five (5) years that are similar in nature to the one described in this solicitation. Questions #1 What is meant by "secured facilities?" The Edward R. Roybal Federal Building & U.S. Courthouse do not require a top or secret clearances nor do we see any requirements cleaning in Sensitive Compartmented Information Facility (SCIF) areas, can you explain why offerors are required to have references of facilities that are "secured facilities?"

Government Response: The building is considered a secured facility as access to certain spaces is limited and requires monitoring by an individual and or system that prevents unauthorized access, as a result, quoters are required to provide experience in secured facilities.

39. Questions #2 We have contracts such Edward R. Roybal Federal Building & U.S. Courthouse that have more than one building on the contract that are commercial office, executive, and public meeting spaces of 500,000 gross square feet performed within the past five (5) years that are similar in nature to the one described in this solicitation, please confirm this is what is meant by "single building?"

Government Response: The definition of single building is “a building separated from other buildings by intervening clear space; or separated into divisions by solid, vertical, load-bearing walls.”

40. Please confirm if there is a requirement for Snow removal as mentioned in section C.15.7 Snow and Ice Removal for Areas Requiring Heavy Equipment

Government Response: Please see RFI #37

Exterior Window Washing (C.3.2.1, C.3.2.2, C.15.3)

41. Who certifies the swing stage system?

Government Response: The Operations & Maintenance contract has the responsibility to certify the swing stage on an annual basis.

42. When was the last time the annual inspection was performed on the swing stage system by a Cal/OSHA S.I.T.

Certified entity?

Government Response: Exact dates and additional information will be provided to the awardee as coordination with the O&M contractor will be required. The last annual inspection was performed during the 4th quarter of the Government’s fiscal year in 2021.

43. Please provide the last two annual inspection reports of the swing stage system.

Government Response: This information cannot be provided at this time, however the last annual inspection was performed during the 4th quarter of the Government’s fiscal year in 2021.

44. Is the building aware that it is responsible to certify the swing stage equipment during the entire window cleaning cycle? (GSA’s cost). One annual inspection and possibly one 30-day inspection.

Government Response: Yes

45. What window cleaning company currently cleans or last cleaned the building?

Government Response: This information is not available at this time.

46. How did they deal with the low parapet wall issues?

Government Response: Any wall issues discovered will be addressed by GSA.

47. Due to wind and heat, may the window cleaning be performed from 4 a.m. to 1:30 p.m.?

Government Response: The Field Office will provide authorization of when window washing shall be performed.

Escort may be required for both roof and agency access.

48. Does the building have an Operating Procedure Outline Sheet (OPOS)? If yes, may we have a PDF copy? If not, please send us the swing stage (drop zone) roof plans.

Government Response: This information is not available.

49. There is an opaque glass crown on the building without any access to the exterior panes. Are those to be cleaned?

Government Response: Yes

50. What is the current budget line item for the window cleaning?

Government Response: This information is not available.

51. Does the roof have any leaks?

Government Response: No.

52. Does the building have any leaks on the curtain wall system?

Government Response: Yes, in 2 possible locations.

53. Is there a timeline to clean the exterior windows (start to finish)?

Government Response: Exterior window washing shall be coordinated with the Field Office team.

54. How did the last window cleaning company rig the west vertical barrel area to access the windows below?

Government Response: This information is not available.

Interior Window Washing (C.3.1.11, C.15.2)

55. Does the GSA provide a lift to access the interior of the tall windows? (E.g. High lobby windows and other high elevator lobby areas) Government Response: No.

Recording Presence (H.11)

56. May we have a copy of the sign in sheet?

Government Response: A copy of the Pre-Quote Conference/Site Visit was uploaded to Sam.gov as an attachment.

57. What is the pest control frequency for the building?

Government Response: This requirement shall be determined by the quoter and outlined in the Quality Control Plan.

58. What is the pest control scope? What areas are we going to service?

Government Response: Please see C.6.

59. What is the pest control frequency for the kitchen? Does it include the patio?

Government Response: To be determined by the quoter.

60. Does the scope include the garage?

Government Response: Yes, the PBSOW includes the garage.

61. It was mentioned that a coffee shop was going to be installed in the future, will that be part of the scope? If so, do you have the square footage for it?

Government Response: Approximately 207.28 sqft

62. Will we need to be part of the GSA/Vendor meetings?

Government Response: See Section C.11.2 of the PBSOW. The contractor shall participate in GSA, tenant meetings, quality control meetings, and partnering meetings requested by the CO or the designee.

63. Is the current Pest Control provider a sub-contractor of the janitorial company or is the staff in house and we will need to hire them?

Government Response: This is a Performance Based requirement. Potential quoters should determine how they will fulfill this requirement. GSA does not utilize in-house staff for this requirement.

64. Sq. footage to be cleaned – The building information sheet reflects Gross sq. feet, Cleanable sq. feet and rentable

sq. feet; which of the listed items is the contractor responsible for? Please clarify the sq. footage to be cleaned (interior and exterior).

Government Response: The quoter will need to provide cleaning for 763,486 rentable square feet.

65. The net cleaning area listed on page 42, reflects 567,549.02, which excludes the areas with an asterisk. Please advise if the areas with an asterisk (for instance the garage/Parking) should be included from the contract labor estimate? Please clarify the sq. footage to be cleaned (interior and exterior).

Government Response: Cleaning of the garage space is a requirement in the PBSOW. The cleanable square footage provide allows for the contractor to determine the level of cleaning required for each of the space types provided. The quoter will need to provide cleaning for 763,486 rentable square feet.

66. Regarding the Child Care Center - only the interior sq. footage of the childcare center is listed in the net cleaning area. Is the Playground to be also included in the contract labor estimate since it also listed in the PBSOW? Please clarify the sq. footage to be cleaned (interior and exterior).

Government Response: Quoters shall include cleaning of the exterior playground. The interior square footage is 5,788.34 RSF. There is no measurement for the exterior playground.

67. During the call, it was mentioned the Rentable sq. footage was to be used in the vacant space reductions if any, therefore should the rentable sq. feet be used for the contract labor estimate?

Government Response: The rentable square footage of 763,486 of a fully occupied building shall be used for the labor estimate. If there are vacant space reductions, please see section B.6.

68. Please provide site map reflecting the exterior areas covered by the contract.

Government Response: There is currently no site map available for the exterior area covered by the contract.

69. Stripping and Waxing – Are Public Areas Only to be included standard services?

Government Response: Stripping and waxing is required for the public areas.

70. Should a JV already have had three contracts awarded, will the JV be considered for a fourth award? Two of the listed attendees currently have had 3 contracts awarded under a JV, would they qualify for more awards under the SBA rules?

Government Response: The SBA “three in two years” is no longer in effect as of November 2020. As such, a JV can have as many contract awards within a two year period starting from the date of the first award. However, if the JV was awarded their first contract prior to the rule change, their JV agreement may still reflect the three in two year rule and that would be binding.

71. Regarding experience levels – Can a JV or Prime/Sub partnership use combined experience to meet the requirements listed in Section M.2.1?

Government Response: See Amendment 0002 Section I, subparagraph 2 of this Amendment.

72. Is there a location and allowance for the contractor to bring in a washer and dryer to launder work materials (towels/mops)?

Government Response: Yes.

73. Will follow up questions for additional clarification on the original questions be accepted?

Government Response: No.

74. Is the incumbents most recent CPARS rated higher than Satisfactory?

Is the incumbents most recent CPARS rated lower than Satisfactory?

Is the incumbents most recent CPARS rated Satisfactory?

Government Response: FAR 42.1503(4)(d) deems all past performance data as Source Selection Sensitive.

75. What is the number of receptacles required by the contractor to provide at the start of the contract?

All in the building or just replacements as needed?

Government Response: Replacement as needed

76. What is the number of dispensers required by the contractor to provide at the start of the contract? All in the building or just replacements as needed?

Government Response: The Government is not clear on which dispensers this question refers to.

77. How many restrooms are located in building?

Government Response: Approximately 50 restrooms. Please see Attachment 2 which provides an approximate layout for the restrooms by showing the 1st Floor layout and a typical floor plan.

78. How many Pest Control calls are being placed above the scheduled calls annually?

Government Response: Approximately 24 calls annually

79. When is the last time the interior windows were cleaned?

Government Response: September 30, 2021

80. When is the last time the exterior windows were cleaned?

Government Response: September 30, 2021

81. What was the last date the Window cleaning staging equipment was OSHA Certified for use?

Government Response: Approximately September 1, 2021

82. Is the Operations and Maintenance contractor currently performing periodic pressure washing on the exterior of the building or the incumbent?

Government Response: Periodic pressure washing is not a recurring service and is performed as an above standard service when ordered by the Field Office.

83. Part M. Evaluations for Award M.2.1.1 Experience & M.2.1.2 Past Performance Page 96-97 “Quoter will MEET this Technical Criteria by submitting three (3) Similar Work projects” & Quoters must submit past performance information for the three (3) projects submitted under M.2.1.1- Experience.

Context: We plan to bid as a team to meet the (3) Similar Work Projects requirement.

Question: When contractors are teaming Prime/Sub, will experience & past performance from both individual entities be considered equal and as part of the “Team” bidding? Or will a Joint Venture be required to view both partners' experience references as part of the bidders qualifications and past performance? In other words : What partnership formation - Team Prime/Sub or Joint Venture will provide the strongest position to demonstrate qualifying experience and past performance?

Government Response: Please see Amendment 0002 Section I, subparagraph 2.

84. Part L.5 Submission of Quote Package #7 *Volume I – Technical Quotation is limited to 25 pages, to include the Experience Reference Data Sheets (ERDS) and Past Performance Questionnaires (PPQ).

Question: Does this statement above lead to understanding that Part L.5.7 c. Additional Quote Submission Requirements: Communication Plan, QCP, Cleaning Schedule and Staffing Plan are not part of the 25 page limit?

Government Response: As stated in the PBSOW, “Volume I – Technical Quotation is limited to 25 pages, to include the Experience Reference Data Sheets (ERDS) and Past Performance Questionnaires (PPQ).” As such, the items that do not fall under Volume I such as the Communication Plan, QCP, Cleaning Schedule and Staffing Plan do not fall within this page limitation.

85. Part C. Description/Specifications/Statement of Work Page 13 – 50 Question: What changes were made from the incumbent contract SOW to this new Acquisition SOW?

Government Response: See PQQ # 8.

86. No Part in the Solicitation Specifically Question: Does the government have any information about when/if the building will see more tenant population?

We understand that the use of the building, as with most facilities post-2020, has gone down.

Government Response: Not at this time.

87. Question: Does the government anticipate any additional square footage, or scope work to be added to the contract post-award?

Government Response: Not at this time.

88. Exhibit J.6.1The current CBA Agreement post in Beta.Sam expired 9/21. What are the current wages per the CBA agreement?

Government Response: Please review the CBA attachment posted on SAM.gov. The CBA expires September 1, 2022.

89. Exhibit J.6.1If the CBA Agreement has expired, how are we to bid on wages moving forward?

Government Response: See PQQ #88.

90. Exhibit J6.1 When a new Bargaining Agreement is established and the wages that we bid are lower than the agreement will an REA for wage difference be accepted by the government?

Government Response: The Government cannot determine acceptability of future REAs. The contractor who is awarded the contract will be able to submit a Request For Equitable adjustment in accordance with the RFQ and regulatory requirements.

91. Exhibit J.6.1 - Since there is not any applicable wages in the Bargaining Agreement after 9/22 is the bidder to continue to use the 9/21 wage throughout the option years and submit an REA once a new agreement has been reached?

Government Response: The contractor who is awarded the contract will be able to submit a Request For Equitable adjustment in accordance with the RFQ and regulatory requirements.

92. Exhibit J.6.1 When is the SCA Wage Determination listed in this RFQ applicable since the wage and benefits are apparently controlled by a CBA?

Government Response: Please review Section B.5 of the PBSOW.

93. C.3.1 What is the square footage of floors that require stripping and waxing?

Government Response: See Building Information Sheet

94. C.3.1.2 What is the square footage of floors that are carpeted?

Government Response: See Building Information Sheet

95. C.3.1.3 Who is responsible for replacements of mats and runners?

Government Response: C.3.1.3 The government shall furnish all mats and runners.

96. C.3.1.4 How many shower liners are there to be replaced?

Government Response: Replace as needed

97. C.3.1.4 What is the square footage of ceramic tile?

Government Response: See Building Information Sheet

98. C.3.1.4 What type of hand towels are being used, rolls or multi-folds?

Government Response: Rolls and Multi-folds

99. C.3.1.4 What type of toilet paper dispensers are being used standard rolls or jumbo rolls?

Government Response: Both types

100. C.3.1 How many square feet is there of marble, granite and terrazzo floors are there?

Government Response: See Building Information Sheet

101. How many Janitorial closets are there in this facility?

Government Response: One per floor

102. C.3.1.4 Is the contractor responsible for replacing dispensers or is this part of the O&M contract?

Government Response: The custodial contractor is responsible for providing replacement dispensers. C.3.1.4

103. C.3.1.4 If the Contractor is responsible for replacing dispensers, how many of each type dispenser are there to be replaced?

Government Response: The Government is not clear on which dispensers this question refers to.

104. C.3.11 How many total floors are there in the facility?

Government Response: This is a 26 story facility.

105. C.3.1.11 What is the number of windows that are to be cleaned?

Government Response: Not available. All windows are to be cleaned. Please see PQQ #33.

106. C.3.1.17 What time does the Food Service Contractor’s day end?

Government Response: Cafeteria hours are from 7:00AM-2:00PM Hours subject to change.

107. Can a building floor plan be provided?

Government Response: A floor plan is not available to the general public.

108. C.4.5 How many Cubic yards of mulch are historically put out?

Government Response: None

109. C.4.7 Will the contractor be able to dispose of material in the dumpsters on site?

Government Response: Yes, GSA currently has trash and recycling dumpsters located in the sub basement.

110. C.4.8 What is the approximate square footage of turf at the facility?

Government Response: Not available

111. What is the square footage of flower beds to be planted?

Government Response: Square footage is not available. Please see PQQ #22.

112. What is the square footage of unimproved ground to be maintained?

Government Response: None

113. C.5.1 What are the types and sizes of the dumpsters that are currently being provided?

Government Response: 300 NLA and Roybal FB currently share loading dock space for trash and recycling services. The loading dock is currently comprised of the following (and maybe subject to change):

● Blue dumpster, 3 yd

● Green, 2 yd

● Black (trash compactor), 30 yd

● Black (roll off), 40 yd,

● Recycling compactor (Cubic Yards TBD)

114. C.15.11 How many holding cells are there in the facility?

Government Response: Approximately 45

115. M.2.1.1 Is experience that has a single site with multiple buildings consisting over 500,000 sqft going to be considered as acceptable relevant experience.

Government Response: No. Please see PQQ # 39 for the definition of a single building.

116. C.4 Will a storage area for the ground’s maintenance equipment be provided on site?

Government Response: Not at this time.

117. L.5 – 7.a 7.c and 8. Based on our review of the requirements, 25 pages would not be sufficient to provide the comprehensive responses requested. To meet the submission requirements can we submit the plans, experience references, etc., as attachments to the main document of 25 pages?

Government Response: No, the page limitation remains unchanged. Please reread the PBSOW which states “Volume I – Technical Quotation is limited to 25 pages, to include the Experience Reference Data Sheets (ERDS) and Past Performance Questionnaires (PPQ).” No attachments or links to the Volume will be accepted.

118. Are there any mandatory staffing requirements for key personnel, such as on-site Project Manager or Quality Control Manager?

Government Response: Please review the PBSOW for all mandatory staffing requirements.

119. Are there specific times of day that janitors are required to clean?

Government Response: No, however, the custodial contractor must be able to provide immediate response in accordance with the requirements in the PBSOW.

120. Is it the Government’s intent for the Contractor to arrange for a recycling company to remove recyclables from the premises, or are those arrangements made by the Government? To clarify, the contractor is expected to collect all recyclables form cleaning spaces and place them in a designated recycling collection point without sorting?

Government Response: Yes, Contractor to arrange for removal

121. Has the current Solicitation changed significantly from the incumbent contract? If so, please describe the differences.

Government Response: Please see PQQ #8.

122. Exhibit J1 gives building information, but no information about the grounds effort.

Government Response: Please see general photos provided in Attachment 3 which show some of the plants to be maintained.

123. C.4.4 Please provide the number of trees and shrubs to be maintained. C.15.5 How frequently are the trees to be thinned?

Government Response: 29 trees, approximately 25 shrubs. Maintain as needed.

124. C.4.5 How much area is to be mulched? Is the contractor responsible for providing the mulch?

Government Response: Not Applicable

125. C.4.6, C.4.8 How much area requires mowing, fertilizing, dethatching, plugging? How much linear feet of edging?

Government Response: Roybal Plaza Lawn.

126. C.4.10 Are we required to replace flowers or plant in bed and planters, or are they provided by the government?

Government Response: Contractor is responsible for replacement.

127. C.4.13 How much fence line, what type of fences is the contractor required to maintain?

Government Response: Fence Line is located at Day Care exterior. Linear feet not available.

128. C.4.15 Is there an irrigation system the contractor is required to maintain?

Government Response: Yes

129. C.3.1.16 states the contractor is responsible to maintain the plants in the Atrium. Please provide an inventory of the plants in the Atrium and any special soil or plant care requirements.

Government Response: Yes, the contractor is responsible. Both drought tolerant and non-drought tolerant.

130. Exhibit J1 states that the building has 26 stories, but on the site visit we saw only 21 stories. Are there some stories of the building for which the contractor will not be responsible?

Government Response: 26 stories to include underground parking and multi-roof levels

131. C.15.4 Does the pressure washing have to be conducted after hours? Are there exterior water hook-ups the contractor can use to supply the pressure washer? Is there a required frequency for pressure washing?

Government Response: Yes

132. C.15.11 How many holding cells are in the building, and their sizes?

Government Response: Approximately 45, sizes vary.

133. C.15.15 Are COVID disinfecting services to be priced separately, or included in the overall labor hours in the custodial breakdown?

Government Response: Please review the PBSOW, Section B.2.3.

134. Please confirm that the selected contractor will not be responsible for refuse/trash disposal from the building site. During the site visit, it was said that GSA has a separate contract with the City of Los Angeles for refuse services.

Government Response: Contractor will be responsible for refusing trash disposal. Trash will be moved to trash compactor and picked up by trash company

135. I have attached the Collective Bargaining Agreement that is included as Exhibit J6.1 with the RFP package. Appendix A on page 28 of the agreement has two tables as part of paragraph D. In the table it appears to be displaying the wage rate and Health and Welfare for the periods of September 2019, September 2020 and September 2021. Per the RFP Section B.5, proposers shall price their proposals using the CBA rates.

My question is what is the wage rate and Health and Welfare Rate for Custodian and Lead categories that are effective September 2021? Also, if there are any other collectively bargained benefits or wages that is not displayed in Exhibit J6.1, please communicate them.

Government Response: The Health and Welfare Rates are shown in Article XVIII in the CBA. The hourly Wage Rates are shown in Appendix A.

136. What arrangements are available for employee parking? It was noted that parking was limited and if employees must park in adjacent parking structures for a fee, what allowance should be included in pricing?

Government Response: It is the responsibility of the employee to make their own personal transportation and parking arrangements.

137. 1. Under Section C, the criteria for how the government is planning to evaluate performance frequency is vague. Reviewing Exhibit J5 Definitions, the definition of Standard Service is equally vague, can the Government define whether Standard should be interpreted as daily, once per shift, weekly, bi-weekly, monthly or another desired frequency?

Government Response: No. This is a Performance Based requirement. This is a procurement strategy that seeks to issue technical requirements that set forth outcomes for performance instead of specific requirements on how to perform the service

138. Can the Government please delineate the cleaning frequencies for each task the government would like the contractor to perform for Standard Services?

Government Response: This is a Performance Based requirement. Potential quoters should determine how they will fulfill this requirement.

139. Section C.3.1 Interior Services is referenced as a standard service requirement for Section 3.1.4, can the Government please elaborate on the meaning of "interior standard services" and how it relates to the requirements outlined in Section C.3.1.4? Similarly, in the same section, for the "Routine cleaning" of the Holding Cells, Section C.15.11 Holding Cell Interiors, an Above Standard Service, is referenced however when viewing that section, it again refers the vendor to Section C.3.1.4, a standard service. Can the Government please establish the cleaning frequencies and service requirements requested for this service?

Government Response: See PQQ #138.

140. Section C.3.1.1 Floor Care; Stripping Floors: The old finish or wax shall be removed in accordance with standard commercial practices and spots shall be eliminated. There shall be no evidence of burns or wax build-up in corners or crevices. How would the Government expect the floors to be stripped?

Government Response: See PQQ #138.

141. Section C.3.1.2 Carpets and Rugs; Vacuuming shall be done at a frequency that protects the carpets integrity and to reduce carpet wear. How does the Government interpret "frequency that protects the carpet integrity and reduces carpet wear"? How does that translate to the frequency required to fulfill the task?

Government Response: See PQQ #138.

142. Please explain the wage applicable by classification in Appendix A. How much is a lead worker's wage in 2021? How much is a custodial worker's wage in 2021?

Government Response: The minimum prevailing wage for Janitors is $19.40. The minimum prevailing wage for the lead worker is not shown. The classification amounts indicate the amount added from the previous years hourly rate (i.e. September 2019 was $18.40 and $0.45 was added in September 2020 for the revised hourly wage of $18.85).

143. Section C.3.1.7 "Routinely, for purposes of this scope, is defined as being in accordance with applicable guidance from the CDC but shall not be less frequently than once daily or once per shift where custodial services are provided for during more than one shift. Daily is defined as the normal operating hours where the custodial contractor is currently performing the standard services." Does the definition of routinely apply to all Standard Services or only those referenced in Section C.3.1.7?

Government Response: Per Exhibit J5: Definitions, Routine Cleaning is defined as “Tasks performed at least once daily or multiple times a month (e.g. daily, weekly, two times per month, three times a month, etc.).” As this is a Performance Based requirement, potential quoters should determine how they will fulfill the requirements requiring routine cleaning unless the frequency is provided such as those required for high-touch (frequently touched) surfaces.

144. How are window cleaners tether to the building's rooftop?

Government Response: They are permanently fixed in place

145. What areas have more than one (1) daily shift or clean? Is it just the child care facility?

Government Response: Service calls outside of daily cleaning

146. How many custodians are currently employed?

Government Response: See PQQ #138.

147. How many FTE are on-site each day?

Government Response: See PQQ #138.

148. What is the current base value of the contract?

Government Response: Please utilize usaspending.gov for any questions regarding current contract pricing.

149. How much of the standard base requirements have changed from the previous contract? What parts have been removed or added into standard or above standard service requirements?

Government Response: See PQQ #8.

150. Is the 500,000 gross square feet specific to interior space or can the 500,000 gsf include exterior square footage?

Government Response: Interior cleaning space

III. All other terms and conditions remain unchanged.

topmostSubform[0]:
Page2[0]:
TextField1[5]:
TextField1[2]:
TextField1[1]:
TextField1[4]:
TextField1[3]:
TextField1[0]:
Page1[0]:
Code[0]: 9PQBRLAG
Copies[0]: 1
CheckBox9[0]: 1
Code[2]: 9PQBRLAG
NameandTitleOfficer[0]: Sarah Connor, Contracting Officer
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 12
AmendmentNo[0]: 0002
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: GSA, AMD, Building Services Br

Recurring Services Sec (9PQBR) 24000 Avila Road Ste 4100 Laguna Niguel, CA 92677-3493 USA

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ9P3PSFG-22-0001
Dated9B[0]: 3/22/2022
C13[0]:
Description[0]: SOLICITATION:47PK0222Q0008
AMD NO.:0002
TITLE:Custodial and Related Services at Edward R. Roybal Federal Building & U.S. Courthouse

[See Description of Modification Continuation Page]

NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PK0222Q0008
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 4/21/2022
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: GSA, AMD, Building Services Br

Recurring Services Sec (9PQBR) 24000 Avila Road Ste 4100 Laguna Niguel, CA 92677-3493 USA NameandTitleSigner[0]: