This notice provides details for a Request for Proposal (RFP) for tenant improvement construction services at the James M. Carter and Judith N. Keep United States Courthouse in San Diego, CA. The General Services Administration (GSA) seeks a contractor to provide design and construction for approximately 10,665 gross square feet of tenant improvements on the 12th floor, including two new courtrooms, holding cells, and associated judiciary support spaces. The work must be performed after hours without disrupting existing tenants and operations. The completion time is 440 calendar days from the Notice to Proceed, with an estimated cost between $5-10 million. The RFP will be issued on or about February 10, 2020 via beta.sam.gov, with proposals due approximately 50 calendar days later. The procurement is set aside as a total small business opportunity under NAICS code 236220 for construction of commercial and institutional buildings with average annual receipts less than $39.5 million. Award will be made based on the proposal most advantageous to the government considering cost/price and other factors. Questions should be directed to the Contracting Officer listed in the notice.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

2. AMENDMENT / MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION / PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (IF OTHER THAN ITEM 6) CODE

GENERAL SERVICES ADMINISTRATION

ACQUISITION MANAGEMENT DIVISION

401 W. WASHINGTON ST., ROOM 210

PHOENIX, AZ 85003

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTRY, STATE, ZIP CODE) 9A. AMENDMENT OF SOLICITATION/RFP

X

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT / ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended X is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing items 8 and 15, and returning two (2) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED

FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS,

IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the administering office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE ATTACHMENT TO SF 30 FOR DESCRIPTION OF AMENDMENT

Except as provided herein, all terms & conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force & effect.

15A. Name and Title of Signer (type or print) 16A. Name and Title of Contracting Officer (type or print)

DAN MAKOWSKI

15B. Contractor / Offeror 15C. Date Signed 16B. United States of America 16C. Date Signed

(Authorized signature) (Signature of Contracting Officer)

REVISED STANDARD FORM 30 (2-93)

1 2/21/2020

AND ANCILLARY SUPPORT SPACES EXPANSION PROJECT"

2/13/2020

47PK0120R0001

JAMES M. CARTER & JUDITH N. KEEP USCH, SAN DIEGO, CA

"12TH FLOOR DISTRICT COURTROOM, HOLDING CELLS,

“12TH FLOOR DISTRICT COURTROOM, HOLDING CELLS, RFP NO. 47PK0120R0001

AND ANCILLARY SUPPORT SPACES EXPANSION PROJECT” AMENDMENT NO. 1 (02/21/2020)

CARTER & KEEP U.S. COURTHOUSE, SAN DIEGO, CA

ATTACHMENT TO STANDARD FORM 30

ITEM 14, DESCRIPTION OF AMENDMENT

Amendment No. 1 – 02/21/2020

THIS AMENDMENT IS ISSUED TO ADD OR CHANGE THE FOLLOWING ITEMS IN REQUEST FOR

PROPOSALS NO. 47PK0120R0001:

1. In the RFP, delete the RFP cover pages 1 & 2, and replace with the attached cover pages 1 & 2.

2. In the RFP document entitled “The Solicitation”, delete paragraph I.D. in its entirety and replace with the following:

“I.D. Pre-Proposal Conference

A pre-proposal conference regarding this Solicitation is scheduled as follows:

Date: Thursday, February 27, 2020

Time: 10:00 AM (PST)

Location: Carter & Keep U.S. Courthouse, 333 W. Broadway, San Diego, CA th

Floor, Room 227”

3. In the RFP document entitled “The Solicitation”, delete paragraph I.G. in its entirety and replace

“I.G. FAR 52.236-27 Site Visit – Construction (Feb 95)

(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions

Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

(2) A site visit will be held only in conjunction with the scheduled Pre-Proposal Conference, at the following date and time:

Date: Thursday, February 27, 2020

Time: 10:00 AM (PST)

Location: Carter & Keep U.S. Courthouse, 333 W. Broadway, San Diego, CA th

Floor, Room 227

No other site visits will be allowed.

(3) The Site Visit shall be limited to not more than five (5) representatives from each Offeror. Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal conference and Site Visit.”

4. In the RFP document entitled “The Solicitation”, delete paragraph I.H. in its entirety and replace

“I.H. Receipt of Offers http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113365 http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113375

CARTER & KEEP U.S. COURTHOUSE, SAN DIEGO, CA

ATTACHMENT TO STANDARD FORM 30

ITEM 14, DESCRIPTION OF AMENDMENT

Amendment No. 1 – 02/21/2020

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 4:00 pm PDT on the following date and at the following address:

Date: Thursday, March 26, 2020

Address: EMAIL SUBMISSION ONLY to dan.makowski@gsa.gov

Although e-mail submission is required, a follow-up of the original bid bond document only is also required within 3 working days, mailed to:

U.S. General Services Administration

Attn: Dan Makowski, Contracting Officer

401 W. Washington St., Rm. 210

Phoenix, AZ 85003

5. In the RFP, Attachment F: Technical Specifications Division 01, add the attached “Section 017419

Construction Nonhazardous Waste Management & Disposal.”

6. The proposal closing date and time for this solicitation remains THURSDAY, MARCH 26, 2020, 4:00 PM (PDT).

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

***** YOU MUST ACKNOWLEDGE RECEIPT OF THIS AND ALL AMENDMENTS AS

INDICATED IN BLOCK 11 SHOWN ABOVE. FAILURE TO DO SO MAY RESULT IN

REJECTION OF YOUR OFFER. *****

CARTER & KEEP U.S. COURTHOUSE, SAN DIEGO, CA ITEM 1

SENSITIVE BUT UNCLASSIFIED (SBU) - PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY Do not remove this notice

Properly destroy or return documents when no longer needed

REQUEST

FOR

PROPOSALS

PROJECT: “12TH FLOOR DISTRICT COURTROOM,

HOLDING CELLS, AND ANCILLARY

SUPPORT SPACES EXPANSION PROJECT”,

JAMES M. CARTER & JUDITH N. KEEP U.S.

COURTHOUSE, 333 W. BROADWAY

SAN DIEGO, CA

ISSUE DATE: THURSDAY, FEBRUARY 13, 2020

PROPOSAL DUE DATE

AND TIME :

THURSDAY, MARCH 26, 2020

4:00 PM (PDT)

SUBMIT TO : EMAIL SUBMISSION ONLY TO:

DAN.MAKOWSKI@GSA.GOV

SOLICITATION NO.: 47PK0120R0001

GENERAL SERVICES ADMINISTRATION

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS DOCUMENT TO UNAUTHORIZED

RECIPIENTS IS PROHIBITED

Do not remove this notice

Properly destroy or return documents when no longer needed

CARTER & KEEP U.S. COURTHOUSE, SAN DIEGO, CA ITEM 1

SENSITIVE BUT UNCLASSIFIED (SBU) - PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY Do not remove this notice

Properly destroy or return documents when no longer needed

REQUEST FOR PROPOSAL

PROJECT TITLE: “12TH FLOOR DISTRICT COURTROOM, HOLDING CELLS, AND ANCILLARY

SUPPORT SPACES EXPANSION PROJECT”

LOCATION OF WORK:

JAMES M. CARTER & JUDITH N. KEEP U.S. COURTHOUSE

333 W. BROADWAY

SAN DIEGO, CA 92101

SITE VISIT DATE(S) / INSTRUCTIONS: THURSDAY, FEBRUARY 27, 2020, 10:00 AM (PST)

Carter & Keep USCH

333 W. Broadway, San Diego, CA

TH

Floor, Room 227

DEADLINE FOR SUBMISSION OF QUESTIONS: TUESDAY, MARCH 3, 2020, 4:00 PM (PST)

Questions must be submitted in writing via email to: dan.makowski@gsa.gov AND monica.cater@gsa.gov

DEADLINE FOR PROPOSAL SUBMISSION: THURSDAY, MARCH 26, 2020, 4:00 P.M. (PDT)

REQUIRED COMPLETION TIME: 381 CALENDAR DAYS FROM NOTICE TO

PROCEED

LIQUIDATED DAMAGES AMOUNT (PER DAY): $2,400.00

TABLE OF CONTENTS

RFP:

“THE SOLICITATION”

“THE AGREEMENT”

REPRESENTATIONS AND CERTIFICATIONS

ATTACHMENTS:

ATTACHMENT A: STANDARD FORM 1442 – SOLICITATION, OFFER AND AWARD

ATTACHMENT B: STANDARD FORM 24 – BID GUARANTEE

ATTACHMENT C: GSA FORM 527 – CONTRACTOR’S QUALIFICATION AND FINANCIAL INFORMATION

ATTACHMENT D: WAGE DETERMINATION CA20200001, DATED 01/31/2020

ATTACHMENT E: PAST PERFORMANCE QUESTIONNAIRE

ATTACHMENT F: TECHNICAL SPECIFICATIONS DIVISION 01

ATTACHMENT G: STATEMENT OF WORK

ATTACHMENT H: PROPOSED 12

TH

FLOOR PLAN

ATTACHMENT I: TYPICAL COURTROOM PHOTOGRAPHS (PHOTOS 1-4)

ATTACHMENT J: CARTER & KEEP BUILDING DESIGN STANDARDS

END OF TABLE OF CONTENTS

mailto:dan.makowski@gsa.gov

CARTER & KEEP U.S. COURTHOUSE, SAN DIEGO, CA ITEM 5

FY15 Update Oct. 1, 2014 Construction Nonhazardous Waste Management & Disposal 017419 - 1

SECTION 017419 - CONSTRUCTION NONHAZARDOUS WASTE MANAGEMENT AND DISPOSAL

PART 1 -

1.1 GENERAL

A. Drawings and general provisions of the Contract, including Federal Acquisition Regulation (FAR) and General Services Administration Acquisition Regulation (GSAR) contract clauses, and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for the following:

1. Salvaging nonhazardous demolition and construction waste.

2. Recycling nonhazardous demolition and construction waste.

3. Disposing of nonhazardous demolition and construction waste.

1.3 DEFINITIONS

A. Construction Waste: Building and site improvement materials and other waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.

B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations.

C. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction. Use of incinerators for disposal is not considered diversion.

D. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.

E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.

F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.

1.4 PERFORMANCE REQUIREMENTS

A. General: Achieve end-of-Project rates for salvage/recycling of 50 percent minimum by weight of total waste generated by the Work unless additional rates are indicated. Practice efficient waste management in the use of materials in the course of the Work. Use all reasonable means to divert construction and demolition waste from landfills and incinerators. Facilitate recycling and salvage of materials.

FY15 Update Oct. 1, 2014 Construction Nonhazardous Waste Management & Disposal 017419 - 2

1. Mandatory minimum salvage/recycling requirement is 50 percent.

1.5 ACTION SUBMITTALS

A. Waste Management Plan: Submit plan 15 days prior to the commencement of demolition work, prepare and submit a Waste Management Plan including, but not limited to, the following:

1. List of the recycling facilities, reuse facilities, municipal waste landfills and other disposal area(s) to be used. Include:

a. Name, location, and phone number.

b. Copy of permit or license for each facility.

2. Identify materials that cannot be recycled or reused. Provide explanation or justification.

3. Revise and resubmit Plan as required by Owner.

a. Approval of Contractor’s Plan will not relieve the Contractor of responsibility for compliance with applicable environmental regulations.

1.6 INFORMATIONAL SUBMITTALS

A. Waste Reduction Progress Reports: Concurrent with each Application for Payment, electronically submit reports in ePM for construction waste and for demolition waste. Include the following information:

1. Material category.

2. Generation point of waste. (Building address)

3. Total quantity of waste in tons.

4. Quantity of waste salvaged, both estimated and actual in tons.

5. Quantity of waste recycled, both estimated and actual in tons.

6. Total quantity of waste recovered (salvaged plus recycled) in tons.

7. List of Materials made from recycled materials/bio-based materials and their cost (not including installation costs) purchased for use on this project.

8. Total quantity of waste recovered (salvaged plus recycled) as a percentage of total waste.

B. Waste Reduction Calculations: Before request for Substantial Completion, submit calculated end-of-Project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work.

C. Records of Donations: Indicate receipt and acceptance of salvageable waste donated to individuals and organizations. Indicate whether organization is tax exempt.

D. Records of Sales: Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt.

E. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing/salvaging facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

F. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them, incineration of waste is not considered diversion.

Include manifests, weight tickets, receipts, and invoices.

FY15 Update Oct. 1, 2014 Construction Nonhazardous Waste Management & Disposal 017419 - 3

1.7 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Waste Management Conference: Conduct conference 15 days prior to demolition at Project site to comply with requirements in Division 01 Section "Project Management and Coordination." Review methods and procedures related to waste management including, but not limited to, the following:

1. Review and discuss waste management plan including responsibilities of waste management coordinator.

2. Review requirements for documenting quantities of each type of waste and its disposition.

3. Review and finalize procedures for materials separation and verify availability of containers and bins needed to avoid delays.

4. Review procedures for periodic waste collection and transportation to recycling and disposal facilities.

5. Review waste management requirements for each trade.

1.8 WASTE MANAGEMENT PLAN

A. General: Develop a waste management plan according to ASTM E 1609 and requirements of this Section. Plan shall consist of waste identification, waste reduction work plan, and cost/revenue analysis. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan.

B. Waste Identification: Indicate anticipated types and quantities of demolition and construction waste generated by the Work. Include estimated quantities and assumptions for estimates.

C. Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator. Include points of waste generation, total quantity of each type of waste, quantity for each means of recovery, and handling and transportation procedures.

1. Salvaged Materials for Reuse: For materials that will be salvaged and reused in this Project, describe methods for preparing salvaged materials before incorporation into the Work.

2. Salvaged Materials for Sale: For materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers.

3. Salvaged Materials for Donation: For materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers.

4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.

5. Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.

6. Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location where materials separation will be performed.

FY15 Update Oct. 1, 2014 Construction Nonhazardous Waste Management & Disposal 017419 - 4

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 PLAN IMPLEMENTATION

A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.

B. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work.

1. Distribute waste management plan to everyone concerned within 3 days of submittal return.

2. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.

C. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Designate and label specific areas on Project site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold.

3.2 SALVAGING DEMOLITION WASTE

A. Salvaged Items for Reuse in the Work: Salvage items for reuse and handle as follows:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.

3. Store items in a secure area until installation.

4. Protect items from damage during transport and storage.

5. Install salvaged items to comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated.

B. Salvaged Items for Sale and Donation is not permitted on Project site.

C. Salvaged Items for the Government's Use: Salvage items for the Government's use and handle as follows:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.

3. Store items in a secure area until delivery to Owner.

4. Transport items to the Government's storage area to be designated by GSA

5. Protect items from damage during transport and storage.

D. Doors and Hardware: Brace open end of door frames. Except for removing door closers, leave door hardware attached to doors.

FY15 Update Oct. 1, 2014 Construction Nonhazardous Waste Management & Disposal 017419 - 5

E. Equipment: Drain tanks, piping, and fixtures. Seal openings with caps or plugs. Protect equipment from exposure to weather.

F. Plumbing Fixtures: Separate by type and size.

G. Lighting Fixtures: Separate lamps by type and protect from breakage.

H. Electrical Devices: Separate switches, receptacles, switchgear, transformers, meters, panel-boards, circuit breakers, and other devices by type.

3.3 RECYCLING [DEMOLITION] [AND] [CONSTRUCTION] WASTE, GENERAL

A. General: Recycle paper (bond or newsprint) and beverage containers (glass, plastic or aluminum) used by on-site workers.

B. Preparation of Waste: Prepare and maintain recyclable waste materials according to recycling or reuse facility requirements. Maintain materials free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process.

C. Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project site to the maximum extent practical according to approved construction waste management plan.

1. Provide appropriately marked containers or bins for controlling recyclable waste until removed from Project site. Include list of acceptable and unacceptable materials at each container and bin.

a. Inspect containers and bins for contamination and remove contaminated materials if found.

2. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

3. Stockpile materials away from construction area. Do not store within drip line of remaining trees.

4. Store components off the ground and protect from the weather.

5. Remove recyclable waste from the Government's property and transport to recycling receiver or processor.

3.4 RECYCLING DEMOLITION WASTE

A. Asphalt Paving: Grind asphalt to maximum [38-mm (1-1/2-inch)] [100-mm (4-inch)] size.

B. Asphalt Paving: Break up and transport paving to asphalt-recycling facility.

C. Concrete: Remove reinforcement and other metals from concrete and sort with other metals.

1. Pulverize concrete to maximum [38-mm (1-1/2-inch)] [100-mm (4-inch)] size.

D. Masonry: Remove metal reinforcement, anchors, and ties from masonry and sort with other metals.

FY15 Update Oct. 1, 2014 Construction Nonhazardous Waste Management & Disposal 017419 - 6

1. Pulverize masonry to maximum [19-mm (3/4-inch)] [25-mm (1-inch)] [38-mm (1-1/2-inch)] [100-mm (4-inch)] size.

E. Clean and stack undamaged, whole masonry units on wood pallets

F. Wood Materials: Sort and stack members according to size, type, and length. Separate lumber, engineered wood products, panel products, and treated wood materials.

G. Metals: Separate metals by type.

1. Structural Steel: Stack members according to size, type of member, and length.

2. Remove and dispose of bolts, nuts, washers, and other rough hardware.

H. Gypsum Board: Stack large clean pieces on wood pallets or in container and store in a dry location. Remove edge trim and sort with other metals. Remove and dispose of fasteners.

I. Acoustical Ceiling Panels and Tile: Stack large clean pieces on wood pallets and store in a dry location.

J. Metal Suspension System: Separate metal members including trim, and other metals from acoustical panels and tile and sort with other metals.

K. Carpet Tile: Remove debris, trash, and adhesive.

1. Stack tile on pallet and store clean, dry carpet in a closed container or trailer provided by Carpet Reclamation Agency or carpet recycler.

L. Carpet and Pad: Roll large pieces tightly after removing debris, trash, adhesive, and tack strips.

1. Store clean, dry carpet and pad in a closed container or trailer provided by Carpet Reclamation Agency or carpet recycler.

M. Piping: Reduce piping to straight lengths and store by type and size. Separate supports, hangers, valves, sprinklers, and other components by type and size.

N. Conduit: Reduce conduit to straight lengths and store by type and size.

3.5 RECYCLING CONSTRUCTION WASTE

A. Packaging:

1. Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location.

2. Polystyrene Packaging: Separate and bag materials.

3. Pallets: As much as possible, require deliveries using pallets to remove pallets from Project site. For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood.

4. Crates: Break down crates into component wood pieces and comply with requirements for recycling wood.

B. Wood Materials:

FY15 Update Oct. 1, 2014 Construction Nonhazardous Waste Management & Disposal 017419 - 7

1. Clean Cut-Offs of Lumber: Grind or chip into small pieces.

2. Clean Sawdust: Bag sawdust that does not contain painted or treated wood.

C. Gypsum Board: Stack large clean pieces on wood pallets or in container and store in a dry location.

1. Clean Gypsum Board: Grind scraps of clean gypsum board using small mobile chipper or hammer mill. Screen out paper after grinding.

3.6 DISPOSAL OF WASTE

A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.

1. Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn waste materials.

C. Disposal: Transport waste materials and dispose of at designated spoil areas on the Government's property.

END OF SECTION 017419

SF30 - AMENDMENT 1
attach to sf30 - AMEND 1
RFP - Cover Page AMENDMENT 1
GSA 017419 Construction Nonhazardous Waste Management & Disposal