About this file

This federal contract opportunity notice seeks proposals for design and construction services for tenant improvements on the 12th floor of the James M. Carter and Judith N. Keep United States Courthouse in San Diego, California. The project scope includes construction of two new courtrooms, holding cells, and associated judiciary support spaces totaling approximately 10,665 gross square feet. Work will involve mechanical, electrical, plumbing, vertical transportation, fire and life safety, data, audiovisual and security systems, as well as premium quality millwork and interior finishes. The project completion time is 440 calendar days from notice to proceed, with an estimated cost range of $5-10 million. The contract will be set aside for total small businesses with average annual receipts less than $39.5 million over the last three years. Proposals will be evaluated based on best value. The solicitation is expected to be available for download on February 10, 2020, with proposals due approximately 50 days later. The North American Industry Classification System code is 236220.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

2. AMENDMENT / MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION / PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (IF OTHER THAN ITEM 6) CODE

GENERAL SERVICES ADMINISTRATION

ACQUISITION MANAGEMENT DIVISION

401 W. WASHINGTON ST., ROOM 210

PHOENIX, AZ 85003

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTRY, STATE, ZIP CODE) 9A. AMENDMENT OF SOLICITATION/RFP

X

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT / ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended X is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing items 8 and 15, and returning two (2) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED

FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS,

IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the administering office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE ATTACHMENT TO SF 30 FOR DESCRIPTION OF AMENDMENT

Except as provided herein, all terms & conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force & effect.

15A. Name and Title of Signer (type or print) 16A. Name and Title of Contracting Officer (type or print)

DAN MAKOWSKI

15B. Contractor / Offeror 15C. Date Signed 16B. United States of America 16C. Date Signed

(Authorized signature) (Signature of Contracting Officer)

REVISED STANDARD FORM 30 (2-93)

2/13/2020

47PK0120R0001

JAMES M. CARTER & JUDITH N. KEEP USCH, SAN DIEGO, CA

"12TH FLOOR DISTRICT COURTROOM, HOLDING CELLS,

6 3/19/2020

AND ANCILLARY SUPPORT SPACES EXPANSION PROJECT"

“12TH FLOOR DISTRICT COURTROOM, HOLDING CELLS, RFP NO. 47PK0120R0001

AND ANCILLARY SUPPORT SPACES EXPANSION PROJECT” AMENDMENT NO. 6 (03/19/2020)

CARTER & KEEP U.S. COURTHOUSE, SAN DIEGO, CA

ATTACHMENT TO STANDARD FORM 30

ITEM 14, DESCRIPTION OF AMENDMENT

Amendment No. 6 – 03/19/2020

THIS AMENDMENT IS ISSUED TO ADD OR CHANGE THE FOLLOWING ITEMS IN REQUEST FOR

PROPOSALS NO. 47PK0120R0001:

1. Questions received regarding this solicitation, with answers immediately following (in red), are attached to this amendment, starting on page 3.

2. Some of the answers from Item 1 reference new attachments to this solicitation. The following attachments are incorporated into this solicitation, and can be accessed only through the same “Google

Drive” folder that was set up for Amendment 2:

Attachment M - Salvaged Items Photographs

Attachment N - Fire Alarm As-builts

Attachment O - GSA_s National Smart Building Requirements and Best Practices

Attachment P - Original Building Subcontractor List

Attachment Q - Lighting System

All offerors who requested and received access to the “Google Drive” for Amendment 2 will have access to the above attachments for Amendment 6.

3. In the RFP document entitled “The Solicitation”, paragraph II.D. Technical Proposal, subparagraph 3) D.

(on page 12 of 54), delete the title of the paragraph in its entirety and replace with the following:

“D. FACTOR 4: Lead Designer experience and past performance”.

4. In the RFP document entitled “The Solicitation”, paragraph VI. Method of Award, delete subparagraph

A. Evaluation of Offers (on page 52 of 54), in its entirety and replace with the following:

“VI.A. Evaluation of Offers

(1) The Government will award a contract resulting from this Solicitation to the responsible Offeror whose offer conforming to the Solicitation will be most advantageous to the Government, Total Evaluated Price and other factors considered. In addition to Total Evaluated Price, the following non-price factors shall be used to evaluate offers:

(a)Experience of the General Contractor

(b)Past Performance of the General Contractor

(c)Schedule

(d) Lead Designer Experience and Past Performance

(e)Technical and Management Approach

(2) Non-Price Factors, when combined, are more important than Total Evaluated Price.

(3) Other mandatory submittal requirements

The following are also required to be submitted with an offer and will be evaluated on a “go/no-go” basis.

Offerors not meeting all of the following criteria will not be given further consideration. The Contracting

Officer will make the determination as to an Offeror’s responsibility/responsiveness.

(1) Completed Representations and Certifications verified on-line including proof of current System Award

Management (SAM) registration;

(2) Proof of performance and payment bonding capacity (see FAR 52.228-15, Performance and Payment

Bonds – Construction (OCT 10)) in the form of a letter from your surety demonstrating that bonding capacity;

(3) Standard Form 24, Bid bond;

(4) GSA Form 527 – Contractors Qualifications and Financial Information

(5) Inclusion of all other required proposal submission materials.”

5. The proposal closing date and time for this solicitation remains THURSDAY, APRIL 2, 2020, 4:00

PM (PDT).

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

***** YOU MUST ACKNOWLEDGE RECEIPT OF THIS AND ALL AMENDMENTS AS

INDICATED IN BLOCK 11 SHOWN ABOVE. FAILURE TO DO SO MAY RESULT IN

REJECTION OF YOUR OFFER. *****

Amendment 6, Item 1 - Questions and Answers:

Q1. Since Richard Meier is the Architect of record for the building, does this exclude them from proposing on the renovation?

No, Richard Meier & Partners Architects is not excluded from this solicitation.

Q2. For projects where BIM is provided by the Government (e.g. Master Model)

● Is a ‘master model’ available at the time of award to the design-build team

● If the ‘master model’ includes mechanical, electrical, plumbing, structural, and fire, can we assume ‘clash detection’ has addressed all major ‘clashes?’

A master model is not available. GSA can provide Navisworks files of the existing as-builts at the time of award, however the selected DB Contractor and their team will have to develop a record BIM model for the project.

Q3. According to the section, the design-build team is to produce a building information model.

● We would like to know the limits of the model; for instance, the model will only show the 12 th floor.

The model is only required for work related to the scope of the project, with reasonable representation/tie-ins to the existing structure & systems to communicate the intent of the design - GSA does not expect a full modeling of the existing building.

Q4. Is the intent to take the typical courtroom plans from another floor and modify and apply them for the 12 th as your design standard.

No, RFP Attachment H which is the 12th Floor proposed floor plan is pulled directly from Amendment 2 - Attachment K -

“Volume 2 - Design Drawings”, see Building Design Drawings - Architectural Sheet A2.1.22. The Building Design

Drawings are a conformed set 100% CD drawings for a whole building project where certain floors were not ultimately built out as shown on the plans, such as the 12th Floor. This project looks to build out the 12th Floor per the Building Design

Drawings. The DB Contractor’s A/E should refer to the Building Design Drawings to develop their 12th Floor complete drawing set.

Q5. Is it possible to get a single compiled pdf of the drawings and specifications to be used as the bridging documents?

No, the “Building Design Drawings”, rather than bridging documents, have been provided in the format GSA has available.

Q6. The RFP requires that the design team demonstrate experience in the use of metric units. Can you please confirm if this project will utilize metric units as the primary unit of measurement?

A soft metric unit with imperial measurement system notations, similar to as shown on the as-builts, should be used. Per the

GSA policy 8000.1D ADM GSA Metric Program (4)(d.), “Soft metric” is “The result of mathematical conversion of English system measurements to metric equivalents in specifications, standards, supplies, and services. The physical dimensions are not changed.” The use of soft metric unit with imperial measurement system notations is a requirement for the design drawings, but will not be an evaluation factor requirement.

Q7. Will there be part numbers of the lights, controls and BAS that will need to be matched for the following statement.

2.7.1.6 Building Automated System

Starting from the Design Phase, Design Build Contractor shall coordinate with the GSA Project Team, Building

Management Office, and Building Engineers to tie new lighting, security, mechanical, HVAC, fire and safety systems to existing Building Automated System (BAS). The building BAS should be expanded as needed to accommodate the new equipment, which is the responsibility of the DB contractor.

The building runs on Tridium Niagara N4 and has Vykon JACE-8000s with IO-R modules at each AHU and central plant. At the field device level, it has Siemens application specific VAV and FCU controllers (LON-TEC's/Lonworks).

Please refer to Attachment O for the GSA's National Smart Building Requirements and Best Practices documents.

FIRE SYSTEM

Main fire alarm control panel (1st floor) – EST 3 ( Sub Panels located on floors 5,10 and 15)

Fire work station – UL5W7

Monitoring company – Advanced monitoring

Fire system vendor- HCI systems

HVAC

System type – Tridium Niagra

VAV box control ‘s – Siemens (APOGEE AUTOMATION )

AHU’s that feed the 12th floor- AHU 16-2 and AHU 16-5 ( Units also feed the 11th floor and 12th floor, north and south end)

Scheduled times – Mon- Fri 5am -6pm

Controls Contractor- Climatec

LIGHTING SYSTEM

System type- Lutron ( Quantum 2.3.83) (Local laptop access located in Facilities office )

Fixture types- See Attachment Q

Ballast type- See Attachment Q

Bulb type -See Attachment Q

Lutron plans showing the main panel, local panel, dimming panel, etc... will be made available to the D/B contractor after award.

Q8. Is there any existing raised flooring?

The 12th floor does not contain raised access flooring.

Q9. Is there a set of as-builts for one of the existing Court rooms, so that the contractor can match all existing lighting, electrical, floor boxes etc.

As-builts for all existing Courtrooms can be found in Amendment 2 - Attachment K - “Volume 2 - Design Drawings” -

Building As-builts

Q10. What are the low voltage, communications and security requirements for the expansion? Camera part numbers to match, card reader part numbers to match, duress, AV etc.

The contractor is responsible for providing infrastructure, as needed, and cabling to support low-voltage, communications, and security requirements as noted in the following:

● RFP - Attachment G - Statement of Work

● Amendment 2 - Attachment K - “Volume 2 - Design Drawings” - Security Drawings folder

● Amendment 2 - Attachment K - “Volume 2 - Design Drawings” - Building Design Drawings - Building Design

Drawings Vol 1

● Security requirements are per U.S. Marshals Publication 64.

It is the contractor’s responsibility to review Building As-builts vs Building Design Drawings, to determine what infrastructure is needed.

Q11. The lighting schedules are missing from the as-builts. Will this be provided for bidding?

Lighting Schedules can be found in Amendment 2 - Attachment K - “Volume 2 - Design Drawings” - Building As-builts -

NCA00041_As-builts Elec

Q12. Can the existing 2x2 light fixtures be removed, reused and relocated?

The existing 2x2 light fixtures shall be removed and stored with salvaged items, GSA does not anticipate re-using the 2x2 light fixtures for this project.

Q13. Is there an as-built power plan?

As-built power plans can be found in Amendment 2 - Attachment K - “Volume 2 - Design Drawings” - Building As-builts -

NCA00041_As-builts Elec

Q14. Can FAS schedule pricing be used for lighting?

No, FAS schedule pricing is not allowed for this project in accordance with the Federal Acquisition Regulations.

Q15. Respectively request a time extension, there is quite a bit of information etc to gather in the short time span.

Due date for RFP questions was extended.

Q16. Is the government looking to certify the project under one of the LEED categories (silver, gold, platinum)? If so, please specify which one as the design scope of work can significantly vary depending on the sustainability goals.

No, this will not be a LEED certified project.

Q17. If LEED certification is not required for this project, Would the LEED AP requirement still be relevant for this project’s lead designer’s qualifications?

No, the Architect of Record will not require LEED AP.

Q18. Per the recent job walk, the extent of the designer’s scope of work is limited to replicating the design provided by the government and verifying compliance with the current code or adjusting as needed. Considering this, are all the requirements listed within section “D. Factor 5: Lead Designer experience and past performance” still relevant to the project? If not, would a State of California Licensed Architect suffice?

The Lead Designer experience and past performance noted on Evaluation Factor 5 are relevant to this project and will be required.

Q19. Due to the substantial amount of information provided on Attachment K and the limited time to review it, we would like to request another opportunity to submit questions prior to the response deadline.

Due date for RFP questions has passed and will not be extended further.

Q20. Are the plans contained within Attachment K to be considered the design intent drawings or bridging documents?

The 12th Floor plans and Courtroom requirements in folders titled “BUILDING DESIGN DRAWINGS”, “BUILDING

DESIGN STANDARDS”, and “SECURITY DRAWINGS” are considered the project’s design intent drawings.

Q21. Please confirm if Timely Frames are acceptable or if Hollow Metal Frames are Required

Hollow Metal Frames are required.

Q22. Please provide the DDC controls manufacturer of the building and any integration requirements.

The building runs on Tridium Niagara N4 and has Vykon JACE-8000s with IO-R modules at each AHU and central plant. At the field device level, it has Siemens application specific VAV and FCU controllers (LON-TEC's/Lonworks).

Please refer to Attachment O for the GSA's National Smart Building Requirements and Best Practices documents.

Q23. Please confirm if the existing AHU and exhaust fan serving the 12th floor have adequate capacity. Should a pre-

TAB be included in the scope of the Design Builder?

It is the responsibility of the DB Contractor and their design team to survey the existing building conditions, perform a pre-

TAB, to inform their design of the new project space.

Q24. Please confirm if the existing AHU will provide the humidification for this project or will a separate humidification system be required for this project?

It is the responsibility of the DB Contractor and their design team to survey the existing building conditions to inform their design of the new project space.

Q25. The referenced paragraph includes a list of the materials to be salvaged from the 12th Floor during demolition, and these items were discussed during the site walk.

Please provide photographs of the 12th Floor existing conditions, and in particular of the items to be salvaged.

Please refer to Attachment M for photos of the existing conditions and items to be salvaged.

Q26. During the site walk, it was noted that GSA does have as-built drawings for the existing conditions on the 12 Floor.

Please confirm whether the As-Built drawings included in Amendment 02, Attachment K, reflect the current conditions on the 12th Floor, and if not, please provide as-built drawings for the existing conditions.

The as-built drawings included in Amendment 2 - Attachment K should reflect the current conditions of the 12th Floor, however it is the responsibility of the contractor to survey the space post award to support their design drawings.

Q27. This specification does not mention any manufacturers. Can GSA provide the manufacturer and model for the lifts provided in the existing courtrooms? We were unable to locate this information in the drawings, specs or other information provided in Attachments K (and L).

LIFT-U ACME SCREW JACK

by Hogan MFG, Inc

Style: Accessor I

Q28. How many design presentations should be budgeted in our proposal?

Are in-person presentations anticipated and will they be held in San Diego?

Per section 2.9.3 Project Progress Meetings/Presentations of the Statement of Work “During the design stage, the DB

Contractor shall host regular weekly on-site project progress meetings, and design submission presentations as required, with the GSA and primary tenant group heads to keep all parties appraised of the design progress/status and impending activities.” At a minimum, the DB Contractor shall anticipate (3) design presentations, however should expect weekly in-person meetings post award.

Q29. Please provide more information on the AV Consultant listed as TBD on the Distribution List.

• Will the AV consultant’s deliverable regarding pathways be available within 10 days of the NTP?

• Please confirm that the DB Contractor will only provide pathways or conduits for the AV system and the cabling and provision of AV components will be by others.

Please confirm that the tele-data cabling will be by others.

● The AV consultant will not provide a deliverable regarding pathways. As noted in Statement of Work - Section

3.5.2.2 Tenant Agencies' Audio Visual (AV), "

"The project design drawings provide the DB Contractor with substantial direction on the infrastructure required to support the new A/V systems that will be required.. The new A/V systems will require, power, pathways, pullstrings, backboxes, blank cover plates, and similar items to support the installation of the new

A/V equipment. During the design phase the DB contractor will coordinate with the tenant and their A/V design consultant to finalize the direction the project design drawings provide. The court’s A/V design consultant will provide comments to the DB contractor during design reviews on the completeness of the infrastructure requirements to support the equipment installation.

The approved baseline schedule shall establish a milestone for the Design Builder’s turn-over of all related infrastructure and distribution paths and termination closets".

DB contractor is to provide the infrastructure as noted in the Statement of Work. A/V equipment and associated cabling will be by others.

● As noted in Statement of Work - Section 3.5.2.1 Telecommunications (Telephone, IT/Data) Systems Installation "

"The DB Contractor will be responsible for providing the design and specifications for the cabling that will be installed in the project space, the cabling design shall be submitted for GSA review once the

DB Contractor has completed infrastructure provisions in the electrical sheets of design submittals (main pathway layouts and supporting conduit details etc.). The DB contractor shall be responsible for finalizing data outlet locations during the design phase through coordination with GSA and the tenants. Once the cable design and specifications are approved, the Design/Build Contractor shall be responsible for providing the entire infrastructure and cabling to support the cabling system for the project ".

The DB Contractor is responsible for providing the design, infrastructure and cabling associated with new tel/data drop locations

Q30. Please confirm that existing restrooms, elevators, stairs, Lobby, and exterior Paths of Travel are ABA compliant and no work will be required on them.

There is no ABA work anticipated outside of the project boundaries.

Q31. There are two Factor 5’s and no Factor 4 in the solicitation. Please confirm that Factor 4 is Lead Designer

Experience and Past Performance.

Correct, Lead Designer experience and past performance is Factor 4, not 5. See this amendment, Item 2.

Q32. Attachment G, Section 2.11 outlines the requirements for a BIM model: Section 3.3.1.2.10 calls for AutoCAD files to be updated during construction and AutoCAD files for the As-builts.

• Please confirm whether this project’s design will require CAD or BIM.

• If BIM is required, please confirm that the 100% DD package that will be provided by GSA is already on a BIM model that reflects the as-built conditions.

• If BIM is not required during design and construction, please confirm that BIM Models will not be required for record documents.

● Construction Documents and Record Drawings will be required in AutoCAD. A Record Drawing Set in BIM is required at project close-out

● A BIM record model is required, however a master model is not available. Please see GSA responses to Questions 2

& 3.

Q33. At the pre-proposal meeting, it was mentioned that a list of all the subcontractors, material and product vendors, etc for the original building as actually installed will be distributed. We have not been able to locate such a list. Please provide.

Please see Amendment 02 - Attachment K - Volume 2 Design Drawings - Building Design Standards and Attachment P -

Original Building Subcontractor List

Q34. Note that the As-Built drawings include only red-marks that, for example, would flag a certain RFI # for revisions.

These RFIs are not in the RFP.

RFI files are not available during bidding, but will be made available to the selected contractor post award, pending security clearance approval for access to ePM system.

Q35. ATTACHMENT F - TECHNICAL SPECIFICATIONS

DIVISION 01

SECTION 011000 – SUMMARY

1.2 WORK BY OTHER CONTRACTORS

Please completely define work that will be conducted by other contractors affecting the work under this contract.

The work by other contractors will include, but is not limited to, security device installation by the United States Marshal and

AV equipment installation by the Courts contractors

Q36. ATTACHMENT F - TECHNICAL SPECIFICATIONS

SECTION 011400

Says “Government reserves the right to occupy, place, and install equipment in completed areas of the building prior to

Substantial Completion”.

Please define types of equipment and areas of the building where this will occur. Please define any required phasing that will result in areas of the building being completed prior to Substantial

Completion?

The work by other contractors will include, but is not limited to, security device installation by the United States Marshal and AV equipment installation by the Courts contractors

Q37. ATTACHMENT F - TECHNICAL SPECIFICATIONS

1.2 GENERAL SUBMITTAL REQUIREMENTS

Says “12. The contractor to schedule and allow a minimum of ten working days for the internal

Architect/Engineer submittal review. The government comment period initiates upon the receipt of the submittal by the A/E performing the preliminary review. Such submittals may include structural steel, curtain wall, or complex systems requiring coordination with other systems.”

Are all construction submittals to be reviewed by the DB A/E or only complex systems?

This is an internal DB contractor decision as to which consultants will review submittals prior to submitting to GSA for review/approval, however it is GSA’s preference that DB consultants providing subject matter expertise provide review before final submittal to GSA.

Q38. ATTACHMENT G – STATEMENT OF WORK

2.6 DB Contractor Team

Says “At a minimum, the DB Contractor key team members shall consist of the following:

● Mechanical Engineer, P.E., California, LEED® AP” As achieving a LEED rating is not required for this contract is it necessary that the Mechanical Engineer, P.E., California also be LEED A/P?

No, the Mechanical Engineer will not require LEED AP.

Q39. ATTACHMENT G – STATEMENT OF WORK

2.7.1.5 Fire Protection/Life Safety

Says “See additional information in Volume 2B of this RFP with Design Drawings.”

Please provide referred additional information. No Fire Protection drawings provided with Design Drawings.

Please refer to Attachment N - Fire Alarm As-builts. Fire Sprinkler drawings are available on-site as a hardcopy document and will be accessible to the selected D/B Contractor after contract award. The Contractor will be responsible for any document scanning and must adhere to the document security proper destruction requirements referenced in PBS Order

3490.1, Document Services for Sensitive but Unclassified Paper and Electronic Building Information.

Q40. ATTACHMENT G – STATEMENT OF WORK

2.7.1.6 Building Automated System

Says “tie new lighting, security, mechanical, HVAC, fire and safety systems to existing Building

Automated System (BAS). The building BAS should be expanded as needed to accommodate the new equipment” Ease provide specific information regarding the existing BAS; manufacturer, installer, service contractor, system type, configuration, capacity for expansion etc.

The building runs on Tridium Niagara N4 and has Vykon JACE-8000s with IO-R modules at each AHU and central plant. At the field device level, it has Siemens application specific VAV and FCU controllers (LON-TEC's/Lonworks).

Please refer to Attachment O for the GSA's National Smart Building Requirements and Best Practices documents.

Q41. ATTACHMENT G – STATEMENT OF WORK

2.7.1.8 gBUILD Reporting Requirements

Says “gBUILD User Guide and Executive Order 13514 in Volume 3 References attachment of this RFP” Please describe where this is available or provide

Please refer to Amendment 02 - Attachment L - Volume 3 - References - gBUILD User Guide

Q42. ATTACHMENT G – STATEMENT OF WORK

2.8.1 Cost Allocating Updates

Says “provide cost estimates defining the core and shell, tenant improvements (TI) and security components of the construction cost” Please confirm this is required. If required please define what work is considered “core and shell”.

Yes the cost estimate requirements as noted in the Statement of Work are required. Please refer to Amendment 02 -

Attachment L - Volume 3 - References - Pricing Desk Guide 5th Edition for core and shell, tenant improvement, and security component definitions.

Q43. ATTACHMENT G – STATEMENT OF WORK

2.9.3 Project Progress Meetings/Presentations

Says “DB Contractor shall host regular weekly onsite project progress meetings

2.9.5.1 Owner’s Review

Says “The DB Contractor shall host an over-the-shoulder design review meeting for each submittal” Can these be the same

Meeting?

Yes, if stakeholders are available to accommodate a design review meeting at the same time as the regular weekly on-site project progress meeting then they can be conducted at the same time.

Q44. ATTACHMENT G – STATEMENT OF WORK

2.11.1 Computer Aided Design (CAD) Standards and BIM Standards

Says “The Contractor shall attend a BIM workshop hosted by the GSA”

Where and when?

The first BIM workshop will be teleconference at 75% CD Submittal. The Draft BEP is due by 100% CD, followed by GSA

14 day review. The second BEP review teleconference workshop will be at 100% CD Submittal. A conceptual record BIM model submittal is due by 50% Construction Completion, followed by a GSA 14 day review. The final record BIM model submittal is due by 95% Construction Completion.

Q45. ATTACHMENT G – STATEMENT OF WORK

3.4.3 Building Design Standards

Will current building design standards be provided to the DB Contractor?

Please see Amendment 02 - Attachment K - Volume 2 Design Drawings - Building Design Standards

Q46. ATTACHMENT G – STATEMENT OF WORK

3.4.5 Project Awards/Certifications

Please define design awards and/or certifications for which documentation and applications will be required.

The design award and/or certifications for which documentation and applications are required, if any, is unknown at this time.

Q47. ATTACHMENT G – STATEMENT OF WORK

3.4.5 Project Awards/Certifications

Who is responsible to pay fees for applications for design awards and/or certifications.

GSA would be responsible for GSA initiated design award and/or certifications.

Q48. ATTACHMENT G – STATEMENT OF WORK

3.5.2.1 Telecommunications (Telephone, IT/Data) Systems Installation

Says “Design/Build Contractor shall be responsible for providing the entire infrastructure and cabling to support the cabling system for the project.” It was stated at the pre-proposal conference that the telecom/data cable would be provided and installed by separate contract to the GSA. Who provides and installs the telecom cabling?

The statement at the pre-proposal conference regarding the telecom/data cable requirements noted above is incorrect. The

DB contractor is responsible for the telecom design, infrastructure, and cabling installation for this project, as further defined in Statement of Work - Section 3.5.2.1 Telecommunications (Telephone, IT/Data) Systems Installation

Q49. ATTACHMENT G – STATEMENT OF WORK

3.5.2.3 Security Systems

Says “The project design drawings provide the DB Contractor with substantial direction on the infrastructure required to support the security system”

Please confirm which drawings provide this information, no Security drawings were provided in the design drawing

Please see Amendment 02 - Attachment K - Volume 2 - Design Drawings - Security Drawings

Q50. At the pre-bid meeting it was stated that, for Fire/Life Safety System outages the selected contractor must use the buildings current maintenance contractor for safe-off and re-energizing the buildings fire systems. Please provide the name and contact of the required contractor for these services.

The O&M representatives are Abe Abril and Edgar Valdivia.

Abril can be reached by telephone at 858-967-4687 and email at sandiego_pm@kcorptechnology.net

Valdivia can be reached by telephone at 619-496-6621 and email at sandiego_leadeng@kcorptechnology.net

Q51. At the pre-bid meeting you had stated that a list of the subcontractors that worked on the original project and the pre-bid sign in sheets for this project would be made available via amendment. When do you anticipate that information to be distributed?

Please refer to GSA response to Question 33 for subcontractor list.

The pre-proposal sign in sheet was issued in a previous amendment.

Q52. The RFP states “A “Similar Interiors Project” for purposes of this solicitation means a renovation or alteration construction project which includes over 2000 square feet of American Woodwork Institute Premium grade certified interior finish space.” Did the Government mean the Architectural Woodwork Institute (AWI) Premium grade certified interior space? On the West Coast, Woodwork Institute is more prevalent and has similar requirements to AWI. Would experience/certification through Woodwork Institute be acceptable?

The requirement is for American Woodwork Institute (AWI) premium grade certified interior space.

Q53. At the pre-bid walk, it was stated that the USMS security equipment would be provided and installed by a third party contractor, does that include detention locks and controls?

All security locks and controls is a turn-key system and the responsibility of the DB contractor. Refer to USMS Publication

64.

END OF QUESTIONS AND ANSWERS